CN106884535A - A kind of construction technology of imitative stone material Self-leveling waterproof mortar - Google Patents

A kind of construction technology of imitative stone material Self-leveling waterproof mortar Download PDF

Info

Publication number
CN106884535A
CN106884535A CN201710041173.1A CN201710041173A CN106884535A CN 106884535 A CN106884535 A CN 106884535A CN 201710041173 A CN201710041173 A CN 201710041173A CN 106884535 A CN106884535 A CN 106884535A
Authority
CN
China
Prior art keywords
leveling
self
water
construction
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710041173.1A
Other languages
Chinese (zh)
Inventor
曹青
沈强儒
陆雪梅
曹晓燕
李连凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG SUBAO BUILDING ENERGY-SAVING TECHNOLOGY Co Ltd
Original Assignee
NANTONG SUBAO BUILDING ENERGY-SAVING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG SUBAO BUILDING ENERGY-SAVING TECHNOLOGY Co Ltd filed Critical NANTONG SUBAO BUILDING ENERGY-SAVING TECHNOLOGY Co Ltd
Priority to CN201710041173.1A priority Critical patent/CN106884535A/en
Publication of CN106884535A publication Critical patent/CN106884535A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of construction technology of imitative stone material Self-leveling waterproof mortar, comprise the following steps:Equipment prepares with instrument, base treatment, brushing interfacial agents, dispensing, cast, maintenance, expansion joint treatment, speed of application can be greatly speeded up using imitative stone material Self-leveling waterproof mortar, reduce labour intensity, improve using effect, for basic unit to be levelling and once visited place face, dusting ground and unqualified ground repairing of constructing, at the same time as epoxy floor or can require that foundation base intension screed-coat high is used as PVC coiled materials, basic unit's alignment material of composite floor board.

