CN113586060A - Construction method for freezing common tunneling prefabricated well wall support - Google Patents
Construction method for freezing common tunneling prefabricated well wall support Download PDFInfo
- Publication number
- CN113586060A CN113586060A CN202110997013.0A CN202110997013A CN113586060A CN 113586060 A CN113586060 A CN 113586060A CN 202110997013 A CN202110997013 A CN 202110997013A CN 113586060 A CN113586060 A CN 113586060A
- Authority
- CN
- China
- Prior art keywords
- well wall
- shaft
- prefabricated
- wall
- freezing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 230000008014 freezing Effects 0.000 title claims abstract description 19
- 238000007710 freezing Methods 0.000 title claims abstract description 19
- 230000005641 tunneling Effects 0.000 title claims abstract description 15
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 6
- 238000009434 installation Methods 0.000 claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 16
- 238000000034 method Methods 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 7
- 238000009415 formwork Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/10—Preparation of the ground
- E21D1/12—Preparation of the ground by freezing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/04—Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/11—Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The invention discloses a construction method for freezing a common tunneling prefabricated well wall support, which comprises the following steps: 1) freezing the stratum at the construction position of the shaft; 2) after the shaft is frozen and looped, constructing the vertical shaft, and after a vertical shaft section is constructed, binding reinforcing steel bars by using a diaphragm plate, pouring concrete, constructing an outer-layer shaft wall and constructing to the bottom of the vertical shaft; 3) when an inner-layer well wall is constructed, the prefabricated pipe pieces are hoisted and assembled underground, and the prefabricated pipe pieces are constructed to a well mouth from the bottom of a vertical shaft; 4) and when the inner-layer well wall is installed, the gap between the inner-layer well wall and the outer wall is subjected to grouting treatment by synchronously utilizing the installation of the prefabricated pipe piece and the grouting hole. When the inner-layer well wall is constructed, the invention utilizes the vertical well wall duct pieces prefabricated in advance on the ground to carry out underground assembly, thereby solving the problems of poor construction quality of the vertical well wall, large thickness of the inner-layer well wall, long construction period and high labor intensity of workers.
Description
Technical Field
The invention relates to a construction method of a mine vertical shaft, in particular to a construction method of a frozen common tunneling prefabricated shaft wall support.
Background
In engineering design, a geological condition that the water inflow of a vertical shaft is large is often met, and because the water inflow of the shaft is large, a construction method of sinking the shaft by a freezing method has to be adopted in many mines. The construction method that the inner wall and the outer wall of the vertical shaft wall are both made of concrete poured by the templates, the inner layer wall of the shaft is made of a sliding formwork construction method, and the shaft wall is made of high-grade concrete, so that the thickness of the shaft wall is large, the construction condition is poor, the problem of hydration heat is not solved, and the construction method has the defects that the thickness of the inner layer wall of the shaft is large, the vertical shaft wall of the shaft needs to be bound with reinforcing steel bars and poured with concrete, the maintenance period is long, the construction quality of the shaft wall of the shaft is poor, the labor intensity of workers is high, the construction period of the shaft wall of the shaft is long, and the like.
Disclosure of Invention
The invention aims to provide a construction method for freezing a common tunneling prefabricated well wall support aiming at the existing problems. When the inner-layer well wall is constructed, the vertical well wall segments prefabricated on the ground in advance are utilized for underground assembly, so that the problems that the vertical well wall is poor in construction quality, the inner-layer well wall is large in thickness, the construction period is long, and the labor intensity of workers is large are solved.
In order to achieve the purpose, the invention adopts the technical scheme that:
a construction method for freezing a common tunneling prefabricated well wall support comprises the following steps:
1) freezing the stratum at the construction position of the shaft;
2) after the shaft is frozen and looped, constructing the vertical shaft, and after a vertical shaft section is constructed, binding reinforcing steel bars by using a diaphragm plate, pouring concrete, constructing an outer-layer shaft wall and constructing to the bottom of the vertical shaft;
3) when an inner-layer well wall is constructed, the prefabricated pipe pieces are hoisted and assembled underground, and the prefabricated pipe pieces are constructed to a well mouth from the bottom of a vertical shaft;
4) and when the inner-layer well wall is installed, the gap between the inner-layer well wall and the outer wall is subjected to grouting treatment by synchronously utilizing the installation of the prefabricated pipe piece and the grouting hole.
The invention has the further improvement that in the step 2), a water cushion groove is arranged at the butt joint of the pipe piece of the outer well wall and the pipe piece of the inner well wall, and a water stop cushion which expands when meeting water is arranged when the pipe piece of the inner well wall is arranged
The invention has the further improvement that in the step 3), the pipe pieces are manufactured according to the diameter of the shaft, and 6 pipe pieces are assembled into a ring and completed by adopting a through joint assembling method and a staggered joint assembling method.
The invention is further improved in that the annular parts of the pipe pieces are connected by high-strength bolts. The vertical bolt hole that sets up of section of jurisdiction, the section of jurisdiction sets up steel bolt through the bolt hole and connects between the ring.
The invention has the further improvement that water stop pads are arranged between the pipe pieces and between the ring directions of the pipe pieces.
The invention has the further improvement that the duct piece assembling positioning block D blocks and the assembling standard blocks B1 and B2 are crossed left and right; assembling the adjacent blocks L1 and L12 to be crossed left and right, and finally assembling the F block to be inserted longitudinally.
Compared with the prior art, the invention has at least the following beneficial technical effects:
the invention provides a construction method for freezing a common tunneling prefabricated well wall support, which adopts freezing construction and common tunneling, adopts formwork construction to pour concrete for an outer well wall person, adopts ground prefabricated vertical well wall pipe pieces when constructing an inner vertical well wall, carries out underground assembly, and utilizes pipe piece grouting pipes to carry out inner and outer well wall grouting. The problems of poor construction quality of the vertical shaft wall, large thickness of the inner layer wall, long construction period and high labor intensity of workers are solved. The method has the advantages of guaranteed and controllable quality of the inner well wall of the vertical shaft, low safety risk, low cost, high construction speed, short construction period, low investment and the like.
Drawings
FIG. 1 is a diagram of the borehole wall structure.
Fig. 2 is a schematic diagram of the assembling sequence of prefabricated pipe pieces on the inner well wall of the vertical well.
Fig. 3 is a diagram of the position of the tube sheet after looping.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
The invention provides a construction method for freezing a common tunneling prefabricated well wall support, which comprises the following steps of:
1) freezing the stratum at the construction position of the shaft;
2) after the shaft is frozen and jointed, the vertical shaft is constructed by adopting a common method, after a vertical shaft section is constructed to be high, a diaphragm plate is adopted for binding reinforcing steel bars, concrete is poured, the outer wall of the shaft is constructed to be constructed to the bottom of the vertical shaft, a water cushion groove is arranged at the joint of the segment of the outer wall of the shaft and the segment of the inner wall of the shaft, and a water-swelling water stop cushion is arranged when the segment of the inner wall of the shaft is installed.
3) When the inner-layer well wall is constructed, the prefabricated pipe pieces are lifted and assembled underground, and the construction is always carried out from the bottom of the vertical shaft to a well mouth. The pipe pieces are manufactured according to the diameter of a shaft, the number of the pipe pieces which are generally assembled into a ring is 6, and through joint assembling and staggered joint assembling methods can be adopted. The segments are connected in the circumferential direction by high-strength bolts. The vertical bolt hole that sets up of section of jurisdiction, the section of jurisdiction sets up steel bolt through the bolt hole and connects between the ring. Water stopping pads are arranged between the annular direction of the duct piece and the annular direction of the duct piece.
The segment assembling positioning blocks D and the assembling standard blocks B1 and B2 are crossed left and right; assembling the adjacent blocks L1 and L12 to be crossed left and right, and finally assembling the F block to be inserted longitudinally.
The structure diagram of the vertical shaft wall is shown in figure 1, the assembly sequence diagram of prefabricated pipe pieces on the inner layer shaft wall of the vertical shaft is shown in figure 2, and the position of the pipe pieces after ring forming is shown in figure 3.
4) And when the inner-layer well wall is installed, the gap between the inner-layer well wall and the outer wall is subjected to grouting treatment by synchronously utilizing the installation of the prefabricated pipe piece and the grouting hole.
Examples
The net diameter is 7.0m, the inner well wall is 500mm, the outer wall well wall is 450mm, and the inner well wall is 6 parts with the same size. The method comprises the following specific steps:
1) freezing the stratum at the construction position of the shaft;
2) after the shaft is frozen and jointed, the vertical shaft is constructed by adopting a common method, after a vertical shaft section is constructed to be high, a diaphragm plate is adopted for binding reinforcing steel bars, concrete is poured, the outer wall of the shaft is constructed to be constructed to the bottom of the vertical shaft, a water cushion groove is arranged at the joint of the segment of the outer wall of the shaft and the segment of the inner wall of the shaft, and a water-swelling water stop cushion is arranged when the segment of the inner wall of the shaft is installed.
3) When the inner-layer well wall is constructed, the prefabricated pipe pieces are lifted and assembled underground, and the construction is always carried out from the bottom of the vertical shaft to a well mouth. The pipe pieces are manufactured according to the diameter of a shaft, the number of the pipe pieces which are generally assembled into a ring is 6, and through joint assembling and staggered joint assembling methods can be adopted. The segments are connected in the circumferential direction by high-strength bolts. The vertical bolt hole that sets up of section of jurisdiction, the section of jurisdiction sets up steel bolt through the bolt hole and connects between the ring. Water stopping pads are arranged between the annular direction of the duct piece and the annular direction of the duct piece.
The segment assembling positioning blocks D and the assembling standard blocks B1 and B2 are crossed left and right; assembling the adjacent blocks L1 and L12 to be crossed left and right, and finally assembling the F block to be inserted longitudinally.
The structure diagram of the vertical shaft wall is shown in figure 1, the assembly sequence diagram of prefabricated pipe pieces on the inner layer shaft wall of the vertical shaft is shown in figure 2, and the position of the pipe pieces after ring forming is shown in figure 3.
4) And when the inner-layer well wall is installed, the gap between the inner-layer well wall and the outer wall is subjected to grouting treatment by synchronously utilizing the installation of the prefabricated pipe piece and the grouting hole.
Although the invention has been described in detail hereinabove with respect to a general description and specific embodiments thereof, it will be apparent to those skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.
Claims (6)
1. A construction method for freezing a common tunneling prefabricated well wall support is characterized by comprising the following steps:
1) freezing the stratum at the construction position of the shaft;
2) after the shaft is frozen and looped, constructing the vertical shaft, and after a vertical shaft section is constructed, binding reinforcing steel bars by using a diaphragm plate, pouring concrete, constructing an outer-layer shaft wall and constructing to the bottom of the vertical shaft;
3) when an inner-layer well wall is constructed, the prefabricated pipe pieces are hoisted and assembled underground, and the prefabricated pipe pieces are constructed to a well mouth from the bottom of a vertical shaft;
4) and when the inner-layer well wall is installed, the gap between the inner-layer well wall and the outer wall is subjected to grouting treatment by synchronously utilizing the installation of the prefabricated pipe piece and the grouting hole.
2. The construction method for freezing a common tunneling prefabricated well wall support according to claim 1, characterized in that in the step 2), a water cushion groove is arranged at the joint of the pipe piece of the outer well wall and the pipe piece of the inner well wall, and a water stop cushion which expands when water is filled is arranged when the pipe piece of the inner well wall is installed
3. The construction method for freezing a common tunneling prefabricated well wall support according to claim 1, characterized in that in the step 3), the pipe pieces are manufactured according to the diameter of the well shaft, and 6 pipe pieces are assembled into a ring and completed by adopting a through joint assembling method and a staggered joint assembling method.
4. The construction method for freezing a common tunneling prefabricated well wall support according to claim 3, characterized in that the annular segments are connected by high-strength bolts. The vertical bolt hole that sets up of section of jurisdiction, the section of jurisdiction sets up steel bolt through the bolt hole and connects between the ring.
5. The construction method for the frozen common tunneling prefabricated well wall support according to claim 3, characterized in that water stop pads are arranged between the annular direction of the duct piece and the annular direction of the duct piece.
6. The construction method for freezing a common tunneling prefabricated well wall support according to claim 3, wherein the segment splicing positioning block D, the splicing standard blocks B1 and B2 are crossed left and right; assembling the adjacent blocks L1 and L12 to be crossed left and right, and finally assembling the F block to be inserted longitudinally.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110997013.0A CN113586060A (en) | 2021-08-27 | 2021-08-27 | Construction method for freezing common tunneling prefabricated well wall support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110997013.0A CN113586060A (en) | 2021-08-27 | 2021-08-27 | Construction method for freezing common tunneling prefabricated well wall support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113586060A true CN113586060A (en) | 2021-11-02 |
Family
ID=78239794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110997013.0A Pending CN113586060A (en) | 2021-08-27 | 2021-08-27 | Construction method for freezing common tunneling prefabricated well wall support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113586060A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162543A (en) * | 2022-07-11 | 2022-10-11 | 中冶南方城市建设工程技术有限公司 | Composite waterproof protective cylinder for reserved hole |
US11878479B1 (en) * | 2022-09-20 | 2024-01-23 | Jiangsu Ocean University | Film winding assembly and winding method for use in fiber-reinforced plastic tank production |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103133004A (en) * | 2013-01-25 | 2013-06-05 | 北京中煤矿山工程有限公司 | Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft |
CN203081452U (en) * | 2013-01-23 | 2013-07-24 | 中国矿业大学 | Compound double-layer freezing shaft wall with sprayed film interlayer |
CN104533425A (en) * | 2015-01-04 | 2015-04-22 | 中煤能源黑龙江煤化工有限公司 | Vertical shaft overall pouring section walling crib and vertical shaft overall pouring section walling crib construction method |
CN204552747U (en) * | 2015-04-21 | 2015-08-12 | 西安科技大学 | A kind of coal mine shaft lining shaft wall structure |
CN105134219A (en) * | 2015-08-12 | 2015-12-09 | 北京中煤矿山工程有限公司 | Construction technology for freezing shaft lining in soft rock layer |
CN106121658A (en) * | 2016-08-05 | 2016-11-16 | 煤炭工业合肥设计研究院 | Freeze-wellboring pit shaft borehole wall supporting construction and construction method thereof |
CN107387089A (en) * | 2017-06-21 | 2017-11-24 | 中煤邯郸特殊凿井有限公司 | Prevent water freezing device in inclined shaft freezing osculum |
CN213625657U (en) * | 2020-11-03 | 2021-07-06 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Prefabricated concrete segment of assembled open caisson |
-
2021
- 2021-08-27 CN CN202110997013.0A patent/CN113586060A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203081452U (en) * | 2013-01-23 | 2013-07-24 | 中国矿业大学 | Compound double-layer freezing shaft wall with sprayed film interlayer |
CN103133004A (en) * | 2013-01-25 | 2013-06-05 | 北京中煤矿山工程有限公司 | Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft |
CN104533425A (en) * | 2015-01-04 | 2015-04-22 | 中煤能源黑龙江煤化工有限公司 | Vertical shaft overall pouring section walling crib and vertical shaft overall pouring section walling crib construction method |
CN204552747U (en) * | 2015-04-21 | 2015-08-12 | 西安科技大学 | A kind of coal mine shaft lining shaft wall structure |
CN105134219A (en) * | 2015-08-12 | 2015-12-09 | 北京中煤矿山工程有限公司 | Construction technology for freezing shaft lining in soft rock layer |
CN106121658A (en) * | 2016-08-05 | 2016-11-16 | 煤炭工业合肥设计研究院 | Freeze-wellboring pit shaft borehole wall supporting construction and construction method thereof |
CN107387089A (en) * | 2017-06-21 | 2017-11-24 | 中煤邯郸特殊凿井有限公司 | Prevent water freezing device in inclined shaft freezing osculum |
CN213625657U (en) * | 2020-11-03 | 2021-07-06 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Prefabricated concrete segment of assembled open caisson |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162543A (en) * | 2022-07-11 | 2022-10-11 | 中冶南方城市建设工程技术有限公司 | Composite waterproof protective cylinder for reserved hole |
CN115162543B (en) * | 2022-07-11 | 2023-10-20 | 中冶南方城市建设工程技术有限公司 | A waterproof protective cylinder of combined type for reserving hole |
US11878479B1 (en) * | 2022-09-20 | 2024-01-23 | Jiangsu Ocean University | Film winding assembly and winding method for use in fiber-reinforced plastic tank production |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204041081U (en) | A kind of constructing tunnel preliminary bracing device | |
CN110630283B (en) | Three-layer supporting structure suitable for double-arch tunnel and construction method | |
CN110821503B (en) | Construction method for main body of ultra-deep shield section air shaft after tunnel advance | |
CN106930777B (en) | The construction method that Bored Section of Metro main track assembled two serves as a contrast | |
CN107091101B (en) | Superimposed joint structure of middle mine shield junction tunnel in sea area and construction method | |
CN113586060A (en) | Construction method for freezing common tunneling prefabricated well wall support | |
CN105909268B (en) | Prestressing combination formula well tunnel modular structure construction method and modular structure | |
CN107725068A (en) | A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab | |
CN105484765A (en) | Fabricated secondary lining structure of bored tunnel and construction method of fabricated secondary lining structure | |
CN201412163Y (en) | Circular tunnel lining structure for construction of open-type tunnel boring machine | |
CN105351001B (en) | A kind of method based on gob side entry retaining region reinforcement gas pumping | |
CN105862990A (en) | Prefabricated assembly well wall structure and construction method thereof | |
CN107460882A (en) | A kind of retaining piles construction method of deep basal pit closing sealing | |
CN108843342A (en) | Realize the assembled preliminary bracing structure of tunnel quick closure | |
CN106014456A (en) | Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof | |
CN111648787A (en) | Method for reinforcing shield tunnel lining structure by adopting ultra-high performance concrete | |
CN111305869A (en) | Prefabricated lining structure of arch wall and construction method | |
CN113006822A (en) | Special-shaped shield segment structure penetrating through yellow land cracks and construction method thereof | |
CN207033463U (en) | Mine shield handing-over tunnel folded type joint design in the middle part of marine site | |
CN109989756B (en) | Method for preventing water inrush and sand collapse of thick-surface-soil thin-bedrock drilling shaft | |
CN103133004A (en) | Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft | |
CN109184752B (en) | Supporting structure for coal mine to penetrate through old kiln goaf and supporting method thereof | |
CN111236965A (en) | In-situ jacking and assembling construction method for fabricated tunnel lining structure | |
CN102619521B (en) | Construction method for vertical shaft bedrock section wall structure | |
CN114109442A (en) | Tunnel karst broken zone collapse half-section curtain forward grouting reinforcement treatment method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |