CN207392708U - A kind of Fast Installation scaffold for building - Google Patents

A kind of Fast Installation scaffold for building Download PDF

Info

Publication number
CN207392708U
CN207392708U CN201721385453.6U CN201721385453U CN207392708U CN 207392708 U CN207392708 U CN 207392708U CN 201721385453 U CN201721385453 U CN 201721385453U CN 207392708 U CN207392708 U CN 207392708U
Authority
CN
China
Prior art keywords
supporting rod
card slot
scaffold
fixed link
fast installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721385453.6U
Other languages
Chinese (zh)
Inventor
陆玮玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong No 2 Construction Group Co Ltd
Original Assignee
Jiangsu Nantong No 2 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No 2 Construction Group Co Ltd filed Critical Jiangsu Nantong No 2 Construction Group Co Ltd
Priority to CN201721385453.6U priority Critical patent/CN207392708U/en
Application granted granted Critical
Publication of CN207392708U publication Critical patent/CN207392708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model is related to engineering construction instrument fields, and disclose a kind of Fast Installation scaffold for building, including supporting rod and fixed link, the bottom of supporting rod is installed with pedestal, four angles of pedestal offer threaded hole, and equal screw thread is socketed with screw in the threaded hole of pedestal, on supporting rod mounting hole is offered away from 40 centimeters of ground, the inside of mounting hole and one end of fixed link are clamped, fixed link is fixed on by screw rod in mounting hole, card slot is installed at 1 point 5 meter away from ground on supporting rod, the inner wall of supporting rod is installed with gripping mechanism.The Fast Installation scaffold for building, pass through the cooperation between supporting rod, fixed link and screw rod, so that scaffold is easier for installation quick, reduce the set-up time, improve installation effectiveness, pass through the cooperation between gripping mechanism, card slot and cross bar again so that manned plate installation is quicker, greatly reduces labour cost.

