CN105970993B - The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap - Google Patents

The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap Download PDF

Info

Publication number
CN105970993B
CN105970993B CN201610505940.5A CN201610505940A CN105970993B CN 105970993 B CN105970993 B CN 105970993B CN 201610505940 A CN201610505940 A CN 201610505940A CN 105970993 B CN105970993 B CN 105970993B
Authority
CN
China
Prior art keywords
prefabricated
pile
cushion cap
pile crown
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201610505940.5A
Other languages
Chinese (zh)
Other versions
CN105970993A (en
Inventor
高金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CN201610505940.5A priority Critical patent/CN105970993B/en
Publication of CN105970993A publication Critical patent/CN105970993A/en
Application granted granted Critical
Publication of CN105970993B publication Critical patent/CN105970993B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

The invention discloses the underwater connection structures and its construction method of a kind of prefabricated pile and prefabricated cushion cap, the prefabricated cushion cap is fixedly connected on the top of prefabricated pile, the top of prefabricated pile has pile crown, the diameter of the pile crown is less than pile crown prefabricated pile diameter below, the prefabricated cushion cap is equipped with the through-hole connecting with pile crown, the diameter of the through-hole is greater than the diameter of pile crown, but it is less than pile crown prefabricated pile diameter below, to concrete perfusion between through-hole and pile crown by way of subaqueous concreting, it is fixed together prefabricated pile with prefabricated cushion cap.

