CN207392708U - A kind of Fast Installation scaffold for building - Google Patents
A kind of Fast Installation scaffold for building Download PDFInfo
- Publication number
- CN207392708U CN207392708U CN201721385453.6U CN201721385453U CN207392708U CN 207392708 U CN207392708 U CN 207392708U CN 201721385453 U CN201721385453 U CN 201721385453U CN 207392708 U CN207392708 U CN 207392708U
- Authority
- CN
- China
- Prior art keywords
- supporting rod
- card slot
- scaffold
- fixed link
- fast installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 34
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 17
- 230000007246 mechanism Effects 0.000 claims abstract description 15
- 229910001220 stainless steel Inorganic materials 0.000 claims description 3
- 239000010935 stainless steel Substances 0.000 claims description 3
- 240000007594 Oryza sativa Species 0.000 claims 1
- 235000007164 Oryza sativa Nutrition 0.000 claims 1
- 235000009566 rice Nutrition 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model is related to engineering construction instrument fields, and disclose a kind of Fast Installation scaffold for building, including supporting rod and fixed link, the bottom of supporting rod is installed with pedestal, four angles of pedestal offer threaded hole, and equal screw thread is socketed with screw in the threaded hole of pedestal, on supporting rod mounting hole is offered away from 40 centimeters of ground, the inside of mounting hole and one end of fixed link are clamped, fixed link is fixed on by screw rod in mounting hole, card slot is installed at 1 point 5 meter away from ground on supporting rod, the inner wall of supporting rod is installed with gripping mechanism.The Fast Installation scaffold for building, pass through the cooperation between supporting rod, fixed link and screw rod, so that scaffold is easier for installation quick, reduce the set-up time, improve installation effectiveness, pass through the cooperation between gripping mechanism, card slot and cross bar again so that manned plate installation is quicker, greatly reduces labour cost.
Description
Technical field
The utility model is related to engineering construction equipment technology fields, are specially a kind of Fast Installation scaffold for building.
Background technology
Scaffold be in order to ensure operation platform that all kinds of work progress are smoothed out and build, it is flourishing with construction industry
Development, scaffold are widely used in engineering construction, road and bridge construction and ship construction, the work that scaffold plays in the construction process
With increasingly increasing.
At present, common scaffold clasp quantity is various, it is difficult to manage, be easily lost, disassembly and installation process is very numerous
It is trivial, it is time- and labor-consuming, very big trouble is caused to construction working, greatly reduces work efficiency, it is therefore it is proposed that a kind of
Quick peace scaffold for building.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of Fast Installation scaffold for building, possesses installation
The advantages that quick, solves the problems, such as that common scaffold installation is slow.
(2) technical solution
To realize the purpose of above-mentioned Fast Installation, the utility model provides following technical solution:A kind of quick peace for building
Scaffold is filled, including supporting rod and fixed link, the bottom of the supporting rod is installed with pedestal, and four angles of the pedestal are equal
Threaded hole is offered, and equal screw thread is socketed with screw, 40 centimetres far from ground of the inside of the supporting rod in the threaded hole of pedestal
Place offers mounting hole, and the inside of the mounting hole and one end of fixed link are clamped, and the fixed link is fixed on by screw rod
Determine in hole, away from being installed with card slot at ground one point five on the inside of the supporting rod, and the inner wall of supporting rod is installed with card
Tight device, the other end of the gripping mechanism run through and extend to the outside of supporting rod and flushed with the upper edge of card slot, the card
Cross bar is movably installed on slot, the both ends of the cross bar are installed with fixed block, and away from two fixed blocks 20 on cross bar
Centimeters open up fluted respectively, and montant is placed on two grooves, load is installed between two montants
People's plate, the montant are bolted with groove.
Preferably, the gripping mechanism includes loop bar, and the loop bar is fixedly mounted on the inner wall of supporting rod, and loop bar
Inside is installed with adjustable spring, and the other end of the adjustable spring is installed with telescopic rod, the both sides of the telescopic rod
Sliding block is installed with, and the sliding slot to match with sliding block is offered on loop bar, the telescopic rod runs through and extends to supporting rod
Outside.
Preferably, the supporting rod has four, and four supporting rods surround a rectangle, and two are offered on the supporting rod
A orthogonal mounting hole of opening direction.