Description

A kind of Fast Installation scaffold for building
Technical field
The utility model is related to engineering construction equipment technology fields, are specially a kind of Fast Installation scaffold for building.
Background technology
Scaffold be in order to ensure operation platform that all kinds of work progress are smoothed out and build, it is flourishing with construction industry Development, scaffold are widely used in engineering construction, road and bridge construction and ship construction, the work that scaffold plays in the construction process With increasingly increasing.
At present, common scaffold clasp quantity is various, it is difficult to manage, be easily lost, disassembly and installation process is very numerous It is trivial, it is time- and labor-consuming, very big trouble is caused to construction working, greatly reduces work efficiency, it is therefore it is proposed that a kind of Quick peace scaffold for building.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of Fast Installation scaffold for building, possesses installation The advantages that quick, solves the problems, such as that common scaffold installation is slow.
(2) technical solution
To realize the purpose of above-mentioned Fast Installation, the utility model provides following technical solution:A kind of quick peace for building Scaffold is filled, including supporting rod and fixed link, the bottom of the supporting rod is installed with pedestal, and four angles of the pedestal are equal Threaded hole is offered, and equal screw thread is socketed with screw, 40 centimetres far from ground of the inside of the supporting rod in the threaded hole of pedestal Place offers mounting hole, and the inside of the mounting hole and one end of fixed link are clamped, and the fixed link is fixed on by screw rod Determine in hole, away from being installed with card slot at ground one point five on the inside of the supporting rod, and the inner wall of supporting rod is installed with card Tight device, the other end of the gripping mechanism run through and extend to the outside of supporting rod and flushed with the upper edge of card slot, the card Cross bar is movably installed on slot, the both ends of the cross bar are installed with fixed block, and away from two fixed blocks 20 on cross bar Centimeters open up fluted respectively, and montant is placed on two grooves, load is installed between two montants People's plate, the montant are bolted with groove.
Preferably, the gripping mechanism includes loop bar, and the loop bar is fixedly mounted on the inner wall of supporting rod, and loop bar Inside is installed with adjustable spring, and the other end of the adjustable spring is installed with telescopic rod, the both sides of the telescopic rod Sliding block is installed with, and the sliding slot to match with sliding block is offered on loop bar, the telescopic rod runs through and extends to supporting rod Outside.
Preferably, the supporting rod has four, and four supporting rods surround a rectangle, and two are offered on the supporting rod A orthogonal mounting hole of opening direction.
Preferably, the supporting rod, fixed link, cross bar and montant are stainless steel, the length of the fixed link and cross bar It is 1 point 2 meter to spend identical and length.
Preferably, movable set rubber sleeve on the card slot, and card slot is concave shape card slot.
Preferably, the telescopic rod stretches out one end of supporting rod inner wall for inclined-plane, and telescopic rod chamfered portion is smooth table Face.
(3) advantageous effect
Compared with prior art, the utility model provides a kind of Fast Installation scaffold for building, possesses following beneficial Effect:
1st, the Fast Installation scaffold for building, passes through the cooperation between supporting rod, fixed link and screw rod so that scaffold It is easier for installation quick, the set-up time is reduced, improves installation effectiveness, then by between gripping mechanism, card slot and cross bar Cooperation so that the installation of manned plate is quicker, greatly reduces labour cost.
2nd, the Fast Installation scaffold for building, passes through the mutual cooperation between pedestal and screw so that scaffold is fixed Must be more secured, it is not easy to tilt, improves the safety coefficient of scaffold, and pass through the rubber sleeve on card slot and improve cross bar and card Frictional force between slot so that card slot will not rock easily with cross bar so that scaffold is more firm, and people more pacifies at station above Entirely.
Description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model structure top view;
Fig. 3 is the utility model gripping mechanism enlarged diagram.
In figure:1 supporting rod, 2 pedestals, 3 screws, 4 mounting holes, 5 screw rods, 6 fixed links, 7 card slots, 8 gripping mechanisms, 81 sets Bar, 82 springs, 83 telescopic rods, 84 sliding blocks, 9 cross bars, 10 fixed blocks, 11 grooves, 12 montants, 13 manned plates, 14 bolts.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, a kind of Fast Installation scaffold for building, including supporting rod 1, peace is fixed in the bottom of supporting rod 1 Equipped with pedestal 2, supporting rod 1 has four, and four supporting rods 1 surround a rectangle so that entire scaffold is more firm, improves The security of scaffold, four angles of pedestal 2 offer threaded hole, and equal screw thread is socketed with spiral shell in the threaded hole of pedestal 2 Silk 3 so that scaffold can be fixed on ground, improve the stability of scaffold, opened up on supporting rod 1 away from 40 centimeters of ground There is mounting hole 4, and there are two mounting holes 4, the opening direction of two mounting holes 4 is mutually perpendicular to, the inside of mounting hole 4 and fixed link 6 one end clamping, fixed link 6 are fixed on by screw rod 5 in mounting hole 4, the speed of the installation of fixed link 6 are improved, convenient for foot hand The stable property of frame and the climbing of people are installed with card slot 7 on supporting rod 1 at 1 point 5 meter away from ground, and the inner wall of supporting rod 1 is consolidated Dingan County is equipped with gripping mechanism 8, and gripping mechanism 8 includes loop bar 81, and loop bar 81 is fixedly mounted on the inner wall of supporting rod 1, and loop bar 81 inside is installed with adjustable spring 82, and the other end of adjustable spring 82 is installed with telescopic rod 83, telescopic rod 83 Both sides are installed with sliding block 84, and the sliding slot to match with sliding block 84 is offered on loop bar 81, and telescopic rod 83 runs through and extends To the outside of supporting rod 1, telescopic rod 83 stretches out one end of 1 inner wall of supporting rod for inclined-plane, and 83 chamfered portion of telescopic rod is smooth Surface so that telescopic rod 83 is more prone to flexible, improves the rate of installation, further improves work efficiency, clamping dress It puts 8 other end to run through and extend to the outside of supporting rod 1 and flush with the upper edge of card slot 7, cross bar is movably installed on card slot 7 9, movable set rubber sleeve on card slot 7, and card slot 7 is concave shape card slot, improves the frictional force of card slot 7 and cross bar 9 so that Cross bar 9 is more prone to be fixed in card slot 7, is not easy to rock, and improves the safety coefficient of scaffold, and the both ends of cross bar 9 are fixed Fixed block 10 is installed, and fluted 11 are opened up respectively away from two 10 20 centimeters of fixed block on cross bar 9, on two grooves 11 Montant 12 is placed with, supporting rod 1, fixed link 6, cross bar 9 and montant 12 are stainless steel, fixed link 6 and the length of cross bar 9 Identical and length is 1 point 2 meter, meets the installation requirement of scaffold, manned plate is installed between two montants 12 13, manned 13 periphery of plate is installed with baffle, ensure that people station is safer on manned plate 13, montant 12 is logical with groove 11 Bolt 14 is crossed to fix.
During work, fixed link 6 is sticked into the mounting hole 4 on supporting rod 1, fixed link 6 is then fixed by screw rod 5, really After setting installation site, fixed by the screw 3 on pedestal 2, subsequently cross bar 9 is stuck in card slot 7, cross bar 9 is direct It being pressed downward, gripping mechanism 7 can contract inwards automatically, and after treating that cross bar 9 is put well, the meeting automatic spring of gripping mechanism 7 engages cross bar 9, Finally montant 12 is placed in the groove 11 on cross bar 9, is fixed after placing by bolt 14, after fixing, foot hand Frame installs.
In conclusion the Fast Installation scaffold for building, by the cooperation between supporting rod 1, fixed link 6 and screw rod 5, So that scaffold is easier for installation quick, the set-up time is reduced, installation effectiveness is improved, then passes through gripping mechanism 8, card slot Cooperation between 7 and cross bar 9 so that manned net installation is quicker, greatly reduces labour cost;Pass through pedestal 2 and screw 3 Between mutual cooperation so that scaffold is fixed more secured, is not easy to tilt, and improves the safety coefficient of scaffold, and leads to The rubber sleeve crossed on card slot 7 improves the frictional force between cross bar 9 and card slot 7 so that and card slot 7 will not rock easily with cross bar 9, So that scaffold is more firm, people station is safer above;Solve the problems, such as that common scaffold installation is slow.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Fast Installation scaffold for building, including supporting rod (1), it is characterised in that:The bottom of the supporting rod (1) is consolidated Dingan County is equipped with pedestal (2), and four angles of the pedestal (2) offer threaded hole, and equal thread bush in the threaded hole of pedestal (2) Be connected to screw (3), mounting hole (4) offered away from 40 centimeters of ground on the supporting rod (1), the mounting hole (4) it is interior Portion and one end of fixed link (6) are clamped, and the fixed link (6) is fixed on by screw rod (5) in mounting hole (4), the supporting rod (1) card slot (7) is installed at 1 point 5 meter away from ground on, and the inner wall of supporting rod (1) is installed with gripping mechanism (8), the other end of the gripping mechanism (8) runs through and extends to the outside of supporting rod (1) and flushed with the upper edge of card slot (7), Cross bar (9) is movably installed on the card slot (7), the both ends of the cross bar (9) are installed with fixed block (10), and cross bar (9) open up fluted (11) away from two 20 centimeters of fixed block (10) on, be placed on two grooves (11) respectively Montant (12) is installed with manned plate (13) between two montants (12), and the montant (12) passes through with groove (11) Bolt (14) is fixed.
2. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:The gripping mechanism (8) Including loop bar (81), the loop bar (81) is fixedly mounted on the inner wall of supporting rod (1), and the inside of loop bar (81) is fixedly mounted There is adjustable spring (82), the other end of the adjustable spring (82) is installed with telescopic rod (83), the telescopic rod (83) Both sides are installed with sliding block (84), and the groove to match with sliding block (84), the telescopic rod are offered on loop bar (81) (83) run through and extend to the outside of supporting rod (1).
3. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:The supporting rod (1) has Four, and four supporting rods (1) surround a rectangle, open up that there are two opening direction is orthogonal on the supporting rod (1) Mounting hole (4).
4. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:The fixed link (6), horizontal stroke Bar (9) and montant (12) are stainless steel, and the fixed link (6) is identical with the length of cross bar (9) and length is one point two Rice.
5. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:It is living on the card slot (7) Dynamic suit rubber sleeve, and card slot (7) is concave shape card slot.
6. a kind of Fast Installation scaffold for building according to claim 2, it is characterised in that:The telescopic rod (83) is stretched Go out one end of supporting rod (1) inner wall for inclined-plane, and telescopic rod (83) chamfered portion is smooth surface.
CN201721385453.6U 2017-10-25 2017-10-25 A kind of Fast Installation scaffold for building Expired - Fee Related CN207392708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721385453.6U CN207392708U (en) 2017-10-25 2017-10-25 A kind of Fast Installation scaffold for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721385453.6U CN207392708U (en) 2017-10-25 2017-10-25 A kind of Fast Installation scaffold for building

Publications (1)

Publication Number Publication Date
CN207392708U true CN207392708U (en) 2018-05-22

Family

ID=62330004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721385453.6U Expired - Fee Related CN207392708U (en) 2017-10-25 2017-10-25 A kind of Fast Installation scaffold for building

Country Status (1)

Country Link
CN (1) CN207392708U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748001A (en) * 2019-11-06 2020-02-04 江苏杰瑞钢结构有限公司 Steel structure net rack
CN111075180A (en) * 2020-01-02 2020-04-28 黄河水利职业技术学院 Adjustable scaffold for water conservancy construction
CN111593870A (en) * 2020-06-08 2020-08-28 洛阳鼎桓电力科技有限公司 Circuit emergency repair is with helping support
CN112211388A (en) * 2020-09-28 2021-01-12 安徽长青建筑制品有限公司 Scaffold frame of easy dismouting
CN113178793A (en) * 2021-06-29 2021-07-27 山东万海电气科技有限公司 Distribution box protection system and distribution box thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748001A (en) * 2019-11-06 2020-02-04 江苏杰瑞钢结构有限公司 Steel structure net rack
CN111075180A (en) * 2020-01-02 2020-04-28 黄河水利职业技术学院 Adjustable scaffold for water conservancy construction
CN111593870A (en) * 2020-06-08 2020-08-28 洛阳鼎桓电力科技有限公司 Circuit emergency repair is with helping support
CN112211388A (en) * 2020-09-28 2021-01-12 安徽长青建筑制品有限公司 Scaffold frame of easy dismouting
CN113178793A (en) * 2021-06-29 2021-07-27 山东万海电气科技有限公司 Distribution box protection system and distribution box thereof

Similar Documents

Publication Publication Date Title
CN207392708U (en) A kind of Fast Installation scaffold for building
CN106088587B (en) A kind of Combined formwork support system
CN108489440A (en) A kind of high-supported formwork supporting rack upright bar dynamic level displacement monitor and its application method
CN208251589U (en) A kind of architectural engineering scaffold bracing means
CN215631613U (en) Post-cast strip bottom mold supporting system
CN207468013U (en) Solid pier formwork hoisting structure
CN209163372U (en) A kind of fast-positioning device for metallic door installation
CN108560901A (en) Fixing device for construction site scaffolding
CN209293383U (en) A kind of adjustable scaffold for building
CN206521932U (en) overhanging scaffold
CN207348498U (en) A kind of construction building decoration auxiliary support apparatus
CN207847086U (en) A kind of tall and big beam form support frame
CN214575505U (en) Scaffold reinforcing apparatus for building engineering
CN206680963U (en) Truss-like heavy type dam template
CN211714527U (en) Constructor supporting device for building
CN211597633U (en) Scaffold for building engineering that can install fast
CN204492192U (en) A kind of building form tension and compression rod member
CN208949829U (en) A kind of truss-like cantilever form
CN207063474U (en) A kind of scaffold connecting structure
CN207086976U (en) A kind of architectural engineering drilling bracket
CN222595455U (en) Building engineering building climbing frame
CN214402640U (en) Installation mechanism of steel frame for building
CN208686041U (en) A kind of construction platform being easily installed
CN217998865U (en) Wall scaffold board installation device is leaned on to activity assembled scaffold frame
CN219909917U (en) Detachable steel pipe scaffold wall connecting device for constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522

Termination date: 20181025