CN209510390U - A kind of hangers victory assembling device - Google Patents

A kind of hangers victory assembling device Download PDF

Info

Publication number
CN209510390U
CN209510390U CN201821424302.1U CN201821424302U CN209510390U CN 209510390 U CN209510390 U CN 209510390U CN 201821424302 U CN201821424302 U CN 201821424302U CN 209510390 U CN209510390 U CN 209510390U
Authority
CN
China
Prior art keywords
bolt
hangers
sliding slot
external sliding
auricle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821424302.1U
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peng Jian
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821424302.1U priority Critical patent/CN209510390U/en
Application granted granted Critical
Publication of CN209510390U publication Critical patent/CN209510390U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of hangers victory assembling device, which includes: hangers, external sliding slot and bolt assembly;Wherein, hangers includes: pendant groove, and the U-type groove and auricle of pendant groove bottom is arranged in;Angle between auricle and the upper surface of pendant groove is acute angle;External sliding slot nesting is mounted in pendant groove;Bolt assembly passes through U-type groove, and hangers and external sliding slot are connected and fixed.The Fast Installation of Shield-bored tunnels electromechanical equipment and pipeline is realized by the utility model.

Description

A kind of hangers victory assembling device
Technical field
The utility model belongs to shield tunnel construction technology field more particularly to a kind of hangers victory assembling device.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.How to subtract Few construction of underground tunnel period, improve construction quality, extend tunnel service life, reduce complete period overall cost, prevent dust, The problems such as noise pollution, mitigation construction labor intensity, will become industry project urgently to be solved.
Utility model content
The technology of the utility model solves the problems, such as: a kind of hangers victory assembling device is overcome the deficiencies of the prior art and provide, with reality The Fast Installation of existing Shield-bored tunnels electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the utility model discloses a kind of hangers victory assembling devices, comprising: hangers (1-1), External sliding slot (2-1) and bolt assembly (3-0);Wherein, hangers (1-1), comprising: pendant groove (1-4) is arranged in pendant groove (1- 4) U-type groove (1-3) and auricle (1-5) of bottom surface;
Angle between auricle (1-5) and the upper surface of pendant groove (1-4) is acute angle;
External sliding slot (2-1) nesting is mounted in pendant groove (1-4);
Bolt assembly (3-0) passes through U-type groove (1-3), and hangers (1-1) and external sliding slot (2-1) are connected and fixed.
In above-mentioned hangers victory assembling device, the bolt assembly (3-0), comprising: T-bolt (3-1), flat shim (3-2) With nut (3-3);
It after T-bolt (3-1) passes through auricle (1-5), is fastened, external sliding slot (2-1) is connected solid by nut (3-3) It is fixed;Wherein, the bolt head of T-bolt (3-1) is located in the conduit of external sliding slot (2-1);
Flat shim (3-2) is mounted between T-bolt (3-1) and external sliding slot (2-1).
In above-mentioned hangers victory assembling device, the hangers (1-1), further includes: earhole (1-2);
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0).
In above-mentioned hangers victory assembling device, the shield tunnel concrete pipe sheet (4-0), comprising: shield duct piece left member (4- 1), shield duct piece right member (4-2), anchor rod bolt (4-3), segment bolt fastening nut left member (4-4) and segment bolt fasten spiral shell Female right member (4-5);
Shield duct piece left member (4-1) and shield duct piece right member (4-2) are connected by anchor rod bolt (4-3), and pass through section of jurisdiction Bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) are connected and fixed.
In above-mentioned hangers victory assembling device, earhole (1-2) across anchor rod bolt (4-3) left end, by segment bolt it is tight Gu nut left member (4-4) is connected and fixed with shield duct piece left member (4-1).
