CN208121543U - A kind of prefabricated assembled bent cap structure - Google Patents

A kind of prefabricated assembled bent cap structure Download PDF

Info

Publication number
CN208121543U
CN208121543U CN201820604561.6U CN201820604561U CN208121543U CN 208121543 U CN208121543 U CN 208121543U CN 201820604561 U CN201820604561 U CN 201820604561U CN 208121543 U CN208121543 U CN 208121543U
Authority
CN
China
Prior art keywords
bent cap
short column
column section
ring flange
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820604561.6U
Other languages
Chinese (zh)
Inventor
陈娟
何四春
朱凌云
柯昌君
李昊洋
刘鸿伟
朱聪
万小青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingzhou Huasheng New Material Ltd By Share Ltd
Yangtze University
Original Assignee
Jingzhou Huasheng New Material Ltd By Share Ltd
Yangtze University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingzhou Huasheng New Material Ltd By Share Ltd, Yangtze University filed Critical Jingzhou Huasheng New Material Ltd By Share Ltd
Priority to CN201820604561.6U priority Critical patent/CN208121543U/en
Application granted granted Critical
Publication of CN208121543U publication Critical patent/CN208121543U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of prefabricated assembled bent cap structures, including bent cap, short column section and ring flange;The bent cap is full batch production prefabricated component;The lower end of bent cap is equipped with several short column sections, and the number of short column section and the number of bridge pier are consistent;The lower end of short column section and the upper end of bridge pier are respectively equipped with ring flange, are connected between two ring flanges by high-strength bolt.Bent cap in the structure is attached with pier column using high-strength bolt at the scene completely by prefabrication, be not present cast-in-place part, simple and quick construction, can it is uncivil to avoid noise, the dust of construction site etc., not environmentally construction problem, social benefit are significant.

