CN206987887U - Subway tunnel electromechanical equipment and pipeline quick fixation structure - Google Patents
Subway tunnel electromechanical equipment and pipeline quick fixation structure Download PDFInfo
- Publication number
- CN206987887U CN206987887U CN201720496369.5U CN201720496369U CN206987887U CN 206987887 U CN206987887 U CN 206987887U CN 201720496369 U CN201720496369 U CN 201720496369U CN 206987887 U CN206987887 U CN 206987887U
- Authority
- CN
- China
- Prior art keywords
- chute
- seismic
- crab
- duct piece
- external anti
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
It the utility model is related to a kind of subway tunnel electromechanical equipment and pipeline quick fixation structure, including tunnel duct piece, cast-in fixing bolt, external anti-seismic chute and mounting bracket, multiple crab-bolt groups are embedded with the madial wall of tunnel duct piece, each crab-bolt group includes multiple cast-in fixing bolts set along same circular arc line, the inner side of tunnel duct piece is provided with an external anti-seismic chute being fixedly connected by crab-bolt group with tunnel duct piece madial wall corresponding to each crab-bolt group, mounting bracket includes bracket and ring stand, one end of bracket is fixedly connected with external anti-seismic chute, and the other end is pointed on the inside of tunnel duct piece;One end of ring stand is fixedly connected with external anti-seismic chute, and the other end is provided with pipeline mounting hole.Mounting bracket of the present utility model need to be only fixedly connected along the c-type band tooth slide of external anti-seismic chute to required position and then with external anti-seismic chute, the cans such as electromechanical equipment and pipeline in subway tunnel are directly installed in mounting bracket, it is quick for installation, greatly shorten equipment installation period.
Description
Technical field
The utility model belongs to technical field of tunnel construction, and in particular to a kind of subway tunnel electromechanical equipment and pipeline fast-assembling
Structure.
Background technology
With the continuous acceleration of urbanization process, Underground Space Resource is increasingly consumed, and traditional buried cable passage is applied
Make difficulty is increasingly increased by the influence of urban track traffic and other underground municipal pipeline construction.Section of jurisdiction refers to that shield method is applied
The tunnel of work, the liner structure of generally use.Section of jurisdiction is all using the mode of precast block, then assembled cyclization.It is most conventional
Shield method subway sectional tunnel, section of jurisdiction typically all use 5+1 pattern, 3 pieces of calibrated bolck B blocks, 2 pieces of adjacent block L blocks, 1 piece of wedge shape
Block (bind block) K blocks.
Pre-buried is in construction, for follow-up secondary construction reinforcing bar and ironware pre-buried in concrete, is avoided that
Bar planting and bolt these destructive forms of construction work are beaten, also can be cost-effective.
Traditional subway construction technique is the punching implantation chemical anchor bolts on concrete pipe sheet madial wall, for pacifying
The support of tubulature line, electromechanical equipment, being implanted into anchorage technology after this, there are the following problems:Structural damage, construction trouble, installation fee
When, labor strength is high, needs charging construction safety without guarantee, the dust of work progress, noise injury workmen health, peace
Packing quality can not ensure that installing component displacement is difficult, and long-term hidden danger is brought to operation.
Utility model content
To solve the above problems, the purpose of this utility model is to provide a kind of subway tunnel electromechanical equipment and pipeline fast-assembling
Structure, it is quick for installation, greatly shorten equipment installation period.
To achieve the above object, the technical scheme that the utility model is taken is:A kind of subway tunnel electromechanical equipment and pipeline
Quick fixation structure, including tunnel duct piece, cast-in fixing bolt group, external anti-seismic chute and mounting bracket, the madial wall of the tunnel duct piece
On be embedded with multiple crab-bolt groups, each crab-bolt group includes multiple cast-in fixing bolt groups set along same circular arc line, the tunnel
The inner side of road section of jurisdiction is fixedly connected external provided with one corresponding to each crab-bolt group by crab-bolt group with tunnel duct piece madial wall
Antidetonation chute, the mounting bracket include bracket and ring stand, and one end of the bracket is fixedly connected with external anti-seismic chute, another
Point on the inside of tunnel duct piece at end;One end of the ring stand is fixedly connected with external anti-seismic chute, and the other end is installed provided with pipeline
Hole.
Wherein, the mounting bracket also includes suspension bracket, the suspension bracket and the external anti-seismic located at tunnel duct piece inside top
Chute is fixedly connected.
Further, the inside bottom of the tunnel duct piece is provided with two tracks axially extended.
Wherein, the cast-in fixing bolt group is made up of section of jurisdiction positioner, cast-in fixing bolt and crab-bolt sheath, the section of jurisdiction positioning
The both ends of device are respectively provided with a cast-in fixing bolt, and each cast-in fixing bolt is provided with a crab-bolt sheath.
Wherein, the external anti-seismic chute is made up of c-type band tooth chute and multiple mounting seats, multiple mounting seats
It is arranged at intervals along its length in dorsal part of the c-type with tooth chute, the external anti-seismic chute passes through mounting seat and pre-buried anchor
The cooperation of bolt group is fixedly connected on the madial wall of tunnel duct piece.
Preferably, the mounting seat is to be fixedly arranged on steel disc of the c-type with tooth chute dorsal part, and the steel disc is provided with two points
Positioned at crab-bolt via of the c-type with tooth chute both sides.
Further, the c-type band tooth chute has and tunnel duct piece identical internal diameter and radian.
Compared with prior art, the utility model has the advantages that:External anti-seismic chute of the present utility model leads to
Cast-in fixing bolt group is crossed to be fixedly connected with the madial wall of tunnel duct piece, only need to be along the c-type of external anti-seismic chute when mounting bracket is installed
Band tooth slide is fixedly connected to required position and then with external anti-seismic chute, electromechanical equipment and pipe in subway tunnel
The cans such as line are directly installed in mounting bracket, quick for installation, greatly shorten equipment installation period.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the structure decomposition figure of cast-in fixing bolt group in embodiment one;
Fig. 3 is the structural representation of external anti-seismic chute in embodiment one.
Description of reference numerals:1st, tunnel duct piece;2nd, cast-in fixing bolt group;20th, section of jurisdiction positioner;21st, cast-in fixing bolt;22、
Crab-bolt sheath;3rd, external anti-seismic chute;30th, c-type band tooth chute;31st, mounting seat;4th, mounting bracket;40th, bracket;41st, ring
Frame;42nd, suspension bracket;5th, track.
Embodiment
To make the technical problems to be solved in the utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing
And specific embodiment is described in detail.
Referring to shown in Figure of description 1, the utility model is a kind of subway tunnel electromechanical equipment and pipeline quick fixation structure,
It is pre- on the madial wall of the tunnel duct piece 1 including tunnel duct piece 1, cast-in fixing bolt group 2, external anti-seismic chute 3 and mounting bracket 4
Multiple crab-bolt groups are embedded with, each crab-bolt group includes multiple cast-in fixing bolt groups 2 set along same circular arc line, the tunneltron
The inner side of piece 1 correspond to each crab-bolt group be provided with one by crab-bolt group be fixedly connected with the madial wall of tunnel duct piece 1 it is external resist
Shake chute 3.
Depending on the number amount and type of the mounting bracket 4 demand such as the electromechanical equipment of installation, pipeline needed for, general bag
Bracket 40, ring stand 41 and suspension bracket 42 are included, one end of the bracket 40 is fixedly connected with external anti-seismic chute 3, and the other end points to tunnel
The inner side of road section of jurisdiction 1;One end of the ring stand 41 is fixedly connected with external anti-seismic chute 3, and the other end is provided with pipeline mounting hole
410;The suspension bracket 42 is fixedly connected with the external anti-seismic chute 3 located at the inside top of tunnel duct piece 1.
The inside bottom of the tunnel duct piece 1 is provided with two tracks 5 axially extended.
As shown in Fig. 2 the cast-in fixing bolt group 2 is made up of section of jurisdiction positioner 20, cast-in fixing bolt 21 and crab-bolt sheath 22,
The both ends of the section of jurisdiction positioner 20 are respectively provided with a cast-in fixing bolt 21, and each cast-in fixing bolt 21 is provided with a crab-bolt sheath
22。
As shown in figure 3, the external anti-seismic chute 3 is made up of c-type band tooth chute 30 and multiple mounting seats 31, Duo Gesuo
State mounting seat 31 to be arranged at intervals along its length in dorsal part of the c-type with tooth chute 30, the external anti-seismic chute 3 passes through peace
Dress base 31 and the cooperation of cast-in fixing bolt group 2 are fixedly connected on the madial wall of tunnel duct piece 1.
For the mounting seat 31 to be fixedly arranged on steel disc of the c-type with the dorsal part of tooth chute 30, the steel disc is provided with two points of positions
In crab-bolt via of the c-type with the both sides of tooth chute 30.
The c-type band tooth chute 30 has and the identical internal diameter of tunnel duct piece 1 and radian.
The utility model embodiment has the following advantages that:
1st, relative to traditional punching crab-bolt technique, the technology is to Structural Test of Tunnel Segments not damaged, it is ensured that tunnel structure
Century-old service life;
2nd, relative to traditional punching crab-bolt technique, the technology is quick for installation, greatly shortens equipment installation period;
3rd, pre-buried part is stainless steel, rational in infrastructure, stably, it is ensured that non-maintaining in the service life cycle;
4th, external anti-seismic chute is flexible, highly integrated, is easy to adjustment during operation, increase equipment;
5th, external anti-seismic chute is Q345B high strength low-carbon steel alloys, significantly save chute material, reduce system cost and
Easy to maintenance, maintenance cost;
6th, relative to traditional punching crab-bolt technique, skilled worker's labor intensity is low, without charging construction, there is guarantor safely
Barrier, work progress is noiseless without dust, is green construction technology to workmen's health fanout free region.
Embodiment above is only the preferred embodiment of this creation, all in this wound not to limit this creation
Any modification, equivalent substitution and improvements for being done etc. within the spirit and principle of work, should be included in this creation protection domain it
It is interior.
Claims (7)
1. a kind of subway tunnel electromechanical equipment and pipeline quick fixation structure, it is characterised in that including tunnel duct piece (1), cast-in fixing bolt
Group (2), external anti-seismic chute (3) and mounting bracket (4), multiple crab-bolt groups are embedded with the madial wall of the tunnel duct piece (1),
Each crab-bolt group includes multiple cast-in fixing bolt groups (2) set along same circular arc line, and the inner side of the tunnel duct piece (1) is right
An external anti-seismic chute (3) being fixedly connected by crab-bolt group with tunnel duct piece (1) madial wall should be provided with each crab-bolt group,
The mounting bracket (4) includes bracket (40) and ring stand (41), and one end of the bracket (40) and external anti-seismic chute (3) are fixed
Connection, the other end are pointed on the inside of tunnel duct piece (1);One end of the ring stand (41) is fixedly connected with external anti-seismic chute (3), separately
One end is provided with pipeline mounting hole (410).
2. subway tunnel electromechanical equipment according to claim 1 and pipeline quick fixation structure, it is characterised in that the installation branch
Frame (4) also includes suspension bracket (42), and the suspension bracket (42) and the external anti-seismic chute (3) located at tunnel duct piece (1) inside top are solid
Fixed connection.
3. subway tunnel electromechanical equipment according to claim 1 or 2 and pipeline quick fixation structure, it is characterised in that the tunnel
The inside bottom of road section of jurisdiction is provided with the track (5) axially extended.
4. subway tunnel electromechanical equipment according to claim 1 and pipeline quick fixation structure, it is characterised in that the pre-buried anchor
Bolt group (2) is made up of section of jurisdiction positioner (20), cast-in fixing bolt (21) and crab-bolt sheath (22), the section of jurisdiction positioner (20)
Both ends be respectively provided with a cast-in fixing bolt (21), each cast-in fixing bolt (21) is provided with a crab-bolt sheath (22).
5. subway tunnel electromechanical equipment according to claim 1 and pipeline quick fixation structure, it is characterised in that described external anti-
Shake chute (3) is made up of c-type band tooth chute (30) and multiple mounting seats (31), and multiple mounting seats (31) are in c-type band
The dorsal part of tooth chute (30) is arranged at intervals along its length, and the external anti-seismic chute (3) is by mounting seat (31) and in advance
The cooperation for burying crab-bolt group (2) is fixedly connected on the madial wall of tunnel duct piece (1).
6. subway tunnel electromechanical equipment according to claim 5 and pipeline quick fixation structure, it is characterised in that the installation bottom
For seat (31) to be fixedly arranged on steel disc of the c-type with tooth chute (30) dorsal part, the steel disc is provided with two points positioned at c-type band tooth chute
(30) the crab-bolt via of both sides.
7. subway tunnel electromechanical equipment according to claim 5 and pipeline quick fixation structure, it is characterised in that the c-type band
Tooth chute (30) has and tunnel duct piece (1) identical internal diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720496369.5U CN206987887U (en) | 2017-05-07 | 2017-05-07 | Subway tunnel electromechanical equipment and pipeline quick fixation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720496369.5U CN206987887U (en) | 2017-05-07 | 2017-05-07 | Subway tunnel electromechanical equipment and pipeline quick fixation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206987887U true CN206987887U (en) | 2018-02-09 |
Family
ID=61393068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720496369.5U Active CN206987887U (en) | 2017-05-07 | 2017-05-07 | Subway tunnel electromechanical equipment and pipeline quick fixation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206987887U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107218059A (en) * | 2017-06-23 | 2017-09-29 | 福建康元捷装有限公司 | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline |
CN108590759A (en) * | 2018-06-28 | 2018-09-28 | 彭健 | A kind of hangers victory assembling device and its installation method |
CN109578072A (en) * | 2018-11-22 | 2019-04-05 | 华侨大学 | A kind of pre-buried channel flow positioning device and application method for subway segment |
CN114498522A (en) * | 2021-11-30 | 2022-05-13 | 湖南志同兴环保建材有限公司 | Reinforced concrete pre-buried bolt electric jacking pipe |
CN114688436A (en) * | 2022-04-26 | 2022-07-01 | 中建二局安装工程有限公司 | Installation and construction device for electromechanical equipment and pipelines |
-
2017
- 2017-05-07 CN CN201720496369.5U patent/CN206987887U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107218059A (en) * | 2017-06-23 | 2017-09-29 | 福建康元捷装有限公司 | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline |
CN107218059B (en) * | 2017-06-23 | 2019-03-29 | 康元轨道交通科技(福建)有限公司 | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline |
CN108590759A (en) * | 2018-06-28 | 2018-09-28 | 彭健 | A kind of hangers victory assembling device and its installation method |
CN109578072A (en) * | 2018-11-22 | 2019-04-05 | 华侨大学 | A kind of pre-buried channel flow positioning device and application method for subway segment |
CN109578072B (en) * | 2018-11-22 | 2024-02-27 | 华侨大学 | Pre-buried channel positioning device for subway segments and use method |
CN114498522A (en) * | 2021-11-30 | 2022-05-13 | 湖南志同兴环保建材有限公司 | Reinforced concrete pre-buried bolt electric jacking pipe |
CN114688436A (en) * | 2022-04-26 | 2022-07-01 | 中建二局安装工程有限公司 | Installation and construction device for electromechanical equipment and pipelines |
CN114688436B (en) * | 2022-04-26 | 2023-08-29 | 中建二局安装工程有限公司 | Installation construction device for electromechanical equipment and pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206987887U (en) | Subway tunnel electromechanical equipment and pipeline quick fixation structure | |
CN111636898B (en) | Shield segment stress testing device in connection channel construction process of shield tunnel | |
CN107218059B (en) | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline | |
CN109026061A (en) | Form the bracing means and its installation method of shield duct piece in tunnel | |
CN108035771B (en) | A kind of not damaged quick-mount system of rail traffic shield tunnel | |
CN204163766U (en) | Tunnel pipeline, electromechanical equipment bracket fixing device | |
CN106437767A (en) | Tunnel pre-burying conduit installation structure and tunnel pre-burying conduit installation method | |
CN104747206A (en) | Shield tunnel segment structure considering municipal cable pipelines and installing method | |
CN104265306B (en) | A kind of municipal administration shield tunnel | |
CN212105888U (en) | Shield segment structure with embedded bolt sleeve | |
CN106836829B (en) | A kind of mounting structure and its installation method of ring crane corbel | |
CN105350987A (en) | Fixed installation structure and method for pre-buried channel in mine digging method trolley | |
CN109082951B (en) | Highway tunnel vibration and noise reduction structure and construction method thereof | |
CN108278034A (en) | Difficult location electric pole replaces construction method | |
CN211975055U (en) | Shield tunnel equipment fixing device | |
CN108930540B (en) | Tunnel primary support-secondary lining contact pressure measuring device and embedding method thereof | |
CN209369828U (en) | A kind of tunnel pre-buried channel flow device | |
CN109057860A (en) | A kind of method and anchor for improving pre-buried channel flow surrounding concrete and sticking up skin pulling capacity | |
CN206987826U (en) | Tunnel duct piece and its external anti-seismic chute used | |
CN208900111U (en) | Two lined steel muscle ruggedized construction of Super-large-section tunnel arch | |
CN107893431A (en) | A kind of assembled suspension and support fastener inserts and its pre-buried construction method of installation | |
CN202260356U (en) | Special cable holder structure for pipeline | |
CN106522985B (en) | A kind of connection structure and its construction method of non-built-in type shield duct piece sliding slot pedestal | |
CN108071123A (en) | The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery | |
CN104358190A (en) | Hidden type exchangeable shearing joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province Patentee after: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) Co.,Ltd. Address before: 350000 unit B-1, 25th floor, Yuanhong building, No. 32, Wuyi Middle Road, Gulou District, Fuzhou City, Fujian Province Patentee before: FUJIAN KANGYUAN JIEZHUANG Co.,Ltd. |
|
CP03 | Change of name, title or address |