CN107218059A - For Fast Installation subway tunnel electromechanical equipment and the device of pipeline - Google Patents
For Fast Installation subway tunnel electromechanical equipment and the device of pipeline Download PDFInfo
- Publication number
- CN107218059A CN107218059A CN201710486888.8A CN201710486888A CN107218059A CN 107218059 A CN107218059 A CN 107218059A CN 201710486888 A CN201710486888 A CN 201710486888A CN 107218059 A CN107218059 A CN 107218059A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- pipeline
- duct piece
- chute
- electromechanical equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/008—Anchoring or tensioning means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/02—Suspension devices for tubes or the like, e.g. for ventilating ducts
Abstract
The present invention relates to the technical field of constructing tunnel, the particularly installation of subway tunnel electromechanical equipment and pipeline, it is specifically a kind of to be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it includes tunnel duct piece, cast-in fixing bolt, multiple external anti-seismic chutes and mounting bracket, the cast-in fixing bolt includes section of jurisdiction positioner and crab-bolt, and each external anti-seismic chute includes c-type band tooth chute and at least two mounting seats.The present invention in tunnel duct piece by setting cast-in fixing bolt to instead of traditional punching tendon-planted craft; without the intensive punching on tunnel structure, it is ensured that tunnel structure zero is damaged, the integrality of tunnel structure is protected; the service life of tunnel structure is greatly extended, subway circulation safety has also been ensured;And avoid the infringement to workmen's health;Also have the advantages that Embedment Construction is simple, quick for installation, can significantly save electromechanical equipment and pipeline installation period;Construction and maintenance cost can be greatly reduced simultaneously.
Description
Technical field:
The present invention relates to the installation of the technical field of constructing tunnel, particularly subway tunnel electromechanical equipment and pipeline, specifically
Ground is a kind of device for Fast Installation subway tunnel electromechanical equipment and pipeline.
Background technology:
With the quickening of the fast-developing and new Development of China's Urbanization of national economy, urban rail transit in China is built in recent years
Fast development.By the end of the year 2016, existing 45 cities in China's Mainland obtain state approval and build rail line, wherein 25
The existing circuit in seat city builds up and opens operation, and operation mileage is up to 3137 kilometers.In the city such as Beijing, Shanghai, Guangzhou, Shenzhen rail
The perfect megalopolis development Operation Network of road traffic base, while optimize the structure of production, each provincial capital and other two, three
The urban track traffic framework in line city is also being formed.According to the requirement built a service-oriented government with sustainable development, country
Will based on urban track traffic Facilities Construction field key target for investment.
China's metro industry electromechanical equipment and pipeline mounting process are compared with foreign countries still to fall behind, and traditional mounting means is
Using punching tendon-planted craft, it destroys serious to tunnel structure, and intensive punching causes tunnel structure ftracture, seep water, collapses block even
Collapse and bring very big hidden danger to subway circulation, cause subway circulation accident of common occurrence, life and national wealth peace to passenger
It is complete to bring very big threat.Meanwhile, when also there is construction trouble, installation fee in traditional punching tendon-planted craft, labor strength it is high,
Need charging construction safely can not ensure without guarantee, the dust of work progress, noise injury workers ' health, installation quality, installation portion
The shortcomings of part displacement is difficult, finally brings long-term hidden danger to operation.
The content of the invention:
The technical problems to be solved by the invention are to be directed to prior art when installing subway tunnel electromechanical equipment and pipeline
In the presence of to tunnel structure destruction is serious, construction is troublesome, infringement safety of workers is healthy, installation quality can not ensure and may be to fortune
The shortcomings of battalion brings long-term hidden danger is used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline there is provided a kind of.
The technical scheme adopted by the invention to solve the technical problem is that:For Fast Installation subway tunnel electromechanical equipment and
The device of pipeline, it is characterised in that:It is described pre- including tunnel duct piece, cast-in fixing bolt, multiple external anti-seismic chutes and mounting bracket
Burying crab-bolt includes section of jurisdiction positioner and crab-bolt, and a crab-bolt, section of jurisdiction positioning are fixed in the two ends of section of jurisdiction positioner vertically respectively
Device is embedded in the madial wall of tunnel duct piece, axis direction arrangement of multiple external anti-seismic chutes along tunnel duct piece, each outer
Putting antidetonation chute includes c-type band tooth chute and at least two mounting seats, and at least two mounting seats are fixed on c-type band tooth chute
Dorsal part and be arranged at intervals along its length, each external anti-seismic chute passes through the crab-bolt of multiple cast-in fixing bolts and at least two
Mounting seat is fixed on the madial wall of tunnel duct piece along the circumferencial direction of tunnel duct piece, and mounting bracket is slided with multiple external anti-seismics
Groove is fixedly connected.
Wherein, tunnel duct piece includes 3 pieces of calibrated bolcks, 2 pieces of adjacent blocks and 1 piece of wedge.
Wherein, the mounting bracket includes bracket, ring stand and suspension bracket, and one end of bracket is fixed with external anti-seismic chute to be connected
Connect, the other end of bracket points to the centre of tunnel duct piece;One end of ring stand is fixedly connected with external anti-seismic chute, ring stand it is another
End is provided with pipeline mounting hole;Suspension bracket is fixedly connected with the external anti-seismic chute at the top of tunnel duct piece madial wall.
Wherein, two axially extending tracks along tunnel duct piece are set in the madial wall bottom of tunnel duct piece.
Wherein, the cast-in fixing bolt also includes crab-bolt sheath, and the crab-bolt of each cast-in fixing bolt is correspondingly arranged a crab-bolt shield
Set.
Wherein, the mounting seat is the steel disc for offering two anchor holes, and two anchor holes are located at c-type band tooth and slided respectively
The both sides of groove.
Wherein, diameter of the c-type with tooth chute is equal to the internal diameter of tunnel duct piece.
The present invention is due to taking above-mentioned technical proposal, and it has the advantages that:
It is of the present invention to be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, by tunnel duct piece
Cast-in fixing bolt is set to instead of traditional punching tendon-planted craft, without the intensive punching on tunnel structure, it is ensured that to tunnel knot
Structure zero is damaged, and is protected the integrality of tunnel structure, is greatly extended the service life of tunnel structure, also ensured subway circulation
Safety;And revolutionize the looks that traditional handicraft dust is more, the big construction environment of noise is severe, it is to avoid to workmen's health
Infringement;Also have the advantages that Embedment Construction is simple, quick for installation, can significantly save electromechanical equipment and pipeline installation period;
Meanwhile, do not increase cost in the subway construction phase, later stage operation maintenance is simple can to save huge maintenance, overhaul cost without overhaul,
Construction and maintenance cost can be greatly reduced.
Brief description of the drawings:
Fig. 1 is the structural representation of the present invention for Fast Installation subway tunnel electromechanical equipment and the device of pipeline
Figure;
Fig. 2 is the structural representation of cast-in fixing bolt of the present invention;
Fig. 3 is the structural representation of external anti-seismic chute of the present invention.
Embodiment:
Present disclosure is described further below in conjunction with accompanying drawing.
As shown in Figure 1, Figure 2 and Figure 3, it is of the present invention to be used for the dress of Fast Installation subway tunnel electromechanical equipment and pipeline
Put, it is characterised in that:Including tunnel duct piece 1, cast-in fixing bolt 2, multiple external anti-seismic chutes 3 and mounting bracket 4, the pre-buried anchor
Bolt 2 includes section of jurisdiction positioner 21 and crab-bolt 22, and a crab-bolt 22, section of jurisdiction are fixed in the two ends of section of jurisdiction positioner 21 vertically respectively
Positioner 21 is embedded in the madial wall of tunnel duct piece 1, axis direction cloth of multiple external anti-seismic chutes 3 along tunnel duct piece 1
Put, each external anti-seismic chute 3 includes c-type band tooth chute 31 and at least two mounting seats 32, at least two mounting seats 32
It is fixed on dorsal part of the c-type with tooth chute 31 and is arranged at intervals along its length, each external anti-seismic chute 3 passes through multiple pre-buried
Circumferencial direction of the mounting seat 32 of crab-bolt 22 and at least two of crab-bolt 2 along tunnel duct piece 1 is fixed on the madial wall of tunnel duct piece 1
On, mounting bracket 4 is fixedly connected with multiple external anti-seismic chutes 3;So by setting cast-in fixing bolt 2 in tunnel duct piece 1, replace
For traditional punching tendon-planted craft, just without the intensive punching on tunnel structure, it is ensured that tunnel structure zero is damaged, protect
The integrality of tunnel structure, greatly extends the service life of tunnel structure, has also ensured subway circulation safety;And thoroughly
Change the looks that traditional handicraft dust is more, the big construction environment of noise is severe, it is to avoid the infringement to workmen's health;Also have
Embedment Construction is simple, quick for installation, can significantly save the advantage of electromechanical equipment and pipeline installation period;Meanwhile, built in subway
If the phase does not increase cost, later stage operation maintenance is simple without overhaul, can save huge maintenance, overhaul cost, can be greatly reduced
Build and maintenance cost.
Wherein, tunnel duct piece 1 refers to the tunnel of shield construction, the liner structure generally used;Tunnel duct piece is all used
Be precast block mode, then assembled cyclization;Most conventional shield method subway sectional tunnel, tunnel duct piece typically all uses 5+
1 pattern, 3 pieces of calibrated bolck B blocks, 2 pieces of adjacent block L blocks and 1 piece of wedge (bind block) K block.
In Fig. 1, the mounting bracket 4 includes bracket 41, ring stand 42 and suspension bracket 43, one end of bracket 41 and external anti-seismic
Chute 3 is fixedly connected, and the other end of bracket 41 points to the centre of tunnel duct piece 1;One end of ring stand 42 is consolidated with external anti-seismic chute 3
Fixed connection, the other end of ring stand 42 is provided with pipeline mounting hole;Suspension bracket 43 is external anti-at the top of the madial wall of tunnel duct piece 1 with being located at
Shake chute 3 is fixedly connected;Certainly, the particular number and type of the bracket 41 of the mounting bracket 4, ring stand 42 and suspension bracket 43, can
Depending on the demands such as the electromechanical equipment of required installation, pipeline.Fig. 1 also show the madial wall bottom setting in tunnel duct piece 1
Two axially extending tracks 5 along tunnel duct piece 1.
In fig. 2, the cast-in fixing bolt 2 also includes crab-bolt sheath 23, and the crab-bolt 22 of each cast-in fixing bolt 2 is correspondingly arranged one
Individual crab-bolt sheath 23.
In figure 3, the mounting seat 32 is the steel disc for offering two anchor holes, and two anchor holes are located at c-type respectively
Both sides with tooth chute 31.Preferably, diameter of the c-type with tooth chute 31 is equal to the internal diameter of tunnel duct piece 1.
Claims (7)
1. for Fast Installation subway tunnel electromechanical equipment and the device of pipeline, it is characterised in that:Including tunnel duct piece, pre-buried anchor
Bolt, multiple external anti-seismic chutes and mounting bracket, the cast-in fixing bolt include section of jurisdiction positioner and crab-bolt, section of jurisdiction positioner
Two ends fix a crab-bolt vertically respectively, section of jurisdiction positioner is embedded in the madial wall of tunnel duct piece, multiple external anti-seismics
Axis direction arrangement of the chute along tunnel duct piece, each external anti-seismic chute includes c-type band tooth chute and at least two and installs bottom
Seat, at least two mounting seats are fixed on dorsal part of the c-type with tooth chute and are arranged at intervals along its length, each external anti-seismic
Chute is fixed on tunneltron by the crab-bolt and at least two mounting seats of multiple cast-in fixing bolts along the circumferencial direction of tunnel duct piece
On the madial wall of piece, mounting bracket is fixedly connected with multiple external anti-seismic chutes.
2. according to claim 1 be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that:
Tunnel duct piece includes 3 pieces of calibrated bolcks, 2 pieces of adjacent blocks and 1 piece of wedge.
3. according to claim 1 be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that:
The mounting bracket includes bracket, ring stand and suspension bracket, and one end of bracket is fixedly connected with external anti-seismic chute, the other end of bracket
Point to the centre of tunnel duct piece;One end of ring stand is fixedly connected with external anti-seismic chute, and the other end of ring stand is pacified provided with pipeline
Fill hole;Suspension bracket is fixedly connected with the external anti-seismic chute at the top of tunnel duct piece madial wall.