Description

A kind of prefabricated assembled bent cap structure
Technical field
The utility model belongs to technical field of bridge construction, and in particular to a kind of prefabricated assembled bent cap structure.
Background technique
With the continuous development of economy and society, urbanization process is increasingly accelerated, and road traffic problem is more and more prominent.People In order to solve the traffic problems of increasingly congestion, start largely to build various elevated bridges.In existing method of construction, generally use The mode of support cast-in-place carries out.The construction method of support cast-in-place bent cap is there are long construction period, field procedure is more, to surrounding enviroment Big drawback is influenced, is no longer satisfied people to safety, civilization and the construction requirement of environmental protection.
Complete prefabricated bridge structure, the effective hand for being to speed up speed of application, reducing scene pollution, realizing low-carbon construction Section.Under the guidance that national policy and technology develop, bridge fabricated construction also obtains in all kinds of engineerings more and more extensive Using.At home, the bent cap of viaduct mostly uses support cast-in-place method to construct, that is, sets up bracket and template, column is pricked on cushion cap Reinforcing bar, after completing the casting of column concrete and maintenance, rotary ligating cover beam steel, then carry out the casting of bent cap concrete.
Currently, integral prefabricated bent cap and the partial precast bent cap that lower layer is prefabricated, upper layer is cast-in-place have begun in city height It is applied in bridge, but in the assembly of the joint connection in site of prefabricated bent cap and pier stud, constructs more complex, need second pouring coagulation Soil.
Utility model content
For the above-mentioned problems in the prior art, the utility model provides a kind of prefabricated assembled bent cap structure, Bent cap in the structure is attached with pier column using high-strength bolt at the scene completely by prefabrication, and cast-in-place portion is not present Point, simple and quick construction, can, not environmentally construction problem uncivil to avoid noise, the dust of construction site etc., social benefit is aobvious It writes.
For this purpose, the utility model uses following technical scheme:
A kind of prefabricated assembled bent cap structure, including bent cap, short column section and ring flange;The bent cap is that full batch production is prefabricated Part;The lower end of bent cap is equipped with several short column sections, and the number of short column section and the number of bridge pier are consistent;The lower end of short column section and bridge pier Upper end is respectively equipped with ring flange, is connected between two ring flanges by high-strength bolt.
Further, the bent cap is made of reinforcing bar and concrete material, and the short column section uses steel reinforced concrete system Make, the bent cap and short column section are integrally poured in factory.
Further, it is connected by the way of welding between the reinforcing bar in the short column section and the lower end and ring flange of fashioned iron Together.
Further, the bridge pier is made of armored concrete, and the steel inside bridge pier upper section built-in profile steel, bridge pier It is linked together by the way of welding between muscle and the upper end and ring flange of fashioned iron.
Further, the fashioned iron includes I-steel, channel steel, angle steel, round steel.
Preferably, the ring flange is rectangular or round, the bolt hole for being surrounded by certain amount of ring flange, the spiral shell Keyhole matches with high-strength bolt.
Compared with prior art, the utility model has the beneficial effects that:
(1) it using complete fabricated construction method, is attached between bent cap and bridge pier by ring flange and high-strength bolt, It no longer needs to carry out injecting treatment.
(2) construction period is shortened, bridge construction speed is accelerated.
(3) simple and quick construction, can, not environmentally construction problem uncivil to avoid noise, the dust of construction site etc., society It can remarkable benefit.
Detailed description of the invention
Fig. 1 is a kind of overall structure composition schematic diagram of prefabricated assembled bent cap structure provided by the utility model.
Fig. 2 is the structural schematic diagram of bent cap.
Fig. 3 is the structural schematic diagram of pier column.
Fig. 4 is the structural schematic diagram of ring flange.
Description of symbols:1, bent cap;2, short column section;3, ring flange;4, bridge pier;5, high-strength bolt;6, bolt hole;7, steel Muscle;8, fashioned iron.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is described in detail the utility model, specific embodiment therein and says It is bright to be only used to explain the utility model, but be not intended to limit the scope of the present invention.
As shown in Figure 1, the utility model discloses a kind of prefabricated assembled bent cap structure, including bent cap 1,2 and of short column section Ring flange 3;The bent cap 1 is full batch production prefabricated component;The lower end of bent cap 1 be equipped with several short column sections 2, the number of short column section 2 with The number of bridge pier 4 is consistent;The lower end of short column section 2 and the upper end of bridge pier 4 are respectively equipped with ring flange 3, pass through between two ring flanges High-strength bolt 5 connects.
Specifically, the bent cap 1 is made of reinforcing bar and concrete material, and the short column section 2 uses steel reinforced concrete system Make, the bent cap 1 and short column section 2 are integrally poured in factory, as shown in Figure 2.
Specifically, connected by the way of welding between the reinforcing bar 7 in the short column section 2 and the lower end and ring flange 3 of fashioned iron 8 It is connected together, as shown in Figure 2 and Figure 4.
Specifically, the bridge pier 4 is made of armored concrete, and the steel inside bridge pier upper section built-in profile steel, bridge pier 4 It is linked together by the way of welding between the upper end and ring flange 3 of muscle 7 and fashioned iron 8, as shown in Figure 3 and Figure 4.
Specifically, the fashioned iron 8 includes I-steel, channel steel, angle steel, round steel.
Preferably, the ring flange 3 is rectangular or round, the bolt hole 6 for being surrounded by certain amount of ring flange 3, institute It states bolt hole 6 to match with high-strength bolt 5, as shown in Figure 4.
Embodiment
A kind of prefabricated assembled bent cap structure, including bent cap, short column section and ring flange, bent cap are that full batch production is prefabricated, It completes to assemble by ring flange and high-strength bolt and pier column in construction site.Detailed process is as follows:
Bent cap is prefabricated in the factory using reinforcing bar and concrete material, the several short column sections of the lower end band of bent cap, the number of short column section Mesh is consistent with bridge pier number, and short column section and bent cap are integrally poured in factory.Short column section is made of steel reinforced concrete, reinforcing bar in column Pass through welded connecting with the lower end of fashioned iron and ring flange.Bridge pier is made of armored concrete, bridge pier upper section built-in profile steel, bridge pier The upper end of reinforcing bar and fashioned iron inside column and ring flange pass through welded connecting.The ring flange of bent cap and bridge pier lifts positioning at the scene It is connected afterwards by high-strength bolt.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modification, equivalent replacement and improvement etc., should be included in this reality within the spirit and spirit of utility model Within novel protection scope.

Claims (6)

1. a kind of prefabricated assembled bent cap structure, including bent cap, short column section and ring flange, it is characterised in that:The bent cap is complete Batch production prefabricated component;The lower end of bent cap is equipped with several short column sections, and the number of short column section and the number of bridge pier are consistent;Under short column section End and the upper end of bridge pier are respectively equipped with ring flange, are connected between two ring flanges by high-strength bolt.
2. a kind of prefabricated assembled bent cap structure according to claim 1, it is characterised in that:The bent cap using reinforcing bar and Concrete material production, the short column section are made of steel reinforced concrete, and the bent cap and short column section are integrally poured in factory.
3. a kind of prefabricated assembled bent cap structure according to claim 2, it is characterised in that:Reinforcing bar in the short column section It is linked together by the way of welding between the lower end and ring flange of fashioned iron.
4. a kind of prefabricated assembled bent cap structure according to claim 3, it is characterised in that:The bridge pier is mixed using reinforcing bar Solidifying soil production, and using welding between the upper end and ring flange of the reinforcing bar and fashioned iron inside bridge pier upper section built-in profile steel, bridge pier Mode link together.
5. a kind of prefabricated assembled bent cap structure according to claim 4, it is characterised in that:The fashioned iron includes I-shaped Steel, channel steel, angle steel, round steel.
6. a kind of prefabricated assembled bent cap structure according to any one of claims 1 to 5, it is characterised in that:The flange Disk be it is rectangular or round, the bolt hole for being surrounded by certain amount of ring flange, the bolt hole matches with high-strength bolt.
CN201820604561.6U 2018-04-23 2018-04-23 A kind of prefabricated assembled bent cap structure Expired - Fee Related CN208121543U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820604561.6U CN208121543U (en) 2018-04-23 2018-04-23 A kind of prefabricated assembled bent cap structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820604561.6U CN208121543U (en) 2018-04-23 2018-04-23 A kind of prefabricated assembled bent cap structure

Publications (1)

Publication Number Publication Date
CN208121543U true CN208121543U (en) 2018-11-20

Family

ID=64186569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820604561.6U Expired - Fee Related CN208121543U (en) 2018-04-23 2018-04-23 A kind of prefabricated assembled bent cap structure

Country Status (1)

Country Link
CN (1) CN208121543U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868753A (en) * 2019-04-18 2019-06-11 上海市城市建设设计研究总院(集团)有限公司 Precast assembly pier consolidation structure and its construction method
CN110004819A (en) * 2019-05-16 2019-07-12 福州大学 A kind of girder of Longspan Bridge and bridge pier built-in structure and its construction method
CN110820543A (en) * 2019-10-18 2020-02-21 同济大学 Cylindrical pier structure capable of being repeatedly disassembled and assembled and design method
CN110952440A (en) * 2019-11-19 2020-04-03 东北大学 Prefabricated section steel concrete and reinforced concrete spliced pier and construction process
CN111283860A (en) * 2020-02-28 2020-06-16 中铁上海工程局集团有限公司 Assembly line production construction method for assembly type hollow bent cap of high-speed railway
CN111691309A (en) * 2020-07-07 2020-09-22 郑琼华 Method for connecting bridge pier and cross beam of bridge

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868753A (en) * 2019-04-18 2019-06-11 上海市城市建设设计研究总院(集团)有限公司 Precast assembly pier consolidation structure and its construction method
CN109868753B (en) * 2019-04-18 2024-03-12 上海市城市建设设计研究总院(集团)有限公司 Prefabricated assembled pier beam consolidation structure and construction method thereof
CN110004819A (en) * 2019-05-16 2019-07-12 福州大学 A kind of girder of Longspan Bridge and bridge pier built-in structure and its construction method
CN110820543A (en) * 2019-10-18 2020-02-21 同济大学 Cylindrical pier structure capable of being repeatedly disassembled and assembled and design method
CN110820543B (en) * 2019-10-18 2020-12-29 同济大学 Cylindrical pier structure capable of being repeatedly disassembled and assembled and design method
CN110952440A (en) * 2019-11-19 2020-04-03 东北大学 Prefabricated section steel concrete and reinforced concrete spliced pier and construction process
CN110952440B (en) * 2019-11-19 2021-06-15 东北大学 Prefabricated section steel concrete and reinforced concrete spliced pier and construction process
CN111283860A (en) * 2020-02-28 2020-06-16 中铁上海工程局集团有限公司 Assembly line production construction method for assembly type hollow bent cap of high-speed railway
CN111691309A (en) * 2020-07-07 2020-09-22 郑琼华 Method for connecting bridge pier and cross beam of bridge
CN111691309B (en) * 2020-07-07 2021-11-05 中交(临沂)建筑科技有限公司 Method for connecting bridge pier and cross beam of bridge

Similar Documents

Publication Publication Date Title
CN208121543U (en) A kind of prefabricated assembled bent cap structure
CN106869172A (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN102535355B (en) Method for reinforcing bridge structure separated steel-concrete combined truss
CN106481023B (en) Assembled steel-concrete composite beam structure and its implementation method
CN102535357B (en) Method for strengthening double-T bridge composite structure for railway
CN209619858U (en) A kind of combination assembled bridge framed bent pier system of steel-concrete
CN106567499B (en) Assembled steel reinforced concrete joining column structure and its implementation method
CN108035437A (en) A kind of prefabricated node of the high-strength high concrete assembled frame of ductility and connection method
CN106049691A (en) Fully-prefabricated assembling type steel tube constraint frame node
CN208685438U (en) A kind of wet seam type of attachment of sectional type floorings
CN105970993B (en) The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap
CN113279324A (en) Semi-prefabricated UHPC-NC combined cover beam connecting structure and assembling method
CN207919746U (en) A kind of prefabricated node of high-strength high concrete assembled frame of ductility
CN108755964A (en) A kind of partial precast assembly steel reinforced concrete mixed column and construction method
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN109487681A (en) Erosion resistant ultra-high performance concrete constrains section assembling bridge pier and method of construction
CN109403201A (en) A kind of new and old bridge jointing seam new structural systen and implementation method
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN208685437U (en) A kind of wet seam construction of prefabricated assembled concrete floorings
CN110004791A (en) A kind of prestressing without bondn assembled road and its construction method
CN207296182U (en) Assembled architecture skeleton reinforcing steel bar concrete column
CN106320165A (en) Prefabricated concrete-filled steel tube overlapped pier
CN208501895U (en) A kind of partial precast assembly steel reinforced concrete mixed column
CN103966956A (en) Hooped concrete-filled steel tube reinforced single-pole bridge pier constructing device and construction method
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181120