CN209603534U - Multifunctional wall body corrects instrument - Google Patents
Multifunctional wall body corrects instrument Download PDFInfo
- Publication number
- CN209603534U CN209603534U CN201822116909.XU CN201822116909U CN209603534U CN 209603534 U CN209603534 U CN 209603534U CN 201822116909 U CN201822116909 U CN 201822116909U CN 209603534 U CN209603534 U CN 209603534U
- Authority
- CN
- China
- Prior art keywords
- rod
- compression bar
- righting
- force application
- wall body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
It include righting rod, the compression bar being obliquely installed the utility model relates to a kind of multifunctional wall body correction instrument, and the force application rod for driving the righting rod to move up, the upper end of the compression bar is pushed up to righting rod, is additionally provided with to rotate in vertical plane to force application rod on compression bar and is provided the hanging piece of fulcrum.The external force of application is passed to compression bar and righting rod by force application rod by the utility model simultaneously, righting is carried out to wall while compression bar Forced rotation, using righting rod gradually upward righting wall is moved up simultaneously, ensure that the stabilization of righting and continuous, avoid the occurrence of the secondary injuries such as wall fracture.
Description
Technical field
The utility model relates to ancient building repair technical fields more particularly to a kind of multifunctional wall body to correct instrument.
Background technique
The wall of ancient building handles wind and weather due to of the remote past for a long time, and wall basis is shallower in addition, therefore will appear
The case where wall tilts, wall righting are a very important job in ancient building repair.Ancient architecture wall is carried out at present
When reparation, generallys use and directly toppling over side to the method for wall application thrust, but this method be easy to cause wall to be broken,
Even collapse.Also have and righting is carried out using the method for the two-sided anchoring of wall, but structure is more complicated, speed of application is slow,
Lead to claim for eot.
Summary of the invention
In view of the shortcomings of the prior art, the utility model provides a kind of multifunctional wall bodies to correct instrument, carries out to wall
While promotion, wall is made gradually by righting, to avoid the case where wall is broken from the bottom up, and facilitates operation and apply
Work.
The utility model is achieved by the following technical solution, and provides a kind of multifunctional wall body correction instrument, including help
Positive bar, the compression bar being obliquely installed, and the force application rod for driving the righting rod to move up, the upper end of the compression bar is pushed up to righting
Bar, is additionally provided on compression bar to rotate in vertical plane to force application rod and provides the hanging piece of fulcrum.
Righting rod in use, is attached to the face of toppling over of wall by this programme vertically, and compression bar and righting rod are positioned at same vertical flat
In face, compression bar upper end is withstood on righting rod, and compression bar lower end is axially fixed, compression bar is rotated, but avoids compression bar
Then axial displacement applies downward power to the force side of force application rod, pass through the point action and lever principle of hanging piece, force application rod
Righting rod is driven to move up, meanwhile, power suffered by force application rod reaches compression bar by hanging piece, pulls downward on to compression bar, since compression bar is another
One end axial restraint can only rotate, and generate uprighting force to wall when compression bar is rotated down, as righting rod moves up, by
Cumulative plus righting contact area realizes wall righting.
As optimization, the sliding slot extended along its length is offered on the righting rod, the upper end of the compression bar is slidably connected to
In sliding slot.By the way that sliding slot is arranged, guiding role is provided to the rotation of compression bar, and compression bar upper end is limited to two lateral deviations by sliding slot
Tiltedly, compression bar and righting rod in wall righting is avoided to be detached from.
It further include the pedestal with compression bar rotation connection as optimization.This prioritization scheme when in use fixes pedestal
It realizes that the axial of compression bar limits, to the arrangement of compression bar when facilitating construction, while avoiding and digging groove ground is damaged.
As optimization, the compression bar is connect by adapter with pedestal, and the adapter and pedestal are hinged, adapter and pressure
Bar is detachably affixed.This prioritization scheme can be adjusted by setting adapter by adjusting link position of the adapter on compression bar
The use length of seamless bar, meets the use demand of construction site different spaces, and adapter can be the set being set on compression bar
Cylinder, makes compression bar have sleeve relatively fixed by the bolt connecting with bush whorl, is also possible to sleeve and is connected by screw thread and compression bar
It connects, adapter is also possible to for building to card, is gripped compression bar by two opposite snap rings.
