CN204125850U - A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable - Google Patents

A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable Download PDF

Info

Publication number
CN204125850U
CN204125850U CN201420436607.XU CN201420436607U CN204125850U CN 204125850 U CN204125850 U CN 204125850U CN 201420436607 U CN201420436607 U CN 201420436607U CN 204125850 U CN204125850 U CN 204125850U
Authority
CN
China
Prior art keywords
steel tube
concrete pile
tunnel
tube concrete
anchorage cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420436607.XU
Other languages
Chinese (zh)
Inventor
杜永刚
丁祖德
曹净
刘海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201420436607.XU priority Critical patent/CN204125850U/en
Application granted granted Critical
Publication of CN204125850U publication Critical patent/CN204125850U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model relates to a kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable, belongs to construction of tunnel technical field.This is provided with the cantilever shed tunnel of steel tube concrete pile and prestress anchorage cable, this cantilever shed tunnel is rearranged by some bracing or strutting arrangement orders, bracing or strutting arrangement comprises base support means, top braces device be connected base support means, the reinforced concrete upright column of top braces device, base support means comprises basis, steel tube concrete pile and vertical prestressed anchor cables, top braces device comprises hangar tunnel crossbeam and transverse prestress anchor cable, hangar tunnel crossbeam between two on adjacent supports device is provided with linking beam, linking beam is provided with roof support with reinforced concrete, roof support with reinforced concrete covers complex waterproof layer from the inside to the outside successively, backfill, clay aquiclude.This device shortens the duration, reduction engineering cost, structural stability and anticorrosion ability is good.

