CN205532621U - Pre -buried formula section of jurisdiction and channel mounting structure - Google Patents

Pre -buried formula section of jurisdiction and channel mounting structure Download PDF

Info

Publication number
CN205532621U
CN205532621U CN201620111722.9U CN201620111722U CN205532621U CN 205532621 U CN205532621 U CN 205532621U CN 201620111722 U CN201620111722 U CN 201620111722U CN 205532621 U CN205532621 U CN 205532621U
Authority
CN
China
Prior art keywords
jurisdiction
section
construction
advance
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620111722.9U
Other languages
Chinese (zh)
Inventor
夏峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Worthy Rail Transit Technology Zhenjiang Co ltd
Original Assignee
Worthy Rail Transit Technology Zhenjiang Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Worthy Rail Transit Technology Zhenjiang Co ltd filed Critical Worthy Rail Transit Technology Zhenjiang Co ltd
Priority to CN201620111722.9U priority Critical patent/CN205532621U/en
Application granted granted Critical
Publication of CN205532621U publication Critical patent/CN205532621U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a pre -buried formula section of jurisdiction and channel mounting structure. It includes the section of jurisdiction and is used for carrying out the connecting bolt that connects with adjacent section of jurisdiction, still includes pre -buriedly in the section of jurisdiction and along section of jurisdiction radial distribution's buried bolt in advance and the channel through buried bolt installation in advance, and still pre -buried respectively in the every section of jurisdiction have many steel bands, and a plurality of buried bolt in advance fix on every bar iron area through the connecting piece respectively. After the structure of the utility model is adopted, can be with the channel through buried bolt installation in advance, the connection structure of its section of jurisdiction makes and connects swift convenience between the section of jurisdiction, short construction time and high construction efficiency, additionally, not only can make the channel install in different positions, the flexibility of installation has improved, especially carry out buried bolt structural design in advance through the steel band, make the position accuracy improve greatly, and construction quality is improved, the pill case and cell phone holder is reasonable in structural design, convenient and rapid assembly, the automatic nimble intensity of just installing is very low, and the efficiency of construction is greatly improved, shortens construction period, easy construction and construction cost reduction.

Description

Built-in type section of jurisdiction and conduit mounting structure
Technical field
This utility model relates to section of jurisdiction and the mounting structure of conduit in a kind of tunnel, specifically a kind of built-in type section of jurisdiction and conduit mounting structure.
Background technology
In prior art, tunnel in track traffic is duct type structure, tunnel inner wall is to be spliced by multi-disc section of jurisdiction, conduit is installed on the inwall in tunnel the most again, the conduit in tunnel is generally and carries out installing by the way of punching on inwall, existing this mounting means, on the one hand drill process needs to destroy pipeline, another further aspect, relatively big by installation site restriction ratio, very flexible;Still further aspect, construction trouble, installation intensity are big so that efficiency of construction is low, installation period is long.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of quick and easy for installation, freedom and flexibility and the high built-in type section of jurisdiction of installation strength and conduit mounting structure.
In order to solve above-mentioned technical problem, built-in type section of jurisdiction of the present utility model and conduit mounting structure, the section of jurisdiction spliced can be carried out and for the connecting bolt being attached adjacent section of jurisdiction at tunnel inner wall including multi-disc, radially-arranged pre-embedded bolt and the conduit installed by pre-embedded bolt in also including being embedded in section of jurisdiction and along section of jurisdiction, being embedded with a plurality of steel band in every section of jurisdiction the most respectively, multiple pre-embedded bolts are fixed on every steel band by connector respectively.
Described steel band is arc-shaped steel belt, and the radian of described steel band is identical with the radian of section of jurisdiction.
Described connector is the embedded sleeve barrel being arranged on steel band.
After using above-mentioned structure, due to arrange for connecting bolt that adjacent section of jurisdiction is attached and in being embedded in section of jurisdiction by pre-embedded bolt that steel band is fixing, thus conduit can be installed by pre-embedded bolt, the attachment structure of its section of jurisdiction makes to connect between section of jurisdiction efficient and convenient, improve efficiency of construction, additionally, conduit is installed by pre-embedded bolt, conduit not only can be made to install at diverse location, improve the motility of installation, and avoid the destruction that pipeline is caused by conventionally employed hole knockout, pre-embedded bolt structure design is carried out especially by steel band, positional precision is greatly improved, improve construction quality, its reasonable in design, quick and easy for installation, automatically flexibly and installation strength is the lowest, substantially increase efficiency of construction, shorten construction period, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is this utility model built-in type section of jurisdiction and the structural representation of conduit mounting structure;
Fig. 2 is structure for amplifying schematic diagram at the A of Fig. 1;.
Detailed description of the invention
Below in conjunction with the accompanying drawings and detailed description of the invention, built-in type section of jurisdiction of the present utility model and conduit mounting structure are described in further detail.
As shown in the figure, built-in type section of jurisdiction of the present utility model and conduit mounting structure, the section of jurisdiction 1 spliced can be carried out and for the connecting bolt 2 being attached adjacent section of jurisdiction 1 at tunnel inner wall including multi-disc, adjacent section of jurisdiction 1 is interconnected to form the pipeline configuration of whole annular by connecting bolt 2, radially-arranged multiple pre-embedded bolts 3 and the conduit installed by multiple different pre-embedded bolts in also including being embedded in section of jurisdiction 1 and along section of jurisdiction, a plurality of steel band 4 it is embedded with the most respectively in every section of jurisdiction 1, multiple pre-embedded bolts 3 are fixed on every steel band 4 by connector 5 respectively, described steel band 4 is arc-shaped steel belt, the radian of steel band 4 is identical with the radian of section of jurisdiction 1, described connector 5 is the embedded sleeve barrel being arranged on steel band 4.

Claims (3)

1. a built-in type section of jurisdiction and conduit mounting structure, it is characterized in that: include that multi-disc can carry out the section of jurisdiction spliced and for the connecting bolt being attached adjacent section of jurisdiction at tunnel inner wall, radially-arranged pre-embedded bolt and the conduit installed by pre-embedded bolt in also including being embedded in section of jurisdiction and along section of jurisdiction, being embedded with a plurality of steel band in every section of jurisdiction the most respectively, multiple pre-embedded bolts are fixed on every steel band by connector respectively.
2. according to the built-in type section of jurisdiction described in claim 1 and conduit mounting structure, it is characterised in that: described steel band is arc-shaped steel belt, and the radian of described steel band is identical with the radian of section of jurisdiction.
3. according to the built-in type section of jurisdiction described in claim 1 and conduit mounting structure, it is characterised in that: described connector is the embedded sleeve barrel being arranged on steel band.
CN201620111722.9U 2016-02-03 2016-02-03 Pre -buried formula section of jurisdiction and channel mounting structure Expired - Fee Related CN205532621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620111722.9U CN205532621U (en) 2016-02-03 2016-02-03 Pre -buried formula section of jurisdiction and channel mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620111722.9U CN205532621U (en) 2016-02-03 2016-02-03 Pre -buried formula section of jurisdiction and channel mounting structure

Publications (1)

Publication Number Publication Date
CN205532621U true CN205532621U (en) 2016-08-31

Family

ID=56775798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620111722.9U Expired - Fee Related CN205532621U (en) 2016-02-03 2016-02-03 Pre -buried formula section of jurisdiction and channel mounting structure

Country Status (1)

Country Link
CN (1) CN205532621U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703830A (en) * 2016-11-11 2017-05-24 中铁二院工程集团有限责任公司 Shield segment lining connector structure with limiting function
CN106837374A (en) * 2017-01-10 2017-06-13 汪平 A kind of novel segment for preventing ring faulting of slab ends
CN107218059A (en) * 2017-06-23 2017-09-29 福建康元捷装有限公司 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline
CN111852488A (en) * 2020-08-26 2020-10-30 中铁十四局集团大盾构工程有限公司 Construction method for large-diameter shield tunnel contact net channel of high-speed railway

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703830A (en) * 2016-11-11 2017-05-24 中铁二院工程集团有限责任公司 Shield segment lining connector structure with limiting function
CN106703830B (en) * 2016-11-11 2019-04-12 中铁二院工程集团有限责任公司 A kind of shield duct piece lining joint construction with limit function
CN106837374A (en) * 2017-01-10 2017-06-13 汪平 A kind of novel segment for preventing ring faulting of slab ends
CN107218059A (en) * 2017-06-23 2017-09-29 福建康元捷装有限公司 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline
CN107218059B (en) * 2017-06-23 2019-03-29 康元轨道交通科技(福建)有限公司 For Fast Installation subway tunnel electromechanical equipment and the device of pipeline
CN111852488A (en) * 2020-08-26 2020-10-30 中铁十四局集团大盾构工程有限公司 Construction method for large-diameter shield tunnel contact net channel of high-speed railway

Similar Documents

Publication Publication Date Title
CN205532621U (en) Pre -buried formula section of jurisdiction and channel mounting structure
CN202674561U (en) Support for pipe-jacking liner pipe construction
CN108868817B (en) Connection structure of cable channel and shield tunnel comprising connection structure
CN206987887U (en) Subway tunnel electromechanical equipment and pipeline quick fixation structure
CN110454191B (en) Length adjusting ring of negative ring segment and construction method of negative ring segment
CN204156473U (en) Frp cable protective pipe pipe is rested the head on
CN101725670B (en) Hose band connector
CN205477650U (en) Section of jurisdiction structure with pre -buried installation sleeve
CN201575234U (en) Hose fixing device
CN101338681B (en) Shield tunneling segment pretightening device
CN204962104U (en) Adapting flange
CN103958821A (en) Method and apparatus for energy chain installation
CN209555973U (en) The board-like electric integrated piping lane F type push pipe of pre-buried steel
CN205532713U (en) Tunnel joins externally channel mounting structure
CN201764159U (en) Fast-assembled pipe fitting
CN210768800U (en) Shield tunnel assembled pipeline braced system
CN209909316U (en) Pipe gallery support for fixing pipeline
CN220434327U (en) Positioning device for detachable steel pipe connection system and steel pipe support
CN204901161U (en) Compound pipe quick -operation joint of plastic -aluminum
CN106593495B (en) Arrival is without the interim water-tight device mounting structure of agent structure and its construction method
CN212454443U (en) A section of jurisdiction structure for making up intelligent tunnel
CN202592790U (en) Hidden towline bracket for movable worktable for hydraulic press
CN213510512U (en) Throttling blowout manifold and well control safety device using throttling blowout manifold
CN104674662A (en) Simple steel pipe bracket for inner die of box girder
CN207394108U (en) A kind of piping lane stent quick assembling mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20220203