CN208309575U - A kind of fixed device of the main reinforcement of filling pile cage of reinforcement - Google Patents

A kind of fixed device of the main reinforcement of filling pile cage of reinforcement Download PDF

Info

Publication number
CN208309575U
CN208309575U CN201820876997.0U CN201820876997U CN208309575U CN 208309575 U CN208309575 U CN 208309575U CN 201820876997 U CN201820876997 U CN 201820876997U CN 208309575 U CN208309575 U CN 208309575U
Authority
CN
China
Prior art keywords
reinforcement
main reinforcement
main
hole
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820876997.0U
Other languages
Chinese (zh)
Inventor
张洪宽
董天雷
太明
张颖
刘克文
刘舒倩
李启富
谢林冲
李英虎
周德标
徐同越
刘海芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment First Survey And Design Co Ltd
Original Assignee
Yunnan Construction Investment First Survey And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment First Survey And Design Co Ltd filed Critical Yunnan Construction Investment First Survey And Design Co Ltd
Priority to CN201820876997.0U priority Critical patent/CN208309575U/en
Application granted granted Critical
Publication of CN208309575U publication Critical patent/CN208309575U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of fixed device of the main reinforcement of filling pile cage of reinforcement, it is characterised in that: including steel loop mold and main reinforcement fixed ring, steel loop mold is equipped with main reinforcement through-hole;The internal diameter of the steel loop mold is 80-200cm, and thickness 2-3cm, outer diameter 10-20cm bigger than internal diameter form a steel loop circle, and steel loop circle is equipped with equally distributed main reinforcement through-hole, main reinforcement through-hole peripheral solder main reinforcement fixed ring;Main ribs fixed ring main body is the steel fixed ring of a side opening, its internal diameter is 0.3-0.5cm bigger than main reinforcement through-hole, open end is equipped with attachment base, the fixed ring of attachment base opposite side is equipped with the welding base of protrusion, attachment base is equipped with screw hole and passes through connection by screw rod, screw rod difference installation and adjustment nut and locked hand on the outside of two attachment bases.Steel reinforcement cage main reinforcement is passed through into steel loop mold and forms the uniform steel reinforcement cage main body of spacing, the quality of the effective steel reinforcement cage for improving production, while saving human cost, improves quality and safety.