As optimization, the hanging piece is hinged with compression bar, force application rod respectively.The hanging piece of this prioritization scheme can be rigid member,
It is also possible to flexible piece, meets different requirements.
As optimization, the hanging piece is flexible piece, and compression bar supports hanging piece, and hanging piece supports force application rod.This prioritization scheme is hung
Part uses flexible piece, and the axial resistance for being subject to force application rod in rotation reduces, while facilitating mitigation tool weight, more convenient to take
Band and carrying, hanging piece upper end can be threaded through on compression bar, can also be tied up on compression bar, and hanging piece lower end can be set in force application rod
On, it can also be threaded through on force application rod.
As optimization, the force application rod and righting rod are hinged.This prioritization scheme is hinged with righting rod by force application rod, both can be with
It is mobile to realize that force application rod drives righting rod, and can fold the two after construction, is convenient for carrying.
It further include force application apparatus as optimization, the force application apparatus includes bracket and the transmission rod hinged with bracket, institute
State one end connection vertical drive of transmission rod, the force side of the other end and force application rod by connecting rod connection, connecting rod respectively with
Force application rod, transmission rod are hinged.This prioritization scheme provides power by vertical drive, and power reaches force application rod through transmission rod,
To alleviate labor intensity of workers, stability and duration, vertical drive when also improving righting firmly can be
Extension end and the hinged jack of transmission rod.
The method for carrying out wall correction using above-mentioned wall correction instrument, specific as follows:
(1) by compression bar axial restraint, that is, avoid compression bar that axial displacement occurs, compression bar can rotate, righting rod is affixed on
Inclined wall topples over face, and the upper end of compression bar is withstood on righting rod;
(2) apply downward pressure to the force side of force application rod, downward pulling force is generated to compression bar by hanging piece, to make
Compression bar rotates down, and due to the pedestal that the compression bar other end is connected and fixed, generates uprighting force to wall, while force application rod is around branch
Point rotation, and righting rod is pushed up, increase righting contact area, realizes wall righting.
The utility model has the following beneficial effects: the external force of application is passed to simultaneously by compression bar and righting rod by force application rod,
Righting is carried out to wall while compression bar Forced rotation, while moving up gradually upward righting wall using righting rod, ensure that
The stabilization of righting and continuous, avoids the occurrence of the secondary injuries such as wall fracture.
Detailed description of the invention
Fig. 1 is one structural schematic diagram of embodiment;
Fig. 2 is A direction view in Fig. 1;
Fig. 3 is two structural schematic diagram of embodiment;
It is as shown in the figure:
1, wall, 2, righting rod, 3, hanging piece, 4, compression bar, 5, force application rod, 6, connecting rod, 7, transmission rod, 8, vertical driving dress
It sets, 9, bracket, 10, adapter, 11, pedestal.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
Embodiment one
A kind of multifunctional wall body corrects instrument as shown in Figure 1, including righting rod 2, the compression bar being obliquely installed 4, and drives
The force application rod 5 that the righting rod 2 moves up, the upper end of the compression bar 4 are pushed up to righting rod 2, are offered on righting rod 2 along length
The sliding slot that direction extends, the upper end of the compression bar are slidably connected in sliding slot, are additionally provided on compression bar and turn in vertical plane to force application rod
Dynamic to provide the hanging piece 3 of fulcrum, the hanging piece 3 of the present embodiment is rigid member, and hanging piece 3 is hinged with compression bar, force application rod respectively.In order to mention
For high force application rod to the accuracy of righting rod power transmission, force application rod 5 and righting rod 2 are hinged, after use, by force application rod and can help
Positive bar is combined, and reduces occupied space.
The present embodiment further includes the pedestal 11 with compression bar rotation connection, and compression bar 4 is connect by adapter 10 with pedestal 11, institute
It states adapter 10 and pedestal 11 is hinged, adapter is detachably affixed with compression bar.The adapter of the present embodiment is to clamp compression bar
Two pipe clamps can be rotated around the axis, by adjusting pipe clamp after pipe clamp and compression bar are affixed wherein a pipe clamp is connect by shaft and pedestal axis
Position on compression bar, the use length of adjustable compression bar, to meet the use demand for not having to construction space.
