CN206191059U - Prefabricated piping lane pipeline support installation device for component - Google Patents

Prefabricated piping lane pipeline support installation device for component Download PDF

Info

Publication number
CN206191059U
CN206191059U CN201621075759.7U CN201621075759U CN206191059U CN 206191059 U CN206191059 U CN 206191059U CN 201621075759 U CN201621075759 U CN 201621075759U CN 206191059 U CN206191059 U CN 206191059U
Authority
CN
China
Prior art keywords
piping lane
built
prefabricated piping
fitting
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621075759.7U
Other languages
Chinese (zh)
Inventor
张建军
高洪刚
刘献伟
陈东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
China State Construction Technology Wuhan Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
China State Construction Technology Wuhan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division, China State Construction Technology Wuhan Co Ltd filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201621075759.7U priority Critical patent/CN206191059U/en
Application granted granted Critical
Publication of CN206191059U publication Critical patent/CN206191059U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a prefabricated piping lane pipeline support installation device for component, it is including installation pipeline support, construction bolt and built -in fitting, the built -in fitting includes anchor bolt and sleeve, the anchor bolt screw in extremely partly space of telescopic one end, the built -in fitting sets up inside prefabricated piping lane, telescopic one end and piping lane inner wall parallel and level, the construction bolt is worn to locate the inside telescopic other end of installation pipeline support and screw in to prefabricated piping lane. The utility model relates to a rational in infrastructure, simple to operate makes the built -in fitting become standardized product, need not to process at the construction field (site), brings the convenience for pipeline support installation and later maintenance, has practiced thrift man -hour, has improved efficiency.

Description

A kind of prefabricated piping lane component line holder erecting device
Technical field
The utility model is related to building field, more particularly to a kind of prefabricated piping lane component line holder erecting device.
Background technology
The installation of line holder is usually after cast-in-place completion, using electric impact drill in piping lane in existing piping lane construction Drilled on wall, expansion bolt is then squeezed into again and is fixed.This method is although simple to operate, but and it is insecure, it is time-consuming It is more, and hollow of underground pipe gallery is limited, is unfavorable for drilling construction, and the positional precision of drilling is also relatively difficult to ensure card, this connection Mode may produce loosening, come off after for a long time, very not firm.
Utility model content
Technical problem to be solved in the utility model is the deficiency existed for above-mentioned prior art, there is provided Yi Zhongjie The prefabricated piping lane component line holder erecting device that structure is simple, be easily installed.
The technical scheme that the utility model is used for:
Prefabricated piping lane component line holder erecting device, it includes installing line holder, installation bolt and built-in fitting;Institute Stating built-in fitting includes anchor bolt and sleeve;The anchor bolt is screwed in a part of space of one end of the sleeve, described Built-in fitting is arranged inside prefabricated piping lane, and one end of the sleeve is concordant with piping lane inwall, and the installation bolt is arranged in described Line holder is installed and is screwed in the other end of the sleeve inside prefabricated piping lane.
In such scheme, the built-in fitting is structure as a whole with the prefabricated piping lane.
In such scheme, the anchor bolt is galvanized bolt.
In such scheme, the sleeve is stainless steel sleeve.
Having the beneficial effect that acquired by the utility model:The utility model design structure is rationally, easy for installation, makes built-in fitting As standard product, without processing at the construction field (site), installed to line holder and later maintenance brings convenience, saved work When, improve efficiency.
Brief description of the drawings
Fig. 1 is the structural representation of prefabricated piping lane component line holder erecting device of the present utility model.
Fig. 2 is the anchor bolt and the structural representation of sleeve in Fig. 1.
Fig. 3 is the manufacturing process figure of prefabricated piping lane component line holder erecting device.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, it is pacified for a kind of prefabricated piping lane component that the utility model embodiment is provided with line holder Assembling device, it includes installing line holder 5, installation bolt 6 and built-in fitting.Built-in fitting includes anchor bolt 1 and sleeve 2.Anchoring Bolt 1 is screwed in a part of space of one end of sleeve 2, and built-in fitting is arranged inside prefabricated piping lane 7.One end of sleeve 2 and pipe The inwall of corridor 7 is concordant, and installation bolt 6 is arranged in be installed line holder 5 and screw in the other end of the sleeve 2 inside prefabricated piping lane 7. Built-in fitting is structure as a whole with prefabricated piping lane 7.
As shown in figure 3, the preparation method that the present embodiment additionally provides the prefabricated piping lane component line holder erecting device, Specially:Before prefabricated piping lane concrete cast, anchor bolt 1 is first screwed into the part of sleeve 2, it is ensured that built-in fitting is in concrete Anchorage length, then built-in fitting is fixed in piping lane template 3 by fixing tool 4, built-in fitting is and piping lane after the component demoulding Became one.One end of sleeve 2 is concordant with piping lane inwall, installation bolt 6 is screwed in when installing line holder 5 and is capable of achieving to fix.
In this example, anchor bolt 1 is galvanized bolt, and the material of sleeve 2 is stainless steel, and this is primarily to contentedly bottom is damp Wet working environment, can be effectively prevented from atmospheric corrosion, prevent the defect such as get rusty, and improve its service life.
The utility model design structure is rationally, easy for installation, built-in fitting is turned into standard product, without at the construction field (site) Processing, installs to line holder and later maintenance brings convenience, and has saved man-hour, improves efficiency.

