CN108071123A - The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery - Google Patents

The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery Download PDF

Info

Publication number
CN108071123A
CN108071123A CN201711293849.2A CN201711293849A CN108071123A CN 108071123 A CN108071123 A CN 108071123A CN 201711293849 A CN201711293849 A CN 201711293849A CN 108071123 A CN108071123 A CN 108071123A
Authority
CN
China
Prior art keywords
pipe gallery
cast
fixing bolt
built
bolt group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711293849.2A
Other languages
Chinese (zh)
Inventor
夏峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kang Yuan Rail Transport Technology (fujian) Co Ltd
Original Assignee
Kang Yuan Rail Transport Technology (fujian) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kang Yuan Rail Transport Technology (fujian) Co Ltd filed Critical Kang Yuan Rail Transport Technology (fujian) Co Ltd
Priority to CN201711293849.2A priority Critical patent/CN108071123A/en
Publication of CN108071123A publication Critical patent/CN108071123A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The present invention provides the prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in a kind of pipe gallery, including several built-in fittings, several fasteners, several assembled suspension and supports, the built-in fitting, fastener and assembled suspension and support form an entirety and are uniformly distributed in pipe gallery inner wall.The built-in fitting includes cast-in fixing bolt group or pre-buried screw shell, the assembled suspension and support includes bottom plate and support arm, one end of the support arm is fixedly connected with bottom plate, the other end is directed toward on the inside of pipe gallery, the bottom plate offers several through holes, the fastener is set in described through in the cast-in fixing bolt group being arranged at outside pipe gallery of through hole, and the fastener screws in pre-buried screw shell through through hole.It is quick for installation, conveniently the invention avoids the broken ring to pipe gallery concrete structure, greatly shorten equipment installation period, greatly reduce construction cost and later stage O&M cost, work progress of the present invention without dust, it is noiseless be real to realize " green construction ".