Description

A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable
Technical field
The utility model relates to a kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable, belongs to construction of tunnel technical field.
Background technology
In Yunnan, Sichuan, the mountain area such as Guizhou be when building highway and railway, often limits by economy, alignment condition, be difficult to build tunnel, and can only excavating cut slope, passes through, often form high gradient slope with roadbed form.Due to massif vegetation deterioration, rain drop erosion, cut the reasons such as slope is precipitous, easily cause cutting location to occur the disasters such as landslide, avalanche, falling rocks and mud-rock flow, have a strong impact on traffic safety.For ensureing the operation security in this type of region, being everlasting and being difficult to build tunnel, arcuately open cut tunnel or for time cost-saving, build canopy formula open cut tunnel.
Build the area of hangar tunnel, often relief is large, and hillside is precipitous, has inconvenient traffic, and large-scale excavating equipment is difficult to enter, and construction plant is narrow, and hangar tunnel difficulty of construction is large.When particularly building hangar tunnel basis, according to blasting method pore-forming, slope instability or destruction may be caused; Often exist in construction and to underlie firm ground, when adopting hand excavation's pile foundation, hand excavation be difficult to carry out or consuming time for a long time, affect the duration, basic building-in depth deficiency and overturning or slip resistance analysis are difficult to the problem met the demands.
Summary of the invention
For above-mentioned prior art Problems existing and deficiency, the utility model provides a kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable.This cantilever shed tunnel is provided with lower support structure, provides antiskid and shearing resistance, solves the problem of basic building-in depth deficiency, improves structural stability; The top support structure of this cantilever shed tunnel rock crown arranges transverse prestress anchorage cable anchoring in crossbeam right-hand member for adopting boring, to provide pulling capacity, meet cantilever construction overturning or slip resistance analysis requirement, ensure the stable of shed hole structure, the utility model is achieved through the following technical solutions.
A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable, this cantilever shed tunnel is rearranged by some bracing or strutting arrangement orders, bracing or strutting arrangement comprises base support means, top braces device be connected base support means, the reinforced concrete upright column 5 of top braces device, base support means comprises basis 2, steel tube concrete pile 3 and vertical prestressed anchor cables 4, manually digging hole is to bottom firm ground layer setting steel tube concrete pile 3 and steel tube concrete pile 3 top connects basis 2, 2 sides, basis are provided with vertical prestressed anchor cables 4 and connect bottom firm ground layer, top braces device comprises hangar tunnel crossbeam 9 and transverse prestress anchor cable 6, hangar tunnel crossbeam 9 side is positioned at tip hard horizon d and this side is provided with boss, boss is provided with transverse prestress anchor cable 6 and is connected with tip hard horizon d, hangar tunnel crossbeam 9 between two on adjacent supports device is provided with linking beam 8, linking beam 8 is provided with roof support with reinforced concrete 10, roof support with reinforced concrete 10 covers complex waterproof layer 11 from the inside to the outside successively, backfill 14, clay aquiclude 15.
Before the cantilever shed tunnel installation of described steel tube concrete pile and prestress anchorage cable, rock slope is arranged slope retaining structure 1, slope retaining structure 1 is grouting rock bolt or form concrete.
Described reinforced concrete upright column 5 and hangar tunnel crossbeam 9 are provided with diagonal brace 7, to strengthen the stability of hangar tunnel crossbeam 9.
Described roof support with reinforced concrete 10 is provided with gutter 12.
Described covering complex waterproof layer 11 front end is provided with ear wall 13, plays and stops falling rocks to fall to the effect on road surface, and arrange clay aquiclude 15 in backfill 14, reduce rainwater infiltration.
The steeper place of cantilever shed tunnel upper slope of described steel tube concrete pile and prestress anchorage cable arranges side slope protective screen 16, prevents rubble from tumbling destruction shed hole structure.
When above-mentioned steel tube concrete pile 3 is built, bore diameter is greater than diameter of steel tube 2 ~ 5cm, builds the fixing steel pipe of micro-expansion cement slurry after inserting steel pipe in steel pipe periphery.
Above-mentioned complex waterproof layer 11 first adopts mass ratio to be that the cement mortar of 1:3.5 is floating, and rear employing cationic emulsified bitumen latex and glass fabric interval are arranged, finally in its surface smear 1:2 cement mortar as topping.
The beneficial effects of the utility model are: manually digging hole need adopted to construct, but the hard area be difficult to carry out of basement rock, adopt the basis being provided with steel tube concrete pile and vertical prestressed anchor cables can reduce embeded depth of foundation, the reduction of erection time; More traditional pile foundation can save a large amount of concrete and bar material, reduces engineering cost; Crossbeam is arranged the stability against overturning that transverse prestress anchor cable is conducive to improving cantilever structure; Top board and backfill arrange waterproofing course, gutter and clay aquiclude, and anticorrosion ability is good.
Accompanying drawing explanation
Fig. 1 is the utility model cantilever shed tunnel section of structure;
Fig. 2 is the utility model braced structures top view.
In figure: 1-slope retaining structure, 2-basis, 3-steel tube concrete pile, 4-vertical prestressed anchor cables, 5-reinforced concrete upright column, 6-transverse prestress anchor cable, 7-diagonal brace, 8-linking beam, 9-hangar tunnel crossbeam, 10-roof support with reinforced concrete, 11-complex waterproof layer, 12-gutter, 13-ear wall, 14-backfill, 15-clay aquiclude, 16-side slope protective screen.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Embodiment 1
As shown in Fig. 1 to 2, this is provided with the cantilever shed tunnel of steel tube concrete pile and prestress anchorage cable, this cantilever shed tunnel is rearranged by some bracing or strutting arrangement orders, bracing or strutting arrangement comprises base support means, top braces device be connected base support means, the reinforced concrete upright column 5 of top braces device, base support means comprises basis 2, steel tube concrete pile 3 and vertical prestressed anchor cables 4, manually digging hole is to bottom firm ground layer setting steel tube concrete pile 3 and steel tube concrete pile 3 top connects basis 2, 2 sides, basis are provided with vertical prestressed anchor cables 4 and connect bottom firm ground layer, top braces device comprises hangar tunnel crossbeam 9 and transverse prestress anchor cable 6, hangar tunnel crossbeam 9 side is positioned at tip hard horizon d and this side is provided with boss, boss is provided with transverse prestress anchor cable 6 and is connected with tip hard horizon d, hangar tunnel crossbeam 9 between two on adjacent supports device is provided with linking beam 8, linking beam 8 is provided with roof support with reinforced concrete 10, roof support with reinforced concrete 10 covers complex waterproof layer 11 from the inside to the outside successively, backfill 14, clay aquiclude 15.
Before wherein the cantilever shed tunnel of steel tube concrete pile and prestress anchorage cable is installed, rock slope is arranged slope retaining structure 1, slope retaining structure 1 is grouting rock bolt or form concrete; Reinforced concrete upright column 5 and hangar tunnel crossbeam 9 are provided with diagonal brace 7, to strengthen the stability of hangar tunnel crossbeam 9; Roof support with reinforced concrete 10 is provided with gutter 12; Cover complex waterproof layer 11 front end and be provided with ear wall 13, play the effect of buffering falling rocks, and clay aquiclude 15 is set in backfill 14, reduce rainwater infiltration; The steeper place of cantilever shed tunnel upper slope of steel tube concrete pile and prestress anchorage cable arranges side slope protective screen 16, prevents rubble from tumbling destruction shed hole structure; When steel tube concrete pile 3 is built, bore diameter is greater than diameter of steel tube 2 ~ 5cm, builds the fixing steel pipe of micro-expansion cement slurry after inserting steel pipe in steel pipe periphery; Complex waterproof layer 11 first adopts mass ratio to be that the cement mortar of 1:3.5 is floating, and rear employing cationic emulsified bitumen latex and glass fabric interval are arranged, finally in its surface smear 1:2 cement mortar as topping.
By reference to the accompanying drawings detailed description of the invention of the present utility model is explained in detail above, but the utility model is not limited to above-mentioned embodiment, in the ken that those of ordinary skill in the art possess, various change can also be made under the prerequisite not departing from the utility model aim.