Claims (4)

1. a kind of prefabricated piping lane component line holder erecting device, it is characterised in that it includes installing line holder, installs spiral shell Bolt and built-in fitting;The built-in fitting includes anchor bolt and sleeve;The anchor bolt is screwed in the one of one end of the sleeve Segment space, the built-in fitting is arranged inside prefabricated piping lane, and one end of the sleeve is concordant with piping lane inwall, the installation spiral shell Bolt is arranged in the installation line holder and screws in the other end of the sleeve inside prefabricated piping lane.
2. prefabricated piping lane component line holder erecting device as claimed in claim 1, it is characterised in that the built-in fitting with The prefabricated piping lane is structure as a whole.
3. prefabricated piping lane component line holder erecting device as claimed in claim 1, it is characterised in that the anchor bolt It is galvanized bolt.
4. prefabricated piping lane component line holder erecting device as claimed in claim 1, it is characterised in that the sleeve is not for Rust steel bushing.
CN201621075759.7U 2016-09-23 2016-09-23 Prefabricated piping lane pipeline support installation device for component Expired - Fee Related CN206191059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621075759.7U CN206191059U (en) 2016-09-23 2016-09-23 Prefabricated piping lane pipeline support installation device for component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621075759.7U CN206191059U (en) 2016-09-23 2016-09-23 Prefabricated piping lane pipeline support installation device for component

Publications (1)

Publication Number Publication Date
CN206191059U true CN206191059U (en) 2017-05-24

Family

ID=58729771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621075759.7U Expired - Fee Related CN206191059U (en) 2016-09-23 2016-09-23 Prefabricated piping lane pipeline support installation device for component

Country Status (1)

Country Link
CN (1) CN206191059U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071123A (en) * 2017-12-08 2018-05-25 康元轨道交通科技(福建)有限公司 The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071123A (en) * 2017-12-08 2018-05-25 康元轨道交通科技(福建)有限公司 The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery

Similar Documents

Publication Publication Date Title
CN109235779A (en) A kind of self-centering full grout sleeve construction of achievable reinforcing bar and the practice
CN204001720U (en) Service sleeve in a kind of constructional column
CN103115721B (en) Embedding device and mounting method for shield segment outside osmometer
CN103821520A (en) Method for fixing mine vertical shaft device
CN206191059U (en) Prefabricated piping lane pipeline support installation device for component
CN207228348U (en) Recyclable magnetic thread embedded parts for assembled architecture
CN202131676U (en) Quake-proof steel tie bar embedded part
CN204327112U (en) Tunnel outlet advance support system
CN203891468U (en) Fixing device for pouring building pipeline embedded part
CN203961322U (en) Prefabricated panel installation adjusting device
CN205558820U (en) Drilling equipment for building engineering
CN102979183A (en) Embedded cylindrical nut anchor bed and use method thereof
CN207777380U (en) Pre-buried channel flow anti-slip T-type spring bolt
CN208415519U (en) A kind of metope pre-embedded formula connection component
CN202187429U (en) Ceiling suspender precast device
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN204941579U (en) The pre-buried orifice tube of a kind of pit shaft borehole wall grouting
CN204493900U (en) A kind of plastic draining pipe fixing device
CN104805910A (en) Embedded part for cast-in-place concrete component and construction method of embedded part
CN205669308U (en) A kind of wall-connecting piece without cutting
CN202882114U (en) Cast-in-place concrete prearranged pull connection piece
CN103016488A (en) Connecting structure, mounting tool and connecting method for speed reducer housing
CN203572477U (en) Assembled settlement observation point
CN207879388U (en) A kind of hiding support node of the plug-in conduit of shield tunnel
CN204456187U (en) A kind of underground pipe gallery construction inner formword support member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524