Description

A kind of construction technology of imitative stone material Self-leveling waterproof mortar
Technical field
The present invention relates to building material technical field, specially a kind of construction technology of imitative stone material Self-leveling waterproof mortar.
Background technology
Waterproof mortar is called cationic chloroprene latex water-proof and anti-corrosive material.Cationic chloroprene latex is a kind of high polymer point The modified based high molecular water-tight corrosion-proof system of son.By being introduced into mouthful epoxy resin modified latex acceding state neoprene latex and poly- The high polymer latex that acrylate, synthetic rubber, various emulsifying agents, modified latex etc. are constituted.Add base-material and appropriate chemistry Auxiliary agent and inserts, through plasticating, knead, the macromolecule water-proof and anti-corrosive material that the operation such as calendering is added.From imported material With domestic high-quality auxiliary material, according to the quality product of national sector standard highest ranking written instructions production, national Research of Comfortable House is pushed away Recommend product.Long lifespan, easy construction, long period of soaking in water the life-span more than 50 years.
Waterproof mortar has a good weatherability, durability, impervious, density and high bonding force and extremely strong Water-tight corrosion-proof effect.It is resistant to soda manufacture medium, urea, ammonium nitrate, seawater hydrochloric acid and acid-base property salt corrosion.It is with sand light water Mud and special cement are configured to cement mortar, by reconcile cement mortar cast or spray, by hand smear method in concrete And surface forms firm water-tight corrosion-proof screed, belong to strong and unyielding property water-proof and anti-corrosive material.With cement, sand mixes can change mortar Property, can be used for treatment and the underground project waterproof layer on building wall and ground.
Gravity flow flat ground material is typically as different decorative floors (such as carpet, PVC floor, epoxide terrace, polyurethane Level ground, timber floor etc.) bed course, be a part for whole ground screed systems, can be used for large area, have to flatness strictly will The ground construction asked, such as use requirement industrial premises higher, supermarket, warehouse, exhibition room, parking lot, library, airport, station , ground renovation repairing levelling etc. public, civilian hall floor and ground waterproof.The characteristics of using gravity flow flat ground material, can be to passing The speed of application of system mortar is expired, and the big problem of construction labour intensity is improved.
The content of the invention
It is an object of the invention to provide one kind using imitative stone material gravity flowing levelling mortar, speed of application can be greatly speeded up, reduced Labour intensity, using effect is improved, for basic unit to be levelling and once visited place face, dusting ground and unqualified ground repairing of constructing, can As PVC coiled materials, basic unit's alignment material of composite floor board, at the same time as epoxy floor or require that foundation base intension is high Screed-coat is used, to solve the problems, such as to be proposed in above-mentioned background technology.
To achieve the above object, the present invention provides following technical scheme:A kind of construction of imitative stone material Self-leveling waterproof mortar Technique, it is characterised in that:Comprise the following steps:
(1)Equipment and instrument prepare, according to common process requirement prepare 300 revs/min slow-speed of revolution agitator, ground sander, Air compressor, vacuum cleaner, electric slicer, level meter, ground pull strength somascope, fluidity tester, painting brush Or roller, steel ladle, special spikes, deflation roller, glue bucket, tooth form trowel, cylinder rain boots high, nail footwear;
(2)Base treatment, basic unit must it is clean, solid, smooth, can load-bearing, without greasy dirt, loose matter;Basic unit's compression strength exists Draw and dial intensity not less than 1.5MPa in more than 20MPa, the surface of basic unit;If original basic unit's concrete ground intensity is too low, surface has floating Slurry or dusting are serious, then must polish, until exposing solid surface;The cement mortar dust and discarded object of polishing are cleared up, is used first Broom is cleaned one time, then is cleaned with dust catcher dust suction and with water, if there is oil stain on basal plane, chemical treatment can be used, so Rinsed with clean water afterwards;If there is seepage in basic unit, water-proofing treatment must be in advance carried out;Basal plane is newly-laid concrete or mortar, then need Self-leveling construction can be carried out after intensity reaches more than 20MPa, age at least 4 weeks;
(3)Brushing interfacial agents, paint interfacial agents on basal plane, day heated drying or basal plane porous water-absorbing are very strong, then should brush 1-3 Being rinsed with clean water before hour allows basal plane fully to soak, and ensures that basal plane, will with painting brush or roller without bright water before brush interfacial agents Self-leveling interfacial agents are applied on concrete surface, brush secondary, are constructed using crossing method, and ground floor can apply the after drying Two layers, self-leveling material could be poured into a mould after waiting last time interfacial agents dry;
(4)When dispensing, small area or lattice are constructed, it is stirred in bucket with minitype electric mixer, often stirs and once use A complete whole bag;During large-area construction, stirred with special-purpose stirring machine, the method pumped with mortar is constructed;The slurry mixed should be 30 It is finished in minute, slurry supply is timely, it is ensured that the continuity of the whole scope of operation;
