CN208280530U - A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure - Google Patents

A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure Download PDF

Info

Publication number
CN208280530U
CN208280530U CN201820742286.4U CN201820742286U CN208280530U CN 208280530 U CN208280530 U CN 208280530U CN 201820742286 U CN201820742286 U CN 201820742286U CN 208280530 U CN208280530 U CN 208280530U
Authority
CN
China
Prior art keywords
composite plate
floor
carbon magnesium
heating
magnesium composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820742286.4U
Other languages
Chinese (zh)
Inventor
程文立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Xinzhong Mao Energy-Saving Building Materials Technology Co Ltd
Original Assignee
Foshan Xinzhong Mao Energy-Saving Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Xinzhong Mao Energy-Saving Building Materials Technology Co Ltd filed Critical Foshan Xinzhong Mao Energy-Saving Building Materials Technology Co Ltd
Priority to CN201820742286.4U priority Critical patent/CN208280530U/en
Application granted granted Critical
Publication of CN208280530U publication Critical patent/CN208280530U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of graphene electrothermals to make somebody a mere figurehead Sound insulation floorings and its mounting structure, including successively compound decorative plies, the first carbon magnesium composite plate, antiseepage film, graphene electric heating lamella, macromolecule reflective coating and the second carbon magnesium composite plate from top to bottom.Further include the keel strip for being installed on the second carbon magnesium composite plate bottom surface, carried out by nail-free glue be bonded between the keel strip and the second carbon magnesium composite plate, while the keel strip bottom surface is also compounded with foam glue-line.

Description

A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure
Technical field
The utility model relates to building material technical field more particularly to a kind of graphene electrothermal make somebody a mere figurehead Sound insulation floorings and Its mounting structure.
Background technique
Traditional heating mode probably has following three categories, is that (1) gas heating is also water heating mode respectively;(2) empty Adjust heating mode;(3) carbon fiber heating mode.
The defect of prior art and prior art: first, the defect of gas heating: gas heating is also hot-water heating, this to lean on The application of the heating mode of water heating on the ground is exactly water floor heating.It is this to be mated formation with gas heating at the hot-water heating floor of hot water Technics comparing is complicated.On being laid with mounted underground heat water pipe fundamental aspect, directly mat formation ceramic tile or so-called floor-heating type wood Quality plate, such underground heat ceramic tile floor tile and floor heating wood floors are extremely traditional, there is very big drawback.Firstly, institute The floor tile mated formation is all thicker, most thin also to want 10mm thick, such floor tile weight itself just than heavier, and pavement process nor Normal is cumbersome, and thickness has been used to be no less than the great Sha grout layer of 30mm in pavement process again.During mating formation, worker is obtained Cement great Sha generation upon generation of is first moved to each room on the floor in spread room, both cement great Sha are shoveled in proportion then and are mixed Uniformly, then inward constantly add water, while waterside is added to stir, start after mixing semi-wet state thoroughly in institute's floor tile region The silt soil that spreading has been mixed thoroughly, covers one piece of size floor tile selected, then constantly beat floor tile surrounding with rubber hammer, with this Come levelling floor tile below silt soil layer, after repeatedly tap it is levelling after, then by the floor tile spread take up again its back use The perching knife striaght cement fine ash that will become reconciled again be put on the floor tile to be mated formation, then this is wiped to the ground of thin concrete grey behind Brick lid is layered on the silt soil layer of levelling mistake, then constantly tapped with rubber hammer it is constantly levelling, with the levelling each floor tile block of level meter Between height is smooth, straightness, and so on, until that completes the region entire room Suo Pu answers floor file face.Such water Unusual very complicated when heating floor is mated formation, it is time-consuming to take resource, also constantly to transport a large amount of not environmentally building material cement Great Sha, exhaustless cement great Sha are transported in the form of building waste again and are outwelled, and the resource greatly wasted simultaneously greatly improves Transportation cost and resources costs.In addition, the flooring mode of this water floor heating occupies the ground level of room about 20mm, thus The huge waste of social resources is caused, while also greatly increasing the weight of building body, seriously constrains the energy conservation of country's promotion Emission reduction and the target built a conservation-minded society;Second, warming by air conditioner mode: universal heating mode of southern winter when air-conditioning, it is special One band of Jiangsu and Zhejiang Provinces Shanghai when other.Everybody suffers from very deep cognition, once weather is quenched, and it is clammy to accompany each other even that air-conditioning whole day is all It opens and does not also play great effect, and the hot wind blow-through of air-conditioning, people is also uncomfortable, calculates from cost, the system in room Heat is mating plus auxiliary heat, and cost is very high and also very power-consuming;Third, carbon fiber heating mode: the installation of this heating mode Belong to the flooring mode of electric heating ground heating floor.This electric heating type heating floor is the hair in new house on the ground first with cement sand Levelling ground is starched, Electrothermal wire or carbon fiber heating electric wire have then been re-layed, then again in the water for being laid with required thickness above It is being laid with ceramic tile or floor-heating type wood floors or other compound floor-heating type floors above again after mud great Sha thin pulp is levelling.More than These three types of heating modes have all inevitably largely used the floor heating of this not energy-efficient not environmentally bearing load weight of cement great Sha The flooring mode of heating.
The mode and defect of the three of the above ground heating floor prior art:
(1) this ground heating floor and flooring mode and are wet construction side since whole pavement process are all manually to mat formation entirely Method construction.Due to the limited strength of worker's hand and arm, the floor tile being laid with largely is no more than 1000mm and advises multiplied by 1000mm Lattice, most common is 800mm multiplied by 800mm specification, and brick is too big, and the worker that mats formation can arduously take a lot of work very much, does not spread daily several Block brick, because every piece of floor tile will at least be moved 3 times or more from the big sand bed of cement has been spread out to levelling bedding, what worker mated formation every time Area is again few, in addition brick massiveness amount weight, carrying number is excessive, to greatly waste the time of worker mated formation, makes At mat formation cost and resources costs it is huge it is high not under, be more difficult to find along with the skilled worker of this tile work surpasses, to cause Because the progress of tile work is seriously slow, the finishing time of house and the finishing duration of tooling is seriously affected and have moved in the time.In addition, The mode of this tile work, due to being entire body cement mortar system, completing the floor used is still not sound insulation, sound upstairs It can be passed directly to go downstairs, to affect other rest downstairs.Oneself has many such lives to collide in actual life Example.
(2) traditional electric heating floor is that carbon fiber heating electric wire is laid on the ground for having used cement mortar levelling, Then the fever electric wire that oneself completes is covered with cement mortar layer again, then be laid with above ceramic tile and to complete.It is such Heating heating method still will appear the various defects that the first water heating method occurs;
(3) warming by air conditioner heats source from room and heats mating heat source to auxiliary, and overall cost is high, and electric heating adds auxiliary thermoelectricity It is big to take consumption, and hot wind blow-through, people is also very uncomfortable, and be easy to get air conditioner disease;
(4) water heating is using 60 DEG C of hot water below as heat source, and the internal circulation flow heating floor in heating tube needs In addition gas fired-boiler is added, expense cost is all very high;