Description

The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery
Technical field
The present invention relates to the concrete strctures of electromechanical equipment and pipeline in building field more particularly to a kind of pipe gallery to damage Prompt dress system.
Background technology
Pipe gallery is exactly underground urban duct synthesis corridor.A tunnel space is built in Urban Underground, by electricity The various utilities pipelines such as power, communication, combustion gas, heat supply, plumbing are integrated in one, equipped with special access hole, hoisting port and monitoring System implements unified planning, Uniting, the unified important infrastructure and " life built and managed, be guarantee city operations Line ".
Underground pipe gallery system not only solves Urban Traffic Jam Based, also greatly facilitate electric power, communication, combustion gas, The maintenance and maintenance of the urban operating mechanisms such as water supply and sewage.In addition, the system also has certain protection against and mitigation of earthquake disasters effect.Such as nineteen ninety-five Japan During the big earthquakes in Osaka and Kobe, a large amount of house collapses in Kobe city, road are ruined, but the most intact nothing of local underground pipe gallery Damage, this significantly reduces the difficulty of the disaster relief and reconstruction after shake.
Underground pipe gallery is played an important role to meeting people's livelihood primary demand and improving city integrated bearing capacity.It is comprehensive The construction of piping lane avoid due to lay and repair underground utilities frequently excavate road and traffic and resident trip are impacted and Interference keeps the appearance of a street complete and beautiful.Reduce the expense repeatedly overhauled on road surface and the maintenance cost of utilities pipeline.Maintain road The durability of the integrality in face and all kinds of pipelines.
In existing pipe gallery the mounting process of electromechanical equipment and pipeline it is general there are two types of:
1st, traditional anchor bolt technique is after concrete casting, according to specific needs using the method for artificial electric drill in synthesis It drills, empty on piping lane inner wall, being implanted into chemical anchor bolts or expansion anchor, all kinds of pipeline suspension and supports, this side are installed using anchor bolt Method is simple and convenient, but manually drilling efficiency is low, and construction quality can not ensure, the seriously polluted threat such as noise, vibrations, dust is applied Work personnel health repeats intensive punching, serious to destroy concrete structure so that hole crack repairing is difficult, influences the engineering service life, jeopardizes Operation security.
2nd, built-in sliding chute technique is that built-in sliding chute is set before concrete casting, and built-in sliding chute and mating is utilized after the demoulding T-bolt installs all kinds of pipeline suspension and supports, and this method has many advantages, such as that construction environmental protection, pipeline are quickly and expediently installed, but simultaneously Bring that Embedment Construction complexity effect is low, with high costs, especially built-in sliding chute later stage operation is difficult in maintenance and can not be more after getting rusty It changes, can not accomplish and the structure same service life.
In addition, the suspension and support that conventional on-site makes, cannot not only meet national the latest specification, while can not ensure to make matter The processing of amount, especially surface anticorrosion cannot be up to standard, secondly also not environmentally, it is impossible to meet design requirement, later stage operation maintenance work Amount and maintenance cost greatly increase.
Chinese utility model patent (201621075759.7:A kind of prefabricated piping lane component line holder erecting device) it is public A kind of prefabricated piping lane component line holder erecting device is opened, including installation line holder, installation bolt and built-in fitting;Institute Stating built-in fitting includes anchor bolt and sleeve, wherein, anchor bolt screws in a part of space of one end to the sleeve, this Built-in process is more complicated, and the position of built-in fitting cannot be accurately positioned, and displacement can be generated in built-in fitting concrete placement, Cause built-in fitting sideslip that line holder cannot be installed.In addition, installation line holder cannot meet the newest regulation of country, while quality Bad, surface corrosion is serious, it is difficult to handle, later stage operation maintenance workload and cost will greatly increase, and also have embedded sleeve barrel only Only be columnar structured, be easily drawn out or loose phenomenon occur, so as to can give the quality of construction and safety belt come it is larger hidden Suffer from.
The device of the electromechanical equipment of pipe gallery and pipeline generally can only pre-buried screw shell and bolt in the prior art One kind, this set cannot be selected as the case may be with the actual needs of site operation, can limited in practical applications System causes unnecessary trouble, therefore, it is a kind of can the device of pre-buried screw shell but also pre-embedded bolt be to be sought after 's.In addition, the durability of built-in fitting, the fastness combined with pipe gallery, accurate positioning etc. all have much room for improvement in the prior art.
The content of the invention
To solve problems of the prior art, the present invention provides electromechanical equipment in a kind of pipe gallery and pipelines Concrete structure victory dress system, it is simple in structure, it is quick for installation, conveniently, and avoid to pipe gallery concrete structural damage.
In order to solve the above technical problems, the technical solution adopted by the present invention is:Electromechanical equipment and pipeline in pipe gallery The prompt dress system of concrete strcture damage, including several built-in fittings, several fasteners, several assembled suspension and supports,
The built-in fitting, fastener and assembled suspension and support form an entirety and are uniformly distributed in pipe gallery inner wall;
The built-in fitting includes cast-in fixing bolt group or pre-buried screw shell;
The cast-in fixing bolt group front end is arranged inside pipe gallery, and rear end is arranged at outside pipe gallery;
