CN217000950U - A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering - Google Patents

A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering Download PDF

Info

Publication number
CN217000950U
CN217000950U CN202220614687.8U CN202220614687U CN217000950U CN 217000950 U CN217000950 U CN 217000950U CN 202220614687 U CN202220614687 U CN 202220614687U CN 217000950 U CN217000950 U CN 217000950U
Authority
CN
China
Prior art keywords
wall body
connecting rod
installation mechanism
fixedly connected
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220614687.8U
Other languages
Chinese (zh)
Inventor
关文龙
吴洪强
于金剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yijin Construction Decoration Group Co ltd
Original Assignee
Qingdao Yijin Construction Decoration Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yijin Construction Decoration Group Co ltd filed Critical Qingdao Yijin Construction Decoration Group Co ltd
Priority to CN202220614687.8U priority Critical patent/CN217000950U/en
Application granted granted Critical
Publication of CN217000950U publication Critical patent/CN217000950U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种基于建筑工程的装配式建筑墙体快速吊装安装机构,包括墙体本体和底座,所述墙体本体的底部设置有导向孔,所述底座的上部设置有导向钢筋,所述导向口的底部设置有扩口部,所述导向钢筋的底部设置有锥块,所述锥块与扩口部的形状相同,本实用新型通过设置墙体本体、底座、导向孔、扩口部、导向钢筋和锥块等,具有能够使得导向孔和导向钢筋更好的插合,使得墙体本体吊装的效率更高的优点,解决了现有的墙体本体吊装的效率较慢的问题。

Figure 202220614687

The utility model discloses a quick hoisting and installing mechanism for a prefabricated building wall based on a construction project, comprising a wall body and a base, a guide hole is arranged at the bottom of the wall body, and a guide steel bar is arranged at the upper part of the base, The bottom of the guide port is provided with a flared part, and the bottom of the guide steel bar is provided with a cone block, and the cone block and the flared part have the same shape. The mouth, guide steel bars and cone blocks, etc., have the advantages that the guide holes and the guide steel bars can be better inserted, making the wall body hoisting more efficient, and solve the problem that the existing wall body hoisting efficiency is relatively slow. question.

Figure 202220614687

Description

一种基于建筑工程的装配式建筑墙体快速吊装安装机构A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering

技术领域technical field

本实用新型属于建筑墙体本体设计技术领域,尤其涉及一种基于建筑工程的装配式建筑墙体快速吊装安装机构。The utility model belongs to the technical field of building wall body design, in particular to a rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering.

背景技术Background technique

在建筑工程中装配式的施工方式越来越普及,传统的房屋建筑都是通过砖块水泥一层一层的逐渐垒高,其施工的效率较低,装配式的施工方式,是将提前制成的装配式墙体本体进行组装,其施工的效率与传统的施工方式相比大大提高,在将装配式的墙体本体进行组装的过程中,需要将提前制备完成的墙体本体用塔吊进行吊装,现有技术存在的问题是,塔吊在吊装墙体本体进行投放时,不能够精准的对墙体本体进行定位,必须要工人在墙体本体未落地之前用双手辅助墙体本体,使得墙体本体底部的导向孔对准底座上表面的导向钢筋插入,吊装的效率较慢,所以急需设计一种基于建筑工程的装配式建筑墙体快速吊装安装机构来解决上述的问题。The prefabricated construction method is becoming more and more popular in construction projects. The traditional house building is gradually built up layer by layer through bricks and cement, and its construction efficiency is low. The prefabricated construction method is to make advance Compared with the traditional construction method, the construction efficiency is greatly improved. In the process of assembling the prefabricated wall body, it is necessary to use the tower crane to assemble the prefabricated wall body. For hoisting, the problem in the prior art is that when the tower crane is hoisting the wall body for delivery, the wall body cannot be positioned accurately, and workers must use both hands to assist the wall body before the wall body is on the ground, so that the wall body can be hoisted. The guide holes at the bottom of the body are aligned with the guide steel bars on the upper surface of the base, and the hoisting efficiency is slow. Therefore, it is urgent to design a fast hoisting and installation mechanism for prefabricated building walls based on construction engineering to solve the above problems.

实用新型内容Utility model content

针对现有技术存在的问题,本实用新型提供了一种基于建筑工程的装配式建筑墙体快速吊装安装机构,具有能够使得导向孔和导向钢筋更好的插合,使得墙体本体吊装的效率更高的优点,解决了现有的墙体本体吊装的效率较慢的问题。Aiming at the problems existing in the prior art, the utility model provides a rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering, which has the advantages of enabling better insertion of guide holes and guide steel bars, and improving the efficiency of hoisting the wall body. The higher advantage solves the problem of slow hoisting efficiency of the existing wall body.

本实用新型是这样实现的,一种基于建筑工程的装配式建筑墙体快速吊装安装机构,包括墙体本体和底座,所述墙体本体的底部设置有导向孔,所述底座的上部设置有导向钢筋,所述导向口的底部设置有扩口部,所述导向钢筋的底部设置有锥块,所述锥块与扩口部的形状相同。The utility model is realized in this way, a quick hoisting and installation mechanism for a prefabricated building wall based on a construction project, comprising a wall body and a base, the bottom of the wall body is provided with a guide hole, and the upper part of the base is provided with a guide hole The guide bar is provided with a flared portion at the bottom of the guide opening, and a taper block is provided on the bottom of the guide bar, and the tapered block has the same shape as the flared portion.

作为本实用新型优选的,所述墙体本体的内部固定连接有连杆,所述连杆的上部延伸到墙体本体的外侧,所述连杆的顶部固定连接有吊环,所述连杆和吊环的数量为两个,且两个所述连杆和吊环对称分布在墙体本体的两侧。As a preferred embodiment of the present invention, a connecting rod is fixedly connected to the inside of the wall body, the upper part of the connecting rod extends to the outside of the wall body, and a lifting ring is fixedly connected to the top of the connecting rod, and the connecting rod and The number of the lifting rings is two, and the two connecting rods and the lifting rings are symmetrically distributed on both sides of the wall body.

作为本实用新型优选的,所述墙体本体的内部埋设有固定板,所述连杆贯穿固定板,所述连杆的下部贯穿固定板,所述连杆的底部固定连接有扩大基座。As a preferred embodiment of the present invention, a fixing plate is embedded in the wall body, the connecting rod penetrates the fixing plate, the lower part of the connecting rod penetrates the fixing plate, and the bottom of the connecting rod is fixedly connected with an enlarged base.

作为本实用新型优选的,所述墙体本体的前侧固定连接有两个定位环,所述底座的上部固定连接有两个固定环,所述定位环和固定环之间设置有支撑件。Preferably, the front side of the wall body is fixedly connected with two positioning rings, the upper part of the base is fixedly connected with two fixing rings, and a support member is arranged between the positioning rings and the fixing rings.

作为本实用新型优选的,所述支撑件包括第一支撑杆、设于第一支撑杆底部的转筒、与转筒螺纹配合的螺纹杆和设于螺纹杆底部的第二支撑杆,所述转筒与第一支撑杆转动连接,所述第一支撑杆的顶部和第二支撑杆的底部均固定连接有卡钩。As a preferred feature of the present invention, the support member includes a first support rod, a rotating cylinder arranged at the bottom of the first support rod, a threaded rod threadedly matched with the rotating cylinder, and a second support rod set at the bottom of the threaded rod. The rotating drum is rotatably connected with the first support rod, and the top of the first support rod and the bottom of the second support rod are fixedly connected with hooks.

作为本实用新型优选的,所述转筒的外表面设置有防滑套。As a preferred option of the present invention, the outer surface of the rotating drum is provided with a non-slip sleeve.

作为本实用新型优选的,所述墙体本体的顶部设置有定位杆。As a preferred option of the present invention, a positioning rod is provided on the top of the wall body.

作为本实用新型优选的,所述卡钩的一侧设置有缺口部。As a preferred embodiment of the present invention, a notch is provided on one side of the hook.

与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the present utility model are as follows:

1、本实用新型通过设置墙体本体、底座、导向孔、扩口部、导向钢筋和锥块,能够使得在墙体本体下落的过程中导向钢筋首先与扩口部进行插合,因为扩口部的面积较大,所以导向钢筋更好的与其插合,在导向钢筋的底部设置有锥块能够对扩口部进行封堵。1. By setting the wall body, the base, the guide hole, the flaring part, the guide steel bar and the taper block, the utility model can make the guide steel bar first insert with the flaring part during the falling process of the wall body, because the flaring part is The area of the guide steel bar is larger, so the guide steel bar is better inserted into it, and a taper block is arranged at the bottom of the guide steel bar to seal the flared part.

2、本实用新型通过设置吊环和连杆,能够使得墙体本体更好的被吊起,两个吊环能够使得墙体本体被吊起的过程中更加的稳固。2. The utility model can make the wall body be better hoisted by arranging the hoisting ring and the connecting rod, and the two hoisting rings can make the wall body more stable during the hoisting process.

3、本实用新型通过设置固定板和扩大基座,能够使得吊环与墙体本体之间更加的牢固,使得吊环的承重性更好。3. By arranging the fixing plate and expanding the base, the utility model can make the connection between the hoisting ring and the wall body more firm, so that the bearing capacity of the hoisting ring is better.

4、本实用新型通过设置定位环、固定环和支撑件,能够使得墙体本体在落到底座上后更加的稳固。4. The utility model can make the wall body more stable after falling on the base by arranging the positioning ring, the fixing ring and the support.

5、本实用新型通过设置第一支撑杆、转筒、第二支撑杆、螺纹杆和卡钩,能够使得通过将卡钩分别与定位环和固定环连接后,能够通过转动转筒使得连接件缩短,使得墙体本体与底座之间连接的更加牢固。5. By setting the first support rod, the rotating drum, the second support rod, the threaded rod and the hook in the present invention, after connecting the hook with the positioning ring and the fixing ring respectively, the connecting piece can be made by rotating the rotating drum. The shortening makes the connection between the wall body and the base firmer.

6、本实用新型通过设置防滑套,能够使得转动转筒的过程中更加的方便。6. The utility model can make the process of rotating the drum more convenient by setting the anti-skid cover.

7、本实用新型通过设置定位杆,能够使得墙体本体与其他墙体本体之间的连接更好的定位。7. By setting the positioning rod in the present invention, the connection between the wall body and other wall bodies can be better positioned.

8、本实用新型通过设置缺口部,能够使得卡钩与定位环或者卡钩与固定环之间的卡合更加的方便。8. By setting the notch portion in the present invention, the engagement between the hook and the positioning ring or between the hook and the fixing ring is more convenient.

附图说明Description of drawings

图1是本实用新型提供的结构示意图;Fig. 1 is the structural representation provided by the utility model;

图2是本实用新型提供的正视图;Fig. 2 is the front view provided by the present utility model;

图3是本实用新型提供的图2中B-B的剖视示意图;Fig. 3 is the sectional schematic diagram of B-B in Fig. 2 provided by the present utility model;

图4是本实用新型提供的侧视图;Fig. 4 is the side view provided by the present utility model;

图5是本实用新型提供的图4中C-C处的剖视示意图;Fig. 5 is the cross-sectional schematic diagram at C-C place in Fig. 4 provided by the present utility model;

图6是本实用新型提供的图5中A处的放大示意图;Fig. 6 is the enlarged schematic diagram of place A in Fig. 5 provided by the present utility model;

图7是本实用新型提供的图3中D处的放大示意图。FIG. 7 is an enlarged schematic diagram of the position D in FIG. 3 provided by the present invention.

图中:1、墙体本体;2、底座;3、导向孔;4、扩口部;5、导向钢筋;6、锥块;7、吊环;8、连杆;9、固定板;10、扩大基座;11、定位环;12、固定环;13、支撑件;14、第一支撑杆;15、转筒;16、第二支撑杆;17、螺纹杆;18、卡钩;19、防滑套;20、定位杆;21、缺口部。In the figure: 1. Wall body; 2. Base; 3. Guide hole; 4. Flaring part; 5. Guide steel bar; 6. Cone block; 7. Lifting ring; 8. Connecting rod; 9. Fixed plate; 10. Enlarged base; 11, positioning ring; 12, fixing ring; 13, support; 14, first support rod; 15, drum; 16, second support rod; 17, threaded rod; 18, hook; 19, Anti-skid sleeve; 20. Positioning rod; 21. Notch part.

具体实施方式Detailed ways

为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下。In order to further understand the inventive content, features and effects of the present utility model, the following embodiments are exemplified and described in detail with the accompanying drawings as follows.

下面结合附图对本实用新型的结构作详细的描述。The structure of the present utility model will be described in detail below in conjunction with the accompanying drawings.

如图1、图5和图6所示,本实用新型一种基于建筑工程的装配式建筑墙体快速吊装安装机构,包括墙体本体1和底座2,所述墙体本体1的底部设置有导向孔3,所述底座2的上部设置有导向钢筋5,所述导向口的底部设置有扩口部4,所述导向钢筋5的底部设置有锥块6,所述锥块6与扩口部4的形状相同。As shown in Fig. 1, Fig. 5 and Fig. 6, a quick hoisting and installation mechanism for prefabricated building walls based on construction projects of the present invention comprises a wall body 1 and a base 2, and the bottom of the wall body 1 is provided with Guide hole 3, the upper part of the base 2 is provided with a guide steel bar 5, the bottom of the guide port is provided with a flared part 4, and the bottom of the guide steel bar 5 is provided with a tapered block 6, the tapered block 6 and the flared The shape of the part 4 is the same.

采用上述方案:通过设置墙体本体1、底座2、导向孔3、扩口部4、导向钢筋5和锥块6,能够使得在墙体本体1下落的过程中导向钢筋5首先与扩口部4进行插合,因为扩口部4的面积较大,所以导向钢筋5更好的与其插合,在导向钢筋5的底部设置有锥块6能够对扩口部4进行封堵。The above solution is adopted: by arranging the wall body 1, the base 2, the guide hole 3, the flared part 4, the guide steel bar 5 and the taper block 6, the guide steel bar 5 can be first connected with the flared part during the falling process of the wall body 1. 4 is inserted, because the area of the flared part 4 is large, the guide steel bar 5 is better inserted with it, and the bottom of the guide steel bar 5 is provided with a cone 6 to block the flared part 4 .

参考图5,所述墙体本体1的内部固定连接有连杆8,所述连杆8的上部延伸到墙体本体1的外侧,所述连杆8的顶部固定连接有吊环7,所述连杆8和吊环7的数量为两个,且两个所述连杆8和吊环7对称分布在墙体本体1的两侧。Referring to FIG. 5 , a connecting rod 8 is fixedly connected to the inside of the wall body 1 , the upper part of the connecting rod 8 extends to the outside of the wall body 1 , and the top of the connecting rod 8 is fixedly connected with a lifting ring 7 . The number of the connecting rods 8 and the lifting rings 7 is two, and the two connecting rods 8 and the lifting rings 7 are symmetrically distributed on both sides of the wall body 1 .

采用上述方案:通过设置吊环7和连杆8,能够使得墙体本体1更好的被吊起,两个吊环7能够使得墙体本体1被吊起的过程中更加的稳固。The above solution is adopted: by providing the lifting ring 7 and the connecting rod 8, the wall body 1 can be better hoisted, and the two lifting rings 7 can make the wall body 1 more stable during the lifting process.

参考图5,所述墙体本体1的内部埋设有固定板9,所述连杆8贯穿固定板9,所述连杆8的下部贯穿固定板9,所述连杆8的底部固定连接有扩大基座10。Referring to FIG. 5 , a fixing plate 9 is embedded inside the wall body 1 , the connecting rod 8 penetrates the fixing plate 9 , the lower part of the connecting rod 8 penetrates the fixing plate 9 , and the bottom of the connecting rod 8 is fixedly connected with a Expand the base 10.

采用上述方案:通过设置固定板9和扩大基座10,能够使得吊环7与墙体本体1之间更加的牢固,使得吊环7的承重性更好。With the above solution: by arranging the fixing plate 9 and the enlarged base 10 , the connection between the lifting ring 7 and the wall body 1 can be made more firm, so that the bearing capacity of the lifting ring 7 is better.

参考图1,所述墙体本体1的前侧固定连接有两个定位环11,所述底座2的上部固定连接有两个固定环12,所述定位环11和固定环12之间设置有支撑件13。Referring to FIG. 1 , two positioning rings 11 are fixedly connected to the front side of the wall body 1 , and two fixing rings 12 are fixedly connected to the upper part of the base 2 . Support 13 .

采用上述方案:通过设置定位环11、固定环12和支撑件13,能够使得墙体本体1在落到底座2上后更加的稳固。The above solution is adopted: by arranging the positioning ring 11 , the fixing ring 12 and the support member 13 , the wall body 1 can be made more stable after falling on the base 2 .

参考图1、图3和图7,所述支撑件13包括第一支撑杆14、设于第一支撑杆14底部的转筒15、与转筒15螺纹配合的螺纹杆17和设于螺纹杆17底部的第二支撑杆16,所述转筒15与第一支撑杆14转动连接,所述第一支撑杆14的顶部和第二支撑杆16的底部均固定连接有卡钩18。Referring to FIGS. 1 , 3 and 7 , the support 13 includes a first support rod 14 , a drum 15 disposed at the bottom of the first support rod 14 , a threaded rod 17 threaded with the drum 15 , and a threaded rod 17 . 17 The second support rod 16 at the bottom, the drum 15 is rotatably connected to the first support rod 14 , and the top of the first support rod 14 and the bottom of the second support rod 16 are fixedly connected with hooks 18 .

采用上述方案:通过设置第一支撑杆14、转筒15、第二支撑杆16、螺纹杆17和卡钩18,能够使得通过将卡钩18分别与定位环11和固定环12连接后,能够通过转动转筒15使得连接件缩短,使得墙体本体1与底座2之间连接的更加牢固。The above solution is adopted: by arranging the first support rod 14, the rotating drum 15, the second support rod 16, the threaded rod 17 and the hook 18, the hook 18 can be connected to the positioning ring 11 and the fixing ring 12, respectively. By rotating the drum 15, the connecting piece is shortened, so that the connection between the wall body 1 and the base 2 is more firm.

参考图3,所述转筒15的外表面设置有防滑套19。Referring to FIG. 3 , the outer surface of the rotating drum 15 is provided with a non-slip sleeve 19 .

采用上述方案:通过设置防滑套19,能够使得转动转筒15的过程中更加的方便。With the above solution: by arranging the anti-skid sleeve 19 , the process of rotating the drum 15 can be made more convenient.

参考图1,所述墙体本体1的顶部设置有定位杆20。Referring to FIG. 1 , the top of the wall body 1 is provided with a positioning rod 20 .

采用上述方案:通过设置定位杆20,能够使得墙体本体1与其他墙体本体1之间的连接更好的定位。With the above solution: by arranging the positioning rod 20 , the connection between the wall body 1 and other wall bodies 1 can be better positioned.

参考图1,所述卡钩18的一侧设置有缺口部21。Referring to FIG. 1 , a notch 21 is provided on one side of the hook 18 .

采用上述方案:通过设置缺口部21,能够使得卡钩18与定位环11或者卡钩18与固定环12之间的卡合更加的方便。With the above solution: by providing the notch portion 21 , the engagement between the hook 18 and the positioning ring 11 or the hook 18 and the fixing ring 12 can be more convenient.

本实用新型的工作原理:The working principle of the present utility model:

在使用时,首先塔吊通过吊环7将墙体本体1吊起,在塔吊将墙体本体1运输到底座2的上方时,将导向孔3对准导向钢筋5插入,导向孔3的底部设置有扩口部4能够更好的与导向钢筋5插合,锥块6能够与扩口部4插合,吊环7的底部设置有连杆8,连杆8的底部连接有扩大基座10,连杆8、扩大基座10和固定板9之间相互配合能够使得吊环7的承重性增加,提高吊装过程的安全性,在定位环11和固定环12之间设置有支撑件13能够使得墙体本体1更加的稳固,将第一支撑杆14一端的卡钩18通过缺口部21与定位环11挂扣,将第二支撑杆16一端的卡钩18与固定环12挂钩,转动转筒15,能够使得螺纹杆17旋入转筒15的深度增加,防滑套19能够使得转动转筒15的过程中更加的方便,定位杆20能够使得墙体本体1与其他的墙体本体1之间更好的定位。When in use, the tower crane first lifts the wall body 1 through the lifting ring 7, and when the tower crane transports the wall body 1 to the top of the base 2, the guide hole 3 is aligned with the guide steel bar 5 and inserted, and the bottom of the guide hole 3 is provided with a The flared part 4 can be better inserted into the guide steel bar 5, the cone 6 can be inserted into the flared part 4, the bottom of the lifting ring 7 is provided with a connecting rod 8, and the bottom of the connecting rod 8 is connected with an enlarged base 10, which is connected The mutual cooperation between the rod 8, the enlarged base 10 and the fixed plate 9 can increase the load-bearing capacity of the lifting ring 7 and improve the safety of the lifting process. The main body 1 is more stable, the hook 18 at one end of the first support rod 14 is hooked to the positioning ring 11 through the notch 21, the hook 18 at one end of the second support rod 16 is hooked to the fixing ring 12, and the rotating drum 15 is rotated. The threaded rod 17 can be screwed into the drum 15 to increase the depth, the anti-slip sleeve 19 can make the process of rotating the drum 15 more convenient, and the positioning rod 20 can make the wall body 1 and other wall bodies 1 better. positioning.

综上所述:该基于建筑工程的装配式建筑墙体快速吊装安装机构,通过设置墙体本体1、底座2、导向孔3、扩口部4、导向钢筋5和锥块6等,具有能够使得导向孔3和导向钢筋5更好的插合,使得墙体本体1吊装的效率更高的优点,解决了现有的墙体本体1吊装的效率较慢的问题。To sum up: the quick hoisting and installation mechanism for prefabricated building walls based on construction engineering, by setting the wall body 1, the base 2, the guide hole 3, the flared part 4, the guide steel bar 5 and the cone block 6, etc. The guide hole 3 and the guide steel bar 5 are better inserted, which makes the wall body 1 more efficient in hoisting, and solves the problem of slow hoisting efficiency of the existing wall body 1 .

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device comprising a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (8)

1. The utility model provides a quick hoist and mount installation mechanism of assembled building wall based on building engineering, includes wall body (1) and base (2), its characterized in that: the bottom of wall body (1) is provided with guiding hole (3), the upper portion of base (2) is provided with direction reinforcing bar (5), the bottom of guiding hole (3) is provided with flaring portion (4), the bottom of direction reinforcing bar (5) is provided with taper block (6), taper block (6) are the same with the shape of flaring portion (4).
2. The assembly type building wall rapid hoisting installation mechanism based on the building engineering as claimed in claim 1, characterized in that: the inside fixedly connected with connecting rod (8) of wall body (1), the upper portion of connecting rod (8) extends to the outside of wall body (1), the top fixedly connected with rings (7) of connecting rod (8), the quantity of connecting rod (8) and rings (7) is two, and two connecting rod (8) and rings (7) symmetric distribution are in the both sides of wall body (1).
3. The assembly type building wall rapid hoisting installation mechanism based on the building engineering as claimed in claim 2, characterized in that: a fixing plate (9) is embedded in the wall body (1), the connecting rod (8) penetrates through the fixing plate (9), the lower portion of the connecting rod (8) penetrates through the fixing plate (9), and an enlarged base (10) is fixedly connected to the bottom of the connecting rod (8).
4. The assembly type building wall rapid hoisting installation mechanism based on the building engineering as claimed in claim 1, characterized in that: two holding rings (11) of front side fixedly connected with of wall body (1), two solid fixed rings (12) of upper portion fixedly connected with of base (2), be provided with support piece (13) between holding ring (11) and solid fixed ring (12).
5. The assembly type building wall rapid hoisting installation mechanism based on the building engineering in claim 4 is characterized in that: support piece (13) include first bracing piece (14), locate rotary drum (15) of first bracing piece (14) bottom, with rotary drum (15) screw-thread fit's threaded rod (17) and locate second bracing piece (16) of threaded rod (17) bottom, rotary drum (15) rotate with first bracing piece (14) and are connected, the top of first bracing piece (14) and the equal fixedly connected with pothook (18) in bottom of second bracing piece (16).
6. The assembly type building wall rapid hoisting installation mechanism based on the building engineering of claim 5, wherein: the outer surface of the rotary drum (15) is provided with an anti-slip sleeve (19).
7. The assembly type building wall rapid hoisting installation mechanism based on the building engineering as claimed in claim 1, characterized in that: and a positioning rod (20) is arranged at the top of the wall body (1).
8. The assembly type building wall rapid hoisting installation mechanism based on the building engineering as claimed in claim 5, characterized in that: one side of the hook (18) is provided with a gap part (21).
CN202220614687.8U 2022-03-21 2022-03-21 A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering Expired - Fee Related CN217000950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220614687.8U CN217000950U (en) 2022-03-21 2022-03-21 A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220614687.8U CN217000950U (en) 2022-03-21 2022-03-21 A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering

Publications (1)

Publication Number Publication Date
CN217000950U true CN217000950U (en) 2022-07-19

Family

ID=82370516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220614687.8U Expired - Fee Related CN217000950U (en) 2022-03-21 2022-03-21 A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering

Country Status (1)

Country Link
CN (1) CN217000950U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492411A (en) * 2022-10-19 2022-12-20 中铁五局集团建筑工程有限责任公司 High-altitude cantilever steel structure unitized high-precision rapid butt joint device and butt joint method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492411A (en) * 2022-10-19 2022-12-20 中铁五局集团建筑工程有限责任公司 High-altitude cantilever steel structure unitized high-precision rapid butt joint device and butt joint method thereof

Similar Documents

Publication Publication Date Title
CN201857613U (en) Bamboo joint type anchor rod
CN217000950U (en) A rapid hoisting and installation mechanism for prefabricated building walls based on construction engineering
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN101250870B (en) Positioning device for filling pile reinforcement cage
CN203924353U (en) Screw built-in fitting
CN109137924B (en) Structure for reducing pile length of deep soft soil layer by forming composite foundation and construction method
CN208761976U (en) A lifting lug on a support pile of a pile stabilization platform
CN210713483U (en) A precast concrete slab assembly that is easy to hoist
CN207863464U (en) A kind of new take-off seam aluminum alloy pattern plate
CN206735614U (en) The grouting hanging apparatus of spheroidal graphite cast-iron push pipe
CN208776189U (en) A combined detachable reinforcement cage hanging reinforcement device
CN209128990U (en) A bolt-type detachable reinforcement cage hanging reinforcement device
CN105421457A (en) Spiral type pipe pile soil getting machine
CN211816376U (en) A tower crane foundation
CN204040499U (en) Steel pipe column vertical locating device is inserted after contrary sequence method
CN219731988U (en) Turnover hanging bar adjusting device under deep hole
CN217024991U (en) Hollow building block hoisting device
CN211736321U (en) Pre-buried fixed knot of prefabricated outer shear wall scaffold puts up constructs
CN206033024U (en) Pipeline hoist and mount mould
CN210369864U (en) External scaffolding flange wall connecting piece
CN207597885U (en) A kind of pre-buried lifting part of precast stair
CN206309111U (en) A kind of line bar location and installation component
CN223423253U (en) A pipe well dewatering socket-type shaft sinking auxiliary device
CN205857225U (en) A kind of segmentation slope wall type suction barrel base
CN223867127U (en) A large culvert structure that is easy to hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220719