In above-mentioned hangers victory assembling device, earhole (1-2) across anchor rod bolt (4-3) right end, by segment bolt it is tight Gu nut right member (4-5) is connected and fixed with shield duct piece right member (4-2).
In above-mentioned hangers victory assembling device, the angle between auricle (1-5) and the upper surface of pendant groove (1-4) is 45 °.
The utility model has the advantage that
(1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc. Security risk.
(2) it is not necessarily to the aperture on conduit, ensure that the integrality and intensity of conduit.
(3) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
(4) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
(5) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, The operation maintenance expense of equipment is also significantly reduced simultaneously, and equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
(6) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase It is short by 50% or more.
(7) environmentally friendly, pipeline and mechanical and electric equipment installation process are without dust, the noiseless very big construction ring for improving equipment installation Border reduces labor intensity of workers, belongs to typical " green construction ".
(8) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various Equipment.
(9) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
(10) applicability is wide, can use in concrete compression area and tensile region.
(11) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of build Build electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of schematic perspective view of hangers victory assembling device in the utility model embodiment;
Fig. 2 is a kind of schematic perspective view of hangers in the utility model embodiment;
Fig. 3 is a kind of front view of hangers in the utility model embodiment;
Fig. 4 is a kind of left view of hangers in the utility model embodiment;
Fig. 5 is a kind of three-dimensional assembling schematic diagram of hangers victory assembling device in the utility model embodiment;
Fig. 6 is a kind of mounting structure schematic diagram of shield tunnel concrete pipe sheet in the example of the utility model;
Hangers 1-1;Earhole 1-2;U-type groove 1-3;Pendant groove 1-4;Auricle 1-5;External sliding slot 2-1;Bolt assembly 3-0;T Type bolt 3-1;Flat shim 3-2;Nut 3-3;Shield tunnel concrete pipe sheet 4-0;Shield duct piece left member 4-1;Shield duct piece is right Part 4-2;Anchor rod bolt 4-3;Segment bolt fastening nut left member 4-4;Segment bolt fastening nut right member 4-5.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type disclosed embodiment is described in further detail.
The utility model discloses a kind of hangers victory assembling devices, can be used for the prompt dress of subway tunnel electromechanical equipment and pipeline, The part that shield duct piece combines specially on component.The anchor pole spiral shell that the earhole opened on hangers can be used directly with concrete pipe sheet It tethers and connects, this smoothly installs external cunning to reach it is ensured that install hangers under the premise of not destroying concrete pipe sheet The effect of slot.The U-type groove being arranged on the conduit and pendant groove that T-bolt passes through external sliding slot is fastenedly connected, and is carried out by nut It is tightened, is fixed on external sliding slot in the pendant groove of hangers, improve the integrality and durability of shield tunnel, realize subway The Fast Installation of tunnel electromechanical equipment and pipeline.
Such as Fig. 1~6, in the present embodiment, the hangers victory assembling device, comprising: hangers 1-1, external sliding slot 2-1 and bolt Component 3-0.Wherein, hangers 1-1 can specifically include: pendant groove 1-4, and the U-type groove 1-3 of the bottom surface pendant groove 1-4 is arranged in, with And auricle 1-5.
In the present embodiment, the angle theta between auricle 1-5 and the upper surface of pendant groove 1-4 is acute angle;External sliding slot 2-1 Nesting is mounted in pendant groove 1-4;Bolt assembly 3-0 passes through U-type groove 1-3, and hangers 1-1 is connect admittedly with external sliding slot 2-1 It is fixed.