The pre-buried screw shell is arranged inside pipe gallery, concordant with pipe gallery inner wall;
The assembled suspension and support includes bottom plate and support arm, and one end of the support arm is fixedly connected with bottom plate, another It is directed toward on the inside of pipe gallery at end;
The bottom plate offers several through holes;
The cast-in fixing bolt group being arranged at outside pipe gallery is connected through through hole with the fastener;
The fastener is set in described through in the cast-in fixing bolt group being arranged at outside pipe gallery of through hole;
The fastener screws in pre-buried screw shell through through hole.
Preferably, the number of cast-in fixing bolt or pre-buried screw shell is equal in the number of the through hole and cast-in fixing bolt group;
The cast-in fixing bolt group includes two or more cast-in fixing bolts.
Preferably, the fastener is the installation nut that conjunction is assembled with cast-in fixing bolt, the cast-in fixing bolt group and installation spiral shell Fastening square washer is equipped between mother.
Preferably, the fastener is the installation bolt with the cooperation of cast-in fixing bolt sleeve, the cast-in fixing bolt sleeve and peace Fastening square washer is equipped between dress bolt.
Preferably, the anchor bolt group of burying is fixed in positioning steel bands, and the pre-buried position of the cast-in fixing bolt group is by described fixed The location hole of position steel band determines, positions the location hole of steel band according to designing institute's pipeline designs location determination, can appoint as needed Meaning adjustment.
Preferably, the cast-in fixing bolt group and pre-buried screw shell material are stainless steel.
Preferably, the positioning steel band material is Q235 steel bands, and positioning steel band, which can be bound, can also be welded on reinforcing bar Integral structure is formed by concrete protective on cage and with steel reinforcement cage.
Preferably, the built-in fitting is structure as a whole with the pipe gallery.
Preferably, the pipe gallery is concrete structure.
Preferably, the built-in bolt sleeve includes installation section and sleeve part, the installation section and sleeve part Between be equipped with built-in nut, and installation section and sleeve part are integrally formed by structure by the built-in nut.
The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery using the above structure, due to pre-buried Mode is various, it is possible to select most suitable built-in fitting, while such structure with actual demands of engineering as the case may be Simply, quick construction, conveniently, and can avoid to pipe gallery concrete structural damage, therefore, construction is simple is quick, cost is less than Traditional anchor bolt technique and built-in sliding chute technique, and can select according to field condition, it can more meet the needs of piping lane engineering.
As a preferred embodiment of the present invention, cast-in fixing bolt group and pre-buried screw shell are made of stainless steel material, he Service life it is long, with concrete structure with service life Maintenance free, replace, it can be ensured that " project of vital and lasting importance " of pipe gallery engineering.
As a preferred embodiment of the present invention, when built-in fitting is cast-in fixing bolt group, built-in fitting further includes positioning steel band, fixed Position steel band solves the problems, such as cast-in fixing bolt precise positioning, it is ensured that the cast-in fixing bolt during casting concrete and vibrated concrete Group, which will not generate displacement, causes anchor bolt sideslip that cannot install assembled suspension and support.
As a preferred embodiment of the present invention, pre-buried screw shell includes installation section and sleeve part, installation section It is welded as a whole structure with sleeve part, the pre-buried screw shell of this structure is combined more secured with pipe gallery, will not be gone out Existing sleeve loose phenomenon without repair, is replaced, it is ensured that " project of vital and lasting importance " of pipe gallery engineering.
The number of through hole in the present invention in segmental timbering bottom plate and pre-embedded bolt or pre-buried spiral shell in pre-embedded bolt group The number of line sleeve is equal, and the number of through hole is determined by concrete condition, and the number of general through hole is more than 2 integer.
Built-in fitting can be cast-in fixing bolt group and positioning steel band in the present invention, or pre-buried screw shell, wherein, in advance The selection of embedded part depends on concrete condition and actual demands of engineering.
It compares with the prior art, the beneficial effect comprise that:
(1) the prompt dress system structure of the concrete structure of electromechanical equipment and pipeline is simple in pipe gallery provided by the invention, installation Convenient, free from dust is noiseless, without friction;
(2) the concrete structure victory dress system of electromechanical equipment and pipeline in pipe gallery provided by the invention, without welding, significantly Shorten equipment installation period, reduce person works' amount;
(3) the concrete structure victory dress system of electromechanical equipment and pipeline in pipe gallery provided by the invention, not only construction period Cost is substantially reduced less than existing process and later stage operation maintenance workload, and pre-buried component is non-maintaining, and external part can be rapid It replaces, repair, safeguard simple and at low cost;
(4) the concrete structure victory dress system of electromechanical equipment and pipeline in pipe gallery provided by the invention, damages structure zero, The integrality of concrete structure is effectively guaranteed, inside configuration arrangement of reinforcement is not destroyed, prolongs the service life;
(5) stainless steel built-in fitting service life length and concrete structure provided by the invention are the same as service life Maintenance free, replacement, it is ensured that " project of vital and lasting importance " of pipe gallery engineering;
(6) assembled (antidetonation) suspension and support provided by the invention makes suspension and support technique compared with conventional on-site, not only full Foot country the latest specification, factory normalization production quality is guaranteed, and especially surface anticorrosion is handled, and factory normalization process is not only Meet piping lane design requirement, and environmental protection;
(7) positioning steel band and installation form provided by the invention solve the problems, such as cast-in fixing bolt precise positioning, it is ensured that Cast-in fixing bolt, which will not generate displacement, during casting concrete and vibrated concrete causes anchor bolt sideslip that cannot install suspension and support.
Description of the drawings
Fig. 1 is that built-in fitting provided by the invention fills internal system structure for the not damaged victory of cast-in fixing bolt group and positioning steel bands Figure;
Fig. 2 is cast-in fixing bolt group provided by the invention and the installation process figure for positioning steel band;
Fig. 3 is not damaged prompt dress internal system structure chart of the built-in fitting provided by the invention for pre-buried screw shell;
Fig. 4 is the installation process figure of pre-buried screw shell provided by the invention;
Fig. 5 is the three-dimensional knot of the prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery provided by the invention Structure schematic diagram;
Fig. 6 is the perspective of the prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery provided by the invention Structure diagram;
The concrete meaning marked in attached drawing is as follows:
1:Bottom plate;2:Support arm;3:Nut is installed;4:With the fastening square washer of installation nut cooperation;5:Cast-in fixing bolt group; 6:Position steel band;7:Steel reinforcement cage;8:Embedded type nut;9:Installation form;10:Pre-buried screw shell;11:Installation bolt;12:With The fastening square washer of installation bolt cooperation;13:Built-in nut;14:Installation section;15:Sleeve part;16:Lock washer.
Specific embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is described in detail.
Embodiment 1
Join shown in Fig. 1, Fig. 1 is not damaged prompt dress system of the built-in fitting provided by the invention for cast-in fixing bolt group and positioning steel bands System cut-away view.The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery provided by the invention, including Several built-in fittings, several fasteners, several assembled suspension and supports, built-in fitting, fastener and assembled suspension and support are formed One entirety is uniformly distributed in pipe gallery inner wall, wherein, built-in fitting includes cast-in fixing bolt group 5, positioning steel band 6;Cast-in fixing bolt Group 5 is that part is pre-buried, and front end is arranged inside pipe gallery, and rear end is arranged at outside pipe gallery;Fastener be and pre-buried anchor The installation nut 3 and be arranged on cast-in fixing bolt group 5 and install the fastening square washer 4 between nut 3 that bolt group 5 coordinates;Assembled branch Hanger includes bottom plate 1 and support arm 2, and one end of the support arm 2 is fixedly connected with bottom plate, and the other end is directed toward in pipe gallery Side;Bottom plate 1 offers several through holes, and the through hole is corresponding with the position of the cast-in fixing bolt group 5;Nut 3 and tight is installed Gu square washer 4 is set in through in the cast-in fixing bolt group 5 being reserved in outside pipe gallery of through hole, this mode is simple for process, It is at low cost.The number of cast-in fixing bolt is equal in the number of through hole and cast-in fixing bolt group 5, the through hole in this embodiment bottom plate 1 Number is 2, and therefore, the number of the pre-embedded bolt in pre-embedded bolt group 5 is also 2, and but it is not limited to this, of through hole and pre-embedded bolt Number can be the integer more than 2, i.e. cast-in fixing bolt group 5 includes two or more cast-in fixing bolts, as long as ensureing assembled Stent and pre-embedded bolt are firmly combined with.Positioning steel band 6 is fixed on pipe gallery, and the position of the cast-in fixing bolt group 5 is by described It positions 6 location hole of steel band to determine, positions the location hole of steel band 6 according to designing institute's pipeline designs location determination, it can be as needed Arbitrary adjustment, positioning steel band 6 solve the problems, such as 5 precise positioning of cast-in fixing bolt group, while cast-in fixing bolt group 5,6 and of positioning steel band Pipe gallery is structure as a whole, this is added significantly to the tensile property of cast-in fixing bolt group 5, and positioning steel band 6 is Q235 steel bands, pre-buried Anchor bolt group 5 be stainless steel anchor bolt group, stainless steel cast-in fixing bolt group service life length with concrete structure with service life Maintenance free, replace, Ensure " project of vital and lasting importance " of pipe gallery engineering, foregoing description be a pre-buried pre-embedded bolt group 5 situation, wherein pre-buried Bolt group 5, positioning steel band 6 and cast-in fixing bolt assemble the installation nut 3 of conjunction, are arranged on cast-in fixing bolt group between installation nut Fastening square washer 4 and assembled suspension and support form an entirety be uniformly distributed in pipe gallery inner wall.
Join Fig. 5, shown in Fig. 6, two row segmental timberings of uniformly arranging on the left side wall of pipe gallery, each behavior 6, It is also uniformly arrange two row segmental timberings, each behavior 6, and each assembled branch on the right wall of pipe gallery Frame, cast-in fixing bolt group 5, positioning steel band 6 and fastener correspondence and connection mode it is all identical with described in Fig. 1, here, not existing It repeating, assembled suspension and support or so evenly distributes in the present embodiment, neat appearance, and number is 24, but not limited to this, it can root The number of segmental timbering is selected according to the space size and actual needs of pipe gallery inner wall.