Preferably, the supporting rod, fixed link, cross bar and montant are stainless steel, the length of the fixed link and cross bar
It is 1 point 2 meter to spend identical and length.
Preferably, movable set rubber sleeve on the card slot, and card slot is concave shape card slot.
Preferably, the telescopic rod stretches out one end of supporting rod inner wall for inclined-plane, and telescopic rod chamfered portion is smooth table
Face.
(3) advantageous effect
Compared with prior art, the utility model provides a kind of Fast Installation scaffold for building, possesses following beneficial
Effect:
1st, the Fast Installation scaffold for building, passes through the cooperation between supporting rod, fixed link and screw rod so that scaffold
It is easier for installation quick, the set-up time is reduced, improves installation effectiveness, then by between gripping mechanism, card slot and cross bar
Cooperation so that the installation of manned plate is quicker, greatly reduces labour cost.
2nd, the Fast Installation scaffold for building, passes through the mutual cooperation between pedestal and screw so that scaffold is fixed
Must be more secured, it is not easy to tilt, improves the safety coefficient of scaffold, and pass through the rubber sleeve on card slot and improve cross bar and card
Frictional force between slot so that card slot will not rock easily with cross bar so that scaffold is more firm, and people more pacifies at station above
Entirely.
Description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model structure top view;
Fig. 3 is the utility model gripping mechanism enlarged diagram.
In figure:1 supporting rod, 2 pedestals, 3 screws, 4 mounting holes, 5 screw rods, 6 fixed links, 7 card slots, 8 gripping mechanisms, 81 sets
Bar, 82 springs, 83 telescopic rods, 84 sliding blocks, 9 cross bars, 10 fixed blocks, 11 grooves, 12 montants, 13 manned plates, 14 bolts.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, a kind of Fast Installation scaffold for building, including supporting rod 1, peace is fixed in the bottom of supporting rod 1
Equipped with pedestal 2, supporting rod 1 has four, and four supporting rods 1 surround a rectangle so that entire scaffold is more firm, improves
The security of scaffold, four angles of pedestal 2 offer threaded hole, and equal screw thread is socketed with spiral shell in the threaded hole of pedestal 2
Silk 3 so that scaffold can be fixed on ground, improve the stability of scaffold, opened up on supporting rod 1 away from 40 centimeters of ground
There is mounting hole 4, and there are two mounting holes 4, the opening direction of two mounting holes 4 is mutually perpendicular to, the inside of mounting hole 4 and fixed link
6 one end clamping, fixed link 6 are fixed on by screw rod 5 in mounting hole 4, the speed of the installation of fixed link 6 are improved, convenient for foot hand
The stable property of frame and the climbing of people are installed with card slot 7 on supporting rod 1 at 1 point 5 meter away from ground, and the inner wall of supporting rod 1 is consolidated
Dingan County is equipped with gripping mechanism 8, and gripping mechanism 8 includes loop bar 81, and loop bar 81 is fixedly mounted on the inner wall of supporting rod 1, and loop bar
81 inside is installed with adjustable spring 82, and the other end of adjustable spring 82 is installed with telescopic rod 83, telescopic rod 83
Both sides are installed with sliding block 84, and the sliding slot to match with sliding block 84 is offered on loop bar 81, and telescopic rod 83 runs through and extends
To the outside of supporting rod 1, telescopic rod 83 stretches out one end of 1 inner wall of supporting rod for inclined-plane, and 83 chamfered portion of telescopic rod is smooth
Surface so that telescopic rod 83 is more prone to flexible, improves the rate of installation, further improves work efficiency, clamping dress
It puts 8 other end to run through and extend to the outside of supporting rod 1 and flush with the upper edge of card slot 7, cross bar is movably installed on card slot 7
9, movable set rubber sleeve on card slot 7, and card slot 7 is concave shape card slot, improves the frictional force of card slot 7 and cross bar 9 so that
Cross bar 9 is more prone to be fixed in card slot 7, is not easy to rock, and improves the safety coefficient of scaffold, and the both ends of cross bar 9 are fixed
Fixed block 10 is installed, and fluted 11 are opened up respectively away from two 10 20 centimeters of fixed block on cross bar 9, on two grooves 11
Montant 12 is placed with, supporting rod 1, fixed link 6, cross bar 9 and montant 12 are stainless steel, fixed link 6 and the length of cross bar 9
Identical and length is 1 point 2 meter, meets the installation requirement of scaffold, manned plate is installed between two montants 12
13, manned 13 periphery of plate is installed with baffle, ensure that people station is safer on manned plate 13, montant 12 is logical with groove 11
Bolt 14 is crossed to fix.
During work, fixed link 6 is sticked into the mounting hole 4 on supporting rod 1, fixed link 6 is then fixed by screw rod 5, really
After setting installation site, fixed by the screw 3 on pedestal 2, subsequently cross bar 9 is stuck in card slot 7, cross bar 9 is direct
It being pressed downward, gripping mechanism 7 can contract inwards automatically, and after treating that cross bar 9 is put well, the meeting automatic spring of gripping mechanism 7 engages cross bar 9,
Finally montant 12 is placed in the groove 11 on cross bar 9, is fixed after placing by bolt 14, after fixing, foot hand
Frame installs.
In conclusion the Fast Installation scaffold for building, by the cooperation between supporting rod 1, fixed link 6 and screw rod 5,
So that scaffold is easier for installation quick, the set-up time is reduced, installation effectiveness is improved, then passes through gripping mechanism 8, card slot
Cooperation between 7 and cross bar 9 so that manned net installation is quicker, greatly reduces labour cost;Pass through pedestal 2 and screw 3
Between mutual cooperation so that scaffold is fixed more secured, is not easy to tilt, and improves the safety coefficient of scaffold, and leads to
The rubber sleeve crossed on card slot 7 improves the frictional force between cross bar 9 and card slot 7 so that and card slot 7 will not rock easily with cross bar 9,
So that scaffold is more firm, people station is safer above;Solve the problems, such as that common scaffold installation is slow.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those
Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of Fast Installation scaffold for building, including supporting rod (1), it is characterised in that:The bottom of the supporting rod (1) is consolidated
Dingan County is equipped with pedestal (2), and four angles of the pedestal (2) offer threaded hole, and equal thread bush in the threaded hole of pedestal (2)
Be connected to screw (3), mounting hole (4) offered away from 40 centimeters of ground on the supporting rod (1), the mounting hole (4) it is interior
Portion and one end of fixed link (6) are clamped, and the fixed link (6) is fixed on by screw rod (5) in mounting hole (4), the supporting rod
(1) card slot (7) is installed at 1 point 5 meter away from ground on, and the inner wall of supporting rod (1) is installed with gripping mechanism
(8), the other end of the gripping mechanism (8) runs through and extends to the outside of supporting rod (1) and flushed with the upper edge of card slot (7),
Cross bar (9) is movably installed on the card slot (7), the both ends of the cross bar (9) are installed with fixed block (10), and cross bar
(9) open up fluted (11) away from two 20 centimeters of fixed block (10) on, be placed on two grooves (11) respectively
Montant (12) is installed with manned plate (13) between two montants (12), and the montant (12) passes through with groove (11)
Bolt (14) is fixed.
2. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:The gripping mechanism (8)
Including loop bar (81), the loop bar (81) is fixedly mounted on the inner wall of supporting rod (1), and the inside of loop bar (81) is fixedly mounted
There is adjustable spring (82), the other end of the adjustable spring (82) is installed with telescopic rod (83), the telescopic rod (83)
Both sides are installed with sliding block (84), and the groove to match with sliding block (84), the telescopic rod are offered on loop bar (81)
(83) run through and extend to the outside of supporting rod (1).
3. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:The supporting rod (1) has
Four, and four supporting rods (1) surround a rectangle, open up that there are two opening direction is orthogonal on the supporting rod (1)
Mounting hole (4).
4. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:The fixed link (6), horizontal stroke
Bar (9) and montant (12) are stainless steel, and the fixed link (6) is identical with the length of cross bar (9) and length is one point two
Rice.
5. a kind of Fast Installation scaffold for building according to claim 1, it is characterised in that:It is living on the card slot (7)
Dynamic suit rubber sleeve, and card slot (7) is concave shape card slot.
6. a kind of Fast Installation scaffold for building according to claim 2, it is characterised in that:The telescopic rod (83) is stretched
Go out one end of supporting rod (1) inner wall for inclined-plane, and telescopic rod (83) chamfered portion is smooth surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721385453.6U CN207392708U (en) | 2017-10-25 | 2017-10-25 | A kind of Fast Installation scaffold for building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721385453.6U CN207392708U (en) | 2017-10-25 | 2017-10-25 | A kind of Fast Installation scaffold for building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207392708U true CN207392708U (en) | 2018-05-22 |
Family
ID=62330004
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721385453.6U Expired - Fee Related CN207392708U (en) | 2017-10-25 | 2017-10-25 | A kind of Fast Installation scaffold for building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207392708U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110748001A (en) * | 2019-11-06 | 2020-02-04 | 江苏杰瑞钢结构有限公司 | Steel structure net rack |
| CN111075180A (en) * | 2020-01-02 | 2020-04-28 | 黄河水利职业技术学院 | Adjustable scaffold for water conservancy construction |
| CN111593870A (en) * | 2020-06-08 | 2020-08-28 | 洛阳鼎桓电力科技有限公司 | Circuit emergency repair is with helping support |
| CN112211388A (en) * | 2020-09-28 | 2021-01-12 | 安徽长青建筑制品有限公司 | Scaffold frame of easy dismouting |
| CN113178793A (en) * | 2021-06-29 | 2021-07-27 | 山东万海电气科技有限公司 | Distribution box protection system and distribution box thereof |
-
2017
- 2017-10-25 CN CN201721385453.6U patent/CN207392708U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110748001A (en) * | 2019-11-06 | 2020-02-04 | 江苏杰瑞钢结构有限公司 | Steel structure net rack |
| CN111075180A (en) * | 2020-01-02 | 2020-04-28 | 黄河水利职业技术学院 | Adjustable scaffold for water conservancy construction |
| CN111593870A (en) * | 2020-06-08 | 2020-08-28 | 洛阳鼎桓电力科技有限公司 | Circuit emergency repair is with helping support |
| CN112211388A (en) * | 2020-09-28 | 2021-01-12 | 安徽长青建筑制品有限公司 | Scaffold frame of easy dismouting |
| CN113178793A (en) * | 2021-06-29 | 2021-07-27 | 山东万海电气科技有限公司 | Distribution box protection system and distribution box thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207392708U (en) | A kind of Fast Installation scaffold for building | |
| CN106088587B (en) | A kind of Combined formwork support system | |
| CN108489440A (en) | A kind of high-supported formwork supporting rack upright bar dynamic level displacement monitor and its application method | |
| CN208251589U (en) | A kind of architectural engineering scaffold bracing means | |
| CN215631613U (en) | Post-cast strip bottom mold supporting system | |
| CN207468013U (en) | Solid pier formwork hoisting structure | |
| CN209163372U (en) | A kind of fast-positioning device for metallic door installation | |
| CN108560901A (en) | Fixing device for construction site scaffolding | |
| CN209293383U (en) | A kind of adjustable scaffold for building | |
| CN206521932U (en) | overhanging scaffold | |
| CN207348498U (en) | A kind of construction building decoration auxiliary support apparatus | |
| CN207847086U (en) | A kind of tall and big beam form support frame | |
| CN214575505U (en) | Scaffold reinforcing apparatus for building engineering | |
| CN206680963U (en) | Truss-like heavy type dam template | |
| CN211714527U (en) | Constructor supporting device for building | |
| CN211597633U (en) | Scaffold for building engineering that can install fast | |
| CN204492192U (en) | A kind of building form tension and compression rod member | |
| CN208949829U (en) | A kind of truss-like cantilever form | |
| CN207063474U (en) | A kind of scaffold connecting structure | |
| CN207086976U (en) | A kind of architectural engineering drilling bracket | |
| CN222595455U (en) | Building engineering building climbing frame | |
| CN214402640U (en) | Installation mechanism of steel frame for building | |
| CN208686041U (en) | A kind of construction platform being easily installed | |
| CN217998865U (en) | Wall scaffold board installation device is leaned on to activity assembled scaffold frame | |
| CN219909917U (en) | Detachable steel pipe scaffold wall connecting device for constructional engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180522 Termination date: 20181025 |