Description

The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap
Technical field
The present invention relates to a kind of underwater pile structures, further relate to the construction method of this underwater pile structure.
Background technique
In the foundation engineerings such as bridge, harbour, harbour, hydraulic engineering, pile foundation of bearing platform plinth is common base form.When applying When cushion cap is located at the water surface or less between duration, generally constructed using cofferdam method, but the at high cost of cofferdam construction, the period is long, technology is difficult Degree is big, is also possible to will affect navigation.Currently, precast assembly structure uses more and more widely, if pile foundation of bearing platform plinth is adopted With precast construction, on-site consolidation can then remove cofferdam construction process from, substantially reduce construction cost and shorten the construction period.Precast assembly Pile foundation of bearing platform plinth, key node is how to handle the underwater connecting node of stake and cushion cap, but in the prior art, prefabricated pile It is also unreasonable with the underwater connection structure of prefabricated cushion cap, have the shortcomings that difficulty of construction is big, reliability is low.
Summary of the invention
The technical problem to be solved in the present invention is to provide it is a kind of convenient for rapid construction, effect reliable prefabricated pile with it is prefabricated The underwater connection structure of cushion cap, to overcome the drawbacks described above of the prior art.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:A kind of water of prefabricated pile and prefabricated cushion cap Lower connection structure, the prefabricated cushion cap are fixedly connected on the top of prefabricated pile, and the top of prefabricated pile has pile crown, the pile crown Diameter is less than pile crown prefabricated pile diameter below, and the prefabricated cushion cap is equipped with the through-hole that connect with pile crown, the through-hole it is straight Diameter is greater than the diameter of pile crown, but is less than pile crown prefabricated pile diameter below, mixed by underwater grouting between the through-hole and pile crown Solidifying soil is fixed together.
Preferably, the prefabricated pile is concrete square pile, concrete circular pile or concrete tubular pile.
Preferably, the prefabricated pile is equipped with the bulb adjacent with pile crown, and bulb is located at pile crown hereinafter, described pre- The diameter of through-hole is less than the diameter of bulb on cushion cap processed.
It preferably, is identical in pile crown prefabricated pile diameter below.
Preferably, the prefabricated pile is solid concrete stake, constitutes and is embedded with reinforcing bar, steel in the concrete of the prefabricated pile Muscle beam or steel pipe, the reinforcing bar, tendon or steel pipe expose from the top of prefabricated pile and form the pile crown.
Preferably, shear key is additionally provided on the pile crown.
The invention solves another technical problem be to provide the construction method of above-mentioned connection structure.
This approach includes the following steps:
A, prefabricated pile is installed in place under water first;
B, prefabricated cushion cap is then lifted into prefabricated pile top, matches the through-hole on prefabricated cushion cap with pile crown, and Toroidal cavity is formed between pile crown and through-hole wall;
C, by subaqueous concreting technique into the toroidal cavity between pile crown and through-hole wall concrete perfusion, will Prefabricated pile and prefabricated cushion cap are connected and fixed.
Compared with prior art, the invention has the advantages that.
The present invention has carried out reasonable design to the structure of prefabricated pile and the underwater connecting node of prefabricated cushion cap, in prefabricated pile Toroidal cavity is formed between pile crown and the through-hole wall of prefabricated cushion cap, and passes through the subaqueous concreting into the toroidal cavity Mode is connected and fixed prefabricated pile and prefabricated cushion cap.This underwater connection type simple structure, easy for construction, low-cost, company Reliable in quality is connect, and construction period can be greatly shortened, there is huge economic benefit and important realistic meaning.
Detailed description of the invention
Fig. 1 is the elevational schematic view of underwater the first embodiment of connection structure of prefabricated pile of the present invention and prefabricated cushion cap.
Fig. 2 is the elevational schematic view of second of embodiment of underwater connection structure of prefabricated pile of the present invention and prefabricated cushion cap.
Fig. 3 is the elevational schematic view of underwater the third embodiment of connection structure of prefabricated pile of the present invention and prefabricated cushion cap.
Fig. 4 is the top plan view of the underwater connection structure of prefabricated pile of the present invention and prefabricated cushion cap.
In figure:
1, prefabricated cushion cap 2, prefabricated pile 3, subaqueous concreting
11, through-hole 21, pile crown 22, bulb
23, reinforcing bar, tendon or steel pipe
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.These embodiments are only used for Illustrate the present invention, and not limitation of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood as the case may be Concrete meaning in the present invention.
In addition, in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more.
As shown in Figure 1, being the first embodiment of the invention, the underwater connection structure packet of the prefabricated pile and prefabricated cushion cap Prefabricated cushion cap 1 and Duo Gen prefabricated pile 2 are included, the top of prefabricated pile 2 has pile crown 21, and it is below pre- that the diameter of pile crown 21 is less than pile crown The diameter of stake 2 processed, 2 diameter of prefabricated pile below of pile crown 21 is all identical.It is equipped on prefabricated cushion cap 1 and is connected with pile crown 21 Through-hole 11, the diameter of through-hole 11 is greater than the diameter of pile crown 21, but is less than pile crown 2 diameter of prefabricated pile below, therefore, prefabricated to hold Platform 1 can be located in the top of prefabricated pile 2, and be formed between the pile crown of prefabricated pile 21 and the through-hole wall of prefabricated cushion cap 1 Toroidal cavity (as shown in Figure 4), by way of subaqueous concreting into the toroidal cavity concrete perfusion 3, make prefabricated Cushion cap 1 and prefabricated pile 2 are fixed together.2 one side of prefabricated pile can play the role of the prefabricated cushion cap 1 of support, another party Face can double as the bed die of subaqueous concreting.Above-mentioned prefabricated pile 2 can be concrete square pile, concrete circular pile or concrete Tubular pole etc., for square pile, above-mentioned diameter should be understood as the circumscribed circle diameter of square-section.
As shown in Fig. 2, be second of embodiment of the invention, unlike the first embodiment, pile crown 21 with Under the diameter of prefabricated pile 2 be not impartial.The bulb 22 adjacent with pile crown 21, bulb are equipped on prefabricated pile 2 22 be located at pile crown 21 hereinafter, and the diameter of bulb 22 be greater than the diameter at the other positions of prefabricated pile 2, and through-hole on prefabricated cushion cap 11 diameter is less than the diameter of bulb 22.In this way, bulb 22 can support prefabricated cushion cap 1, and double as underwater grouting coagulation The bed die of soil., can be identical as the diameter of pile crown 21 as the diameter of the prefabricated pile 2 below of bulb 22, pile crown can also be compared 21 diameter is big.
In above-mentioned two embodiment, the partial structurtes such as shear key can also be increased, on pile crown 21 further to mention The reliability that high prefabricated cushion cap 1 is bonded with pile crown 21.
As shown in figure 3, be the third embodiment of the invention, unlike above two embodiment, pile crown 21 It is not concrete structure.Prefabricated pile 2 is solid concrete stake, constitutes in the concrete of prefabricated pile 2 and is embedded with reinforcing bar, tendon Or steel pipe 23, the reinforcing bar, tendon or steel pipe 23 expose from the concrete on 2 top of prefabricated pile, and form the pile crown 21. That is, pile crown 21 is made of the reinforcing bar, tendon or steel pipe upwardly extended from concrete.Work as subaqueous concreting After the completion of 3 constructions, these exposed reinforcing bar, tendon or steel pipes are just integrated in concrete, and by prefabricated cushion cap 1 and prefabricated pile 2 are linked together.
Above-mentioned connection structure can construct according to the following steps.
A, each prefabricated pile 2 is installed in place under water first;
B, then prefabricated cushion cap 1 is lifted into 2 top of prefabricated pile and is covered on pile crown 21, make through-hole on prefabricated cushion cap with Pile crown 21 matches, and forms toroidal cavity between pile crown 21 and the inner wall of through-hole 11;
C, coagulation is perfused into the toroidal cavity between 11 inner wall of pile crown 21 and through-hole by subaqueous concreting technique Prefabricated pile 2 and prefabricated cushion cap 1 are connected and fixed by soil.
The invention avoids traditional cofferdam construction methods, realize precast construction with mature subaqueous concreting technique Underwater connection, simple structure, easy for construction, low-cost, quality of connection is reliable, there is huge economic benefit.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these are improved and replacement Also it should be regarded as protection scope of the present invention.