Join shown in Fig. 2, Fig. 2 is cast-in fixing bolt group 5 provided by the invention and the installation process figure for positioning steel band 6;Specifically retouch State for:Before the cast of pipe gallery concrete, first positioning steel band 6 is fixed on steel reinforcement cage 7, then by the one of pre-embedded bolt group 5 End is arranged in the location hole of positioning steel band, and the other end is arranged in the location hole of installation form and fixation, is fixed on determining for steel reinforcement cage 7 Position steel band 6 and 9 location hole of installation form precise positioning cast-in fixing bolt group 5 together, it is ensured that in casting concrete and vibrated concrete Cast-in fixing bolt group 5, which will not generate displacement, in the process causes anchor bolt sideslip that cannot install assembled suspension and support;Secondly, by embedded type spiral shell Mother 8 and installation nut 3 and fastening square washer 4 are sleeved on the both ends of the close installation form 9 of pre-embedded bolt group 5 and fastening, then carry out Concrete cast is vibrated, and after concrete setting, screws out installation nut 3 and fastening square washer 4, then removal installation form 9, component Pre-embedded bolt group 5, positioning steel band 6 and pipe gallery form an entirety after the demoulding.One end of pre-embedded bolt group 5 and pipe gallery Inner wall is concordant, and when installing segmental timbering, the correspondence of cast-in fixing bolt group 5 outside pipe gallery first is arranged in segmental timbering Through hole, then installation nut 3 and fastening square washer 4 are set in the cast-in fixing bolt group 5 outside reserved pipe gallery and tighten, Fixation can be realized.
Embodiment 2
Join shown in Fig. 3, the prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in a kind of pipe gallery, including several A built-in fitting, several fasteners, several assembled suspension and supports, built-in fitting, fastener and assembled suspension and support form one Entirety is uniformly distributed in pipe gallery inner wall, wherein, built-in fitting is pre-buried screw shell 10;Pre-buried screw shell 10 is arranged at comprehensive It closes inside piping lane, structure is integrally formed with pipe gallery, fastener is the installation bolt 11 coordinated with pre-buried screw shell and sets Put the fastening square washer 12 between pre-buried screw shell and installation bolt;Assembled suspension and support includes bottom plate 1 and support arm 2, One end of support arm 2 is fixedly connected with bottom plate 1, and the other end is directed toward on the inside of pipe gallery;Bottom plate 1 offers several through holes, leads to Hole is corresponding with the position of pre-buried screw shell 10, and installation bolt 11 is through fastening square washer 12 and through hole and screws in pre-buried spiral shell In bolt sleeve 10, and the number of through hole and the number of pre-buried screw shell 10 are equal, segmental timbering bottom plate 1 in the present embodiment On through hole number for 2, therefore 10 numbers of corresponding pre-buried screw shell are also 2, and but it is not limited to this, through hole and pre-buried anchor The number of bolt sleeve 10 can be the integer more than 2, as long as ensureing that segmental timbering and pre-buried screw shell 10 are firmly combined with, institute Stating built-in bolt sleeve 10 includes installation section 14 and sleeve part 15, is equipped between the installation section 14 and sleeve part 15 Built-in nut 13, and installation section and sleeve part are integrally formed by structure by the built-in nut 13, it ensure that and synthesis Piping lane combination is more secured, is not in sleeve loose phenomenon, without repair, replaces, and pre-buried screw shell 10 is by stainless steel Material is made, therefore ensures " project of vital and lasting importance " of pipe gallery engineering, and foregoing description is pre-buried one pre-buried screw shell 10 Situation, wherein pre-buried screw shell 10, with pre-buried screw shell cooperation installation bolt 11, be arranged on pre-buried screw shell with Fastening square washer 12 and assembled suspension and support between installation bolt form an entirety and are uniformly distributed in pipe gallery inner wall;
Join Fig. 5, shown in Fig. 6, two row segmental timberings of uniformly arranging on the left side wall of pipe gallery, each behavior 6, It is also uniformly arrange two row segmental timberings, each behavior 6, and each segmental timbering on the right wall of pipe gallery It is all identical with described in Fig. 1 with the correspondence and connection mode of pre-buried screw shell 10 and fastener, here, do not repeating, this Assembled suspension and support is evenly distributed in pipe gallery inner wall or so in embodiment, neat appearance, and number is 24, but is not limited to This, can select the number of segmental timbering according to the space size and actual needs of pipe gallery inner wall.
Join shown in Fig. 4, Fig. 4 is the installation process figure of pre-buried screw shell provided by the invention, is specifically described as:Integrated pipe Before corridor concrete cast, first one end of pre-buried screw shell 10 is fixed on steel reinforcement cage 7, one end is arranged in installation form 9 Location hole and fixation, the location hole of installation form 9 are accurately positioned pre-buried screw shell 10, secondly, by lock washer 16 and tightly Gu square washer 12 is sleeved on and is screwed in the installation bolt 11 of pre-buried screw shell 10 cooperation in pre-buried screw shell 10, then is mixed Solidifying soil cast is vibrated, and after concrete setting, screws out installation bolt 11, fastening square washer 12 and lock washer 16, then removal installation Template 9, after the component demoulding, cast-in fixing bolt sleeve 10 is integrally formed structure with pipe gallery.One end of pre-buried screw shell 10 with Pipe gallery inner wall is concordant, and when installing segmental timbering, first fastening square washer 12 is sleeved in installation bolt 11, then again will peace The through hole for filling bolt 11 through segmental timbering is screwed in pre-buried screw shell 10, you can is realized and is fixed.
The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery provided by the invention, due to pre-buried side Formula is various, it is possible to select most suitable built-in fitting, while the letter of such structure with actual demands of engineering as the case may be Single, quick construction, conveniently, and can avoiding to pipe gallery concrete structural damage, therefore, construction is simple is quick, cost is less than passing Anchor bolt technique of uniting and built-in sliding chute technique, and can select according to field condition, it can more meet the needs of piping lane engineering.
A series of detailed description described above is illustrated only for the feasibility embodiment of the present invention, They are not to limit the scope of the invention, in the knowledge that the technical field those of ordinary skill possesses Interior, the various change made on the premise of present inventive concept is not departed from all belongs to the scope of protection of the present invention.