Description

A kind of fixed device of the main reinforcement of filling pile cage of reinforcement
Technical field
The utility model relates to build piling technology field, it is specifically related to a kind of fixed dress of main reinforcement of filling pile cage of reinforcement It sets.
Background technique
Bored concrete pile is the directly aperture on designed stake position, and section is circle, and steel reinforcement cage is placed in hole after pore-forming, Made of concrete perfusion, due to without friction, without squeezing soil when constructing, noise is small, is suitable in City Building dense region The advantages that use, bored concrete pile obtain relatively broad application in construction.According to the difference of pore-forming technique, bored concrete pile can be divided into The bored concrete pile of dry operation pore-forming, the bored concrete pile of mud off pore-forming and bored concrete pile of manually digging hole etc..
Steel reinforcement cage primarily function is similarly, mainly to play drawing-resistant function with the stress of pillar longitudinal reinforcement, concrete Compression strength is high but tensile strength is very low.Play the role of constraint to pile concrete, makes it to bear certain horizontal force. In the production process, in order to improve the quality and safety of steel reinforcement cage, steel reinforcement cage main reinforcement needs uniformly to put phase in advance steel reinforcement cage Form the device of an approximate cylinder between mutually, but operation artificial at present for steel reinforcement cage main reinforcement put accuracy compared with Difference wastes time if doing over again and reforming so that the steel reinforcement cage quality made and safety are poor, if directly use There is security risk, does not allow in construction;In addition, reinforcing bar main reinforcement is put using manually lifting, when main reinforcement is relatively large in diameter, Very laborious also inaccuracy (needs people to lift the main reinforcement of steel reinforcement cage, another person is fixed, and excessively heavy main reinforcement is non- It is often laborious time-consuming), it is inconvenient, it is also dangerous.
Utility model content
In view of the above-mentioned problems existing in the prior art, the main reinforcement that the utility model provides a kind of filling pile cage of reinforcement is fixed Steel reinforcement cage main reinforcement is passed through steel loop mold and forms the uniform steel reinforcement cage main body of spacing, the effective steel reinforcement cage for improving production by device Quality, while saving human cost, improve quality and safety.
To realize above-mentioned technical purpose and the technique effect, the utility model is achieved through the following technical solutions:
A kind of fixed device of the main reinforcement of filling pile cage of reinforcement, including steel loop mold and main reinforcement fixed ring are set on steel loop mold There is main reinforcement through-hole;
The internal diameter of the steel loop mold is 80-200cm, and thickness 2-3cm, outer diameter 10-20cm bigger than internal diameter form a steel Ring, steel loop circle are equipped with equally distributed main reinforcement through-hole, main reinforcement through-hole peripheral solder main reinforcement fixed ring;
Main ribs fixed ring main body is the steel fixed ring of a side opening, and internal diameter is 0.3-0.5cm bigger than main reinforcement through-hole, Open end is equipped with attachment base, and the fixed ring of attachment base opposite side is equipped with the welding base of protrusion, and attachment base is equipped with screw hole and passes through Screw rod passes through connection, screw rod difference installation and adjustment nut and locked hand on the outside of two attachment bases.
Preferably, the steel loop circle is equipped with equally distributed main reinforcement through-hole, main reinforcement through-hole away from steel loop circle periphery 2-3cm, And different size is arranged according to diameter difference;
Main ribs through-hole is evenly distributed on steel ring ring, and the angle at interval is 15 ° or 30 °.
Preferably, main ribs fixed ring is welded on the main reinforcement through-hole of steel loop circle side.
Preferably, the outside of an attachment base of main ribs fixed ring connects locked hand, locked hand by screw rod Supporting pad is installed between attachment base.
The main reinforcement of the utility model filling pile cage of reinforcement fixes device, is arranged on the steel loop circle of steel loop mold equally distributed Main reinforcement through-hole directly passes through the main reinforcement of steel reinforcement cage from main reinforcement through-hole in fabrication of reinforcing cage, by passing through several steel loop circles Main reinforcement through-hole obtain steel reinforcement cage main body, the main reinforcement of steel reinforcement cage main body puts the steel reinforcement cage for uniformly obtaining high quality, pass through main reinforcement The main reinforcement of through-hole can be pre-fixed by main reinforcement fixed ring, after the completion of entire fabrication of reinforcing cage, by main reinforcement fixed ring and main reinforcement It is welded and fixed with steel loop circle, obtains filling pile cage of reinforcement.
The beneficial effects of the utility model are: the fixed device of the main reinforcement of the utility model filling pile cage of reinforcement, in steel reinforcement cage When production, the steel loop mold of appropriate size is selected, equally distributed main reinforcement is directly arranged in the main reinforcement of steel reinforcement cage from steel loop circle Through-hole passes through, and the main reinforcement of steel reinforcement cage main body is put uniformly, and the main reinforcement through-hole by passing through several steel loop circles obtains steel reinforcement cage master Body can be pre-fixed later across the main reinforcement of main reinforcement through-hole by main reinforcement fixed ring, after the completion of entire fabrication of reinforcing cage, will be led Muscle fixed ring and main reinforcement are welded and fixed with steel loop circle, obtain filling pile cage of reinforcement, the quality of the effective steel reinforcement cage for improving production, To improve building safety and quality;Meanwhile when main reinforcement is relatively large in diameter, installation main reinforcement production steel reinforcement cage also relatively convenient fast and Safety can effectively save manual labor and improve construction safety and quality.