4. according to claim 1 be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that:
In the madial wall bottom of tunnel duct piece, two axially extending tracks along tunnel duct piece are set.
5. according to claim 1 be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that:
The cast-in fixing bolt also includes crab-bolt sheath, and the crab-bolt of each cast-in fixing bolt is correspondingly arranged a crab-bolt sheath.
6. according to claim 1 be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that:
The mounting seat is the steel disc for offering two anchor holes, and two anchor holes are located at both sides of the c-type with tooth chute respectively.
7. according to claim 1 be used for the device of Fast Installation subway tunnel electromechanical equipment and pipeline, it is characterised in that:
Diameter of the c-type with tooth chute is equal to the internal diameter of tunnel duct piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486888.8A CN107218059B (en) | 2017-06-23 | 2017-06-23 | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710486888.8A CN107218059B (en) | 2017-06-23 | 2017-06-23 | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107218059A true CN107218059A (en) | 2017-09-29 |
CN107218059B CN107218059B (en) | 2019-03-29 |
Family
ID=59951367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710486888.8A Active CN107218059B (en) | 2017-06-23 | 2017-06-23 | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107218059B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590759A (en) * | 2018-06-28 | 2018-09-28 | 彭健 | A kind of hangers victory assembling device and its installation method |
CN109113760A (en) * | 2018-07-06 | 2019-01-01 | 江苏华威线路设备集团有限公司 | A kind of prompt dress engineering method of environmental protection for Fast Installation shield tunnel electromechanical equipment pipeline |
CN112431610A (en) * | 2020-12-17 | 2021-03-02 | 华侨大学 | Mounting structure and mounting method of shield tunnel auxiliary equipment |
CN113266395A (en) * | 2021-07-01 | 2021-08-17 | 上海市城市建设设计研究总院(集团)有限公司 | Shield tunnel pipeline support connecting device and anti-falling device in earthquake high-intensity area |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103075190A (en) * | 2013-01-08 | 2013-05-01 | 嘉善三方电力器材有限公司 | Cable support for supporting cable in subway tunnel |
US8491061B2 (en) * | 2011-10-17 | 2013-07-23 | Michel Bernard Breault | System for spraying water to reduce dust while drilling in a mine tunnel |
CN104747206A (en) * | 2015-03-18 | 2015-07-01 | 济南轨道交通集团有限公司 | Shield tunnel segment structure considering municipal cable pipelines and installing method |
CN105317460A (en) * | 2014-06-04 | 2016-02-10 | 达诺尔电气(集团)有限公司 | Tunnel cable hanging frame |
CN205532621U (en) * | 2016-02-03 | 2016-08-31 | 维机轨道交通科技(镇江)有限公司 | Pre -buried formula section of jurisdiction and channel mounting structure |
CN205638473U (en) * | 2016-05-20 | 2016-10-12 | 北京建工混凝土构件有限公司 | Novel shield tunnel section of jurisdiction |
CN206987887U (en) * | 2017-05-07 | 2018-02-09 | 福建康元捷装有限公司 | Subway tunnel electromechanical equipment and pipeline quick fixation structure |
-
2017
- 2017-06-23 CN CN201710486888.8A patent/CN107218059B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8491061B2 (en) * | 2011-10-17 | 2013-07-23 | Michel Bernard Breault | System for spraying water to reduce dust while drilling in a mine tunnel |
CN103075190A (en) * | 2013-01-08 | 2013-05-01 | 嘉善三方电力器材有限公司 | Cable support for supporting cable in subway tunnel |
CN105317460A (en) * | 2014-06-04 | 2016-02-10 | 达诺尔电气(集团)有限公司 | Tunnel cable hanging frame |
CN104747206A (en) * | 2015-03-18 | 2015-07-01 | 济南轨道交通集团有限公司 | Shield tunnel segment structure considering municipal cable pipelines and installing method |
CN205532621U (en) * | 2016-02-03 | 2016-08-31 | 维机轨道交通科技(镇江)有限公司 | Pre -buried formula section of jurisdiction and channel mounting structure |
CN205638473U (en) * | 2016-05-20 | 2016-10-12 | 北京建工混凝土构件有限公司 | Novel shield tunnel section of jurisdiction |
CN206987887U (en) * | 2017-05-07 | 2018-02-09 | 福建康元捷装有限公司 | Subway tunnel electromechanical equipment and pipeline quick fixation structure |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108590759A (en) * | 2018-06-28 | 2018-09-28 | 彭健 | A kind of hangers victory assembling device and its installation method |
CN109113760A (en) * | 2018-07-06 | 2019-01-01 | 江苏华威线路设备集团有限公司 | A kind of prompt dress engineering method of environmental protection for Fast Installation shield tunnel electromechanical equipment pipeline |
CN112431610A (en) * | 2020-12-17 | 2021-03-02 | 华侨大学 | Mounting structure and mounting method of shield tunnel auxiliary equipment |
CN112431610B (en) * | 2020-12-17 | 2022-09-06 | 华侨大学 | Mounting structure and mounting method of shield tunnel auxiliary equipment |
CN113266395A (en) * | 2021-07-01 | 2021-08-17 | 上海市城市建设设计研究总院(集团)有限公司 | Shield tunnel pipeline support connecting device and anti-falling device in earthquake high-intensity area |
Also Published As
Publication number | Publication date |
---|---|
CN107218059B (en) | 2019-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107218059A (en) | For Fast Installation subway tunnel electromechanical equipment and the device of pipeline | |
CN206987887U (en) | Subway tunnel electromechanical equipment and pipeline quick fixation structure | |
CN103243815B (en) | End-anchored composite beam structure and corresponding reinforcing construction method | |
CN102094649A (en) | Method for constructing underground space by shield-shallow buried covered excavation composite method | |
CN108678775A (en) | A kind of anti-horizontal ovalizing deflection shield tunnel ruggedized construction of pre-embedded steel slab and construction method | |
CN109252875A (en) | Existing tunnel lining reinforcement structure and reinforcement means | |
CN106049289B (en) | Bailey beam make-shift bridge transform the construction method of steel reinforced concrete combination permanent bridge as | |
CN203639932U (en) | Pre-embedded foundation structure used for installation of machine column of high-column signal machine of railway | |
CN103938875A (en) | Ground single body tensioning lifting construction method of single layer suspendome | |
CN104989419B (en) | A kind of Tunnel invades the processing method and its construction corollary equipment of limit | |
CN110004791A (en) | A kind of prestressing without bondn assembled road and its construction method | |
CN108162162A (en) | A kind of precast concrete column and preparation method thereof and application method | |
CN105239475A (en) | Line reinforced structure in culvert jacking process under complex existing railway line | |
CN215857846U (en) | A template braced system for circular shaft reverse construction method | |
CN205532623U (en) | Be applicable to special ground shield tunnel segment ring | |
CN113586060A (en) | Construction method for freezing common tunneling prefabricated well wall support | |
CN106906704B (en) | High-speed rail non-fragment orbit repairs roadbed physical isolation method | |
CN207793762U (en) | A kind of precast concrete column for attachment rail | |
CN111236965A (en) | In-situ jacking and assembling construction method for fabricated tunnel lining structure | |
CN209244590U (en) | Surrounding rock of chamber pays protecting system and cavern's structure in advance | |
CN206987826U (en) | Tunnel duct piece and its external anti-seismic chute used | |
CN208803307U (en) | The rapid splicing structure in streetcar track basis | |
CN111271078A (en) | Construction method for assembling sectional longitudinal translation in prefabricated tunnel lining structure tunnel | |
CN102767140B (en) | Construction method for rapidly mounting and dismounting temporary support of continuous girder bridge pier | |
CN109404019A (en) | Surrounding rock of chamber pays protecting system and cavern's structure in advance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Unit B-1 25 51 Road Gulou District of Fuzhou city of Fujian Province, No. 32 Building, 350001 yuan Applicant after: Kang Yuan rail transport technology (Fujian) Co., Ltd. Address before: Unit B-1 25 51 Road Gulou District of Fuzhou city of Fujian Province, No. 32 Building, 350001 yuan Applicant before: Fujian Kang Yuanjie dress Co Ltd |
|
GR01 | Patent grant | ||
GR01 | Patent grant |