Claims (10)

1. the prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery, including several built-in fittings, several Fastener, several assembled suspension and supports, which is characterized in that
Each built-in fitting, fastener and assembled suspension and support form an entirety and are uniformly distributed in pipe gallery inner wall;
The built-in fitting includes cast-in fixing bolt group or pre-buried screw shell;
The cast-in fixing bolt group front end is arranged inside pipe gallery, and rear end is arranged at outside pipe gallery;
The pre-buried screw shell is arranged inside pipe gallery, concordant with pipe gallery inner wall;
The assembled suspension and support includes bottom plate and support arm, and one end of the support arm is fixedly connected with bottom plate, and the other end refers to On the inside of to pipe gallery;
The bottom plate offers several through holes;
The cast-in fixing bolt group for being arranged at pipe gallery concrete structural outer is connected through through hole with the fastener;
The fastener screws in pre-buried screw shell through through hole.
2. not damaged prompt dress system as described in claim 1, which is characterized in that in the number and cast-in fixing bolt group of the through hole The number of cast-in fixing bolt or pre-buried screw shell is equal;
The cast-in fixing bolt group includes two or more cast-in fixing bolts.
3. not damaged prompt dress system as described in claim 1, which is characterized in that the fastener is to assemble conjunction with cast-in fixing bolt Installation nut, the cast-in fixing bolt group and installation nut between be equipped with fastening square washer.
4. not damaged prompt dress system as described in claim 1, which is characterized in that the fastener is to match somebody with somebody with cast-in fixing bolt sleeve The installation bolt of conjunction is equipped with fastening square washer between the cast-in fixing bolt sleeve and installation bolt.
5. not damaged prompt dress system as described in claim 1, the built-in fitting further include positioning steel band, the cast-in fixing bolt group It is fixed on positioning steel band, the pre-buried position of the cast-in fixing bolt group is determined by the location hole of the positioning steel band.
6. not damaged prompt dress system as claimed in claim 5, which is characterized in that the positioning steel band material is Q235 steel Band.
7. not damaged prompt dress system as described in claim 1, which is characterized in that the cast-in fixing bolt group and pre-buried thread bush Cylinder material is stainless steel.
8. not damaged prompt dress system as described in claim 1, which is characterized in that the built-in fitting is one with the pipe gallery Body structure.
9. not damaged tipping system as described in claim 1, which is characterized in that the pipe gallery is concrete structure.
10. not damaged prompt dress system as described in claim 1, which is characterized in that the built-in bolt sleeve includes mounting portion Point and sleeve part, between the installation section and sleeve part be equipped with built-in nut, and pass through the built-in nut will install Part and sleeve part are integrally formed structure.
CN201711293849.2A 2017-12-08 2017-12-08 The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery Pending CN108071123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711293849.2A CN108071123A (en) 2017-12-08 2017-12-08 The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711293849.2A CN108071123A (en) 2017-12-08 2017-12-08 The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery

Publications (1)

Publication Number Publication Date
CN108071123A true CN108071123A (en) 2018-05-25

Family

ID=62158118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711293849.2A Pending CN108071123A (en) 2017-12-08 2017-12-08 The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery

Country Status (1)

Country Link
CN (1) CN108071123A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565528A (en) * 2021-03-24 2021-10-29 江苏誉朔新材料科技有限公司 Nondestructive connecting piece pre-embedded in duct piece and pre-embedding method thereof
CN113585334A (en) * 2021-07-29 2021-11-02 中铁一局集团(广州)建设工程有限公司 Comprehensive pipe gallery support pre-buried channel and installation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805910A (en) * 2015-05-21 2015-07-29 中太建设集团股份有限公司 Embedded part for cast-in-place concrete component and construction method of embedded part
CN204828950U (en) * 2015-08-04 2015-12-02 中铁建大桥工程局集团第五工程有限公司 A a suspension type gallows that is used for pipeline classification rationally to arrange
CN205446924U (en) * 2016-03-31 2016-08-10 福建美益预制构件有限公司 Pipeline support's mounting structure can be dismantled to utility tunnel bolt formula
CN206191059U (en) * 2016-09-23 2017-05-24 中建科技武汉有限公司 Prefabricated piping lane pipeline support installation device for component

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805910A (en) * 2015-05-21 2015-07-29 中太建设集团股份有限公司 Embedded part for cast-in-place concrete component and construction method of embedded part
CN204828950U (en) * 2015-08-04 2015-12-02 中铁建大桥工程局集团第五工程有限公司 A a suspension type gallows that is used for pipeline classification rationally to arrange
CN205446924U (en) * 2016-03-31 2016-08-10 福建美益预制构件有限公司 Pipeline support's mounting structure can be dismantled to utility tunnel bolt formula
CN206191059U (en) * 2016-09-23 2017-05-24 中建科技武汉有限公司 Prefabricated piping lane pipeline support installation device for component

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565528A (en) * 2021-03-24 2021-10-29 江苏誉朔新材料科技有限公司 Nondestructive connecting piece pre-embedded in duct piece and pre-embedding method thereof
CN113585334A (en) * 2021-07-29 2021-11-02 中铁一局集团(广州)建设工程有限公司 Comprehensive pipe gallery support pre-buried channel and installation method thereof

Similar Documents

Publication Publication Date Title
CN108071123A (en) The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery
CN108590757A (en) A kind of victory assembling device and its installation method
CN210798276U (en) Open caisson pouring template convenient to disassemble and assemble
CN208815540U (en) Deep foundation pit support structure
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN206429790U (en) A kind of buried gas pipeline branch box
CN209278631U (en) Suspension and support fixed structure
CN208456667U (en) A kind of hangers victory assembling device
CN105951885B (en) A kind of assembled work well standard knot and its installation method in new construction
CN208456666U (en) A kind of victory assembling device
CN210152263U (en) Assembly type water supply contact box and assembly structure thereof
CN209510390U (en) A kind of hangers victory assembling device
CN209066501U (en) A kind of city integrated piping lane anti-pinch cover plate assembly
CN209687545U (en) A kind of hangers victory assembling device
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN209413944U (en) A kind of hangers victory assembling device
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN206987826U (en) Tunnel duct piece and its external anti-seismic chute used
CN209413945U (en) A kind of hangers victory assembling device
CN206616590U (en) A kind of prestressing force point plus serial side storehouse drainage type underground pipe gallery
CN106351259A (en) Pipe gallery assembly type bridge frame installing method
CN110440060A (en) A kind of swing antidetonation support of pipelines
CN109281408A (en) A kind of pipe gallery built-in fitting
RU214762U1 (en) ENGINEERING COMMUNICATION UNIT (TECHNICAL NICHE)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180525