CN109458221A - A kind of hangers victory assembling device and installation method - Google Patents

A kind of hangers victory assembling device and installation method Download PDF

Info

Publication number
CN109458221A
CN109458221A CN201811600519.8A CN201811600519A CN109458221A CN 109458221 A CN109458221 A CN 109458221A CN 201811600519 A CN201811600519 A CN 201811600519A CN 109458221 A CN109458221 A CN 109458221A
Authority
CN
China
Prior art keywords
hangers
bolt
assembling device
sliding slot
external
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811600519.8A
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811600519.8A priority Critical patent/CN109458221A/en
Publication of CN109458221A publication Critical patent/CN109458221A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/02Suspension devices for tubes or the like, e.g. for ventilating ducts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/04Distributing means for power supply in mines
    • E21F17/06Distributing electric power; Cable networks; Conduits for cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Power Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of hangers victory assembling device and installation method, which includes: hangers component, external sliding slot and bolt assembly;Wherein, hangers component includes: auricle, pendant groove and U-type groove;Auricle and pendant groove are arranged in set angle, and U-type groove is arranged in pendant groove bottom;An external conduit is provided on external sliding slot bottom surface;External sliding slot nesting is mounted in pendant groove, and external sliding slot and hangers component are connected and fixed by bolt assembly by U-type groove and external conduit.The Fast Installation of iron shield tunnel electromechanical equipment and pipeline is realized through the invention.

Description

A kind of hangers victory assembling device and installation method
Technical field
The invention belongs to shield tunnel construction technology field more particularly to a kind of hangers victory assembling devices and installation method.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.How to subtract Few construction of underground tunnel period, improve construction quality, extend tunnel service life, reduce complete period overall cost, prevent dust, The problems such as noise pollution, mitigation construction labor intensity, will become industry project urgently to be solved.
Summary of the invention
Technology of the invention solves the problems, such as: overcoming the deficiencies of the prior art and provide a kind of hangers victory assembling device and installation side Method, to realize the Fast Installation of Shield-bored tunnels electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the invention discloses a kind of hangers victory assembling devices, comprising: hangers component (1-0), External sliding slot (2-0) and bolt assembly (3-0);Wherein, hangers component (1-0), comprising: auricle (1-1), pendant groove (1-3) and U Type groove (1-4);Auricle (1-1) and pendant groove (1-3) are arranged in set angle, and U-type groove (1-4) is arranged at the bottom pendant groove (1-3) Face;An external conduit (2-1) is provided on external sliding slot (2-0) bottom surface;
External sliding slot (2-0) nesting is mounted in pendant groove (1-3), and bolt assembly (3-0) passes through U-type groove (1-4) and outer Conduit (2-1) is set, external sliding slot (2-0) and hangers component (1-0) are connected and fixed.
Preferably,
Bolt assembly (3-0) is positive to pass through U-type groove (1-4) and external conduit (2-1), by external sliding slot (2-0) and hangers Component (1-0) is connected and fixed;Or,
Bolt assembly (3-0) passes back through external conduit (2-1) and U-type groove (1-4), by external sliding slot (2-0) and hangers Component (1-0) is connected and fixed.
Preferably, bolt assembly (3-0), comprising: T-bolt (3-1), nut (3-2) and washer (3-3);
When bolt assembly (3-0) is positive to be installed, the threaded post of T-bolt (3-1) passes through U-type groove (1-4) and external slot Road (2-1) is fastened by nut (3-2) afterwards;Wherein, bolt head and U-type groove (1- of washer (3-3) setting in T-bolt (3-1) 4) between;
When bolt assembly (3-0) is reversely installed, the threaded post of T-bolt (3-1) passes through external conduit (2-1) and U-shaped Slot (1-4) is fastened by nut (3-2) afterwards;Wherein, bolt head and external conduit of washer (3-3) setting in T-bolt (3-1) Between (2-1).
Preferably, hangers component (1-0), further includes: earhole (1-2);Wherein, earhole (1-2) is arranged at auricle (1-1) On;
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), and hangers victory is filled It sets and is mounted on shield tunnel concrete pipe sheet (4-0).
Preferably, shield tunnel concrete pipe sheet (4-0), comprising: shield duct piece left member (4-1), shield duct piece right member (4- 2), anchor rod bolt (4-3), segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and are passed through respectively Segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
Preferably, earhole (1-2) passes through the left end of anchor rod bolt (4-3), passes through segment bolt fastening nut left member (4-4) It is connected and fixed with shield duct piece left member (4-1).
Preferably, earhole (1-2) passes through the right end of anchor rod bolt (4-3), passes through segment bolt fastening nut right member (4-5) It is connected and fixed with shield duct piece right member (4-2).
The invention also discloses a kind of installation methods of hangers victory assembling device, comprising:
External sliding slot (2-0) nesting is put into the pendant groove (1-3) of hangers component (1-0), and by external sliding slot (2-0) It adjusts to setting position;Wherein, a U-type groove (1-4) is provided on pendant groove (1-3);It is provided with outside one on external sliding slot (2-0) Set conduit (2-1);
Bolt assembly (3-0) is passed through into U-type groove (1-4) and external conduit (2-1), by external sliding slot (2-0) and hangers Component (1-0) is connected and fixed.
Preferably, further includes:
Even by the anchor rod bolt (4-3) of the earhole (1-2) of hangers component (1-0) and shield tunnel concrete pipe sheet (4-0) It connects, is fixed after adjustment hangers component (1-0) to design position by segment bolt fastening nut, hangers victory assembling device is installed On shield tunnel concrete pipe sheet (4-0);
Pipeline suspension and support is installed by external sliding slot (2-0), and tunnel pipeline and other equipment are installed on bracket.
Preferably, by the anchor rod bolt of the earhole (1-2) of hangers component (1-0) and shield tunnel concrete pipe sheet (4-0) (4-3) connection, is fixed by segment bolt fastening nut after adjustment hangers component (1-0) to design position, hangers victory is filled Device is mounted on shield tunnel concrete pipe sheet (4-0), comprising:
By the anchor rod bolt (4-3) of the earhole (1-2) of hangers component (1-0) and shield tunnel concrete pipe sheet (4-0) Left end connection, it is fixed by segment bolt fastening nut left member (4-4) after adjustment hangers component (1-0) to design position, make to hang Ear component (1-0) is fitted closely with shield duct piece left member (4-1), and hangers victory assembling device is mounted on shield tunnel pipe of concrete On piece (4-0);Or,
By the anchor rod bolt (4-3) of the earhole (1-2) of hangers component (1-0) and shield tunnel concrete pipe sheet (4-0) Right end connection, it is fixed by segment bolt fastening nut right member (4-5) after adjustment hangers component (1-0) to design position, make to hang Ear component (1-0) is fitted closely with shield duct piece right member (4-2), and hangers victory assembling device is mounted on shield tunnel pipe of concrete On piece (4-0).
The invention has the following advantages that
1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc. Security risk.
2) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
3) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
4) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, together When also significantly reduce the operation maintenance expense of equipment, equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
5) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase It is short by 50% or more.
6) environmentally friendly, the construction environment of pipeline and mechanical and electric equipment installation process without dust, noiseless very big improvement equipment installation, Labor intensity of workers is reduced, typical " green construction " is belonged to.
7) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various Equipment.
8) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
9) applicability is wide, can use in concrete compression area and tensile region.
10) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings Electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of three-dimensional assembling schematic diagram of hangers victory assembling device in the embodiment of the present invention;
Fig. 2 is a kind of structural schematic diagram of hangers component in the embodiment of the present invention;
Fig. 3 is a kind of separation distributed architecture schematic diagram of hangers victory assembling device in the embodiment of the present invention;
Fig. 4 is a kind of mounting structure schematic diagram of shield tunnel concrete pipe sheet in the embodiment of the present invention;
Hangers component 1-0, auricle 1-1, earhole 1-2, pendant groove 1-3, U-type groove 1-4, external sliding slot 2-0, external conduit 2- 1, bolt assembly 3-0, T-bolt 3-1, nut 3-2, washer 3-3, shield tunnel concrete pipe sheet 4-0, shield duct piece left member 4- 1, shield duct piece right member 4-2, anchor rod bolt 4-3, segment bolt fastening nut left member 4-4, segment bolt fastening nut right member 4- 5。
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to disclosed by the invention Embodiment is described in further detail.
The invention discloses a kind of hangers victory assembling devices, can be used for the prompt dress of subway tunnel electromechanical equipment and pipeline, specifically The part combined for shield duct piece on component.The earhole opened on auricle can directly connect with the anchor rod bolt that concrete pipe sheet uses It connects, this smoothly installs external cunning to reach it is ensured that install hangers component under the premise of not destroying concrete pipe sheet The effect of slot.External conduit reserved in advance facilitates bolt assembly to pass through connection, makes on external sliding slot convenient for the fine tuning of external sliding slot External sliding slot is fixed in the pendant groove of hangers component, improves the integrality and durability of shield tunnel, realizes subway tunnel The Fast Installation of electromechanical equipment and pipeline.
Such as Fig. 1~4, which be can specifically include: hangers component 1-0, external sliding slot 2-0 and bolt group Part 3-0.Wherein, hangers component 1-0, comprising: auricle 1-1, pendant groove 1-3 and U-type groove 1-4, auricle 1-1 are in pendant groove 1-3 Set angle setting, U-type groove 1-4 are arranged in the bottom surface pendant groove 1-3;An external conduit 2- is provided on the bottom surface external sliding slot 2-0 1。
In the present embodiment, external sliding slot 2-0 nesting is mounted in pendant groove 1-3, and bolt assembly 3-0 passes through U-type groove 1-4 With external conduit 2-1, external sliding slot 2-0 and hangers component 1-0 are connected and fixed.
In the present embodiment, bolt assembly 3-0 positive can pass through U-type groove 1-4 and external conduit 2-1, by external sliding slot 2-0 It is connected and fixed with hangers component 1-0.Alternatively, bolt assembly 3-0 can pass back through external conduit 2-1 and U-type groove 1-4, it will be external Sliding slot 2-0 is connected and fixed with hangers component 1-0.
In the present embodiment, bolt assembly 3-0 can specifically include: T-bolt 3-1, nut 3-2 and washer 3-3.As before Described, when the installation of bolt assembly 3-0 forward direction, the threaded post of T-bolt 3-1 is led to after passing through U-type groove 1-4 and external conduit 2-1 Cross nut 3-2 fastening;Wherein, washer 3-3 is arranged between the bolt head of T-bolt 3-1 and U-type groove 1-4.As bolt assembly 3- When 0 reversed installation, the threaded post of T-bolt 3-1 is fastened after passing through external conduit 2-1 and U-type groove 1-4 by nut 3-2;Its In, washer 3-3 is arranged between the bolt head of T-bolt 3-1 and external conduit 2-1.
In the present embodiment, hangers component 1-0 can also include: earhole 1-2;Wherein, earhole 1-2 is arranged in auricle 1-1 On.Earhole 1-2 is connect with the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0, and hangers victory assembling device is mounted on shield On tunnel concrete pipe sheet 4-0.
In the present embodiment, as Fig. 4, shield tunnel concrete pipe sheet 4-0 can specifically include: shield duct piece left member 4-1, Shield duct piece right member 4-2, anchor rod bolt 4-3, segment bolt fastening nut left member 4-4 and segment bolt fastening nut right member 4-5. Wherein, shield duct piece left member 4-1 is connected with shield duct piece right member 4-2 by anchor rod bolt 4-3, and tight by segment bolt respectively Gu nut left member 4-4 and segment bolt fastening nut right member 4-5 are connected and fixed.
In the present embodiment, earhole 1-2 can pass through the left end of anchor rod bolt 4-3, by a segment bolt fastening nut left side Part 4-4 is connected and fixed with shield duct piece left member 4-1.Alternatively, earhole 1-2 passes through the right end of anchor rod bolt 4-3, passes through segment bolt Fastening nut right member 4-5 is connected and fixed with shield duct piece right member 4-2.
As it can be seen that in the present embodiment, earhole can directly can not destroyed with the bolt connection that concrete pipe sheet uses The installation of hangers component is carried out under the premise of concrete pipe sheet, and then can smoothly complete the installation of external sliding slot, and installation is simple just Victory can rapidly and effectively complete construction task.In addition, the bolt that hangers component is directly used with shield tunnel concrete pipe sheet Connection, increases the structural stability between hangers victory assembling device and shield duct piece.Wherein, it should be noted that external conduit It can be put into pendant groove and be finely adjusted in advance, facilitate the connection of bolt assembly.
On the basis of the above embodiments, the invention also discloses a kind of installation methods of hangers victory assembling device, comprising: will External sliding slot 2-0 nesting is put into the pendant groove 1-3 of hangers component 1-0, and external sliding slot 2-0 is adjusted to setting position;Its In, a U-type groove 1-4 is provided on pendant groove 1-3;An external conduit 2-1 is provided on external sliding slot 2-0;By bolt assembly 3-0 Across U-type groove 1-4 and external conduit 2-1, external sliding slot 2-0 and hangers component 1-0 are connected and fixed.
Preferably, the installation method of the hangers victory assembling device can also include: by the earhole 1-2 and shield of hangers component 1-0 The anchor rod bolt 4-3 connection of structure tunnel concrete pipe sheet 4-0 passes through segment bolt after adjusting hangers component 1-0 to design position Fastening nut is fixed, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0;Pacified by external sliding slot 2-0 Tubulature line suspension and support, and tunnel pipeline and other equipment are installed on bracket.
It preferably, can be by the anchor rod bolt 4-3 of the earhole 1-2 of hangers component 1-0 and shield tunnel concrete pipe sheet 4-0 Left end connection, adjust hangers component 1-0 to design position after fixed by segment bolt fastening nut left member 4-4, make hangers Component 1-0 is fitted closely with shield duct piece left member 4-1, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0 On.
Preferably, by the right side of the earhole 1-2 of hangers component 1-0 and the anchor rod bolt 4-3 of shield tunnel concrete pipe sheet 4-0 End connection, is fixed by segment bolt fastening nut right member 4-5 after adjusting hangers component 1-0 to design position, makes hangers component 1-0 is fitted closely with shield duct piece right member 4-2, and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet 4-0.
Below with reference to being illustrated for an actual installation scene, installation steps be can be such that step 1: first according to mixed The size of bolt notch is reserved to determine the apparent size and shape of hangers component in solidifying soil section of jurisdiction, guarantees that conduit can be close to section of jurisdiction Surface installation.Step 2: the installation of hangers component, installs hangers component while section of jurisdiction is installed, guarantees that construction is primary and completes, It does not need to unclamp bolt again and hangers is installed again.Step 3: external sliding slot is put into pendant groove according to the position of hangers component.The Four steps: external sliding slot is fixed with hangers component by bolt assembly.This mounting means dismounting it is simple and convenient, can quickly and It is effective to complete construction task.The structural stability of external conduit and shield duct piece can also be enhanced, moreover it is possible to which ensuring will not be with tunnel Gut line etc. collides.
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The above, optimal specific embodiment only of the invention, but scope of protection of the present invention is not limited thereto, In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by anyone skilled in the art, It should be covered by the protection scope of the present invention.
The content that description in the present invention is not described in detail belongs to the well-known technique of professional and technical personnel in the field.

Claims (10)

1. a kind of hangers victory assembling device characterized by comprising hangers component (1-0), external sliding slot (2-0) and bolt assembly (3-0);Wherein, hangers component (1-0), comprising: auricle (1-1), pendant groove (1-3) and U-type groove (1-4);Auricle (1-1) and extension Part slot (1-3) is arranged in set angle, and U-type groove (1-4) is arranged in the bottom surface pendant groove (1-3);It is set on external sliding slot (2-0) bottom surface It is equipped with an external conduit (2-1);
External sliding slot (2-0) nesting is mounted in pendant groove (1-3), and bolt assembly (3-0) passes through U-type groove (1-4) and external slot External sliding slot (2-0) and hangers component (1-0) are connected and fixed by road (2-1).
2. hangers victory assembling device according to claim 1, which is characterized in that
Bolt assembly (3-0) is positive to pass through U-type groove (1-4) and external conduit (2-1), by external sliding slot (2-0) and hangers component (1-0) is connected and fixed;Or,
Bolt assembly (3-0) passes back through external conduit (2-1) and U-type groove (1-4), by external sliding slot (2-0) and hangers component (1-0) is connected and fixed.
3. hangers victory assembling device according to claim 2, which is characterized in that bolt assembly (3-0), comprising: T-bolt (3-1), nut (3-2) and washer (3-3);
When bolt assembly (3-0) is positive to be installed, the threaded post of T-bolt (3-1) passes through U-type groove (1-4) and external conduit (2- 1) it is fastened afterwards by nut (3-2);Wherein, washer (3-3) setting T-bolt (3-1) bolt head and U-type groove (1-4) it Between;
When bolt assembly (3-0) is reversely installed, the threaded post of T-bolt (3-1) passes through external conduit (2-1) and U-type groove (1- 4) it is fastened afterwards by nut (3-2);Wherein, bolt head and external conduit (2-1) of washer (3-3) setting in T-bolt (3-1) Between.
4. hangers victory assembling device according to claim 1, which is characterized in that hangers component (1-0), further includes: earhole (1- 2);Wherein, earhole (1-2) is arranged on auricle (1-1);
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), and hangers victory assembling device is pacified On shield tunnel concrete pipe sheet (4-0).
5. hangers victory assembling device according to claim 4, which is characterized in that shield tunnel concrete pipe sheet (4-0), packet It includes: shield duct piece left member (4-1), shield duct piece right member (4-2), anchor rod bolt (4-3), segment bolt fastening nut left member (4- And segment bolt fastening nut right member (4-5) 4);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and pass through section of jurisdiction respectively Bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
6. hangers victory assembling device according to claim 5, which is characterized in that earhole (1-2) is across anchor rod bolt (4-3) Left end is connected and fixed by segment bolt fastening nut left member (4-4) with shield duct piece left member (4-1).
7. hangers victory assembling device according to claim 5, which is characterized in that earhole (1-2) is across anchor rod bolt (4-3) Right end is connected and fixed by segment bolt fastening nut right member (4-5) with shield duct piece right member (4-2).
8. a kind of installation method of hangers victory assembling device characterized by comprising
External sliding slot (2-0) nesting is put into the pendant groove (1-3) of hangers component (1-0), and external sliding slot (2-0) is adjusted To setting position;Wherein, a U-type groove (1-4) is provided on pendant groove (1-3);An external slot is provided on external sliding slot (2-0) Road (2-1);
Bolt assembly (3-0) is passed through into U-type groove (1-4) and external conduit (2-1), by external sliding slot (2-0) and hangers component (1-0) is connected and fixed.
9. the installation method of hangers victory assembling device according to claim 8, which is characterized in that further include:
The earhole (1-2) of hangers component (1-0) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), is adjusted It is fixed after whole hangers component (1-0) to design position by segment bolt fastening nut, hangers victory assembling device is mounted on shield On structure tunnel concrete pipe sheet (4-0);
Pipeline suspension and support is installed by external sliding slot (2-0), and tunnel pipeline and other equipment are installed on bracket.
10. the installation method of hangers victory assembling device according to claim 9, which is characterized in that by hangers component (1-0) Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0), adjustment hangers component (1-0) to design It is fixed behind position by segment bolt fastening nut, hangers victory assembling device is mounted on shield tunnel concrete pipe sheet (4-0) On, comprising:
By the left end of the earhole (1-2) of hangers component (1-0) and the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0) Connection, it is fixed by segment bolt fastening nut left member (4-4) after adjustment hangers component (1-0) to design position, make hangers group Part (1-0) is fitted closely with shield duct piece left member (4-1), and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet On (4-0);Or,
By the right end of the earhole (1-2) of hangers component (1-0) and the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0) Connection, it is fixed by segment bolt fastening nut right member (4-5) after adjustment hangers component (1-0) to design position, make hangers group Part (1-0) is fitted closely with shield duct piece right member (4-2), and hangers victory assembling device is mounted on shield tunnel concrete pipe sheet On (4-0).
CN201811600519.8A 2018-12-26 2018-12-26 A kind of hangers victory assembling device and installation method Withdrawn CN109458221A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811600519.8A CN109458221A (en) 2018-12-26 2018-12-26 A kind of hangers victory assembling device and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811600519.8A CN109458221A (en) 2018-12-26 2018-12-26 A kind of hangers victory assembling device and installation method

Publications (1)

Publication Number Publication Date
CN109458221A true CN109458221A (en) 2019-03-12

Family

ID=65614665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811600519.8A Withdrawn CN109458221A (en) 2018-12-26 2018-12-26 A kind of hangers victory assembling device and installation method

Country Status (1)

Country Link
CN (1) CN109458221A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983474A (en) * 2021-03-31 2021-06-18 广西安盾交通科技有限公司 Shield segment convenient for fixing channel
CN115263357A (en) * 2022-09-26 2022-11-01 中铁建电气化局集团第三工程有限公司 External channel and installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983474A (en) * 2021-03-31 2021-06-18 广西安盾交通科技有限公司 Shield segment convenient for fixing channel
CN112983474B (en) * 2021-03-31 2023-10-20 广西安盾交通科技有限公司 Shield segment convenient for fixing channel
CN115263357A (en) * 2022-09-26 2022-11-01 中铁建电气化局集团第三工程有限公司 External channel and installation method

Similar Documents

Publication Publication Date Title
CN108590757A (en) A kind of victory assembling device and its installation method
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN107882591B (en) Assembled hanging piece, rapid mounting device and mounting method
CN206987887U (en) Subway tunnel electromechanical equipment and pipeline quick fixation structure
CN109159275A (en) Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method
CN109082951B (en) Highway tunnel vibration and noise reduction structure and construction method thereof
CN109113760A (en) A kind of prompt dress engineering method of environmental protection for Fast Installation shield tunnel electromechanical equipment pipeline
CN109403788A (en) A kind of high-precision high-intensity protective door load module
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN208456667U (en) A kind of hangers victory assembling device
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN209510390U (en) A kind of hangers victory assembling device
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN108915769A (en) A kind of hangers victory assembling device and its installation method
CN208456666U (en) A kind of victory assembling device
CN204590344U (en) Sheet material curtain wall antidetonation connects Combined hanger
CN209687544U (en) A kind of hangers victory assembling device
CN209687545U (en) A kind of hangers victory assembling device
CN209413944U (en) A kind of hangers victory assembling device
CN209413945U (en) A kind of hangers victory assembling device
CN209510389U (en) A kind of hangers victory assembling device
CN109458220A (en) A kind of hangers victory assembling device and installation method
CN109441536A (en) A kind of hangers victory assembling device and installation method
CN209369828U (en) A kind of tunnel pre-buried channel flow device
KR101994482B1 (en) Water and sewage pipe installation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190312