Claims (1)

1. a kind of construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap, the prefabricated cushion cap(1)It is fixedly connected on Prefabricated pile(2)Top, prefabricated pile(2)Top have pile crown(21), the pile crown(21)Diameter be less than pile crown it is below Prefabricated pile(2)Diameter, the prefabricated cushion cap(1)It is equipped with and pile crown(21)The through-hole of connection(11), the through-hole(11)It is straight Diameter is greater than pile crown(21)Diameter, but be less than pile crown(21)Prefabricated pile below(2)Diameter, the through-hole(11)With pile crown(21) Between pass through subaqueous concreting(3)It is fixed together, characterized in that include the following steps:
A, prefabricated pile is installed in place under water first;
B, prefabricated cushion cap is then lifted into prefabricated pile top, matches the through-hole on prefabricated cushion cap with pile crown, and in pile crown Toroidal cavity is formed between through-hole wall;
C, by subaqueous concreting technique into the toroidal cavity between pile crown and through-hole wall concrete perfusion, will be prefabricated Stake and prefabricated cushion cap are connected and fixed.
CN201610505940.5A 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap Withdrawn - After Issue CN105970993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610505940.5A CN105970993B (en) 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610505940.5A CN105970993B (en) 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap

Publications (2)

Publication Number Publication Date
CN105970993A CN105970993A (en) 2016-09-28
CN105970993B true CN105970993B (en) 2018-11-27

Family

ID=56954930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610505940.5A Withdrawn - After Issue CN105970993B (en) 2016-06-30 2016-06-30 The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap

Country Status (1)

Country Link
CN (1) CN105970993B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059774A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 A kind of assembled high-rise pile cap revetment structure and construction method
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN108265737B (en) * 2018-03-27 2024-03-08 淮海工学院 Assembled concrete bearing platform and micro pile combined foundation and construction method
CN109183827A (en) * 2018-09-18 2019-01-11 何文峰 Underwater reinforced concrete foundation construction operation engineering method
CN109797765B (en) * 2018-12-25 2019-11-22 广州市市政集团设计院有限公司 It is a kind of to carry out the construction method that cushion cap is connect with pile foundation by attachment device
CN109989415B (en) * 2019-05-06 2021-05-28 河南绿建建筑科技有限公司 Construction method of fabricated foundation
CN110158475A (en) * 2019-05-21 2019-08-23 北京工业大学 A kind of prefabricated assembled bridge substructure and its construction method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100744693B1 (en) * 2005-10-24 2007-08-01 (주) 선암기술연구소 Concrete-steel house and pile foundation footing construction method using thereof
CN103711139A (en) * 2012-09-29 2014-04-09 上海中技桩业股份有限公司 Semi-rigid connection structure between pile foundation and bearing platform
CN103628504B (en) * 2013-11-28 2016-01-20 广州市恒盛建设工程有限公司 The method of attachment of a kind of pin-connected panel prefabricated reinforced concrete platform structure node under water
JP6379554B2 (en) * 2014-03-20 2018-08-29 ジャパンパイル株式会社 Ready-made piles and support methods for ready-made piles
CN204456160U (en) * 2014-12-12 2015-07-08 中交公路规划设计院有限公司 A kind of bridge prefabrication cushion cap
CN204919635U (en) * 2015-09-18 2015-12-30 贵州省公路局 Bridge foundation reinforced structure
CN205857219U (en) * 2016-06-30 2017-01-04 上海勘测设计研究院有限公司 Prefabricated pile and the attachment structure under water of prefabricated cushion cap

Also Published As

Publication number Publication date
CN105970993A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105970993B (en) The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN103628504B (en) The method of attachment of a kind of pin-connected panel prefabricated reinforced concrete platform structure node under water
CN109555151A (en) Precast concrete column combines connecting structure and construction method with the steel reinforced concrete of cushion cap
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
WO2017084573A1 (en) Upheaval-resisting support structure
CN105544593A (en) Wind power generation tower foundation with prefabricated foundation prestressed beams and slab
CN108360678A (en) A kind of assembled beam-column node tenon connection structure
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN107435338A (en) Overhead transmission line concrete precast pipe pile cushion cap attachment means
CN205857219U (en) Prefabricated pile and the attachment structure under water of prefabricated cushion cap
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN106193644B (en) Basement reconstruction structure with raft foundation building
CN212317544U (en) A post connection structure about newly-built basis for expanding underground space
CN209703418U (en) Assembled flood-control wall
CN207194001U (en) A kind of new overhead transmission line concrete precast pipe pile cushion cap foundation
CN106592586B (en) Additional cuff back-up sand building stones prefabricated pile and its construction method
CN212294679U (en) Combined lattice column-concrete precast pile inclined support structure
CN213896714U (en) Prefabricated beam type arch bridge
CN213773339U (en) Tubular pile with large bearing capacity
CN209585028U (en) A kind of open caisson applies broken pile
CN209384243U (en) A kind of prestressing force support pile and piling wall
CN208803631U (en) Light steel grating concrete superposed column
CN206902719U (en) Preassembling support beam combines support system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20181127

Effective date of abandoning: 20220329

AV01 Patent right actively abandoned

Granted publication date: 20181127

Effective date of abandoning: 20220329