CN208328952U - Side slope Initiative Defence System - Google Patents

Side slope Initiative Defence System Download PDF

Info

Publication number
CN208328952U
CN208328952U CN201820957942.2U CN201820957942U CN208328952U CN 208328952 U CN208328952 U CN 208328952U CN 201820957942 U CN201820957942 U CN 201820957942U CN 208328952 U CN208328952 U CN 208328952U
Authority
CN
China
Prior art keywords
rope
grid
side slope
steel
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820957942.2U
Other languages
Chinese (zh)
Inventor
孙勇军
葛力
杨乐绪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority to CN201820957942.2U priority Critical patent/CN208328952U/en
Application granted granted Critical
Publication of CN208328952U publication Critical patent/CN208328952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a kind of side slope Initiative Defence Systems, including reinforcing bar, supporting rope, anchor pole and steel rope net.Anchor pole is equidistantly fixed in side slope by grout layer.The horizontal and vertical setting of supporting rope difference is simultaneously connect with anchor pole.Supporting rope upper berth hangs grid, and iron wire ligation is used between grid and grid and between grid and supporting rope.Steel rope net is laid on grid, every steel rope net carries out suture and pre- tensioning with the supporting rope of suture rope and surrounding, and suture rope both ends are respectively fixedly connected with rope card with supporting rope.Mutual ligation is carried out by iron wire between steel rope net and grid.Reinforcing bar is fixed in the corresponding side slope in steel rope net center, for fixing steel rope net.The utility model structure is simple, and design is reasonable, more than traditional slope protection system robust, and protection effect is good, and safety coefficient is high, loose suitable for soil property, the special side slope of structure.

Description

Side slope Initiative Defence System
Technical field
The utility model belongs to tunnel construction side slope protection technical field, more particularly to a kind of side slope active defense system System.
Background technique
Since hole topography is precipitous, features as poor geologic condition, before start tunneling, it is necessary to remove the danger stone on cliff, Tunnel slope By design slope than excavating.The protection of conventional needle side slope is relatively simple, the side slope relatively stable suitable for soil structure.And for Some cases are special, and the severe side slope of soil structure can not then play the role of effective protection.As hole be in shake after loose heap On product body, hole rises side slope section and easily generates new collapse rock-fall, can not carry out side slope protection, easily go out in the construction process Existing slungshot slides, and causes security risk.
Therefore, above-mentioned technical problem how to be overcome to become those skilled in the art's technical problem urgently to be resolved.
Utility model content
The purpose of this utility model is just to provide a kind of side slope Initiative Defence System, can be fully solved the above-mentioned prior art Shortcoming.
The purpose of this utility model is realized by following technical proposals:
A kind of side slope Initiative Defence System, including 16 reinforcing bar of Φ, supporting rope, anchor pole and steel rope net, the anchor pole pass through water Mud layer is equidistantly fixed in side slope, and the supporting rope difference is horizontal and vertical to be arranged and connect with anchor pole, connection type Be it is next in supporting rope tensioning, supporting rope both ends are fixedly connected by rope card with the exposed ring set of anchor pole, the supporting rope upper berth extension Grid, the overlapping widths between grid and grid are at least 5cm, suture and grid and branch between two grids Ligation is carried out by 1m spacing with 1.2 iron wire of Φ between support rope, steel rope net is laid on the grid, every steel rope net is with suture rope Suture and pre- tensioning are carried out with the supporting rope of surrounding, suture rope both ends are respectively fixedly connected with two rope cards with supporting rope, institute It states and mutual ligation is carried out by iron wire between steel rope net and grid, screw thread is provided on 16 reinforcing bar of Φ, 16 reinforcing bar of Φ passes through Grout layer is fixed in the corresponding side slope in every steel rope net center, passes through grid and steel rope net simultaneously at the top of 16 reinforcing bar of Φ It is successively arranged nut and fastener from the top down, is used for fixed grating aperture plate and steel rope net.
Further, the grout layer is the grout layer for being at least M30 using label.
Further, the suture rope is using 8 steel cable of Φ as suture rope.
Further, mutual ligation is carried out by 1.5 iron wire of Φ between the steel rope net and grid, ligation point spacing in length and breadth 0.8-1.2m。
Further, the steel rope net is D0/08/300 fashioned iron netting, and grid is SO/2.2/50 type grid.
Compared with prior art, the utility model has the beneficial effects that: structure is simple, design is reasonable, this active defense System is on protection slope or rock needed for all kinds of flexible nets covering based on wire rope net is wrapped in, to limit slope surface rock The weathering off of the soil body or destruction and be eboulement, play reinforcement effect, or falling rocks is controlled in a certain range, play The effect of going along with sb. to guard him.Robust more than traditional slope protection system, protection effect is good, and safety coefficient is high, loose suitable for soil property, The special side slope of structure.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of this system;
Fig. 2 is the cross-section diagram of this system;
Fig. 3 is supporting rope scheme of installation;
Fig. 4 is enlarged drawing at A in Fig. 1;
Fig. 5 is enlarged drawing at B in Fig. 2.
Appended drawing reference: 16 reinforcing bar 1 of Φ, supporting rope 2, anchor pole 3, steel rope net 4, grid 5, suture rope 6, nut 7, fastener 8.
Specific embodiment
The utility model is further described with attached drawing combined with specific embodiments below.
As shown in Figures 1 to 5, a kind of side slope Initiative Defence System, including 16 reinforcing bar 1 of Φ, supporting rope 2, anchor pole 3 and steel cable Net 4.Anchor pole 3 is equidistantly fixed in side slope by grout layer, the spacing between anchor pole 1 may be configured as 4.5m × 4.5m or 2.5m×4.5m.Supporting rope 2 is distinguished horizontal and vertical setting and is connect with anchor pole 1, and connection type is tight in 2 tensioning of supporting rope Afterwards, by rope card, (2 length of supporting rope, three rope cards in every end when being less than 30m, respectively use four when greater than 30m at supporting rope 2 both ends It is a) it is fixedly connected with the exposed ring set of anchor pole 3.2 upper berth of supporting rope hangs grid 5, and grid 5 uses the SO/2.2/50 of small mesh Type grid, for preventing the slump of small size sillar.Overlapping widths between grid 5 and grid 5 are at least 5cm, and two It opens and carries out ligation by 1m spacing with 1.2 iron wire of Φ between suture and grid 5 and supporting rope 2 between grid 5.On grid 5 It is laid with steel rope net 4, laying standard is the D0/08/300 fashioned iron that a 4.0m × 4.0m is laid in each grid of supporting rope 2 The D0/08/300 fashioned iron netting 4 of netting 4 or two 4.0m × 2.0m, every steel rope net 4 is with the support of suture rope 6 and surrounding Rope 2 carries out suture connection and carries out pre- tensioning, and it is pre- that the purpose of this design can make guard system impose certain normal direction to the plane of fracture Compaction forces, to improve the stability of surface layer Dangerous Rock Body.Respectively use two rope cards and 2 company of being fixed of supporting rope in 6 both ends of suture rope It connects.Mutual ligation is carried out by 1.5 iron wire of Φ between steel rope net 4 and grid 5, ligation point spacing 0.8-1.2m in length and breadth.16 steel of Φ Screw thread is provided on muscle 1,16 reinforcing bar 1 of Φ is fixed in the corresponding side slope in 4 center of every steel rope net by grout layer, Φ Grid 5 and steel rope net 4 are passed through at the top of 16 reinforcing bars 1 and is successively arranged nut 7 and fastener 8 from the top down, for further fixing Grid 5 and steel rope net 4.
The grout layer is to be at least the mixed mud of M30 as grout layer using label.
The suture rope 6 is using 8 steel cable of Φ as suture rope.
The installation process of the utility model is, first in slope protection region surface dust and float stone is purged or part After reinforcing, unwrapping wire is carried out to determine anchor pole hole location, and digs out depth not less than the exposed ring set length of anchor pole 3 at each hole location Pit, general bore 20cm, depth 20cm.Then by projected depth drilling anchor rod hole and borehole cleaning, hole depth should be than designing 3 length of anchor pole Long 5cm, aperture are Φ 70.By anchor pole 3 be inserted into bolthole in and slip casting, slurries label be not less than M30, preferably use cement-sand ratio 1:1~ 1.1, the cement paste that the cement mortar of the ratio of mud 0.45~0.50 or the ratio of mud are 0.45~0.50, cement preferably use 425 general Logical portland cement, the preferential medium-fine sand for selecting partial size to be not more than 3mm, it is ensured that slurries are full, and cement slurry is formed after grout cures Layer.It pours after being poured in, the maintenance carried out no less than three days to grout layer carries out next step installation again.It is installed after band maintenance is good longitudinal With lateral supporting rope 2, then the grid element center position that supporting rope 2 and anchor pole 3 are formed (the as center of steel rope net 4, such as The each grid of fruit is two steel rope nets 4 of connection, just digs a hole in the center for netting 4 of often throwing the net) dig installation Φ The hole of 16 reinforcing bars 1,16 reinforcing bar 1 of insertion Φ and slip casting, 16 reinforcing bar 1 of Φ is fixed in side slope after digging well.Then from the top down Paving hangs grid 5, is laid with steel rope net 4, steel while grid 5 is laid with, then in the grid that supporting rope 2 and anchor pole 3 are formed Netting 4 is located at the top of grid 5.Ligation finally is carried out to steel rope net 4 and grid 5.After ligation is good, then by every steel rope net 4 are held on 16 reinforcing bar 1 of Φ by nut 7 and fastener 8, are bonded its center with side slope, are further functioned as preferably anti- Protect effect.
Compared with prior art, the utility model has the beneficial effects that: structure is simple, design is reasonable, this active defense System is on protection slope or rock needed for all kinds of flexible nets covering based on wire rope net is wrapped in, to limit slope surface rock The weathering off of the soil body or destruction and be eboulement, play reinforcement effect, or falling rocks is controlled in a certain range, play The effect of going along with sb. to guard him.Robust more than traditional slope protection system, protection effect is good, and safety coefficient is high, after being particularly suitable for shake Soil property is loose, the special side slope of structure.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (5)

1. a kind of side slope Initiative Defence System, it is characterised in that: including 16 reinforcing bar of Φ, supporting rope, anchor pole and steel rope net, the anchor Bar is equidistantly fixed in side slope by grout layer, and the supporting rope difference is horizontal and vertical to be arranged and connect with anchor pole, Connection type be it is next in supporting rope tensioning, supporting rope both ends are fixedly connected by rope card with the exposed ring set of anchor pole, the support Rope upper berth hangs grid, and the overlapping widths between grid and grid are at least 5cm, and the suture between two grids is to pass Ligation is carried out by 1m spacing with 1.2 iron wire of Φ between aperture plate and supporting rope, steel rope net is laid on the grid, every steel rope net is equal Suture and pre- tensioning are carried out with the supporting rope of suture rope and surrounding, suture rope both ends are respectively fixed with two rope cards with supporting rope Connection, carries out mutual ligation by iron wire between the steel rope net and grid, screw thread, 16 steel of Φ is provided on 16 reinforcing bar of Φ Muscle is fixed in the corresponding side slope in every steel rope net center by grout layer, and grid and steel are passed through at the top of 16 reinforcing bar of Φ Netting is simultaneously successively arranged nut and fastener from the top down, is used for fixed grating aperture plate and steel rope net.
2. side slope Initiative Defence System according to claim 1, it is characterised in that: the grout layer is to use label extremely It is less the grout layer of M30.
3. side slope Initiative Defence System according to claim 1, it is characterised in that: the suture rope is made using 8 steel cable of Φ For suture rope.
4. side slope Initiative Defence System according to claim 1, it is characterised in that: pass through between the steel rope net and grid 1.5 iron wire of Φ carries out mutual ligation, ligation point spacing 0.8-1.2m in length and breadth.
5. side slope Initiative Defence System according to claim 1, it is characterised in that: the steel rope net is D0/08/300 type Steel rope net, grid are SO/2.2/50 type grid.
CN201820957942.2U 2018-06-21 2018-06-21 Side slope Initiative Defence System Active CN208328952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820957942.2U CN208328952U (en) 2018-06-21 2018-06-21 Side slope Initiative Defence System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820957942.2U CN208328952U (en) 2018-06-21 2018-06-21 Side slope Initiative Defence System

Publications (1)

Publication Number Publication Date
CN208328952U true CN208328952U (en) 2019-01-04

Family

ID=64769209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820957942.2U Active CN208328952U (en) 2018-06-21 2018-06-21 Side slope Initiative Defence System

Country Status (1)

Country Link
CN (1) CN208328952U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944260A (en) * 2019-05-06 2019-06-28 重庆建工市政交通工程有限责任公司 Counter-slope system and its excavation method are protected close to existing railway high slope active network
CN110080251A (en) * 2019-04-30 2019-08-02 中国地质大学(武汉) A kind of construction method of massif side slope protective screen
CN110578333A (en) * 2019-08-12 2019-12-17 安徽国祯环卫科技有限公司 temporary slope supporting device for garbage pile excavation and construction method thereof
CN112854265A (en) * 2021-03-10 2021-05-28 中矿复绿(北京)生态科技发展有限公司 Ecological restoration construction method for high and steep rock surface and ecological vertical bag used in construction method
CN114032721A (en) * 2021-11-29 2022-02-11 杭州光华路桥工程有限公司 Asphalt pavement composite structure and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080251A (en) * 2019-04-30 2019-08-02 中国地质大学(武汉) A kind of construction method of massif side slope protective screen
CN109944260A (en) * 2019-05-06 2019-06-28 重庆建工市政交通工程有限责任公司 Counter-slope system and its excavation method are protected close to existing railway high slope active network
CN110578333A (en) * 2019-08-12 2019-12-17 安徽国祯环卫科技有限公司 temporary slope supporting device for garbage pile excavation and construction method thereof
CN112854265A (en) * 2021-03-10 2021-05-28 中矿复绿(北京)生态科技发展有限公司 Ecological restoration construction method for high and steep rock surface and ecological vertical bag used in construction method
CN114032721A (en) * 2021-11-29 2022-02-11 杭州光华路桥工程有限公司 Asphalt pavement composite structure and construction method thereof
CN114032721B (en) * 2021-11-29 2022-12-27 杭州光华路桥工程有限公司 Asphalt pavement composite structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN208328952U (en) Side slope Initiative Defence System
CN107761584A (en) A kind of freeway tunnel mouth Dangerous Rock Body Treatment Methods
CN107130609B (en) Without the basement supporting to support
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN109594568B (en) Rock slope ecological protection structure and method thereof
CN103352477A (en) Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN103603369A (en) Construction method of anchor pile counterfort retaining wall
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN110374111A (en) A kind of slope cooperates with support system with steel pipe piled anchor
CN110847195A (en) Construction method for stable treatment of side and upward slope of large-block-diameter loose rock pile body opening
CN207878473U (en) Layer depth foundation pit hangs foot stake supporting construction to Tu Yan in combination
CN102425181A (en) Side slope greening restoration method
CN110629770B (en) Reservoir side slope hydro-fluctuation belt seepage-proofing slope protection structure and construction method thereof
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN212077981U (en) Combined slope supporting structure
CN204125850U (en) A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable
CN104196036A (en) Foundation pit supporting structure and method based on old underground outdoor wall structure
CN103572761A (en) Protection method for existing line nearby construction by using brook protective screenings
KR100991505B1 (en) Environment-friendly river side reinforcement fabric
CN211447015U (en) H-shaped anti-slide pile plate wall
CN107869143A (en) Ruggedized construction for loose crushing Dangerous Rock Body
CN107130617A (en) A kind of flat pressure dispersing anchorage cable wall retaining structure of rock matter cut slope
KR20190004497A (en) A Eco-friendly retain wall structure
CN207846436U (en) Ruggedized construction for loose crushing Dangerous Rock Body
CN205617175U (en) Be applied to temporary support structure of widening fast in place

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190312

Address after: 201700 Shanghai Qingpu District Zhujiajiao Town Shanghai Qingping Highway 6670

Patentee after: The 2ND Construction Company Ltd. Of China Railway Construction 15th Corporation

Address before: 611730 No. 16 Pearl River East Street, Xipu Town, Pidu District, Chengdu City, Sichuan Province

Patentee before: China Railway fifteen Bureau Group Third Engineering Co., Ltd.

TR01 Transfer of patent right