In order to mitigate worker labour, the present embodiment further includes force application apparatus, the force application apparatus include bracket 9 and with
One end of the hinged transmission rod 7 of bracket 9, the transmission rod 7 connects vertical drive 8, the force side of the other end and force application rod
It is connected by connecting rod 6.Wherein vertical drive is extension end and the hinged jack of transmission rod, and connecting rod is flexible strand, flexible
The upper and lower ends of rope are affixed with compression bar, transmission rod respectively.For the globality for improving centralizing tool, the cylinder body and bracket of jack are cut with scissors
It connects, hinge joint is located at cylinder body towards the side of connecting rod.
The method for carrying out wall correction using the present embodiment multifunctional wall body correction instrument, specific as follows:
1, pedestal is fixed, to make compression bar axial restraint, that is, avoids compression bar that axial displacement occurs, compression bar can occur to turn
It is dynamic, righting rod is affixed on to the face of toppling over of inclined wall 1, compression bar and righting rod are located in the same vertical plane, and by the upper of compression bar
End is withstood on righting rod;
2, apply downward pressure to the force side of force application rod, downward pulling force is generated to compression bar by hanging piece, to make
Compression bar rotates down, and due to the pedestal that the compression bar other end is connected and fixed, generates uprighting force to wall, while force application rod is around branch
Point rotation, and righting rod is pushed up, increase righting contact area, realizes wall righting.
Embodiment two
The difference between this embodiment and the first embodiment lies in hanging piece is flexible piece, compression bar supports hanging piece, hanging piece support force
Bar, hanging piece upper end tie up on compression bar, and hanging piece lower end is set on force application rod, it is preferable that hanging piece is nylon rope.
Force application rod extends to below righting rod, and when force side is pressed down, force application rod jacks up righting rod upwards, and structure is simple,
And the contact position of force application rod and righting rod can be adjusted according to righting situation.
Connecting rod is rigid rod, and the upper and lower ends of connecting rod are hinged with compression bar, transmission rod respectively.
When carrying out wall righting using the present embodiment centralizing tool, using ground as pedestal, pit is dug on the ground, it will
The lower end of compression bar extends in pit, carries out axial limiting to compression bar using pit, The method reduces number of components, conveniently take
Band is suitble to the unhardened construction site in ground.
Certainly, above description is also not limited to the example above, and technical characteristic of the utility model without description can lead to
It crosses or realizes that details are not described herein using the prior art;Above embodiments and attached drawing are merely to illustrate the technology of the utility model
Scheme is not limitations of the present invention, and the utility model is described in detail referring to preferred embodiment, this
Field it is to be appreciated by one skilled in the art that those skilled in the art institute in the essential scope of the utility model
The variations, modifications, additions or substitutions made without departure from the objective of the utility model, want by the right that also should belong to the utility model
Seek protection scope.
Claims (9)
1. a kind of multifunctional wall body corrects instrument, it is characterised in that: including righting rod (2), the compression bar (4) being obliquely installed, and
The force application rod (5) for driving the righting rod (2) to move up, the upper end of the compression bar (4) are pushed up to righting rod (2), on compression bar also
The hanging piece (3) of fulcrum is provided equipped with rotating in vertical plane to force application rod.
2. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: offered on the righting rod (2)
The upper end of the sliding slot extended along its length, the compression bar is slidably connected in sliding slot.
3. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: further include being rotatablely connected with compression bar
Pedestal (11).
4. multifunctional wall body according to claim 3 corrects instrument, it is characterised in that: the compression bar (4) passes through adapter
(10) it is connect with pedestal (11), hingedly, adapter is detachably affixed with compression bar for the adapter (10) and pedestal (11).
5. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: the hanging piece (3) respectively with compression bar,
Force application rod is hinged.
6. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: the hanging piece is flexible piece, compression bar
Hanging piece is supported, hanging piece supports force application rod.
7. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: the force application rod (5) and righting rod
(2) hinged.
8. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: the force application rod extends under righting rod
Side.
9. multifunctional wall body according to claim 1 corrects instrument, it is characterised in that: it further include force application apparatus, it is described to apply
Power device includes bracket (9) and the transmission rod (7) hinged with bracket (9), the vertical driving of one end connection of the transmission rod (7)
The force side of device (8), the other end and force application rod is connected by connecting rod (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822116909.XU CN209603534U (en) | 2018-12-17 | 2018-12-17 | Multifunctional wall body corrects instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822116909.XU CN209603534U (en) | 2018-12-17 | 2018-12-17 | Multifunctional wall body corrects instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209603534U true CN209603534U (en) | 2019-11-08 |
Family
ID=68396094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822116909.XU Active CN209603534U (en) | 2018-12-17 | 2018-12-17 | Multifunctional wall body corrects instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209603534U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610878A (en) * | 2018-12-17 | 2019-04-12 | 济南王府园林古建筑工程有限公司 | Multifunctional wall body corrects instrument and wall antidote |
CN111706112A (en) * | 2020-06-11 | 2020-09-25 | 特日各乐 | Building yard wall is with righting device |
CN113006519A (en) * | 2021-03-25 | 2021-06-22 | 中铁建科江门人才岛投资有限公司 | Green brick wall body righting equipment and construction method thereof |
-
2018
- 2018-12-17 CN CN201822116909.XU patent/CN209603534U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610878A (en) * | 2018-12-17 | 2019-04-12 | 济南王府园林古建筑工程有限公司 | Multifunctional wall body corrects instrument and wall antidote |
CN111706112A (en) * | 2020-06-11 | 2020-09-25 | 特日各乐 | Building yard wall is with righting device |
CN113006519A (en) * | 2021-03-25 | 2021-06-22 | 中铁建科江门人才岛投资有限公司 | Green brick wall body righting equipment and construction method thereof |
CN113006519B (en) * | 2021-03-25 | 2022-03-25 | 中铁建科江门人才岛投资有限公司 | Green brick wall body righting equipment and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209603534U (en) | Multifunctional wall body corrects instrument | |
CN205367529U (en) | Balancing hanger of crane | |
CN109610878A (en) | Multifunctional wall body corrects instrument and wall antidote | |
CN205330693U (en) | Laborsaving formula is bow member erection equipment for tunnel construction | |
CN111305540B (en) | Splicing device for building scaffold building | |
CN112647521A (en) | Concrete sprayer for tunnel construction | |
CN209670910U (en) | A kind of geotechnical engineering investigation probing anti-deviation device | |
CN207726600U (en) | A kind of tubular body promotion claw | |
CN204152417U (en) | A kind of removable hanging ladder | |
CN203298145U (en) | Illuminating lamp for construction site of construction engineering | |
CN209239124U (en) | Simple tool for drilling high places | |
CN204725688U (en) | A kind of tunnel concrete hoop groover | |
CN204118541U (en) | A kind of field work service kit | |
CN107986207A (en) | A kind of bow member job platform and bow member Operation Van | |
CN208618254U (en) | Support before a kind of trackless triangle hanging basket | |
CN209350391U (en) | A kind of wooden finishing material cutting equipment | |
CN207827810U (en) | A kind of arch job platform and arch Operation Van | |
CN209430136U (en) | A kind of tubing string is automatically to buckle device | |
CN206220624U (en) | The helicopter servicing unit of extra-high voltage wine glass tower tower head | |
CN107175354A (en) | A kind of construction rig in science of bridge building field | |
CN211663269U (en) | Civil engineering reforms transform and transports transfer device with cement pipe way | |
CN213356754U (en) | Elevating gear for construction | |
CN205389189U (en) | Photovoltaic support with adjustable it is fixed | |
CN204948871U (en) | Branch clipper | |
CN219391631U (en) | Anchor rod drawing instrument for road construction measurement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 250014 1-103, No.66 Heping Road, Lixia District, Jinan City, Shandong Province Patentee after: Wangfu (Shandong) Cultural Relics Protection Group Co.,Ltd. Address before: 250000 No. 1-103, Heping Road, Lixia District, Jinan City, Shandong Province Patentee before: JINAN WANGFU GARDEN ANCIENT ARCHITECTURE ENGINEERING Co.,Ltd. |