(5) electricity heating is relative to the no noise of water heating, but to go out to ask come heating floor with resistance wire heating power Much higher than water floor heating of the root rate of topic, both floor heatings push away the concealed work being mounted under earth material, mounting structure point For basic ground floor, insulation board layer, reflective coating, heating layer, steel screen layer, cement mortar adhesive layer, earth material layer.Due to The number of plies is excessive, so that mounting process is complicated, not only reduces the height of indoor room, reduces the usable floor area of the interior space, And greatly increase manually installed cost.Secondly once there are quality problems, concealed work is difficult to repair.
Summary of the invention
The purpose of the utility model is to overcome the deficiencies in the prior art, a kind of graphene electrothermal is provided with making somebody a mere figurehead sound insulation Plate, including successively compound decorative plies, the first carbon magnesium composite plate, antiseepage film, graphene Electric radiant Heating Film, macromolecule are anti-from top to bottom Penetrate film layer and the second carbon magnesium composite plate.
Preferably, decorative plies, the first carbon magnesium composite plate, antiseepage film, graphene Electric radiant Heating Film, macromolecule reflective coating and It is bonded between two carbon magnesium composite plates by viscose.
Preferably, it is bonded between the macromolecule reflective coating and the second carbon magnesium composite plate by PUR hot melt adhesive, the dress Plaque layer, antiseepage film, graphene Electric radiant Heating Film, passes through polyurethane adhesive between macromolecule reflective coating at the first carbon magnesium composite plate It is bonded.
Preferably, including being installed on the keel strip of the second carbon magnesium composite plate bottom surface, the keel strip and the second carbon magnesium It is bonded between composite plate by nail-free glue, while the keel strip bottom surface is also compounded with foam glue-line.
The utility model has the beneficial effects that:
(1) in terms of manpower consumption: due to the utility model floor laying structure be use overhead type paving structure i.e. Floor is carried levelling by keel, and is dry operation form of construction work, the technical requirements to the worker that mats formation be not it is very high, do not have to It goes to recruit the higher skilled worker of pavement technique by high price expenses of labour.Any common laborer, can be complete as long as by slightly training At skillfully mating formation, labour cost of largely mating formation can be saved;
(2) in terms of energy conservation the utility model has the advantages that quick heating, instant-heating is powered 3~5 minutes since graphene fever is fast It just can reach 18~23 degree or so of heating temperature, electric conversion rate can reach 99.6%.
(3) on flooring mode the utility model has the advantages that since this utility model graphene heating floor is that composite construction is big Floor, bottom plate and the floor of heating floor are affixed by flexibility glue with ground by the second carbon magnesium composite plate of same material Patch, so the miscellaneous acoustic waves on ground will not pass to resident downstairs.Soft glue is used additionally, due to it Floor is country, is society so eliminating largely using this extensive style of cement great Sha, flooring mode not environmentally, not energy-efficient The building waste that a large amount of resource can be saved and largely reduced;
(4) in terms of efficiency of mating formation the utility model has the advantages that convenient understandable, the pole of this utility model ground heating floor and flooring mode Easy pavement construction, bulk are mated formation, saving of work and time, are mated formation quickly and efficiently, and social cost is cheap, thoroughly take leave of the cumbersome of cement great Sha Mat formation the epoch, is very beneficial for the green energy conservation development of society;
(5) in terms of ground heating floor field and flooring mode the utility model has the advantages that this utility model ground heating floor and mating formation Mode is extremely quick, so that production cost, the transportation cost, cost of mating formation, working service on mat formation floor and production floor Cost substantially reduces, and can largely save labour cost 50% or so.
(6) in terms of floor heating field structure the utility model has the advantages that traditionally tile floor heating floor due to floor tile it is closely knit, thickness is again The time of thickness, the heat source conducted below floor to floor is very long, consumes a large amount of electricity charge, once stop supplying heat source, Floor tile and rapid heat dissipation, so that heat is quickly dissipated, so, the floor tile of traditional laying floor heating is extremely not energy-efficient, and the utility model Quick insulation and decoration floor heating belongs to overhead type composite construction, and is compounded with macromolecule reflectance coating and comes to room internal reflection graphene film Whole heat sources of generation avoid the huge waste of the energy so that the energy be greatly saved, and are a black science and technology completely The big floor of the compound floor heating of graphene new material.
(7) in terms of service life and later maintenance cost the utility model has the advantages that graphene floor heating long product lifecycle, surely It is qualitative good, do not corrode, such as normal use, no artificial destruction, can be used continuously 50 years, just at working life 100,000 hours.Paving If the water route circuit below floor heating floor tile floor goes wrong after dress, wherein any one piece of problem can also be easily moved Plate is rooted out without professional using the destructiveness of professional tool, and the worry for excavating ground is exempted, and later maintenance cost is extremely low.
(8) meet national industrial policies and energy-saving and emission-reduction to call: country calls, and coal can not be just had to gas, can electricity consumption just not It with gas, administers fog and starts with from environmental protection is administered, reduce felling, limit the practical of solid wooden floor board;Reduction is opened a mine, and stone is again limited The use on material floor.And the utility model carbon magnesium inanimate matter is maked somebody a mere figurehead the big floor of sound insulation and is produced using inanimate matter material, it can be more Secondary recycling meets national energy conservation and emission reduction policy, promote national life quality while, and active response national environmental protection The call of energy-saving and emission-reduction.
Detailed description of the invention
Fig. 1 is the cross-section diagram of the utility model.
Wherein, 1- decorative plies, 2- the first carbon magnesium composite plate, 3- antiseepage film, 4- graphene Electric radiant Heating Film, the reflection of 5- macromolecule Film layer, 6- the second carbon magnesium composite plate, 7- keel strip, 8- nail-free glue, 9- foam glue-line.
Specific embodiment
The utility model technical solution claimed is made further specifically now in conjunction with the drawings and specific embodiments It is bright.
Shown in Figure 1, one of the present embodiment graphene electrothermal makes somebody a mere figurehead Sound insulation floorings, including from top to bottom successively Compound decorative plies 1, the first carbon magnesium composite plate 2, antiseepage film 3, graphene Electric radiant Heating Film 4, macromolecule reflective coating 5 and the second carbon Magnesium composite plate 6, wherein be bonded between the macromolecule reflective coating 5 and the second carbon magnesium composite plate 6 by PUR hot melt adhesive, it is described Decorative plies 1, antiseepage film 3, graphene Electric radiant Heating Film 4, pass through polyurethane between macromolecule reflective coating 5 at first carbon magnesium composite plate 2 Adhesive is bonded.In the present embodiment, the antiseepage film 3 is polyethylene film for earthwork, and the macromolecule reflective coating 5 uses High molecular polythene reflectance coating or macromolecule polypropylene reflectance coating.
In the present embodiment, the mounting structure of the aerial Sound insulation floorings of graphene electrothermal is as follows: specifically, in graphene electricity 6 bottom surface of the second carbon magnesium composite plate that hot type makes somebody a mere figurehead Sound insulation floorings is equipped with keel strip 7, and keel strip 7 is square groove in the present embodiment, Carried out by nail-free glue 8 be bonded between the keel strip 7 and the second carbon magnesium composite plate 6, while 7 bottom surface of the keel strip is also compound There is foam glue-line 9.
In the present embodiment, the production technology that graphene electrothermal makes somebody a mere figurehead Sound insulation floorings is as follows:
Step 1: production carbon magnesium composite plate mixed slurry to synthesize the first carbon magnesium composite plate 2 and the second carbon magnesium composite plate 6, Wherein carbon magnesium composite plate mixed slurry includes the raw material of following parts by weight:
90 parts of magnesia, 25 parts of magnesium sulfate, 3 parts of hydrochloric acid, 3 parts of the concentrated sulfuric acid, 8 parts of clay, 8 parts of alumina powder, flyash 18 Part, 15 parts of chitin powder, 12 parts of Poplar Powder, 25 parts of bamboo powder, 12 parts of Paris white, 8 parts of foaming agent.
The configuration process of the carbon magnesium composite plate mixed slurry is as follows: water dilution and the concentrated sulfuric acid is added as urging in magnesium sulfate Agent is sufficiently stirred in stirring pool, and addition hydrochloric acid makees catalyst and sufficiently stirs evenly again after uniformly merging, in the process constantly stirred In appropriate appropriate magnesia, flyash, clay, alumina powder, Paris white, the foaming agent of being added be sufficiently stirred again, while stirring Chitin powder, Poplar Powder, bamboo powder ingredient is added to be sufficiently stirred again, is poured into after stirring evenly stand-by in storage tank.
The synthesis process of carbon magnesium composite plate is as follows: the carbon magnesium composite plate mixed slurry is before pouring into mold, first in mold Bottom uniformly brush one layer of thin oil-based release agent so as to plate from mold smooth demoulding, in a mold smear one layer of release agent It uniformly spreads two stratus rock screen cloths again afterwards, then carbon magnesium composite plate mixed slurry stand-by in storage tank is imported in mold and is started Laminator, machine imports one layer of carbon fiber mesh fabric from bottom again in traveling and one layer of carbon fiber mesh fabric, machine continuously roll Pressure determines thickness and paves concora crush, the blanking side low pressure roll forming when paving.
Step 2: first anti-having produced the first carbon magnesium composite plate 2 of thickness as required in machine upper roller and coating in factory Film 3 is seeped for preventing from leaking the graphene electric heating piece below the moisture penetration to the first carbon magnesium composite plate 2 spilt, main mesh on floor Be to protect graphene electric heating piece;
It requires the second carbon magnesium composite plate 6 of thickness step 3: oneself is produced smooth on machine to pave macromolecule anti- Film layer 5 is penetrated, the top that the heat given birth to for graphene Electric radiant Heating Film 4 to be powered is reflected into Stilt layer increases the heat in room;
Step 4: in floor heating erecting bed, first the infrared ray position indicator of keel strip 7, according to the height of spread room floors The concrete condition of low injustice positions, with foam glue-line 9 it is fixed it is high it is levelling after, then keel strip 7 is fixed according to the spacing of regulation To be used after;Secondly, the big plate of complex that macromolecule reflective coating 5 is combined into one with the second carbon magnesium composite plate 6 is coated again It is placed on after nail-free glue 8 on levelling keel strip 7, then completes the big plate paving of Stilt layer with the levelling positioning of infrared equipment again Dress;Again, graphene Electric radiant Heating Film 4 is carefully laid on the second carbon magnesium composite plate 6 maked somebody a mere figurehead, completes graphene Electric radiant Heating Film 4, be connected on floor the graphene Electric radiant Heating Film 4 in need being connected in parallel the end of a thread connection, to complete graphene electric heating The integral installation of film 4;It is put down finally, the first carbon magnesium composite plate 2 of the good antiseepage film 3 of roller coating is coated bonding agent resistant to high temperature again It is layered on and completes the installation that entire graphene electric heating carbon magnesium inanimate matter makes somebody a mere figurehead the big floor of sound insulation in graphene Electric radiant Heating Film 44, it is whole when completing A graphene electric heating carbon magnesium inanimate matter can mating formation into the decorative floor of top layer after making somebody a mere figurehead the big floor of sound insulation.This dress Decorations floor can choose ceramic tile, can choose solid wood geothermal energy floor, also can choose multi-layer solid wood heating floor and various PVC composite floor board.
The embodiment of the above is only the preferred embodiment of the utility model, not does any form to the utility model On limitation.Anyone skilled in the art all can benefit in the case where not departing from technical solutions of the utility model ambit More possible variations and retouching are made to technical solutions of the utility model with the technology contents of the disclosure above, or are revised as equivalent The equivalent embodiment of variation.Therefore all contents without departing from technical solutions of the utility model, the thinking according to the utility model are made Equivalent equivalence changes, should all be covered by the protection scope of the utility model.

Claims (4)

1. a kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings, it is characterised in that: including successively compound decorative plies from top to bottom (1), the first carbon magnesium composite plate (2), antiseepage film (3), graphene Electric radiant Heating Film (4), macromolecule reflective coating (5) and the second carbon magnesium are multiple Plywood (6).
2. a kind of graphene electrothermal according to claim 1 makes somebody a mere figurehead Sound insulation floorings, it is characterised in that: decorative plies (1), First carbon magnesium composite plate (2), antiseepage film (3), graphene Electric radiant Heating Film (4), macromolecule reflective coating (5) and the second carbon magnesium composite plate (6) it is bonded between by viscose.
3. a kind of graphene electrothermal according to claim 2 makes somebody a mere figurehead Sound insulation floorings, it is characterised in that: the macromolecule is anti- It penetrates between film layer (5) and the second carbon magnesium composite plate (6) and is bonded by PUR hot melt adhesive, the decorative plies (1), the first carbon magnesium are multiple Plywood (2), antiseepage film (3), graphene Electric radiant Heating Film (4), macromolecule reflective coating are glued between (5) by polyurethane adhesive It connects.
4. the mounting structure that a kind of graphene electrothermal as described in claim 1 makes somebody a mere figurehead Sound insulation floorings, it is characterised in that: including Be installed on the keel strip (7) of the second carbon magnesium composite plate (6) bottom surface, the keel strip (7) and the second carbon magnesium composite plate (6) it Between be bonded by nail-free glue (8), while the keel strip (7) bottom surface is also compounded with foam glue-line (9).
CN201820742286.4U 2018-05-18 2018-05-18 A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure Expired - Fee Related CN208280530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820742286.4U CN208280530U (en) 2018-05-18 2018-05-18 A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820742286.4U CN208280530U (en) 2018-05-18 2018-05-18 A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure

Publications (1)

Publication Number Publication Date
CN208280530U true CN208280530U (en) 2018-12-25

Family

ID=64730532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820742286.4U Expired - Fee Related CN208280530U (en) 2018-05-18 2018-05-18 A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure

Country Status (1)

Country Link
CN (1) CN208280530U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112128837A (en) * 2020-09-25 2020-12-25 成都天一智造科技有限公司 Novel electric heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112128837A (en) * 2020-09-25 2020-12-25 成都天一智造科技有限公司 Novel electric heater

Similar Documents

Publication Publication Date Title
CN103276831B (en) Inorganic compounding A level does not fire warming plate wall insulation system and construction method
CN101413326B (en) Flat roof structure and construction method thereof
CN101429786B (en) Thermal-insulation, heat insulation wall and method for producing the same
CN101319552A (en) Construction method of ture mineral varnish face brick-imitation construction exterior wall
CN201972172U (en) Underground rigid composite waterproof construction structure
CN106836529A (en) A kind of construction technology for being applied to exterior-wall heat insulation
CN207063215U (en) A kind of external wall of phase-change thermal-storage mortar
CN105399389A (en) Building inner wall whitewashing gypsum and process flow thereof
CN105401654A (en) Environment-friendly assembled type ecological house and construction method thereof
CN106884535A (en) A kind of construction technology of imitative stone material Self-leveling waterproof mortar
CN211313112U (en) Large-area large-gradient integrated waterproof heat-preservation tile-hanging roof
CN108915107B (en) Construction method of EPS inorganic infiltration insulation board
CN102797316B (en) Flat roof fireproof and thermal insulating brick
CN101105070A (en) Polyphenyl board exterior wall outer thermal insulation construction method
CN208280530U (en) A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure
CN111058576A (en) Construction method of assembled roof
CN203129513U (en) Floor tile paving frame
CN203393863U (en) Wall insulation system of inorganic compound A-level noncombustible insulation board
CN211548402U (en) Rapid construction tile roof structure
CN207260455U (en) A kind of anti-aging roof structure of waterproof heat insulation
CN207553357U (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative exterior wall
CN105544829A (en) Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof
CN206205140U (en) A kind of full assembled villages and small towns local-style dwelling houses class composite wall structure system
CN103643769A (en) Construction technology of wall plastering and wall body
CN113882538A (en) Rock panel indoor heat insulation layer construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

Termination date: 20210518

CF01 Termination of patent right due to non-payment of annual fee