CN203129513U - Floor tile paving frame - Google Patents

Floor tile paving frame Download PDF

Info

Publication number
CN203129513U
CN203129513U CN 201320097409 CN201320097409U CN203129513U CN 203129513 U CN203129513 U CN 203129513U CN 201320097409 CN201320097409 CN 201320097409 CN 201320097409 U CN201320097409 U CN 201320097409U CN 203129513 U CN203129513 U CN 203129513U
Authority
CN
China
Prior art keywords
construction
reduced
beams
wood floor
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320097409
Other languages
Chinese (zh)
Inventor
邱世雄
林斯勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Heng Heng Industrial Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320097409 priority Critical patent/CN203129513U/en
Application granted granted Critical
Publication of CN203129513U publication Critical patent/CN203129513U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model provides a floor tile paving frame composed of cross beams and longitudinal beams. The cross beams and the longitudinal beams are detachably connected to form a frame structure. Through holes are arranged on the cross beams and the longitudinal beams. A protruding block and a fixing block is arranged at the side end of one cross beam or one longitudinal beam, and a clamp groove and an installing hole are arranged on the other corresponding longitudinal beam or the other corresponding cross beam. The floor tile paving frame has the advantages that excessive dependence on river sands in construction is reduced, excavation of natural river sand resources is reduced, the manpower and package cost required by material transportation in construction is reduced, the labor intensity of engineering construction workers and construction technical requirements in the building construction process are reduced, pollution (air pollution, noise pollution and construction garbage disposal) produced in the building construction process is reduced, building garbage produced in the maintenance and second construction process is reduced, parts of materials can be reutilized and recycled, air conditioner matching, heater construction and installation are facilitated, energy consumption of an air conditioner and a heater in operation is reduced, and the like.

Description

Wood floor bolck is laid framework
Technical field
The utility model relates to a kind of wood floor bolck and lays framework.
Background technology
Along with the development of society, growth in the living standard, people are more and more higher to the requirement of dwelling environment, and house decoration is exactly one of them, and the laying of indoor floor brick is an important component part of house decoration.The indoor floor brick is laid and is comprised that Ceramic Tiles is laid, plastic tile is laid and woodbox is laid at present, wherein the method that Ceramic Tiles is laid or plastic tile is laid is: earlier with river sand and laying after cement mixing becomes concrete on the ground, ground grading is laid Ceramic Tiles or plastic tile more one by one then.Process is not only loaded down with trivial details but also need use a large amount of cement and river sand, and cost is higher, also can lay unbalanced not firm cracking of wood floor bolck that cause because of concrete sometimes; It is not attractive in appearance that concrete is laid many slightly wood floor bolck surfaces of will giving prominence to; And along with climate change, owing to the reason of expanding with heat and contract with cold, distortion, bulge or cracking appear easily, repair wherein floorboard brick, must pound out contiguous even whole wood floor bolcks, therefore repair the comparison difficulty, it is big to repair noise simultaneously, produces too much building waste, seriously polluted.Defectives such as the secondary decoration that the laying of current floor brick relates to can produce a large amount of building wastes, and is seriously polluted, time-consuming.
It is closely to contact with ground that existing wood floor bolck is laid, floor covering layers pipeline inconvenience, and it is big not only to build bearing load simultaneously, and heating installation or cold air can not be led in wood floor bolck lower floor, use relatively limitation, do not adapt to modern's demand.
The utility model content
The purpose of this utility model be to provide a kind of simple in structure, easy to use, cost is low, the wood floor bolck of easy accessibility, recycling, energy-conserving and environment-protective is laid circle.
To achieve these goals, the technical solution of the utility model is: provide a kind of wood floor bolck to lay framework, wherein, be made of crossbeam and longeron, described crossbeam is removably connected into a frame construction with longeron.
Be equipped with through hole on described crossbeam and the longeron.
Side on described crossbeam or the longeron is provided with projection and fixed block, and corresponding another longeron or crossbeam are provided with draw-in groove and installing hole.
The utility model wood floor bolck is laid the beneficial effect of framework:
1, in the minimizing construction river sand is depended on unduly, reduced the river sand natural resource is felled;
2, reduce in the construction the artificial packing cost that reaches of transport of materials generation;
3, reduce engineering construction personnel labor intensity in the building construction process, and the construction technology technical requirements;
4, reduce the pollution that produces in the building construction process (air, noise pollution, reach the garbage disposal of constructing);
5, reach the building waste that produces in the building secondary work progress in the minimizing maintenance, the part material can carry out secondary utilization and recovery;
6, reduce the building bearing load, reduce the building operations cost;
7, effectively shorten the engineering time;
8, convenient supporting water, electricity construction and installation;
9, convenient supporting cold air, heating installation construction and installation reduce cold air, the operating energy consumption of heating installation;
10, reduce the floor gap noise pollution;
11, effectively strengthen the floor gap water-proof function.
Description of drawings
Fig. 1 lays the structural representation of framework for the utility model wood floor bolck;
Fig. 2 lays the crossbeam of framework and the structural representation of longeron for the utility model wood floor bolck;
Fig. 3 lays the plan structure figure of framework for the utility model wood floor bolck;
Fig. 4 lays the mounting structure schematic diagram of framework for the utility model wood floor bolck;
Among the figure: 1, crossbeam; 2, longeron; 3, through hole; 4, projection; 5, fixed block; 6, draw-in groove; 7, installing hole; 8, construction section; 9, wood floor bolck; 10, structure glue; 11, cement layer; 12, flooring.
The specific embodiment
Lay technology contents, the structural feature of framework, be described further below in conjunction with embodiment and conjunction with figs. in order to describe the utility model wood floor bolck in detail.
Shown in Fig. 1,2,3,4, the utility model wood floor bolck is laid framework, is made of crossbeam 1 and longeron 2, and described crossbeam 1 is removably connected into a frame construction with longeron 2.Be equipped with through hole 3 on described crossbeam 1 and the longeron 2.Through hole 3 is guaranteed to communicate between crossbeam and the longeron inside, can lead to heating installation or cold air etc., can also reduce material simultaneously, reduces cost.Described crossbeam 1 side is provided with projection 4 and fixed block 5 or longeron 2 sides and is provided with projection 4 and fixed block 5, and corresponding another longeron 2 or crossbeam 1 are provided with draw-in groove 6 and installing hole 7.Crossbeam 1 and longeron 2, install and fix by fixed block 5 and installing hole screw with after draw-in groove 6 is connected by projection 4 again.
Be illustrated in figure 4 as the utility model wood floor bolck and lay the mounting structure schematic diagram of framework, lay cement layer 11 at flooring 12, set up the utility model wood floor bolck on the cement layer 11 and lay framework, seam is installed perpendicular to the middle part on crossbeam or the longeron in adjacent two floor bricks 9 splicing backs, after fixing by structure glue 10 bondings between the wood floor bolck, wood floor bolck is fixing with the framework bonding by structure glue 10 again.After installing wood floor bolck, the framework inside of wood floor bolck bottom can lead to heating installation or cold air, and pipeline installation is more convenient.The utility model wood floor bolck lay framework can according to wood floor bolck specification size determine that crossbeam and longeron constitute the size of construction section 8, excessive as the wood floor bolck specification, can guarantee the framework for carrying ability at section interpolation crossbeam or the longeron of constructing.
Lay the plan structure figure of framework for the utility model wood floor bolck as Fig. 3.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalent variations of doing according to the utility model claim still belongs to the scope that the utility model is contained.

Claims (3)

1. wood floor bolck is laid framework, and it is characterized in that: be made of crossbeam and longeron, described crossbeam is removably connected into a frame construction with longeron.
2. wood floor bolck as claimed in claim 1 is laid framework, it is characterized in that: be equipped with through hole on described crossbeam and the longeron.
3. wood floor bolck as claimed in claim 1 is laid framework, and it is characterized in that: the side on described crossbeam or the longeron is provided with projection and fixed block, and corresponding another longeron or crossbeam are provided with draw-in groove and installing hole.
CN 201320097409 2013-03-04 2013-03-04 Floor tile paving frame Expired - Fee Related CN203129513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320097409 CN203129513U (en) 2013-03-04 2013-03-04 Floor tile paving frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320097409 CN203129513U (en) 2013-03-04 2013-03-04 Floor tile paving frame

Publications (1)

Publication Number Publication Date
CN203129513U true CN203129513U (en) 2013-08-14

Family

ID=48937505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320097409 Expired - Fee Related CN203129513U (en) 2013-03-04 2013-03-04 Floor tile paving frame

Country Status (1)

Country Link
CN (1) CN203129513U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643781A (en) * 2013-12-19 2014-03-19 邱世雄 Keel connector for indoor wall and floor decoration
CN106703360A (en) * 2015-11-16 2017-05-24 戴昔晓 Fast-assembling floor keel
CN109853904A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 A kind of construction method of aerial platform
CN109853903A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 Aerial platform and its building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643781A (en) * 2013-12-19 2014-03-19 邱世雄 Keel connector for indoor wall and floor decoration
CN103643781B (en) * 2013-12-19 2016-01-20 邱世雄 Indoor wall, ground decoration keel connecting member
CN106703360A (en) * 2015-11-16 2017-05-24 戴昔晓 Fast-assembling floor keel
CN109853904A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 A kind of construction method of aerial platform
CN109853903A (en) * 2018-12-28 2019-06-07 广东景龙装配科技有限公司 Aerial platform and its building

Similar Documents

Publication Publication Date Title
CN205444458U (en) Integrated assembled steel construction building
CN106522359B (en) Fully-assembled village and town dwelling type composite wall structure system and construction method thereof
CN203129513U (en) Floor tile paving frame
CN105401654A (en) Environment-friendly assembled type ecological house and construction method thereof
Baiani et al. The design process towards resource productivity. A case study
CN203769067U (en) Novel assembly type intelligent house
CN204343623U (en) A kind of combined floor of ground decoration
CN208563863U (en) A kind of floor system of integrated pipeline
CN104060720A (en) Heat insulation structure prefabricated integrated assembly wall panel and overall building forming method
CN105544829A (en) Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof
CN207419699U (en) A kind of energy-saving and environment-friendly industrialization prefabricated buildings structure
CN204370749U (en) A kind of lithotome composite decorating board
CN110259144A (en) A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method
CN206158255U (en) Prefabricated assembled communication machinery room
CN106193685B (en) Prefabricated assembled communications equipment room structure
CN205224397U (en) Large -scale wall plates of modular
CN108277951A (en) Building block system dry-laid electricity floor heating device preparation method
CN208280530U (en) A kind of graphene electrothermal makes somebody a mere figurehead Sound insulation floorings and its mounting structure
CN103643781B (en) Indoor wall, ground decoration keel connecting member
CN208533949U (en) A kind of type dry ground heating system
CN210976452U (en) Ground keel frame with flatness adjusted by screw
CN208518183U (en) Assembled type pipe prefabricated components
CN207794492U (en) A kind of integrated finishing component of integration environmental friendly indoor
CN202152547U (en) Super high-rise fair-faced concrete product protection system
CN204676762U (en) A kind of flooring building block being applied to combined and spliced structure in integrated house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: LIN SIYONG

Effective date: 20140922

Owner name: HAINAN HENGJI INDUSTRIAL CO., LTD.

Free format text: FORMER OWNER: QIU SHIXIONG

Effective date: 20140922

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140922

Address after: 570000, a 303 room in three reservoir area of Haikou City, Hainan Province

Patentee after: Hainan Heng Heng Industrial Co.,Ltd.

Address before: 570000 Hainan city of Haikou province D Xinya garden Ken Road, building 506

Patentee before: Qiu Shixiong

Patentee before: Lin Siyong

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814