Preferably, bolt assembly 3-0 can specifically include: T-bolt 3-1, flat shim 3-2 and nut 3-3.Wherein, T-bolt 3-1 is fastened after passing through auricle 1-5 by nut 3-3, and external sliding slot 2-1 is connected and fixed, T-bolt 3-1's Bolt head is located in the conduit of external sliding slot 2-1;Flat shim 3-2 is mounted between T-bolt 3-1 and external sliding slot 2-1.Simply It is convenient, rapidly and effectively complete construction task.
Preferably, hangers 1-1 can also include: earhole 1-2.Wherein, earhole 1-2 and shield tunnel concrete pipe sheet 4- 0 anchor rod bolt 4-3 connection.For increasing the stability of hangers 1-1 Yu shield tunnel concrete pipe sheet 4-0, can guarantee not Hangers 1-1 is installed under the premise of destruction shield tunnel concrete pipe sheet, to achieve the effect that smoothly to install external sliding slot.
Preferably, shield tunnel concrete pipe sheet 4-0 includes: shield duct piece left member 4-1, shield duct piece right member 4-2, anchor Bar bolt 4-3, segment bolt fastening nut left member 4-4 and segment bolt fastening nut right member 4-5;Shield duct piece left member 4-1 and Shield duct piece right member 4-2 is connected by anchor rod bolt 4-3, and tight by segment bolt fastening nut left member 4-4 and segment bolt Gu nut right member 4-5 is connected and fixed.
One is preferred, and earhole 1-2 passes through the left end of anchor rod bolt 4-3, passes through segment bolt fastening nut left member 4-4 and shield Structure section of jurisdiction left member 4-1 is connected and fixed.
It is another preferred, earhole 1-2 across anchor rod bolt 4-3 right end, by segment bolt fastening nut right member 4-5 with Shield duct piece right member 4-2 is connected and fixed.
Wherein, the angle theta between auricle 1-5 and the upper surface of pendant groove 1-4 can with but be not limited only to as 45 °.It needs It is bright, the size of anchor pole notch can be reserved according to concrete pipe sheet to determine the apparent size and shape of hangers, guarantee slot Road can be close to the installation of section of jurisdiction surface.Hangers is installed in the installation of hangers while section of jurisdiction is installed, and is guaranteed that construction is primary and is completed, It does not need to unclamp anchor pole again and hangers is installed again.Conduit is put into pendant groove according to the position of hangers.Conduit by with hangers U-type groove Corresponding T-bolt is fixed, and bolt requires to be longer than nut+conduit thickness+plate thickness.The dismounting of this mounting means is simple just Victory can rapidly and effectively complete construction task.The structural stability of external conduit and shield duct piece can also be enhanced, moreover it is possible to ensure It will not collide with tunnel gut line etc..
In conclusion a kind of prompt assembling device of novel hangers disclosed by the utility model, specially shield duct piece on component In conjunction with part.The anchor pole connection that the earhole opened on hangers can be used directly with concrete pipe sheet, this is not it is ensured that breaking Hangers is installed under the premise of bad concrete pipe sheet, to achieve the effect that smoothly to install conduit.Conduit is put into pendant groove in advance Convenient for conduit fine tuning, facilitates bolt to pass through connection, have flat shim between bolt and hangers, be tightened by rear with nut. It is fixed on external conduit in the pendant groove of hangers, improves the integrality and durability of shield tunnel, realize that subway tunnel is electromechanical The Fast Installation of equipment and pipeline.
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The optimal specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should be covered within the scope of the utility model.
The content being not described in detail in the utility model specification belongs to the well-known technique of professional and technical personnel in the field.

Claims (3)

1. a kind of hangers victory assembling device characterized by comprising hangers (1-1), external sliding slot (2-1) and bolt assembly (3- 0);Wherein, hangers (1-1), comprising: U-type groove (1-3) and auricle in the bottom surface pendant groove (1-4) is arranged in pendant groove (1-4) (1-5) and the earhole (1-2) being arranged on auricle (1-5);
Angle between auricle (1-5) and the upper surface of pendant groove (1-4) is acute angle;
External sliding slot (2-1) nesting is mounted in pendant groove (1-4);
Bolt assembly (3-0) passes through U-type groove (1-3), and hangers (1-1) and external sliding slot (2-1) are connected and fixed;
Earhole (1-2) is connect with the anchor rod bolt (4-3) of shield tunnel concrete pipe sheet (4-0);Wherein, shield tunnel concrete Section of jurisdiction (4-0), comprising: shield duct piece left member (4-1), shield duct piece right member (4-2), anchor rod bolt (4-3), segment bolt fastening Nut left member (4-4) and segment bolt fastening nut right member (4-5);Shield duct piece left member (4-1) and shield duct piece right member (4-2) It is connected by anchor rod bolt (4-3), and passes through segment bolt fastening nut left member (4-4) and segment bolt fastening nut right member (4-5) is connected and fixed;
Earhole (1-2) passes through the left end of anchor rod bolt (4-3), passes through segment bolt fastening nut left member (4-4) and shield duct piece Left member (4-1) is connected and fixed, or, earhole (1-2) passes through the right end of anchor rod bolt (4-3), by the segment bolt fastening nut right side Part (4-5) is connected and fixed with shield duct piece right member (4-2).
2. hangers victory assembling device according to claim 1, which is characterized in that the bolt assembly (3-0), comprising: T-type spiral shell Bolt (3-1), flat shim (3-2) and nut (3-3);
After T-bolt (3-1) passes through auricle (1-5), is fastened by nut (3-3), external sliding slot (2-1) is connected and fixed; Wherein, the bolt head of T-bolt (3-1) is located in the conduit of external sliding slot (2-1);
Flat shim (3-2) is mounted between T-bolt (3-1) and external sliding slot (2-1).
3. hangers victory assembling device according to claim 1, which is characterized in that the upper table of auricle (1-5) and pendant groove (1-4) Angle between face is 45 °.
CN201821424302.1U 2018-08-31 2018-08-31 A kind of hangers victory assembling device Active CN209510390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821424302.1U CN209510390U (en) 2018-08-31 2018-08-31 A kind of hangers victory assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821424302.1U CN209510390U (en) 2018-08-31 2018-08-31 A kind of hangers victory assembling device

Publications (1)

Publication Number Publication Date
CN209510390U true CN209510390U (en) 2019-10-18

Family

ID=68185643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821424302.1U Active CN209510390U (en) 2018-08-31 2018-08-31 A kind of hangers victory assembling device

Country Status (1)

Country Link
CN (1) CN209510390U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109139105A (en) * 2018-08-31 2019-01-04 彭健 A kind of hangers victory assembling device and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109139105A (en) * 2018-08-31 2019-01-04 彭健 A kind of hangers victory assembling device and its installation method

Similar Documents

Publication Publication Date Title
CN108590757A (en) A kind of victory assembling device and its installation method
CN109159275A (en) Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method
CN209510390U (en) A kind of hangers victory assembling device
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN208456667U (en) A kind of hangers victory assembling device
CN109057860A (en) A kind of method and anchor for improving pre-buried channel flow surrounding concrete and sticking up skin pulling capacity
CN209510389U (en) A kind of hangers victory assembling device
CN208456666U (en) A kind of victory assembling device
CN108915769A (en) A kind of hangers victory assembling device and its installation method
CN209687545U (en) A kind of hangers victory assembling device
CN209369828U (en) A kind of tunnel pre-buried channel flow device
CN109139105A (en) A kind of hangers victory assembling device and its installation method
CN209687544U (en) A kind of hangers victory assembling device
CN109252893A (en) A kind of hangers victory assembling device and its installation method
CN209413945U (en) A kind of hangers victory assembling device
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN208935561U (en) A kind of door-shaped hanging bracket
CN209413944U (en) A kind of hangers victory assembling device
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN104775410B (en) Detachable downside track for horizontal pulled gate
CN207728391U (en) A kind of assembled hangers pendant and prompt assembling device
CN208280171U (en) A kind of city integrated piping lane
CN208456600U (en) A kind of victory assembling device
CN208456618U (en) A kind of victory assembling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210806

Address after: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee after: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) Co.,Ltd.

Address before: 350000 unit B-1, 25 / F, Yuanhong building, No. 32, Wuyi Middle Road, Fuzhou, Fujian

Patentee before: Peng Jian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230713

Address after: Unit 301, Building 2, No. 155 Yangqiao West Road, Gulou District, Fuzhou City, Fujian Province, 350001

Patentee after: Peng Jian

Address before: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee before: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) CO.,LTD.

TR01 Transfer of patent right