(5)Cast, working region is allowed slightly to divulge information, but door and window should be closed, and be must assure that before cast on basal plane without water, Indoor and surface temperature should be higher than that 10 DEG C during construction and in construction one week after;, it is necessary to according to the scope of operation before gravity flowing levelling mortar construction Width and field condition set construction joint, and cement self-leveling operation side width is no more than 6~8 meters;The gravity flow that will be stirred Flat mortar falls on basal plane, uniformly spreads out, and is struck off with special tooth mouthful scraper plate, then with mace reciprocating rolling with profit exhaust and Elimination connects stubble, and treating that it is smeared from putting down, once must reach required thickness, after surface condenses, can not smear again;The strip gravity flow of cast Flat material should reach design thickness, if Self-leveling construction thickness design is less than 3mm, need to use special tooth mouthful scraper plate to be subject to Control;The auto-flowing floor that the rapid mace rolling of drift bolt footwear was poured into a mould is to discharge the air brought into during stirring, it is to avoid bubble, The interface discrepancy in elevation between pitted skin and bar and bar;Used instrument and equipment should be cleaned with water in time;
(6)Maintenance, is not usually required to maintenance, if environment temperature is very high, sun direct projection, be air-dried situation if need to be conserved, Plastic foil is covered on and conserved two days in the gravity flow flat surface of firmization;
(7)Expansion joint is processed, after auto-flowing floor construction terminates 24 hours, can be with cutting machine in substrate concrete structure The expansion joint of 3mm is cut out at expansion joint, the expansion joint of well cutting is cleaned out, sealed with elastic sealant and filled.
Preferably, step(2)The crack of substrate surface will pick and dig into " V " type when middle basic unit has the seepage to carry out water-proofing treatment Groove, and it is smooth with gravity flowing levelling mortar repairing, and pit, hole must also be repaired smooth with gravity flowing levelling mortar.
Preferably, step(4)Middle match ratio is that every 25 kilograms of powders add 5.5 liters of clear water, it is impossible to arbitrarily increase water, will Load weighted water is placed in clean agitator, starts electric mixer, and whole bag self-leveling material, continuous uniform ground are added slowly Stirring 3 ± 1 minutes, to the uniform slurry without caking is formed, after standing 3-5 minutes, is stirred for 1 minute, and check slurry Mobile performance, qualified to can be used, mixing time can not be long, in order to avoid it is mixed into excessive air.
Preferably, in construction technology work progress, U.S. line paper 5-7cm of stickup wide is complete in floor construction on skirting board Afterwards, unnecessary U.S. line paper is removed with blade.
Compared with prior art, the beneficial effects of the invention are as follows:Can be greatly speeded up using imitative stone material Self-leveling waterproof mortar Speed of application, reduces labour intensity, improves using effect, for basic unit to be levelling and once visited place face, dusting ground and construction do not conform to Lattice ground is repaired, can be as PVC coiled materials, basic unit's alignment material of composite floor board, at the same time as epoxy floor or will The screed-coat for asking foundation base intension high is used.It possesses high fluidity energy, can Self-leveling, good stability, condense before be not layered Isolation, excreting water phenomenon, early strong, high-strength, later strength not retraction, adhesion strength is high, good toughness, and durability is high, and volume stability is low Shrink, cracking resistance, waterproof, protection against the tide, easy to operate, quick construction can carry out large area jointless construction, green ring in a short time Protect, it is nontoxic, pollution-free, "dead", many advantages, such as harmless.
Specific embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example is only a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model of present invention protection Enclose.
The present invention provides a kind of technical scheme:A kind of construction technology of imitative stone material Self-leveling waterproof mortar, including following step Suddenly:
(1)Equipment and instrument prepare, according to common process requirement prepare 300 revs/min slow-speed of revolution agitator, ground sander, Air compressor, vacuum cleaner, electric slicer, level meter, ground pull strength somascope, fluidity tester, painting brush Or roller, steel ladle, special spikes, deflation roller, glue bucket, tooth form trowel, cylinder rain boots high, nail footwear;
(2)Base treatment, basic unit must it is clean, solid, smooth, can load-bearing, without greasy dirt, loose matter;Basic unit's compression strength exists Draw and dial intensity not less than 1.5MPa in more than 20MPa, the surface of basic unit;If original basic unit's concrete ground intensity is too low, surface has floating Slurry or dusting are serious, then must polish, until exposing solid surface;The cement mortar dust and discarded object of polishing are cleared up, is used first Broom is cleaned one time, then is cleaned with dust catcher dust suction and with water, if there is oil stain on basal plane, chemical treatment can be used, so Rinsed with clean water afterwards;If there is seepage in basic unit, water-proofing treatment must be in advance carried out;Basal plane is newly-laid concrete or mortar, then need Self-leveling construction can be carried out after intensity reaches more than 20MPa, age at least 4 weeks;
(3)Brushing interfacial agents, paint interfacial agents on basal plane, day heated drying or basal plane porous water-absorbing are very strong, then should brush 1-3 Being rinsed with clean water before hour allows basal plane fully to soak, and ensures that basal plane, will with painting brush or roller without bright water before brush interfacial agents Self-leveling interfacial agents are applied on concrete surface, brush secondary, are constructed using crossing method, and ground floor can apply the after drying Two layers, self-leveling material could be poured into a mould after waiting last time interfacial agents dry;
(4)When dispensing, small area or lattice are constructed, it is stirred in bucket with minitype electric mixer, often stirs and once use A complete whole bag;During large-area construction, stirred with special-purpose stirring machine, the method pumped with mortar is constructed;The slurry mixed should be 30 It is finished in minute, slurry supply is timely, it is ensured that the continuity of the whole scope of operation;
(5)Cast, working region is allowed slightly to divulge information, but door and window should be closed, and be must assure that before cast on basal plane without water, Indoor and surface temperature should be higher than that 10 DEG C during construction and in construction one week after;, it is necessary to according to the scope of operation before gravity flowing levelling mortar construction Width and field condition set construction joint, and cement self-leveling operation side width is no more than 6~8 meters;The gravity flow that will be stirred Flat mortar falls on basal plane, uniformly spreads out, and is struck off with special tooth mouthful scraper plate, then with mace reciprocating rolling with profit exhaust and Elimination connects stubble, and treating that it is smeared from putting down, once must reach required thickness, after surface condenses, can not smear again;The strip gravity flow of cast Flat material should reach design thickness, if Self-leveling construction thickness design is less than 3mm, need to use special tooth mouthful scraper plate to be subject to Control;The auto-flowing floor that the rapid mace rolling of drift bolt footwear was poured into a mould is to discharge the air brought into during stirring, it is to avoid bubble, The interface discrepancy in elevation between pitted skin and bar and bar;Used instrument and equipment should be cleaned with water in time;
(6)Maintenance, is not usually required to maintenance, if environment temperature is very high, sun direct projection, be air-dried situation if need to be conserved, Plastic foil is covered on and conserved two days in the gravity flow flat surface of firmization;
(7)Expansion joint is processed, after auto-flowing floor construction terminates 24 hours, can be with cutting machine in substrate concrete structure The expansion joint of 3mm is cut out at expansion joint, the expansion joint of well cutting is cleaned out, sealed with elastic sealant and filled.
Wherein step(2)The crack of substrate surface will pick and dig into " V " type groove when middle basic unit has the seepage to carry out water-proofing treatment, And it is smooth with gravity flowing levelling mortar repairing, pit, hole must also be repaired smooth with gravity flowing levelling mortar.Step(4)Middle match ratio is Every 25 kilograms of powders add 5.5 liters of clear water, it is impossible to arbitrarily increase water, load weighted water is placed in clean agitator, open Dynamic electric mixer, adds whole bag self-leveling material slowly, and continuous uniform ground stirring 3 ± 1 minutes is starched to formation is uniform without caking Untill body, after standing 3-5 minutes, it is stirred for 1 minute, and checks the mobile performance of slurry, qualified to can be used, mixing time is not Can be long, in order to avoid it is mixed into excessive air.Associated technical parameters after construction are as shown in Table 1:
Table one
Simultaneously in construction technology work progress, 5-7cm U.S. line paper wide is pasted on skirting board, after floor construction is complete, Unnecessary U.S. line paper is removed with blade.Speed of application can be greatly speeded up using imitative stone material Self-leveling waterproof mortar, work is reduced Intensity, using effect is improved, for basic unit to be levelling and once visited place face, dusting ground and unqualified ground repairing of constructing, can conduct Basic unit's alignment material of PVC coiled materials, composite floor board, at the same time as epoxy floor or requires high levelling of foundation base intension Layer is used.It possesses high fluidity energy, can Self-leveling, there is no laminated segregation, excreting water phenomenon before condensing in good stability, it is early by force, It is high-strength, later strength not retraction, adhesion strength is high, good toughness, and durability is high, volume stability, lower shrinkage, cracking resistance, waterproof, anti- Tide, easy to operate, quick construction can carry out large area jointless construction in a short time, environmental protection, it is nontoxic, without dirt Dye, it is "dead", many advantages, such as harmless.
Because the imitative stone material Self-leveling waterproof mortar is the material of cement base, the energy of resistant to dust and the liquid pollution on its surface Power and other cement-based materials are similar, in having the environment compared with high-cleanness requirement, recommend using appropriate surface treatment and ground Protect in face.Ground can be protected in the agent of surface spraying surface-closed, and increase surface colour after gravity flow plane layer is fully cured Color gorgeous property and durability degree.Associated materials consumption is as shown in Table 2:
Base Smoothness Levelling is thick(mm) Proportioning reference(Ratio of water to material) Levelling pass
Elementary errors basal plane 2 3 0.22~0.25 1
General basal plane 3 4.5 0.18~0.22 1
The standard total space, one levelling 6 9 0.25~0.30 1-2
Interfacial agents 1 0.2-0.3kg/m 2 (one time) 1
Table two
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, it is possible to understand that These embodiments can be carried out with various changes, modification, replacement without departing from the principles and spirit of the present invention and become Type, the scope of the present invention be defined by the appended.

Claims (4)

1. a kind of construction technology of imitative stone material Self-leveling waterproof mortar, it is characterised in that:Comprise the following steps:
Equipment prepares with instrument, and 300 revs/min of slow-speed of revolution agitator, ground sander, sky are prepared according to common process requirement Air compressor, vacuum cleaner, electric slicer, level meter, ground pull strength somascope, fluidity tester, painting brush or Roller, steel ladle, special spikes, deflation roller, glue bucket, tooth form trowel, cylinder rain boots high, nail footwear;
Base treatment, basic unit must it is clean, solid, smooth, can load-bearing, without greasy dirt, loose matter;Basic unit's compression strength is in 20MPa More than, the surface of basic unit is drawn and dials intensity not less than 1.5MPa;If original basic unit's concrete ground intensity is too low, there is laitance on surface or Dusting is serious, then must polish, until exposing solid surface;The cement mortar dust and discarded object of polishing are cleared up, broom is used first Clean one time, then cleaned with dust catcher dust suction and with water, if there is oil stain on basal plane, chemical treatment, Ran Houyong can be used Clean water is rinsed;If there is seepage in basic unit, water-proofing treatment must be in advance carried out;Basal plane is newly-laid concrete or mortar, then need to be strong Degree can carry out Self-leveling construction after reaching more than 20MPa, age at least 4 weeks;
Brushing interfacial agents, paint interfacial agents on basal plane, day heated drying or basal plane porous water-absorbing are very strong, then should be small in brushing 1-3 When before rinsed with clean water and allow basal plane fully to soak, basal plane is ensured before brush interfacial agents without bright water, will be from painting brush or roller Levelling interfacial agents are applied on concrete surface, and brushing is secondary, are constructed using crossing method, and ground floor can apply second after drying Layer, self-leveling material could be poured into a mould after waiting last time interfacial agents dry;
When dispensing, small area or lattice are constructed, it is stirred in bucket with minitype electric mixer, often stirs and be once finished one Whole bag;During large-area construction, stirred with special-purpose stirring machine, the method pumped with mortar is constructed;The slurry mixed should be at 30 minutes Inside it is finished, slurry supply is timely, it is ensured that the continuity of the whole scope of operation;
Cast, working region is allowed slightly to divulge information, but door and window should be closed, and be must assure that before cast on basal plane without water, is being applied Indoor and surface temperature should be higher than that 10 DEG C in man-hour and construction one week after;, it is necessary to wide according to the scope of operation before gravity flowing levelling mortar construction Degree and field condition set construction joint, and cement self-leveling operation side width is no more than 6~8 meters;The Self-leveling that will be stirred Mortar falls on basal plane, uniformly spreads out, and is struck off with special tooth mouthful scraper plate, then with mace reciprocating rolling is with profit exhaust and disappears Except stubble is connect, treating that it is smeared from putting down, once must reach required thickness, after surface condenses, can not smear again;The strip Self-leveling of cast Material should reach design thickness, if Self-leveling construction thickness design is less than 3mm, need to use special tooth mouthful scraper plate to be controlled System;The auto-flowing floor that the rapid mace rolling of drift bolt footwear was poured into a mould is to discharge the air brought into during stirring, it is to avoid bubble, fiber crops The interface discrepancy in elevation between face and bar and bar;Used instrument and equipment should be cleaned with water in time;
Maintenance, is not usually required to maintenance, if environment temperature is very high, sun direct projection, be air-dried situation if need to be conserved, will mould Material film covered on and conserved two days in the gravity flow flat surface of firmization;
Expansion joint process, auto-flowing floor construction terminate 24 hours after, can with cutting machine stretching in substrate concrete structure The expansion joint of 3mm is cut out at contracting seam, the expansion joint of well cutting is cleaned out, sealed with elastic sealant and filled.
2. the construction technology of a kind of imitative stone material Self-leveling waterproof mortar according to claim 1, it is characterised in that:It is described Step(2)The crack of substrate surface will pick and dig into " V " type groove when middle basic unit has the seepage to carry out water-proofing treatment, and use Self-leveling sand Slurry repairing is smooth, and pit, hole must also be repaired smooth with gravity flowing levelling mortar.
3. the construction technology of a kind of imitative stone material Self-leveling waterproof mortar according to claim 1, it is characterised in that:The step Suddenly(4)Middle match ratio is that every 25 kilograms of powders add 5.5 liters of clear water, it is impossible to arbitrarily increases water, load weighted water is placed in dry In net agitator, electric mixer is started, add whole bag self-leveling material slowly, continuous uniform ground stirring 3 ± 1 minutes, extremely Untill forming the uniform slurry without caking, after standing 3-5 minutes, it is stirred for 1 minute, and checks the mobile performance of slurry, it is qualified to be Can be used, mixing time can not be long, in order to avoid it is mixed into excessive air.
4. the construction technology of a kind of imitative stone material Self-leveling waterproof mortar according to claim 1, it is characterised in that:It is described to apply During work construction technology, 5-7cm U.S. line paper wide is pasted on skirting board, after floor construction is complete, will be unnecessary with blade U.S. line paper removal.
CN201710041173.1A 2017-01-20 2017-01-20 A kind of construction technology of imitative stone material Self-leveling waterproof mortar Pending CN106884535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710041173.1A CN106884535A (en) 2017-01-20 2017-01-20 A kind of construction technology of imitative stone material Self-leveling waterproof mortar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710041173.1A CN106884535A (en) 2017-01-20 2017-01-20 A kind of construction technology of imitative stone material Self-leveling waterproof mortar

Publications (1)

Publication Number Publication Date
CN106884535A true CN106884535A (en) 2017-06-23

Family

ID=59175738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710041173.1A Pending CN106884535A (en) 2017-01-20 2017-01-20 A kind of construction technology of imitative stone material Self-leveling waterproof mortar

Country Status (1)

Country Link
CN (1) CN106884535A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025108A (en) * 2018-08-07 2018-12-18 苏州金螳螂文化发展股份有限公司 A kind of acrylic crystal resin artificial water surface construction method
CN109441059A (en) * 2018-10-30 2019-03-08 安徽智恒信科技有限公司 A kind of plastic floor laying structure and its construction method
CN109680904A (en) * 2018-12-13 2019-04-26 舍奢(武汉)家居有限公司 Reconciliation Self-leveling construction method
CN110497522A (en) * 2019-08-19 2019-11-26 张晟 Dust protected mortar mixing arrangement and the construction method that terrace is kept the temperature for Self-leveling
CN110563417A (en) * 2019-10-17 2019-12-13 广东火仑建材科技发展有限公司 rapid condensation self-leveling
CN110563416A (en) * 2019-09-20 2019-12-13 济南大学 Repairing method suitable for masonry structure surface and application thereof
CN110820504A (en) * 2018-08-14 2020-02-21 江阴市利民劳务综合服务有限公司 Terrace repairing construction process
CN111734086A (en) * 2020-07-28 2020-10-02 江苏智信达建筑科技有限公司 Printed nano-silicon self-leveling polished artistic floor and construction process thereof
CN112459395A (en) * 2020-12-11 2021-03-09 甘肃第四建设集团有限责任公司 High-strength wear-resistant floor and construction method thereof
CN115839158A (en) * 2022-12-05 2023-03-24 中冶建工集团有限公司 Anti-radiation operating room composite ground structure and construction process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457581A (en) * 2008-12-25 2009-06-17 中国建筑第八工程局有限公司 Construction method for auto-flowing floor
CN103216076A (en) * 2013-05-08 2013-07-24 内蒙古兴泰建筑有限责任公司 Epoxy colored sand floor construction method
CN204571208U (en) * 2015-01-14 2015-08-19 济南捷盛建材新技术有限公司 The super flat auto-flowing floor structure of a kind of large area heavy duty

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457581A (en) * 2008-12-25 2009-06-17 中国建筑第八工程局有限公司 Construction method for auto-flowing floor
CN103216076A (en) * 2013-05-08 2013-07-24 内蒙古兴泰建筑有限责任公司 Epoxy colored sand floor construction method
CN204571208U (en) * 2015-01-14 2015-08-19 济南捷盛建材新技术有限公司 The super flat auto-flowing floor structure of a kind of large area heavy duty

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
冯勇慧: "浅谈水泥基自流平砂浆地面施工技术措施", 《甘肃科技》 *
白立斌: "环氧自流平耐磨地面施工技术", 《施工技术》 *
高继山: "ABS Duro410_工业自流平地面施工工艺", 《铁道建筑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025108A (en) * 2018-08-07 2018-12-18 苏州金螳螂文化发展股份有限公司 A kind of acrylic crystal resin artificial water surface construction method
CN110820504A (en) * 2018-08-14 2020-02-21 江阴市利民劳务综合服务有限公司 Terrace repairing construction process
CN109441059A (en) * 2018-10-30 2019-03-08 安徽智恒信科技有限公司 A kind of plastic floor laying structure and its construction method
CN109680904A (en) * 2018-12-13 2019-04-26 舍奢(武汉)家居有限公司 Reconciliation Self-leveling construction method
CN110497522A (en) * 2019-08-19 2019-11-26 张晟 Dust protected mortar mixing arrangement and the construction method that terrace is kept the temperature for Self-leveling
CN110563416A (en) * 2019-09-20 2019-12-13 济南大学 Repairing method suitable for masonry structure surface and application thereof
CN110563417A (en) * 2019-10-17 2019-12-13 广东火仑建材科技发展有限公司 rapid condensation self-leveling
CN111734086A (en) * 2020-07-28 2020-10-02 江苏智信达建筑科技有限公司 Printed nano-silicon self-leveling polished artistic floor and construction process thereof
CN112459395A (en) * 2020-12-11 2021-03-09 甘肃第四建设集团有限责任公司 High-strength wear-resistant floor and construction method thereof
CN115839158A (en) * 2022-12-05 2023-03-24 中冶建工集团有限公司 Anti-radiation operating room composite ground structure and construction process

Similar Documents

Publication Publication Date Title
CN106884535A (en) A kind of construction technology of imitative stone material Self-leveling waterproof mortar
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN103321442A (en) Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface
CN104846717B (en) Silicon PU type synthetic court
CN112064955A (en) Paving construction method applied to floor tiles
CN107035103A (en) A kind of cement floor construction method
CN201972172U (en) Underground rigid composite waterproof construction structure
CN102251455A (en) Vibration-free anti-slip lane and construction method thereof
CN113152814A (en) Construction method for spraying stone-like paint on outer wall
CN110306819B (en) Method for repairing red brick outer wall of historic building
CN108301320A (en) The method for paving of water-protected enclosure layer based on C40 microlith fiber concretes
CN105178562A (en) Inorganic crystal grindstone integrated terrace system and construction process thereof
CN102344278B (en) Permeable crystallization type cement-based waterproof mucilage
CN206487115U (en) A kind of super abrasive polyurethane garage terrace
CN107540314A (en) A kind of post-cast strip basal plane inorganic agent and its construction method
CN105696358B (en) Environment-friendly type composite of water-proof coiled material and its production method
CN112408851A (en) Anti-radiation semi-permanent nano-penetration crystallization sealing compacting agent and use method thereof
KR100858347B1 (en) Method for carrying out floor board of structure andfloor board of structure carried out by its method
CN110258276B (en) Rapid maintenance method for micro-surface damage of concrete pavement
CN105133855A (en) Energy-saving and environment-friendly waterproof warming construction method for existing roof surface
CN113668885A (en) Plastering anti-cracking construction method for large-area arc-shaped stand
CN208280530U (en) A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure
CN112727136A (en) Waterproof renovation process for outdoor stadium stand
CN114934651B (en) High-hardness abrasion-resistant quick-setting crack-free integrated terrazzo processing technology
KR101016173B1 (en) An artificial turf structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170623