Certainly, any product for implementing the utility model does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model embodiment, make required for being described below to embodiment Attached drawing is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention, For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings Other attached drawings.
Fig. 1 is the structural schematic diagram of the fixed device of main reinforcement of the utility model embodiment filling pile cage of reinforcement;
Fig. 2 is the structural schematic diagram in the utility model Fig. 1 at A;
Fig. 3 is the structural schematic diagram of steel loop mold described in the utility model embodiment;
Fig. 4 is the structural schematic diagram of the utility model embodiment main ribs fixed ring;
Fig. 5 is the use schematic diagram of the main reinforcement fixation device of filling pile cage of reinforcement described in the utility model embodiment;
In attached drawing, parts list represented by the reference numerals are as follows:
1- steel loop mold, 101- steel loop circle, 102- main reinforcement through-hole, 2- main reinforcement fixed ring, 201- fixed ring, 202- connection Seat, 203- welding base, 204- screw rod, 205- regulating nut, 206- supporting pad, 207- locked hand.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts All other embodiment obtained, fall within the protection scope of the utility model.
Embodiment
As described in Fig. 1-5, a kind of fixed device of the main reinforcement of filling pile cage of reinforcement, including steel loop mold 1 and main reinforcement fixed ring 2, steel loop mold 1 is equipped with main reinforcement through-hole 102;
The internal diameter of steel loop mold 1 is 80-200cm, and thickness 2-3cm, outer diameter 10-20cm bigger than internal diameter form a steel loop circle 101, steel loop circle 101 is equipped with equally distributed main reinforcement through-hole 102,102 peripheral solder main reinforcement fixed ring 2 of main reinforcement through-hole;
2 main body of main reinforcement fixed ring is the steel fixed ring 201 of a side opening, and internal diameter is 0.3- bigger than main reinforcement through-hole 102 0.5cm, open end are equipped with attachment base 202, and the fixed ring 201 of 202 opposite side of attachment base is equipped with the welding base 203 of protrusion, connection Seat 202 is equipped with screw hole and passes through connection by screw rod 204, and the screw rod 204 in two 202 outsides of attachment base distinguishes installation and adjustment spiral shell Cap 205 and locked hand 207;
Steel loop circle 101 is equipped with equally distributed main reinforcement through-hole 102, main reinforcement through-hole 102 away from 101 periphery 2-3cm of steel loop circle, And different size is arranged according to diameter difference;
Main ribs through-hole 102 is evenly distributed on steel ring ring 101, and the angle at interval is 15 ° or 30 °;
Main reinforcement fixed ring 2 is welded on the main reinforcement through-hole 102 of 101 side of steel loop circle;
The outside of one attachment base 202 of main reinforcement fixed ring 2 connects locked hand 207, locked hand by screw rod 204 Supporting pad 206 is installed between 207 and attachment base 202;
The main reinforcement of the utility model filling pile cage of reinforcement fixes device, is arranged on the steel loop circle of steel loop mold 1 and is uniformly distributed Main reinforcement through-hole 102,102 peripheral solder main reinforcement fixed ring 2 of main reinforcement through-hole selects the steel of appropriate size in fabrication of reinforcing cage The specification of ring moulds tool 1, i.e., the bored concrete pile and steel reinforcement cage that are perfused as needed selects suitable main reinforcement through-hole 102, according to steel reinforcement cage The demand angle that selects main reinforcement through-hole 102 to be spaced be 15 ° or 30 ° of steel ring ring 101;In fabrication of reinforcing cage, directly by steel Equally distributed main reinforcement through-hole 102 is arranged from steel loop circle 101 and passes through for the main reinforcement of muscle cage, and the main reinforcement of steel reinforcement cage main body is put Even, the main reinforcement through-hole 102 by passing through several steel loop circles 101 obtains steel reinforcement cage main body, passes through the master of main reinforcement through-hole 102 later Muscle can be pre-fixed by main reinforcement fixed ring 2 (main reinforcement fixed ring 2 be a steel fixed ring 201, two attachment bases open at one end The screw rod 204 in 202 outsides distinguishes installation and adjustment nut 205 and locked hand 207, i.e., when progress main reinforcement pre-fixes, locks handle When hand 207 starts on the same line with screw rod 204, open end is locked by rotating regulating nut 205, later by that will lock Determine handle 207 and realizes locking with respect to 204 90-degree bent of screw rod;Welding base 203 is located at the opposite side of open end, for the welding base of protrusion 203, it is welded with steel loop circle 101, main reinforcement fixed ring 2 can be uniformly distributed in the one or both sides of steel loop circle 101), entire After fabrication of reinforcing cage is completed, the main reinforcement of steel reinforcement cage main body is put uniformly by passing through reserved main reinforcement through-hole 102 (such as Fig. 5 institute Show), main reinforcement fixed ring 2 and main reinforcement are welded and fixed with steel loop circle 101, obtain filling pile cage of reinforcement, effective raising production The quality of steel reinforcement cage, to improve building safety and quality;Meanwhile when main reinforcement is relatively large in diameter, installation main reinforcement makes steel reinforcement cage Relatively convenient is quick and safety, with the prior art main reinforcement and the fixed main reinforcement of non-precision are lifted by manpower compared with, can be effective It saves manual labor and raising construction safety and quality, the utility model effectively improves steel reinforcement cage by lower cost Quality and construction efficiency are suitable for the production of building trade filling pile cage of reinforcement and use.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one of the utility model In embodiment or example.In the present specification, schematic expression of the above terms be not necessarily referring to identical embodiment or Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more embodiment or examples In can be combined in any suitable manner.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this Utility model.The utility model is limited only by the claims and their full scope and equivalents.

Claims (5)

1. a kind of fixed device of the main reinforcement of filling pile cage of reinforcement, it is characterised in that: including steel loop mold and main reinforcement fixed ring, steel loop Mold is equipped with main reinforcement through-hole;
The internal diameter of the steel loop mold is 80-200cm, and thickness 2-3cm, outer diameter 10-20cm bigger than internal diameter form a steel loop circle, Steel loop circle is equipped with equally distributed main reinforcement through-hole, main reinforcement through-hole peripheral solder main reinforcement fixed ring;
Main ribs fixed ring main body is the steel fixed ring of a side opening, and internal diameter is 0.3-0.5cm bigger than main reinforcement through-hole, opening End is equipped with attachment base, and the fixed ring of attachment base opposite side is equipped with the welding base of protrusion, and attachment base is equipped with screw hole and passes through screw rod Screw rod difference installation and adjustment nut and locked hand on the outside of connection, two attachment bases.
2. the fixed device of a kind of main reinforcement of filling pile cage of reinforcement as described in claim 1, it is characterised in that: on the steel loop circle Equipped with equally distributed main reinforcement through-hole, different size is arranged away from steel loop circle periphery 2-3cm, and according to diameter difference in main reinforcement through-hole.
3. the fixed device of a kind of main reinforcement of filling pile cage of reinforcement as claimed in claim 2, it is characterised in that: main ribs through-hole It is evenly distributed on steel ring ring, the angle at interval is 15 ° or 30 °.
4. the fixed device of a kind of main reinforcement of filling pile cage of reinforcement as described in claim 1, it is characterised in that: main ribs are fixed Ring is welded on the main reinforcement through-hole of steel loop circle side.
5. the fixed device of a kind of main reinforcement of filling pile cage of reinforcement as described in claim 1, it is characterised in that: main ribs are fixed The outside of one attachment base of ring connects locked hand by screw rod, and supporting pad is installed between locked hand and attachment base.
CN201820876997.0U 2018-06-07 2018-06-07 A kind of fixed device of the main reinforcement of filling pile cage of reinforcement Active CN208309575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820876997.0U CN208309575U (en) 2018-06-07 2018-06-07 A kind of fixed device of the main reinforcement of filling pile cage of reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820876997.0U CN208309575U (en) 2018-06-07 2018-06-07 A kind of fixed device of the main reinforcement of filling pile cage of reinforcement

Publications (1)

Publication Number Publication Date
CN208309575U true CN208309575U (en) 2019-01-01

Family

ID=64709750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820876997.0U Active CN208309575U (en) 2018-06-07 2018-06-07 A kind of fixed device of the main reinforcement of filling pile cage of reinforcement

Country Status (1)

Country Link
CN (1) CN208309575U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112518964A (en) * 2020-11-17 2021-03-19 中国葛洲坝集团机械船舶有限公司 Circular inflatable core mold supporting device and using method
CN115404852A (en) * 2022-09-29 2022-11-29 中国建筑第五工程局有限公司 Large-diameter rotary-digging drilling cast-in-place pile and construction process thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112518964A (en) * 2020-11-17 2021-03-19 中国葛洲坝集团机械船舶有限公司 Circular inflatable core mold supporting device and using method
CN112518964B (en) * 2020-11-17 2022-03-18 中国葛洲坝集团机械船舶有限公司 Circular inflatable core mold supporting device and using method
CN115404852A (en) * 2022-09-29 2022-11-29 中国建筑第五工程局有限公司 Large-diameter rotary-digging drilling cast-in-place pile and construction process thereof
CN115404852B (en) * 2022-09-29 2024-01-26 中国建筑第五工程局有限公司 Large-diameter rotary-digging bored pile and construction process thereof

Similar Documents

Publication Publication Date Title
CN208309575U (en) A kind of fixed device of the main reinforcement of filling pile cage of reinforcement
CN103882798B (en) The reinforced concrete arch bridge of the powerful skeleton of a kind of concrete filled steel tube and construction method thereof
CN207245138U (en) Boat scaffold adjustable in pitch
CN207794658U (en) The connection structure of steel column is connect on a kind of reinforced column
CN211113646U (en) A slip casting section of thick bamboo for PHC tubular pile
CN202090336U (en) Spirally-proceeding type steel tube concrete pile
CN208072776U (en) Connect the upset locking type concrete component joint structure of end bar
CN217000950U (en) Assembly type building wall body quick hoisting installation mechanism based on building engineering
CN207495778U (en) A kind of bar connecting grout sleeve fixed structure
CN207944455U (en) Remove mudcake device
CN206570989U (en) A kind of assembled architecture locking device
CN207685674U (en) The device of double rod iron method construction bridges bent caps
CN211037881U (en) Building construction foundation reinforcing bar reinforcing apparatus
CN109989593A (en) A kind of post-cast strip steel pipe support structure
CN207453484U (en) A kind of hanging separator for concreting
CN208363682U (en) A kind of adjacent handover reinforcement of concrete post structure
CN209760877U (en) Building wall reinforcing and supporting structure
CN209011571U (en) It wears muscle positioning formula wall and pours aluminum alloy pattern plate carrier location structure
CN205776887U (en) Concrete exterior wall structure
CN207739247U (en) A kind of bored concrete pile grouting behind shaft or drift lining structure
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN205444902U (en) Prepared hole die of concrete
CN205604239U (en) Prefabricated bamboo formula dado structure in stake hole
CN210396069U (en) Elevator shaft lifting scaffold
CN217676524U (en) Tower crane online safety early warning auxiliary installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant