CN108843342A - Realize the assembled preliminary bracing structure of tunnel quick closure - Google Patents

Realize the assembled preliminary bracing structure of tunnel quick closure Download PDF

Info

Publication number
CN108843342A
CN108843342A CN201810925767.3A CN201810925767A CN108843342A CN 108843342 A CN108843342 A CN 108843342A CN 201810925767 A CN201810925767 A CN 201810925767A CN 108843342 A CN108843342 A CN 108843342A
Authority
CN
China
Prior art keywords
preliminary bracing
assembled
inverted arch
jurisdiction
batch production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810925767.3A
Other languages
Chinese (zh)
Inventor
靳宝成
符亚鹏
李国良
何永旺
黄双林
刘国庆
严文翔
司剑钧
史先伟
陈霄汉
陈海军
程芳卉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201810925767.3A priority Critical patent/CN108843342A/en
Publication of CN108843342A publication Critical patent/CN108843342A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Abstract

The present invention relates to the assembled preliminary bracing structure for realizing tunnel quick closure, the gunite concrete arch wall preliminary bracing of the preliminary bracing of assembled inverted arch and upper part including bottom, the two circumferential direction forms close ring;The preliminary bracing of assembled inverted arch is made of the splicing of multi-disc batch production prefabricated unit section of jurisdiction, and gunite concrete arch wall preliminary bracing scene is performed using wet spraying process.The present invention is in drill+blast tunnel construction, anchor steel frame supporting construction is sprayed instead of traditional inverted arch using assembled inverted arch preliminary bracing structure, assembled inverted arch preliminary bracing structure each unit section of jurisdiction is the prefabricated grid steel frame concrete structure of batch production, it is assembled using mechanical-assisted in tunnel, reliable in quality is easy to guarantee, consolidation service is high-efficient, it can be achieved that with gunite concrete arch wall preliminary bracing quick closure.

