CN210884903U - Fixing frame for hoisting curtain wall - Google Patents

Fixing frame for hoisting curtain wall Download PDF

Info

Publication number
CN210884903U
CN210884903U CN201921652395.8U CN201921652395U CN210884903U CN 210884903 U CN210884903 U CN 210884903U CN 201921652395 U CN201921652395 U CN 201921652395U CN 210884903 U CN210884903 U CN 210884903U
Authority
CN
China
Prior art keywords
supporting plate
fixed
plate
movable supporting
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921652395.8U
Other languages
Chinese (zh)
Inventor
程龙祥
邱子晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201921652395.8U priority Critical patent/CN210884903U/en
Application granted granted Critical
Publication of CN210884903U publication Critical patent/CN210884903U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a fixing frame for lifting curtain walls, which comprises a fixed supporting plate, a movable supporting plate, side baffle plates and a hinge (5), wherein the cross section of the fixed supporting plate is in an L-shaped plate shape, the movable supporting plate is in a rectangular plate shape, two ends of the hinge (5) are respectively connected with the fixed supporting plate and the movable supporting plate and are fixed through screws, and the centers of the outer walls of the fixed supporting plate and the movable supporting plate are respectively and symmetrically provided with a hanging ring; the side fence plates are symmetrically arranged on two side surfaces of the fixed supporting plate, one end of each side fence plate is fixedly connected to the fixed supporting plate, and the other end of each side fence plate is a free end and is provided with an insertion hole; the plug pin is perpendicular to the movable supporting plate and penetrates through the jack, and the sleeve is sleeved and fixed on the plug pin. The utility model discloses simple structure solves the curtain and can't release and shift out the problem of curtain in a flexible way at handling in-process mount, improves the efficiency of construction, convenient quick operation.

Description

Fixing frame for hoisting curtain wall
The technical field is as follows:
the utility model relates to a architectural equipment technical field, concretely relates to a mount for curtain handling.
Background art:
the curtain wall is a light wall with decorative effect commonly used in modern large and high-rise buildings, and is mostly used for exterior wall enclosure of buildings. The curtain wall is composed of a panel and a supporting structure system, can have certain displacement capacity or certain deformation capacity relative to the main structure, and does not bear the external protective structure or the decorative structure of the building acted by the main structure. Curtain walls are often prefabricated and are lifted to a proper height for installation after being transported to a construction site. When the curtain wall is vertically lifted, the curtain wall needs to be fixed by a lifting fixing frame, and then the fixing frame and the curtain wall are lifted by lifting equipment and a rope. At present, the mount that uses in the current curtain handling can't be loosened in a midair in a flexible way and shift out, leads to just can loosen the mount after need putting the curtain in the support place at every turn, then carries the curtain and installs. Repeated work makes the efficiency of construction low and troublesome poeration, wastes time and energy.
The utility model has the following contents:
in order to solve the not enough of prior art existence, the utility model provides a mount for curtain handling solves the problem that the curtain can't be released and shift out the curtain in a flexible way at handling in-process mount, improves the efficiency of construction, convenient quick operation.
The utility model provides a technical problem's technical scheme as follows:
a fixing frame for hoisting a curtain wall comprises a fixed supporting plate, a movable supporting plate, side fence plates and hinges, wherein the cross section of the fixed supporting plate is in an L-shaped plate shape, the movable supporting plate is in a rectangular plate shape, two ends of each hinge are respectively connected with the fixed supporting plate and the movable supporting plate and are fixed through screws, and hanging rings are respectively symmetrically arranged at the centers of the outer walls of the fixed supporting plate and the movable supporting plate; the side fence plates are symmetrically arranged on two side surfaces of the fixed supporting plate, one end of each side fence plate is fixedly connected to the fixed supporting plate, and the other end of each side fence plate is a free end and is provided with an insertion hole; the plug pin is perpendicular to the movable supporting plate and penetrates through the jack, and the sleeve is sleeved and fixed on the plug pin.
Furthermore, the fixed supporting plate is consistent with the movable supporting plate in height, so that the curtain wall is prevented from being unstable in the transferring and transporting process.
Furthermore, the bolt is L type round bar shape, and the constructor of being convenient for is to the mount operation of loosening.
Furthermore, the fixed supporting plate, the movable supporting plate, the side fence plate sleeve and the hanging ring can be made of aluminum alloy materials, and the steel plate is firm, durable and good in corrosion resistance.
Furthermore, the bolt and the hinge can be made of stainless steel, so that the service life of the fixing frame is prolonged.
Compared with the prior art, the utility model following beneficial effect has: the utility model discloses simple structure makes the mount can be in the midair in a flexible way release and shift out the curtain through the rotatory cooperation between the bolt that sets up and the jack, and the curtain handling directly installs the curtain on the building outer wall to suitable high back, simplifies the work progress, improves the efficiency of construction.
Drawings
The invention will be further explained with reference to the drawings and the detailed description below:
fig. 1 is a schematic structural view of a fixing frame for hoisting curtain walls according to the present invention;
fig. 2 is a side view of the utility model discloses a mount for curtain handling.
The numbers in the figures are as follows: 1-fixing the supporting plate; 2, a movable supporting plate; 3-side fence board; 4, hanging rings; 5, a hinge; 6, inserting a pin; 7, sleeving a sleeve; 8-plug hole.
Detailed Description
Examples
As shown in fig. 1 to 2, the fixing frame for hoisting the curtain wall comprises a fixed supporting plate 1, a movable supporting plate 2, side fence plates 3 and hinges 5, wherein the cross section of the fixed supporting plate 1 is in an L-shaped plate shape, the movable supporting plate 2 is in a rectangular plate shape, two ends of each hinge 5 are respectively connected with the fixed supporting plate 1 and the movable supporting plate 2 and are fixed through screws, and the centers of the outer walls of the fixed supporting plate 1 and the movable supporting plate 2 are respectively and symmetrically provided with hanging rings 4; the side fence plates 3 are symmetrically arranged on two side surfaces of the fixed supporting plate 1, one end of each side fence plate is fixedly connected to the fixed supporting plate 1, and the other end of each side fence plate is a free end and is provided with an insertion hole 8; still include bolt 6 and sleeve pipe 7, bolt 6 perpendicular to movable supporting plate 2 and run through in jack 8, sleeve pipe 7 cover is established and is fixed in bolt 6.
In the embodiment, the fixed supporting plate 1 and the movable supporting plate 2 are consistent in height, so that the curtain wall is prevented from being unstable in the transferring process.
In this embodiment, the bolt 6 is in the shape of an L-shaped round rod, which is convenient for the constructor to loosen the fixing frame.
In the embodiment, the fixed supporting plate 1, the movable supporting plate 2, the side fence plate 3 sleeve and the hanging ring 4 can be made of aluminum alloy materials, and are firm, durable and good in corrosion resistance; the bolt 6 and the hinge 5 can be made of stainless steel, so that the service life of the fixing frame is prolonged.
The utility model discloses a work progress as follows: the curtain wall is arranged in the fixed supporting plate 1 and the movable supporting plate 2, then the rope passes through the hanging rings 4 on the two symmetrical surfaces, and the lifting equipment is used for lifting the rope to pull the curtain wall fixed on the fixed frame. When handling equipment handling to the construction height, the inside and outside constructor of building outer wall cooperates jointly and accomplishes the curtain installation: a constructor standing on the movable elevator outside the outer wall of the building pulls the plug pin 6 out of the jack 8 and then rotatably pulls the movable supporting plate 2 open around the hinge 5; and finally, the constructor in the building outer wall at the construction height directly installs the curtain wall on the building outer wall from the fixed supporting plate 1. The curtain wall hoisting fixing frame can be flexibly released and moved out of a curtain wall in the air, the curtain wall is directly installed after being hoisted to the construction height, the procedure is simplified, and the construction efficiency is improved.
The above is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope defined by the claims.
The parts of the present invention not described in detail are the known techniques of those skilled in the art.

Claims (5)

1. The fixing frame for hoisting the curtain wall is characterized by comprising a fixing supporting plate (1), a movable supporting plate (2), side fence plates (3) and hinges (5), wherein the cross section of the fixing supporting plate (1) is in an L-shaped plate shape, the movable supporting plate (2) is in a rectangular plate shape, two ends of each hinge (5) are respectively connected with the fixing supporting plate (1) and the movable supporting plate (2) and are fixed through screws, and hoisting rings (4) are respectively and symmetrically arranged at the centers of the outer walls of the fixing supporting plate (1) and the movable supporting plate (2); the side fence plates (3) are symmetrically arranged on two side surfaces of the fixed supporting plate (1), one end of each side fence plate is fixedly connected to the fixed supporting plate (1), and the other end of each side fence plate is a free end and is provided with an insertion hole (8); still include bolt (6) and sleeve pipe (7), bolt (6) perpendicular to activity layer board (2) and run through in jack (8), sleeve pipe (7) cover is established and is fixed in bolt (6).
2. The fixing frame for curtain wall hoisting according to claim 1, wherein the height of the fixed supporting plate (1) is consistent with that of the movable supporting plate (2).
3. The fixing frame for curtain wall hoisting according to claim 1, wherein the bolt (6) is in the shape of an L-shaped round rod.
4. The fixing frame for hoisting the curtain wall as claimed in claim 1, wherein the fixing supporting plate (1), the movable supporting plate (2), the side fence plate (3) and the hoisting ring are made of aluminum alloy.
5. The fixing frame for curtain wall hoisting according to claim 1, wherein the bolt (6) and the hinge (5) are made of stainless steel.
CN201921652395.8U 2019-09-27 2019-09-27 Fixing frame for hoisting curtain wall Active CN210884903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921652395.8U CN210884903U (en) 2019-09-27 2019-09-27 Fixing frame for hoisting curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921652395.8U CN210884903U (en) 2019-09-27 2019-09-27 Fixing frame for hoisting curtain wall

Publications (1)

Publication Number Publication Date
CN210884903U true CN210884903U (en) 2020-06-30

Family

ID=71332377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921652395.8U Active CN210884903U (en) 2019-09-27 2019-09-27 Fixing frame for hoisting curtain wall

Country Status (1)

Country Link
CN (1) CN210884903U (en)

Similar Documents

Publication Publication Date Title
CN102261067A (en) Method for installing reinforcement cage of large-diameter ultra-long pile
CN201040922Y (en) Anti-slip hook for fixing and suspending scaffold
CN210884903U (en) Fixing frame for hoisting curtain wall
CN106121259B (en) The hanging apparatus and its hanging method of embedded integrated outer wall plate
CN210064895U (en) Installation hoist of prefabricated unit in space
CN216766397U (en) Building curtain wall mounting structure
CN212769534U (en) Rotatable simple and easy hoist device
CN210853369U (en) Protection device for vertical transportation building blocks of tower crane
CN209988990U (en) Hoist and mount frame convenient to installation is dismantled
CN211037773U (en) Hanging basket suspension device
CN205935718U (en) Hoist device of embedded integral side fascia
CN220223239U (en) Movable lifting appliance for building construction
CN215666580U (en) Transfer device is used in construction of compound incubation exterior sheathing
CN205838328U (en) A kind of reel lifting tool
CN212200753U (en) Steel construction concrete building module
CN217264208U (en) Tool type tool for hoisting prefabricated well
CN212687323U (en) Hoisting system for hoisting converter vaporization cooling system equipment
CN210457366U (en) High-rise ALC wallboard corollary equipment
CN212953790U (en) Detachable lifting bar for thin-wall shell structure
CN215666559U (en) Hoist device for assembly type building construction
CN212689213U (en) Steel structure frame structure convenient to hoist and mount
CN213112186U (en) Hoisting device for assembled component
CN220201149U (en) Prefabricated section of jurisdiction hoisting structure
CN220245268U (en) Inserted hoisting device for hollow precast pile
CN104291225A (en) Non-dragging independent mast device for hoisting rigid steel pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant