CN208456666U - A kind of victory assembling device - Google Patents

A kind of victory assembling device Download PDF

Info

Publication number
CN208456666U
CN208456666U CN201820948469.1U CN201820948469U CN208456666U CN 208456666 U CN208456666 U CN 208456666U CN 201820948469 U CN201820948469 U CN 201820948469U CN 208456666 U CN208456666 U CN 208456666U
Authority
CN
China
Prior art keywords
steel pipe
external conduit
duct piece
shield duct
assembling device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820948469.1U
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peng Jian
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820948469.1U priority Critical patent/CN208456666U/en
Application granted granted Critical
Publication of CN208456666U publication Critical patent/CN208456666U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of prompt assembling devices, wherein the victory assembling device includes: embedded sleeve barrel and external conduit;Embedded sleeve barrel, comprising: steel pipe, umbrella bellend, bolt, spring shim and square washer;One end of steel pipe is umbrella bellend, is cast in shield duct piece in advance;The other end of steel pipe fits in the inner surface of shield duct piece;External conduit is connect by the bolt, spring shim and square washer with the other end of the steel pipe, so that the outer surface of external conduit and shield duct piece fits closely, the integrality and durability of shield tunnel are improved, realizes the Fast Installation of subway tunnel electromechanical equipment and pipeline.

Description

A kind of victory assembling device
Technical field
The utility model belongs to shield tunnel construction technology field more particularly to a kind of prompt assembling device.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.
Utility model content
The technology of the utility model solves the problems, such as: a kind of prompt assembling device is overcome the deficiencies of the prior art and provide, to realize ground The Fast Installation of iron tunnel electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the utility model discloses a kind of prompt assembling devices, comprising: embedded sleeve barrel and external Conduit;Wherein, embedded sleeve barrel, comprising: steel pipe, umbrella bellend, bolt, spring shim and square washer;
One end of steel pipe is umbrella bellend, is cast in shield duct piece in advance;
The other end of steel pipe fits in the inner surface of shield duct piece;
External conduit is connect by the bolt, spring shim and square washer with the other end of the steel pipe, wherein spiral shell Bolt is connected by the other end of internal screw thread and the steel pipe on steel pipe, so that the outer surface of external conduit and shield duct piece is closely pasted It closes.
In above-mentioned prompt assembling device, external conduit is concave slot structure.
In above-mentioned prompt assembling device, be provided with fastening bolt holes on external conduit, bolt pass through the fastening bolt holes with The other end of the steel pipe connects.
In above-mentioned prompt assembling device, one or more fastening bolt holes are provided on external conduit;
One or more of fastening bolt holes are arranged on external conduit according to setting spacing;
One or more steel pipes are cast in shield duct piece in advance, position corresponding with one or more of fastening bolt holes Set place.
In above-mentioned prompt assembling device, the embedded sleeve barrel further include: filler block;
The filler block is mounted at the inside middle section position of steel pipe.
The utility model has the advantage that
1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc. Security risk.
2) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
3) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
4) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, together When also significantly reduce the operation maintenance expense of equipment, equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
5) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase It is short by 50% or more.
6) environmentally friendly, the construction environment of pipeline and mechanical and electric equipment installation process without dust, noiseless very big improvement equipment installation, Labor intensity of workers is reduced, typical " green construction " is belonged to.
7) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various Equipment.
8) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
9) applicability is wide, can use in concrete compression area and tensile region.
10) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings Electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of schematic perspective view of victory assembling device in the utility model embodiment;
Fig. 2 is a kind of main view of victory assembling device in the utility model embodiment;
Fig. 3 is the enlarged drawing in Fig. 2 at A;
Fig. 4 is a kind of structural schematic diagram of embedded sleeve barrel in the utility model embodiment;
1- embedded sleeve barrel, 11- bolt, 12- spring shim, 13- square washer, 14- steel pipe, 15- umbrella bellend, 16- The external conduit of filler block, 2-, 21- shield duct piece, 22- fastening bolt holes.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type disclosed embodiment is described in further detail.
The utility model discloses a kind of prompt assembling devices, belong to the prompt dress side of subway tunnel electromechanical equipment and pipeline installation Case, the victory assembling device include: embedded sleeve barrel and external conduit.Wherein, embedded sleeve barrel one end is umbrella bellend, first in steel pipe Filler block is loaded onto, then is poured in shield duct piece in advance, the other end fits in shield duct piece surface.Fit in the pre- of shield duct piece surface Sleeve is buried with internal screw thread, the fastening bolt being arranged on external conduit is passed through with bolt, spring shim and square washer sub-assembly Hole, it is ensured that after external conduit is fitted closely with shield duct piece, screw in steel tube screw thread hole and simultaneously lock, external conduit is made to be fixed on shield The integrality and durability of shield tunnel are improved in section of jurisdiction surface, realize the Fast Installation of subway tunnel electromechanical equipment and pipeline.
In addition, the victory assembling device applies also for city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings Electromechanical equipment and pipeline installation etc. in object.
Referring to Fig.1~4, in the present embodiment, which can specifically include: embedded sleeve barrel 1 and external conduit 2. Wherein, the embedded sleeve barrel 1 can specifically include: steel pipe 14, umbrella bellend 15, bolt 11, spring shim 12 and rectangular pad Piece 13.
Preferably, one end of steel pipe 14 is umbrella bellend 15, and the other end is provided with internal screw thread: inside can be used in internal screw thread Tapping mode processes to obtain, according to 11 length of bolt, length of the 14 tapping length of steel pipe slightly larger than the bolt 11 of required fastening.
In the present embodiment, embedded sleeve barrel 1 is independently arranged in shield duct piece 21 by pre-buried, while between its arrangement It is arranged away from, installation number and position according to actual requirement of engineering, to be used to support connecting bracket.1 lower part of embedded sleeve barrel It is arranged according to design requirement in 21 lower surface of shield duct piece.It is using mold that steel pipe umbrella bellend 15 is pre-buried to shield duct piece 21 It is interior;Further, external conduit 2 is fixed on by shield duct piece 21 by bolt 11, spring shim 12,13 sub-assembly of square washer Corresponding position.Specific: one end of steel pipe 14 is umbrella bellend 15, is cast in shield duct piece 21 in advance, pre-buried for increasing Sleeve 1 and 21 structural stability of shield duct piece, prevent embedded sleeve barrel from integrally falling off.The other end of steel pipe 14 fits in shield duct piece 21 inner surface;External conduit 2 is another by the bolt 11, spring shim 12 and square washer 13 and the steel pipe 14 End connection, so that external conduit 2 and the outer surface of shield duct piece 21 fit closely.
Preferably, the prompt assembling device can also include: filler block 16.Filler block 16 is mounted in the inside of steel pipe 14 At fragment position, concrete blocks steel duct when preventing pre-buried.
Fastening bolt holes 22 are provided on external conduit 2, bolt 11 passes through the fastening bolt holes 22 with described with interior The other end of the steel pipe 14 of screw thread connects.
Such as Fig. 1, external conduit 2 can be concave groove structure, be provided with one or more fastening bolt holes on external conduit 2 22, which arranges along external 2 slideway direction of conduit, for adjusting the installation position of external conduit 2 It sets.Correspondingly, one or more steel pipes 14 are cast in shield duct piece 21 in advance and one or more of fastening bolt holes 22 At corresponding position.
Preferably, in order to install the good fitting of contact surface energy, external conduit 2 is identical as 21 radians of shield duct piece.
In the present embodiment, embedded sleeve barrel 1 is embedded in shield duct piece 21, to guarantee shield duct piece 21 and embedded sleeve barrel 1 Structural stability, steel pipe 14 is embedded in 21 side of shield duct piece in advance, is equipped with umbrella bellend, and at the top of umbrella bellend and side wall can The coefficient of friction for increasing connector, to prevent embedded sleeve barrel 1 to be detached from shield duct piece 21.The dismounting of this mounting means is simple and convenient, Construction task can rapidly and effectively be completed.The structural stability of external conduit 2 and shield duct piece 21 can also be enhanced, moreover it is possible to ensure It will not collide with tunnel gut line etc..
On the basis of the above embodiments, the victory assembling device is illustrated in conjunction with the installation method of the victory assembling device, In, the installation method of the victory assembling device can be such that is cast in the umbrella bellend 15 of steel pipe 14 in shield duct piece 21 in advance;It will External conduit 2 is fitted closely with shield duct piece 21, and adjusts external conduit 2 to design position;Pass through bolt 11, spring shim 12 and 13 sub-assembly of square washer, external conduit 2 is fixed on shield duct piece 21;Wherein, bolt 11 passes through external conduit 2 The fastening bolt holes 22 of upper setting screw in the other end of steel pipe 14;Pipeline suspension and support is installed by external conduit 2, and in pipeline Tunnel pipeline and other equipment are installed on suspension and support.
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The optimal specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should be covered within the scope of the utility model.
The content being not described in detail in the utility model specification belongs to the well-known technique of professional and technical personnel in the field.

Claims (5)

1. a kind of victory assembling device characterized by comprising embedded sleeve barrel (1) and external conduit (2);Wherein, embedded sleeve barrel (1), It include: steel pipe (14), umbrella bellend (15), bolt (11), spring shim (12) and square washer (13);
One end of steel pipe (14) is umbrella bellend (15), is cast in shield duct piece (21) in advance;
The other end of steel pipe (14) fits in the inner surface of shield duct piece (21);
External conduit (2) is another with the steel pipe (14) by the bolt (11), spring shim (12) and square washer (13) One end connection, wherein bolt (11) is connected by the other end of internal screw thread and the steel pipe (14) on steel pipe (14), so that external Conduit (2) and the outer surface of shield duct piece (21) fit closely.
2. victory assembling device according to claim 1, which is characterized in that external conduit (2) is concave slot structure.
3. victory assembling device according to claim 1, which is characterized in that be provided with fastening bolt holes on external conduit (2) (22), bolt (11) passes through the fastening bolt holes (22) and connect with the other end of the steel pipe (14).
4. victory assembling device according to claim 1, which is characterized in that be provided on external conduit (2) one or more tight Fixing bolt hole (22);
One or more of fastening bolt holes (22) are arranged on external conduit (2) according to setting spacing;
One or more steel pipes (14) are cast in advance in shield duct piece (21), with one or more of fastening bolt holes (22) phase At corresponding position.
5. victory assembling device according to claim 1, which is characterized in that the embedded sleeve barrel (1) further include: filler block (16);
The filler block (16) is mounted at the inside middle section position of steel pipe (14).
CN201820948469.1U 2018-06-20 2018-06-20 A kind of victory assembling device Active CN208456666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820948469.1U CN208456666U (en) 2018-06-20 2018-06-20 A kind of victory assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820948469.1U CN208456666U (en) 2018-06-20 2018-06-20 A kind of victory assembling device

Publications (1)

Publication Number Publication Date
CN208456666U true CN208456666U (en) 2019-02-01

Family

ID=65168433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820948469.1U Active CN208456666U (en) 2018-06-20 2018-06-20 A kind of victory assembling device

Country Status (1)

Country Link
CN (1) CN208456666U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590757A (en) * 2018-06-20 2018-09-28 彭健 A kind of victory assembling device and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590757A (en) * 2018-06-20 2018-09-28 彭健 A kind of victory assembling device and its installation method

Similar Documents

Publication Publication Date Title
CN108590757A (en) A kind of victory assembling device and its installation method
KR101975763B1 (en) Precast Concrete Culvert and Method for Constructing the Same
CN202023204U (en) Water stop device for opening of circular open caisson
CN206987887U (en) Subway tunnel electromechanical equipment and pipeline quick fixation structure
CN109159275A (en) Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method
CN212105888U (en) Shield segment structure with embedded bolt sleeve
CN208456666U (en) A kind of victory assembling device
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN208456618U (en) A kind of victory assembling device
CN208456600U (en) A kind of victory assembling device
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN108590758A (en) A kind of victory assembling device and its installation method
CN209510390U (en) A kind of hangers victory assembling device
CN108625867A (en) A kind of victory assembling device and its installation method
CN208456667U (en) A kind of hangers victory assembling device
CN108825624A (en) A kind of section of jurisdiction built-in turnbuckle component and its application
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN209413944U (en) A kind of hangers victory assembling device
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN108915769A (en) A kind of hangers victory assembling device and its installation method
CN209687544U (en) A kind of hangers victory assembling device
CN209687545U (en) A kind of hangers victory assembling device
CN209413945U (en) A kind of hangers victory assembling device
CN208416563U (en) A kind of service sleeve and the plug-in conduit based on the service sleeve
CN108071123A (en) The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210824

Address after: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee after: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) Co.,Ltd.

Address before: 350000 unit B-1, 25 / F, Yuanhong building, No. 32, Wuyi Middle Road, Fuzhou, Fujian

Patentee before: Peng Jian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230713

Address after: Unit 301, Building 2, No. 155 Yangqiao West Road, Gulou District, Fuzhou City, Fujian Province, 350001

Patentee after: Peng Jian

Address before: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee before: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) CO.,LTD.

TR01 Transfer of patent right