Description

Realize the assembled preliminary bracing structure of tunnel quick closure
Technical field
The present invention relates to traffic tunnel field of engineering technology, and in particular at the beginning of a kind of assembled for realizing tunnel quick closure Phase supporting construction.
Background technique
The composite lining of tunnel structure of drill bursting construction mainly includes:Pneumatically placed concrete(Steelframe)Preliminary bracing, mould build two Secondary lining cutting, general Support System in Soft Rock Tunnels inverted arch bottom are also provided with pneumatically placed concrete(Steelframe)Preliminary bracing structure, construction often use Benching tunnelling method or other partial excavation methods are completed by several times, are limited to constructing tunnel step sequence, and inverted arch often finally excavates, and at the beginning of inverted arch Phase supporting is also to apply before pouring mould and building secondary lining inverted arch, and detent position farther out, cannot achieve apart from tunnel tunnel face Tunnel closes cyclization in time.With the raising of tunneling technology and mechanical equipment manufacture level, more and more Tunnel Engineering uses mechanized construction.Mechanized construction generally uses tunneling boring or micro- benching tunnelling method once to excavate containing inverted arch, can It effectively improves operating efficiency, reduce multiple explosion to the disturbance of country rock and supporting construction, reduction labor intensity, improvement construction personnel Operating environment etc., but for Support System in Soft Rock Tunnels, the timely closing cyclization of preliminary bracing extremely closes stable structure and construction safety It is important, and traditional pneumatically placed concrete(Steelframe)When supporting construction its maximum efficiency from applying to giving full play to generally requires certain Between, supporting construction overall stiffness is weaker before gunite concrete gives full play to efficiency, and the repetition of big machinery, which rolls, to be easily caused Preliminary bracing structure is destroyed.Therefore, development of new can quick closure, quality controllable assembled inverted arch preliminary bracing structure The problem of being soft rock tunnel construction urgent need to resolve, assembled inverted arch preliminary bracing structure is prefabricated using batch production, and quality is easy to protect Card is, it can be achieved that quick assembling, preliminary bracing quick closure, it is ensured that stable structure and construction safety.
Summary of the invention
The object of the present invention is to provide a kind of assembled preliminary bracing structures for realizing tunnel quick closure, it is ensured that at the beginning of tunnel Phase supporting construction quick closure cyclization, reduces the risk of tunnel construction.
The technical scheme adopted by the invention is as follows:
Realize the assembled preliminary bracing structure of tunnel quick closure, it is characterised in that:
The gunite concrete arch wall preliminary bracing of the preliminary bracing of assembled inverted arch and upper part including bottom, the two circumferential direction composition Close ring;
The preliminary bracing of assembled inverted arch is made of the splicing of multi-disc batch production prefabricated unit section of jurisdiction, gunite concrete arch wall preliminary bracing Scene is performed using wet spraying process.
Circumferential grid steel frame, gunite concrete arch wall preliminary bracing inside are provided on the inside of the preliminary bracing of assembled inverted arch It is provided with circumferential steelframe, steelframe both ends bottom is fixedly connected to form with assembled inverted arch preliminary bracing end by connecting fashioned iron Circumferential close ring.
The preliminary bracing of assembled inverted arch is spelled by being longitudinally divided into polycyclic, the lateral batch production prefabricated unit section of jurisdiction for being divided into multi-segmental Composition is connect, fissure of displacement splicing between longitudinal each ring.
The injected hole of perforation is provided on batch production prefabricated unit section of jurisdiction perpendicular to country rock.
One end of connection fashioned iron is welded on the grid steel frame end in assembled inverted arch preliminary bracing, realizes batch production weldering It connects;The other end for connecting fashioned iron is connected at scene in tunnel using the bottom end of bolt and steelframe.
Grid steel frame sub-unit is prefabricated together with batch production prefabricated unit section of jurisdiction, forms whole cellular construction, is unit The grid steel frame concrete structure of form.
Batch production prefabricated unit section of jurisdiction includes calibrated bolck in the same size and link block not of uniform size.
Screw hole is provided on the end face of batch production prefabricated unit section of jurisdiction, adjacent batch production prefabricated unit passes through screw hole between section of jurisdiction In bolt realize splicing.
The present invention has the following advantages that:
The present invention is for spraying anchor instead of traditional inverted arch using assembled inverted arch preliminary bracing structure in drill+blast tunnel construction Steelframe supporting construction, assembled inverted arch preliminary bracing structure each unit section of jurisdiction are the prefabricated grid steel frame concrete knot of batch production Structure, assembled using mechanical-assisted in tunnel, reliable in quality is easy to guarantee, consolidation service is high-efficient, it can be achieved that with injection coagulation Native arch wall preliminary bracing quick closure.
Detailed description of the invention
Fig. 1 is structure of the invention cross-sectional view;
Fig. 2 is preliminary bracing structure structural map of the present invention;
Fig. 3 is preliminary bracing structure piecemeal schematic diagram of the present invention;
Fig. 4 is assembled inverted arch preliminary bracing structure assembly expanded schematic diagram of the present invention.
In figure, 1-assembled inverted arch preliminary bracing, 2-gunite concrete arch wall preliminary bracings, 3-grid steel frames, 4- Steelframe, 5-connection fashioned iron, 6-injected holes, 10-country rocks, 11-preliminary bracing structures, 12-waterproof and water drainage systems, 13-moulds are built Secondary lining.
Specific embodiment
The present invention will be described in detail With reference to embodiment.
The present invention relates to a kind of assembled preliminary bracing structure for realizing tunnel quick closure, the assembled including bottom is faced upward Encircle the gunite concrete arch wall preliminary bracing 2 of preliminary bracing 1 and upper part, the two circumferential direction forms close ring.At the beginning of assembled inverted arch Phase supporting 1 and gunite concrete arch wall preliminary bracing 2 are completed using two kinds of construction technologies, and the preliminary bracing 1 of assembled inverted arch is by more Piece batch production prefabricated unit section of jurisdiction splicing composition, 2 scene of gunite concrete arch wall preliminary bracing are performed using wet spraying process.
Circumferential grid steel frame 3, gunite concrete arch wall preliminary bracing 2 are provided on the inside of assembled inverted arch preliminary bracing 1 It is fixed by connection fashioned iron 5 that inside is provided with circumferential steelframe 4,4 both ends bottom of steelframe and 1 end of assembled inverted arch preliminary bracing Connection forms circumferential close ring.One end of connection fashioned iron 5 is welded on 3 end of grid steel frame in assembled inverted arch preliminary bracing 1 Portion realizes batch production welding;The other end for connecting fashioned iron 5 is connect using bolt with the bottom end of steelframe 4 at scene in tunnel.
Assembled inverted arch preliminary bracing 1 is by being longitudinally divided into polycyclic, the lateral batch production prefabricated unit section of jurisdiction for being divided into multi-segmental Splicing forms, fissure of displacement splicing between longitudinal each ring.3 sub-unit of grid steel frame prefabricated, shape together with batch production prefabricated unit section of jurisdiction Integral cellular construction is the grid steel frame concrete structure of unit form.
The injected hole 6 of perforation is provided on batch production prefabricated unit section of jurisdiction perpendicular to country rock 10.Injected hole 6 also serves as later period fortune Defeated assembly hole for hoist.Gap is filled closely knit by 6 slip casting of injected hole between assembled inverted arch preliminary bracing 1 and country rock 10.
Batch production prefabricated unit section of jurisdiction includes calibrated bolck B in the same size and link block A and C not of uniform size.Wherein connect Block size etc., to realize the preliminary bracing of assembled inverted arch along tunnel axial direction staggered joint erection.
At the preferred inside tension in the piecemeal position of assembled inverted arch preliminary bracing 1, outside compression, each blocking unit section of jurisdiction ring To being connected by screw bolts.Screw hole is provided on the end face of batch production prefabricated unit section of jurisdiction, between adjacent batch production prefabricated unit section of jurisdiction Splicing is realized by the bolt in screw hole.
11 inner surface of Tunnel structure is laid with waterproof and water drainage system 12, sets mould on the inside of waterproof and water drainage system 12 and builds secondary lining Build 13.
When construction, the side of the link block A and C of assembled inverted arch preliminary bracing 1 set connection fashioned iron 5, connection fashioned iron 5 and spray The steelframe 4 penetrated in concrete arch wall preliminary bracing 2 is bolted integral, it can be achieved that inverted arch preliminary bracing and arch wall initial stage Supporting quick closure cyclization.
The contents of the present invention are not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And to any equivalent transformation that technical solution of the present invention is taken, all are covered by the claims of the invention.

Claims (8)

1. realizing the assembled preliminary bracing structure of tunnel quick closure, it is characterised in that:
Assembled inverted arch preliminary bracing including bottom(1)With the gunite concrete arch wall preliminary bracing of upper part(2), the two ring To composition close ring;
Assembled inverted arch preliminary bracing(1)It is made of the splicing of multi-disc batch production prefabricated unit section of jurisdiction, gunite concrete arch wall initial stage Supporting(2)Scene is performed using wet spraying process.
2. the assembled preliminary bracing structure according to claim 1 for realizing tunnel quick closure, it is characterised in that:
Assembled inverted arch preliminary bracing(1)Inside is provided with circumferential grid steel frame(3), gunite concrete arch wall preliminary bracing (2)Inside is provided with circumferential steelframe(4), steelframe(4)Both ends bottom and the preliminary bracing of assembled inverted arch(1)End passes through connection Fashioned iron(5)It is fixedly connected to form circumferential close ring.
3. the assembled preliminary bracing structure according to claim 1 for realizing tunnel quick closure, it is characterised in that:
Assembled inverted arch preliminary bracing(1)It is spelled by being longitudinally divided into polycyclic, the lateral batch production prefabricated unit section of jurisdiction for being divided into multi-segmental Composition is connect, fissure of displacement splicing between longitudinal each ring.
4. the assembled preliminary bracing structure according to claim 3 for realizing tunnel quick closure, it is characterised in that:
Perpendicular to country rock on batch production prefabricated unit section of jurisdiction(10)It is provided with the injected hole of perforation(6).
5. the assembled preliminary bracing structure according to claim 3 for realizing tunnel quick closure, it is characterised in that:
Connect fashioned iron(5)One end be welded on assembled inverted arch preliminary bracing(1)Interior grid steel frame(3)Factory is realized in end Change welding;Connect fashioned iron(5)The other end in tunnel scene use bolt and steelframe(4)Bottom end connection.
6. the assembled preliminary bracing structure according to claim 2 for realizing tunnel quick closure, it is characterised in that:
Grid steel frame(3)Sub-unit is prefabricated together with batch production prefabricated unit section of jurisdiction, forms whole cellular construction, is unit shape The grid steel frame concrete structure of formula.
7. the assembled preliminary bracing structure according to claim 3 for realizing tunnel quick closure, it is characterised in that:
Batch production prefabricated unit section of jurisdiction includes calibrated bolck in the same size and link block not of uniform size.
8. the assembled preliminary bracing structure according to claim 3 for realizing tunnel quick closure, it is characterised in that:
It is provided with screw hole on the end face of batch production prefabricated unit section of jurisdiction, passes through in screw hole between adjacent batch production prefabricated unit section of jurisdiction Bolt realizes splicing.
CN201810925767.3A 2018-08-15 2018-08-15 Realize the assembled preliminary bracing structure of tunnel quick closure Pending CN108843342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810925767.3A CN108843342A (en) 2018-08-15 2018-08-15 Realize the assembled preliminary bracing structure of tunnel quick closure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810925767.3A CN108843342A (en) 2018-08-15 2018-08-15 Realize the assembled preliminary bracing structure of tunnel quick closure

Publications (1)

Publication Number Publication Date
CN108843342A true CN108843342A (en) 2018-11-20

Family

ID=64188146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810925767.3A Pending CN108843342A (en) 2018-08-15 2018-08-15 Realize the assembled preliminary bracing structure of tunnel quick closure

Country Status (1)

Country Link
CN (1) CN108843342A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763838A (en) * 2019-03-13 2019-05-17 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure and its assembling method suitable for drill+blast tunnel
CN110219667A (en) * 2019-07-05 2019-09-10 甘肃省交通规划勘察设计院股份有限公司 Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology
CN110486040A (en) * 2019-07-08 2019-11-22 重庆交通大学 A kind of prefbricated tunnel lining structure for vcehicular tunnel
CN111608699A (en) * 2020-04-08 2020-09-01 贵州省公路工程集团有限公司 Assembled inverted arch unit, assembled inverted arch structure and construction method
CN112145196A (en) * 2020-09-30 2020-12-29 中铁二十局集团有限公司 Tunnel inverted arch structure and construction method thereof
CN112696212A (en) * 2020-12-31 2021-04-23 中铁二院工程集团有限责任公司 Compressible tunnel bottom structure for inhibiting tunnel bottom bulging and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201412163Y (en) * 2009-05-22 2010-02-24 中铁第一勘察设计院集团有限公司 Circular tunnel lining structure for construction of open-type tunnel boring machine
CN101906975A (en) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 Supporting structure for extra-large cross-section loess tunnel underpass railway and construction method thereof
CN102518449A (en) * 2011-12-05 2012-06-27 中铁十八局集团有限公司 Tunnel boring machine (TBM) synchronous lining trolley for overlaying inner cambered surface inverted-arch precast block tunnel and hole
CN203685217U (en) * 2013-12-28 2014-07-02 中铁十二局集团第二工程有限公司 Initial-stage supporting steel frame of large-section weak-surrounding-rock tunnel
CN104863614A (en) * 2015-05-15 2015-08-26 河北腾是达金属结构有限公司 Method for primary support with corrugated steel plate and concrete combined structure taking place of steel grating
CN205154181U (en) * 2015-10-26 2016-04-13 中铁第一勘察设计院集团有限公司 A supporting construction that is used for grooving method construction in advance in tunnel
CN205876350U (en) * 2016-08-24 2017-01-11 重庆工商职业学院 Pin -connected panel tunnel invert structure
CN107044288A (en) * 2017-05-22 2017-08-15 中铁第勘察设计院集团有限公司 Prefabricated support lining structure and construction method for large-deformation tunnel in soft rock

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201412163Y (en) * 2009-05-22 2010-02-24 中铁第一勘察设计院集团有限公司 Circular tunnel lining structure for construction of open-type tunnel boring machine
CN101906975A (en) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 Supporting structure for extra-large cross-section loess tunnel underpass railway and construction method thereof
CN102518449A (en) * 2011-12-05 2012-06-27 中铁十八局集团有限公司 Tunnel boring machine (TBM) synchronous lining trolley for overlaying inner cambered surface inverted-arch precast block tunnel and hole
CN203685217U (en) * 2013-12-28 2014-07-02 中铁十二局集团第二工程有限公司 Initial-stage supporting steel frame of large-section weak-surrounding-rock tunnel
CN104863614A (en) * 2015-05-15 2015-08-26 河北腾是达金属结构有限公司 Method for primary support with corrugated steel plate and concrete combined structure taking place of steel grating
CN205154181U (en) * 2015-10-26 2016-04-13 中铁第一勘察设计院集团有限公司 A supporting construction that is used for grooving method construction in advance in tunnel
CN205876350U (en) * 2016-08-24 2017-01-11 重庆工商职业学院 Pin -connected panel tunnel invert structure
CN107044288A (en) * 2017-05-22 2017-08-15 中铁第勘察设计院集团有限公司 Prefabricated support lining structure and construction method for large-deformation tunnel in soft rock

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763838A (en) * 2019-03-13 2019-05-17 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure and its assembling method suitable for drill+blast tunnel
CN109763838B (en) * 2019-03-13 2023-09-15 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure suitable for tunnel by drilling and blasting method and assembling method thereof
CN110219667A (en) * 2019-07-05 2019-09-10 甘肃省交通规划勘察设计院股份有限公司 Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology
CN110219667B (en) * 2019-07-05 2024-03-19 甘肃省交通规划勘察设计院股份有限公司 Tunnel inverted arch and inverted arch filling layer substituted steel-concrete combined structure and construction process
CN110486040A (en) * 2019-07-08 2019-11-22 重庆交通大学 A kind of prefbricated tunnel lining structure for vcehicular tunnel
CN110486040B (en) * 2019-07-08 2024-03-08 重庆交通大学 Assembled lining structure for highway tunnel
CN111608699A (en) * 2020-04-08 2020-09-01 贵州省公路工程集团有限公司 Assembled inverted arch unit, assembled inverted arch structure and construction method
CN112145196A (en) * 2020-09-30 2020-12-29 中铁二十局集团有限公司 Tunnel inverted arch structure and construction method thereof
CN112696212A (en) * 2020-12-31 2021-04-23 中铁二院工程集团有限责任公司 Compressible tunnel bottom structure for inhibiting tunnel bottom bulging and construction method

Similar Documents

Publication Publication Date Title
CN108843342A (en) Realize the assembled preliminary bracing structure of tunnel quick closure
CN106351670B (en) A kind of closed pre support tunnel structure
CN104653197B (en) Method for constructing extra-large variable cross section tunnel
CN204041081U (en) A kind of constructing tunnel preliminary bracing device
CN107725068A (en) A kind of assembled supporting construction and its construction method based on outside steel arch-shelf and inner side concrete slab
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN106437781B (en) A kind of upper-soft lower-hard ground tunnel support structure and its construction method
CN105909268B (en) Prestressing combination formula well tunnel modular structure construction method and modular structure
CN104975861A (en) Non-disturbance type supporting structure used for tunnel vault collapsed cavity processing
CN109026026A (en) Under wear existing piping lane the multi-thread more arcading bored tunnel groups of big cross section construction method
CN106014456A (en) Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN106150519A (en) A kind of tunneling boring prefbricated tunnel lining structure for drill+blast tunnel and construction method
CN110017145B (en) Sea area shield mine junction tunnel intra-cavity connection joint and construction method thereof
CN102979531A (en) Construction method and structure for reinforcing large rock slope deep weak structural plane
CN106894830B (en) A kind of double curvature arch supporting construction and construction method for underground engineering
CN113803074A (en) Construction method of tunnel structure for artificial and mechanical combined obstacle removal of water-rich sand layer
CN114352289A (en) Air shaft duct and method for breaking shield tunnel segment in mine construction section
CN208816133U (en) A kind of assembled preliminary bracing structure for realizing tunnel quick closure
CN104120739A (en) Multi-pilot tunnel excavation one-off arching construction method
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN204738819U (en) Tunnel is with non - disturbance type chamber supporting construction that collapses
CN108756932B (en) Tunnel construction method comprising supporting structure
CN108952728B (en) A kind of headframe main body construction and self well digging freeze parallel construction system and method
CN217518646U (en) Barrier removing tunnel structure for passing through existing station
CN206144569U (en) Confined is advance in advance and is protected tunnel structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination