CN208456600U - A kind of victory assembling device - Google Patents

A kind of victory assembling device Download PDF

Info

Publication number
CN208456600U
CN208456600U CN201820948277.0U CN201820948277U CN208456600U CN 208456600 U CN208456600 U CN 208456600U CN 201820948277 U CN201820948277 U CN 201820948277U CN 208456600 U CN208456600 U CN 208456600U
Authority
CN
China
Prior art keywords
steel pipe
external conduit
internal thread
fastening bolt
duct piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820948277.0U
Other languages
Chinese (zh)
Inventor
彭健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Peng Jian
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820948277.0U priority Critical patent/CN208456600U/en
Application granted granted Critical
Publication of CN208456600U publication Critical patent/CN208456600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of prompt assembling devices, wherein the victory assembling device includes: embedded sleeve barrel and external conduit;Embedded sleeve barrel, comprising: band internal thread steel pipe, connection bolt, fastening bolt, spring shim and square washer;It connects bolt and screws in one end with internal thread steel pipe, pour in shield duct piece in advance;The other end with internal thread steel pipe fits in the inner surface of shield duct piece;External conduit is connect by fastening bolt, spring shim and square washer with the other end with internal thread steel pipe, so that the outer surface of external conduit and shield duct piece fits closely, the integrality and durability of shield tunnel are improved, realizes the Fast Installation of subway tunnel electromechanical equipment and pipeline.

Description

A kind of victory assembling device
Technical field
The utility model belongs to shield tunnel construction technology field more particularly to a kind of prompt assembling device.
Background technique
As various regions large- and-medium size cities metro project starts successively, shield method has determined absolutely in city tunnel construction Dominant position, someone is referred to as city tunnel engineering method.Original subway pipeline, mechanical and electric equipment installation mostly use chemically-planted steel bar or Person beats the mode of expansion bolt, but these assembled architecture modes are relatively easy in design, and systematicness is of less demanding, and has Have significant limitation: chemically-planted steel bar or expansion bolt require to drill on existing structure, are likely to be encountered during drilling Structure reinforcing bars cause certain damage to structure itself, influence structure durability;Chemically-planted steel bar or expansion bolt itself the service life have Limit, easily corrodes, generally using no more than 15 years will be maintained or replaced, and subway is much not achieved under metro environment Life requirement in 100 years;The reinforcing bar or expansion bolt of implantation are contacted with steel mesh, are easily caused structure reinforcing bars corrosion, are influenced to tie Structure safety.The construction of underground tunnel period how is reduced, construction quality is improved, extends tunnel service life, reduces complete period synthesis Cost, prevent dust, noise pollution, mitigate construction labor intensity the problems such as will become industry project urgently to be solved.
Utility model content
The technology of the utility model solves the problems, such as: a kind of prompt assembling device is overcome the deficiencies of the prior art and provide, to realize ground The Fast Installation of iron tunnel electromechanical equipment and pipeline.
In order to solve the above-mentioned technical problem, the utility model discloses a kind of prompt assembling devices, comprising: embedded sleeve barrel and external Conduit;Wherein, embedded sleeve barrel, comprising: band internal thread steel pipe, connection bolt, fastening bolt, spring shim and rectangular pad Piece;
It connects bolt and screws in one end with internal thread steel pipe, pour in shield duct piece in advance;Band internal thread steel pipe The other end fit in the inner surface of shield duct piece;
External conduit is by the fastening bolt, spring shim and square washer with described with the another of internal thread steel pipe One end connection, so that the outer surface of external conduit and shield duct piece fits closely.
In above-mentioned prompt assembling device, external conduit is concave slot structure.
In above-mentioned prompt assembling device, fastening bolt holes are provided on external conduit, fastening bolt passes through the fastening bolt Hole is connect with the other end with internal thread steel pipe.
In above-mentioned prompt assembling device, one or more fastening bolt holes are provided on external conduit;
One or more of fastening bolt holes are arranged on external conduit according to setting spacing;
The band internal thread steel pipe that one or more one end are connected with connection bolt is cast in shield duct piece in advance and institute It states at the corresponding position of one or more fastening bolt holes.
In above-mentioned prompt assembling device, the band internal thread steel pipe is full pipe tapping or both ends tapping steel pipe.
The utility model has the advantage that
1) not damaged, it is opposite to be not necessarily to the steel planting in structure with traditional anchor bolt technique or beat expansion bolt, to structure without Destroy, the integrality and durability of shield tunnel itself is greatly improved, prevent because intensively punch caused by section of jurisdiction crack, infiltration, etc. Security risk.
2) installation tool and mounting process are simple, install fixing bolt and nut is unified, be easy to normal process and be turned into industry.
3) flexible for installation, it is ensured that the installation accuracy of equipment in tunnel, it is circumferential easy to adjust.
4) at low cost, prevent 30% or more waste of material low cost without 360 degree of arrangements relative to built-in sliding chute technique, together When also significantly reduce the operation maintenance expense of equipment, equipment installation and maintenance are more single, and maintenance cost is greatly reduced.
5) short time limit, equipment installation effectiveness significantly improve, and can at least contract relative to traditional anchor bolt technique hydromechanical installer phase It is short by 50% or more.
6) environmentally friendly, the construction environment of pipeline and mechanical and electric equipment installation process without dust, noiseless very big improvement equipment installation, Labor intensity of workers is reduced, typical " green construction " is belonged to.
7) highly integrated, each professional equipment in tunnel it is mountable on the chute, convenient for the operation phase replace and increase various Equipment.
8) maintenance is simple, and the component of external part is replaceable, and maintenance cost is low.
9) applicability is wide, can use in concrete compression area and tensile region.
10) have a wide range of application, could be applicable to city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings Electromechanical equipment and pipeline installation in object.
Detailed description of the invention
Fig. 1 is a kind of schematic perspective view of victory assembling device in the utility model embodiment;
Fig. 2 is a kind of main view of victory assembling device in the utility model embodiment;
Fig. 3 is the enlarged drawing in Fig. 2 at A;
Fig. 4 is a kind of structural schematic diagram of embedded sleeve barrel in the utility model embodiment;
1- embedded sleeve barrel, 11- fastening bolt, 12- spring shim, 13- square washer, 14- band internal thread steel pipe, 15- connection bolt, the external conduit of 2-, 21- shield duct piece, 22- fastening bolt holes.
Specific embodiment
It is practical new to this below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Type disclosed embodiment is described in further detail.
The utility model discloses a kind of prompt assembling devices, belong to the prompt dress side of subway tunnel electromechanical equipment and pipeline installation Case, the victory assembling device include: embedded sleeve barrel and external conduit.Wherein, embedded sleeve barrel one end is screwed in connection bolt and has interior spiral shell It in the steel pipe of line, then pours in shield duct piece in advance, the other end fits in shield duct piece surface.Fit in the pre- of shield duct piece surface Sleeve is buried with internal screw thread, the fastening being arranged on external conduit is passed through with fastening bolt, spring shim and square washer sub-assembly Bolt hole, it is ensured that after external conduit is fitted closely with shield duct piece, screw in steel tube screw thread hole and simultaneously lock, be fixed on external conduit The integrality and durability of shield tunnel are improved in shield duct piece surface, realize the quick peace of subway tunnel electromechanical equipment and pipeline Dress.
In addition, the victory assembling device applies also for city integrated underground pipe gallery, prefabricated casting plate, cast-in-situ wall, all kinds of buildings Electromechanical equipment and pipeline installation etc. in object.
Referring to Fig.1~4, in the present embodiment, which can specifically include: embedded sleeve barrel 1 and external conduit 2. Wherein, the embedded sleeve barrel 1 can specifically include: band internal thread steel pipe 14, connection bolt 15, fastening bolt 11, spring Gasket 12 and square washer 13.Preferably, the 14 inside tapping of band internal thread steel pipe: according to bolts at two ends (connection spiral shell Bolt 15 and fastening bolt 11) length, band internal thread steel pipe 14 can full pipe tapping or both ends tapping, tapping length be slightly larger than The bolt length of required fastening.
In the present embodiment, embedded sleeve barrel 1 is independently arranged in shield duct piece 21 by pre-buried, while between its arrangement It is arranged away from, installation number and position according to actual requirement of engineering, to be used to support connecting bracket.1 lower part of embedded sleeve barrel It is arranged according to design requirement in 21 lower surface of shield duct piece.Connection bolt 15 is anchored on 14 respective side of steel pipe, afterwards will using mold Its is pre-buried in shield duct piece 21;It further, will be outer by fastening bolt 11, spring shim 12,13 sub-assembly of square washer It sets conduit 2 and is fixed on 21 corresponding position of shield duct piece.Specific: connection bolt 15 screws in one with internal thread steel pipe 14 End, pours in shield duct piece 21 in advance, for increasing embedded sleeve barrel 1 and 21 structural stability of shield duct piece, prevents embedded sleeve barrel whole Body falls off.The other end with internal thread steel pipe 14 fits in the inner surface of shield duct piece 21;External conduit 2 passes through described tight 11 spring shim 12 of fixing bolt and square washer 13 are connect with the other end with internal thread steel pipe 14, so that external slot Road 2 and the outer surface of shield duct piece 21 fit closely.
Fastening bolt holes 22 are provided on external conduit 2, fastening bolt 11 passes through the fastening bolt holes 22 and the band The other end of internal thread steel pipe 14 connects.
Such as Fig. 1, external conduit 2 can be concave groove structure, be provided with one or more fastening bolt holes on external conduit 2 22, which arranges along external 2 slideway direction of conduit, for adjusting the installation position of external conduit 2 It sets.Correspondingly, the band internal thread steel pipe 14 that one or more one end are connected with connection bolt 15 is cast in shield duct piece in advance In 21, at position corresponding with one or more of fastening bolt holes 22.
Preferably, in order to install the good fitting of contact surface energy, external conduit 2 is identical as 21 radians of shield duct piece.
In the present embodiment, embedded sleeve barrel 1 is embedded in shield duct piece 21, to guarantee shield duct piece 21 and embedded sleeve barrel 1 Structural stability, steel pipe 14 is embedded in 21 side of shield duct piece in advance, also is provided with threaded hole, connection bolt 15 can be screwed in steel pipe 14 The screw thread of respective side, bolt top and side wall can increase the coefficient of friction of connector, to prevent embedded sleeve barrel 1 to be detached from shield pipe Piece 21.The dismounting of this mounting means is simple and convenient, can rapidly and effectively complete construction task.External conduit 2 and shield can also be enhanced The structural stability of structure section of jurisdiction 21, moreover it is possible to ensure to collide with tunnel gut line etc..
On the basis of the above embodiments, the victory assembling device is illustrated in conjunction with the installation method of the victory assembling device, In, the installation method of the victory assembling device, which can be such that, screws in one end with internal thread steel pipe (14) for connection bolt (15), And it is poured in shield duct piece (21) in advance;External conduit (2) and shield duct piece (21) are fitted closely, and adjust external conduit (2) To design position;It is by fastening bolt (11), spring shim (12) and square washer (13) sub-assembly, external conduit (2) are solid It is scheduled on shield duct piece (21);Wherein, fastening bolt (11) passes through fastening bolt holes (22) rotation being arranged on external conduit (2) Enter the other end with internal thread steel pipe (14);Pipeline suspension and support is installed by external conduit (2), and on pipeline suspension and support Tunnel pipeline and other equipment are installed.
Various embodiments are described in a progressive manner in this explanation, the highlights of each of the examples are with its The difference of his embodiment, the same or similar parts between the embodiments can be referred to each other.
The optimal specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in Change or replacement, should be covered within the scope of the utility model.
The content being not described in detail in the utility model specification belongs to the well-known technique of professional and technical personnel in the field.

Claims (5)

1. a kind of victory assembling device characterized by comprising embedded sleeve barrel (1) and external conduit (2);Wherein, embedded sleeve barrel (1), It include: band internal thread steel pipe (14), connection bolt (15), fastening bolt (11), spring shim (12) and square washer (13);
It connects bolt (15) and screws in one end with internal thread steel pipe (14), poured in shield duct piece (21) in advance;With interior spiral shell The other end of the steel pipe (14) of line fits in the inner surface of shield duct piece (21);
External conduit (2) has interior spiral shell with described by the fastening bolt (11), spring shim (12) and square washer (13) The other end of the steel pipe (14) of line connects, so that external conduit (2) and the outer surface of shield duct piece (21) fit closely.
2. victory assembling device according to claim 1, which is characterized in that external conduit (2) is concave slot structure.
3. victory assembling device according to claim 1, which is characterized in that be provided with fastening bolt holes on external conduit (2) (22), fastening bolt (11) passes through the fastening bolt holes (22) and the other end of the band internal thread steel pipe (14) connects It connects.
4. victory assembling device according to claim 1, which is characterized in that be provided on external conduit (2) one or more tight Fixing bolt hole (22);
One or more of fastening bolt holes (22) are arranged on external conduit (2) according to setting spacing;
The band internal thread steel pipe (14) that one or more one end are connected with connection bolt (15) is cast in shield duct piece in advance (21) in, at position corresponding with one or more of fastening bolt holes (22).
5. victory assembling device according to claim 1, which is characterized in that the band internal thread steel pipe (14) is that full pipe is attacked Silk or both ends tapping steel pipe.
CN201820948277.0U 2018-06-20 2018-06-20 A kind of victory assembling device Active CN208456600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820948277.0U CN208456600U (en) 2018-06-20 2018-06-20 A kind of victory assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820948277.0U CN208456600U (en) 2018-06-20 2018-06-20 A kind of victory assembling device

Publications (1)

Publication Number Publication Date
CN208456600U true CN208456600U (en) 2019-02-01

Family

ID=65168405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820948277.0U Active CN208456600U (en) 2018-06-20 2018-06-20 A kind of victory assembling device

Country Status (1)

Country Link
CN (1) CN208456600U (en)

Similar Documents

Publication Publication Date Title
CN108590757A (en) A kind of victory assembling device and its installation method
KR101975763B1 (en) Precast Concrete Culvert and Method for Constructing the Same
CN102797219B (en) Arch bridge suspender convenient to replace and method for replacing the same
CN109159275A (en) Metro shield section section of jurisdiction pre-buried channel flow fixed structure and pre-embedded construction method
CN208456666U (en) A kind of victory assembling device
CN208456600U (en) A kind of victory assembling device
CN108825624A (en) A kind of section of jurisdiction built-in turnbuckle component and its application
CN109458221A (en) A kind of hangers victory assembling device and installation method
CN108625867A (en) A kind of victory assembling device and its installation method
CN208456618U (en) A kind of victory assembling device
CN108590758A (en) A kind of victory assembling device and its installation method
CN108590759A (en) A kind of hangers victory assembling device and its installation method
CN209510390U (en) A kind of hangers victory assembling device
CN208456667U (en) A kind of hangers victory assembling device
CN109458219A (en) A kind of hangers victory assembling device and installation method
CN209413944U (en) A kind of hangers victory assembling device
CN209687545U (en) A kind of hangers victory assembling device
CN209687544U (en) A kind of hangers victory assembling device
CN109736888A (en) A kind of hangers victory assembling device and installation method
CN108915769A (en) A kind of hangers victory assembling device and its installation method
CN209413945U (en) A kind of hangers victory assembling device
CN208280171U (en) A kind of city integrated piping lane
CN108071123A (en) The prompt dress system of the concrete strcture of electromechanical equipment and pipeline damage in pipe gallery
CN209510389U (en) A kind of hangers victory assembling device
CN109263683A (en) Rail detection unit special fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210830

Address after: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee after: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) Co.,Ltd.

Address before: 350000 unit B-1, 25 / F, Yuanhong building, No. 32, Wuyi Middle Road, Fuzhou, Fujian

Patentee before: Peng Jian

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230714

Address after: Unit 301, Building 2, No. 155 Yangqiao West Road, Gulou District, Fuzhou City, Fujian Province, 350001

Patentee after: Peng Jian

Address before: 350001 room g, 20th floor, No. 71, Wusi Road, Wenquan street, Gulou District, Fuzhou City, Fujian Province

Patentee before: KANGYUAN TRACK TRAFFIC TECHNOLOGY (FUJIAN) CO.,LTD.

TR01 Transfer of patent right