Claims (6)

1. one kind is provided with the cantilever shed tunnel of steel tube concrete pile and prestress anchorage cable, it is characterized in that: this cantilever shed tunnel is rearranged by some bracing or strutting arrangement orders, bracing or strutting arrangement comprises base support means, top braces device be connected base support means, the reinforced concrete upright column (5) of top braces device, base support means comprises basis (2), steel tube concrete pile (3) and vertical prestressed anchor cables (4), manually digging hole is to bottom firm ground layer setting steel tube concrete pile (3) and steel tube concrete pile (3) top connects basis (2), (2) side, basis is provided with vertical prestressed anchor cables (4) and connects bottom firm ground layer, top braces device comprises hangar tunnel crossbeam (9) and transverse prestress anchor cable (6), hangar tunnel crossbeam (9) side is positioned at tip hard horizon d and this side is provided with boss, boss is provided with transverse prestress anchor cable (6) and is connected with tip hard horizon d, hangar tunnel crossbeam (9) between two on adjacent supports device is provided with linking beam (8), linking beam (8) is provided with roof support with reinforced concrete (10), roof support with reinforced concrete (10) covers complex waterproof layer (11) from the inside to the outside successively, backfill (14), clay aquiclude (15).
2. the cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable according to claim 1, is characterized in that: before the cantilever shed tunnel installation of described steel tube concrete pile and prestress anchorage cable, rock slope is arranged slope retaining structure (1).
3. the cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable according to claim 1, is characterized in that: described reinforced concrete upright column (5) and hangar tunnel crossbeam (9) are provided with diagonal brace (7).
4. the cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable according to claim 1, is characterized in that: described roof support with reinforced concrete (10) is provided with gutter (12).
5. the cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable according to claim 1, is characterized in that: described covering complex waterproof layer (11) front end is provided with ear wall (13).
6. the cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable according to claim 1, is characterized in that: the steeper place of cantilever shed tunnel upper slope of described steel tube concrete pile and prestress anchorage cable arranges side slope protective screen (16).
CN201420436607.XU 2014-08-05 2014-08-05 A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable Expired - Fee Related CN204125850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420436607.XU CN204125850U (en) 2014-08-05 2014-08-05 A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420436607.XU CN204125850U (en) 2014-08-05 2014-08-05 A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable

Publications (1)

Publication Number Publication Date
CN204125850U true CN204125850U (en) 2015-01-28

Family

ID=52382220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420436607.XU Expired - Fee Related CN204125850U (en) 2014-08-05 2014-08-05 A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable

Country Status (1)

Country Link
CN (1) CN204125850U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603893A (en) * 2016-03-07 2016-05-25 中国科学院、水利部成都山地灾害与环境研究所 Tunnel portal flexible nose-shaped rolling stone discharging and guiding shed tunnel structure and designing method thereof
CN109736215A (en) * 2019-01-31 2019-05-10 中铁第一勘察设计院集团有限公司 Rockfall means of defence and its existing hangar tunnel combine stone cut off wall structure
CN111101450A (en) * 2019-12-31 2020-05-05 中铁二院工程集团有限责任公司 Steep slope pier rockfall prevention structure and construction method
CN114606855A (en) * 2022-04-26 2022-06-10 四川省公路规划勘察设计研究院有限公司 Fabricated pier anti-collision buffer device and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603893A (en) * 2016-03-07 2016-05-25 中国科学院、水利部成都山地灾害与环境研究所 Tunnel portal flexible nose-shaped rolling stone discharging and guiding shed tunnel structure and designing method thereof
CN105603893B (en) * 2016-03-07 2017-08-08 中国科学院、水利部成都山地灾害与环境研究所 Tunnel face flexibility nose-shaped Rolling Stone row leads shed hole structure body and its design method
CN109736215A (en) * 2019-01-31 2019-05-10 中铁第一勘察设计院集团有限公司 Rockfall means of defence and its existing hangar tunnel combine stone cut off wall structure
CN111101450A (en) * 2019-12-31 2020-05-05 中铁二院工程集团有限责任公司 Steep slope pier rockfall prevention structure and construction method
CN114606855A (en) * 2022-04-26 2022-06-10 四川省公路规划勘察设计研究院有限公司 Fabricated pier anti-collision buffer device and construction method thereof

Similar Documents

Publication Publication Date Title
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN202969392U (en) Combined support for complex geological deep foundation pit
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN102002956B (en) Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope
CN102562077B (en) Excavation construction method of frame tunnel penetrating special structure at lower portion
CN202707075U (en) Long-span subway station main structure constructed based on column and arch method
CN101476466B (en) Giant heavy laver land slide pre-stress anchor cable antiskid tunnel construction method and novel prevention structure
CN104989425B (en) A kind of tunneling is into hole supporting construction and its method for protecting support
CN106368224A (en) Graded slope reinforcing reverse construction method for high slope under complicated geology
CN103206219A (en) Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN109537604A (en) A method of utilizing screw pile bolt anchorage Cut Slopes of Expansive Soil
CN204125850U (en) A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN101967786B (en) Airfield pavement structure with box-type shock-isolation foundation
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN110374111A (en) A kind of slope cooperates with support system with steel pipe piled anchor
CN108914954A (en) Slope support method of the pre support in conjunction with permanent support
CN104653195A (en) Gully landform tunnel portal structure and construction method thereof
CN105156114A (en) Enlarging repair and reinforcement method of roadways at crossing
CN103306295A (en) Rigid frame pile supporting and blocking structure
CN209568379U (en) A kind of road prevention structure for blocking falling rocks
CN204283438U (en) Portal supporting and protection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150128

Termination date: 20160805