CN208070608U - Building waste clears system - Google Patents

Building waste clears system Download PDF

Info

Publication number
CN208070608U
CN208070608U CN201820411443.3U CN201820411443U CN208070608U CN 208070608 U CN208070608 U CN 208070608U CN 201820411443 U CN201820411443 U CN 201820411443U CN 208070608 U CN208070608 U CN 208070608U
Authority
CN
China
Prior art keywords
case
installation axle
tote bins
clears
guide rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820411443.3U
Other languages
Chinese (zh)
Inventor
李静
杨瑞杰
王安涛
史岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201820411443.3U priority Critical patent/CN208070608U/en
Application granted granted Critical
Publication of CN208070608U publication Critical patent/CN208070608U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

Building waste clears system, including clearing case, tote bins, two delivery tracks and driving mechanism, two delivery tracks are vertically mounted on construction wall and left and right and are arranged side by side, driving mechanism is hoist engine, hoist engine is fixed on architectural top, the body structure that case is open top is cleared, clears directive wheel there are four the trailing flank four corners rotation connections of case, four directive wheels roll respectively to be connected on two delivery tracks;In conclusion can quickly and easily be cleared to the rubbish in architecture storey using the utility model, clear efficient, pollution is small, highly practical.

Description

Building waste clears system
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of building waste clears system.
Background technology
Will produce many construction rubbish in building construction process, there are two types of common method for cleaning, first method be from Every layer of reserved opening is cleared up toward lower layer;The method airborne dust is big, pollutes environment, and there are security risks;Second method is to use Trolley is transported after loading by construction elevator;The method freight volume is small, lost labor and electric power, and the construction site having is not There is construction elevator, both the above method cleaning construction rubbish is all slow in the presence of cleaning speed, the low problem of efficiency.
Utility model content
The utility model is provided and a kind of clears that efficient, pollution is small builds to solve shortcoming in the prior art Building refuse clears system.
In order to solve the above technical problems, the utility model adopts the following technical solution:Building waste clears system, including clear Transport case, tote bins, two delivery tracks and driving mechanism, two delivery tracks be vertically mounted on construction wall and Left and right is arranged side by side, and driving mechanism is hoist engine, and hoist engine is fixed on architectural top, clears the babinet knot that case is open top Structure clears directive wheel there are four the trailing flank four corners rotation connections of case, and four directive wheels roll respectively is connected to two conveyings On track, the rear side of case is cleared equipped with the elevating mechanism for lifting tote bins;Hoist engine is by steel cable and clears box top company It connects.
Elevating mechanism includes driving motor, upper installation axle, lower installation axle and two guide rails, and two guide rails pass through installation respectively Frame is mounted on the rear side for clearing case, and two guide rails are arranged in vertical and two guide rails or so are arranged side by side, upper installation axle It is rotatably connected between two guide rail upper lateral parts, lower installation axle is rotatably connected between two guide rail following sides, in upper installation axle Equipped with accessary sprocket wheel, lower installation axle is equipped with head sprocket, and driving motor is assemblied in the rear lateral portion for clearing case and is driven with lower installation axle Connection, head sprocket are connect by double strand chain with accessary sprocket wheel, and hanging rod is fixed on the rear half range of double strand chain;A wherein guide rail Top be equipped with upper stroke switch, the lower part of guide rail is equipped with lower stroke switch;
The leading flank top of tote bins is equipped with hook, and the leading flank lower parts of tote bins sets that there are two idler wheel, two idler wheel left sides The right side is arranged side by side, and tote bins are by being hung on hanging rod and two idler wheels are rolled and are connected on two guide rails.
The trailing flank lower part of tote bins is equipped with handle.
Using above-mentioned technical proposal, the utility model has the advantages that:The utility model is specifically clearing building When rubbish, start hoist engine first, hoist engine is pulled up by steel cable clears case until clearing case reaches architectural top, then Hoist engine starts to unclamp steel cable so that clears case and slowly declines, clears after case often transfers a floor, by the building waste of the floor After being packed into tote bins, then makes a gift to someone and cleared in case through tote bins;It clears after case often transfers a floor, you can to the building of the floor Rubbish is cleared up, until clear case rows to ground, completes whole to clear work;
Building waste is packed by tote bins to be cleared the operation principle of case and is:The hook of tote bins is hung on hanging rod first On, start driving motor, driving motor drives lower installation axle rotation, and head sprocket follows lower installation axle to rotate, to head sprocket band Dynamic double strand chain is driven upwards, to which double strand chain drives tote bins to move upwards, after idler wheel touches upper stroke switch, is driven Dynamic motor is stopped, and tote bins are transported to the top for clearing case by double strand chain at this time, then up pull handle so that fortune It send bucket to be rotated up around hanging rod, clears in case to which the building waste in tote bins smoothly slides into, then put down tote bins, transport It send two idler wheels of bucket to be reconnected on two guide rails, is again started up driving motor, driving motor rotates backward so that double Chain-driving tote bins move downward, until idler wheel touches lower stroke switch, driving motor stops;Next the utility model is also It can be used for being lifted up construction material and construction appliance.
In conclusion can quickly and easily be cleared to the rubbish in architecture storey using the utility model, clear Efficient, pollution is small, highly practical.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the schematic diagram cleared on rear side of case;
Fig. 3 is the structural schematic diagram of tote bins.
Specific implementation mode
As shown in Figs. 1-3, the building waste of the utility model clears system, including clears 2, two case 1, tote bins conveyings Track 3 and driving mechanism, two delivery tracks 3 are vertically mounted on construction wall and left and right and are arranged side by side, driving Mechanism is hoist engine, and hoist engine is fixed on architectural top, clears the body structure that case 1 is open top, clears the trailing flank of case 1 There are four directive wheel 4, four directive wheels 4 roll be connected on two delivery tracks 3 respectively, clear case 1 for four corners rotation connection Rear side be equipped with elevating mechanism for lifting tote bins 2;Hoist engine is connect by steel cable 5 with 1 top of case is cleared.
Elevating mechanism includes driving motor 6, upper installation axle 7, lower installation axle 8 and two guide rails 9, and two guide rails 9 lead to respectively It crosses mounting bracket and is mounted on the rear side for clearing case 1, two guide rails 9 are arranged in vertical and two guide rails 9 or so are arranged side by side, Upper installation axle 7 is rotatably connected between two 9 upper lateral parts of guide rail, lower installation axle 8 be rotatably connected on two 9 following sides of guide rail it Between, upper installation axle 7 be equipped with accessary sprocket wheel 10, lower installation axle 8 be equipped with head sprocket 11, driving motor 6 is assemblied in clear case 1 after Side is simultaneously sequentially connected with lower installation axle 8, and head sprocket 11 is connect by double strand chain 12 with accessary sprocket wheel 10, after double strand chain 12 Hanging rod 13 is fixed on half range;The top of wherein one guide rail 9 is equipped with upper stroke switch 14, and the lower part of guide rail 9 is equipped with down stroke Switch 15;
The leading flank top of tote bins 2 is equipped with hook 16, and the leading flank lower parts of tote bins 2 is set there are two idler wheel 17, two Idler wheel 17 or so is arranged side by side, and tote bins 2 are hung on by hook 16 on hanging rod 13 and two rollings of idler wheel 17 are connected to two On guide rail 9.
The trailing flank lower part of tote bins 2 is equipped with handle 18.
The utility model specifically when clearing building waste, starts hoist engine first, and hoist engine is pulled up by steel cable 5 Case 1 is cleared until clearing case 1 reaches architectural top, then hoist engine starts to unclamp steel cable 5 so that clear case 1 and slowly decline, clearly After fortune case 1 often transfers a floor, after the building waste of the floor is packed into tote bins 2, then makes a gift to someone through tote bins 2 and clear case 1 Interior, the course of work that wherein building waste clears case 1 by the loading of tote bins 2 is:The hook 16 of tote bins 2 is hung on first On hanging rod 13, starting driving motor 6, driving motor 6 drives lower installation axle 8 to rotate, and head sprocket 11 follows lower installation axle 8 to rotate, To which head sprocket 11 drives double strand chain 12 to be driven upwards, to which double strand chain 12 drives tote bins 2 to move upwards, when idler wheel 17 After touching upper stroke switch 14, driving motor 6 is stopped, and tote bins 2 are transported to by double strand chain 12 and clear case 1 at this time Top, then up pull handle 18 so that tote bins 2 are rotated up around hanging rod 13, to which the building waste in tote bins 2 is suitable Profit slides into and clears in case 1, then puts down tote bins 2, and two idler wheels 17 of tote bins 2 are reconnected on two guide rails 9, then Secondary startup driving motor 6, driving motor 6 rotates backward so that double strand chain 12 drives tote bins 2 to move downward, until idler wheel 17 touch lower stroke switch 15, and driving motor 6 stops;It clears after case 1 often transfers a floor, you can to the building rubbish of the floor Rubbish is cleared up, until clear 1 row of case to ground, completes whole to clear work.
The present embodiment not makes any form of restriction the shape of the utility model, material, structure etc., every foundation The technical essence of the utility model belongs to this reality to any simple modification, equivalent change and modification made by above example With the protection domain of new technique scheme.

Claims (3)

1. building waste clears system, it is characterised in that:Including clearing case, tote bins, two delivery tracks and driving mechanism, Two delivery tracks are vertically mounted on construction wall and left and right and are arranged side by side, and driving mechanism is hoist engine, hoist engine It is fixed on architectural top, clears the body structure that case is open top, there are four the trailing flank four corners rotation connections for clearing case Directive wheel, four directive wheels roll respectively to be connected on two delivery tracks, and the rear side for clearing case is equipped with for lifting tote bins Elevating mechanism;Hoist engine is connect by steel cable with box top is cleared.
2. building waste according to claim 1 clears system, it is characterised in that:Elevating mechanism include driving motor, on Installation axle, lower installation axle and two guide rails, two guide rails are mounted on the rear side for clearing case by mounting bracket respectively, and two guide rails are equal It being arranged in vertical and two guide rails or so is arranged side by side, upper installation axle is rotatably connected between two guide rail upper lateral parts, under Installation axle is rotatably connected between two guide rail following sides, and upper installation axle is equipped with accessary sprocket wheel, and lower installation axle is equipped with head sprocket, Driving motor is assemblied in the rear lateral portion for clearing case and is sequentially connected with lower installation axle, and head sprocket is connected by double strand chain and accessary sprocket wheel It connects, hanging rod is fixed on the rear half range of double strand chain;The top of wherein one guide rail is equipped with upper stroke switch, and the lower part of guide rail is set There is lower stroke switch;
The leading flank top of tote bins is equipped with hook, and the leading flank lower parts of tote bins sets that there are two idler wheels, and two idler wheels or so are simultaneously Row's setting, tote bins are by being hung on hanging rod and two idler wheels are rolled and are connected on two guide rails.
3. building waste according to claim 1 clears system, it is characterised in that:The trailing flank lower part of tote bins is equipped with handle Hand.
CN201820411443.3U 2018-03-26 2018-03-26 Building waste clears system Expired - Fee Related CN208070608U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820411443.3U CN208070608U (en) 2018-03-26 2018-03-26 Building waste clears system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820411443.3U CN208070608U (en) 2018-03-26 2018-03-26 Building waste clears system

Publications (1)

Publication Number Publication Date
CN208070608U true CN208070608U (en) 2018-11-09

Family

ID=64047779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820411443.3U Expired - Fee Related CN208070608U (en) 2018-03-26 2018-03-26 Building waste clears system

Country Status (1)

Country Link
CN (1) CN208070608U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112374004A (en) * 2020-11-26 2021-02-19 武汉慕都环境科技有限公司 Intelligent garbage collection device and collection and transportation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112374004A (en) * 2020-11-26 2021-02-19 武汉慕都环境科技有限公司 Intelligent garbage collection device and collection and transportation system

Similar Documents

Publication Publication Date Title
CN104828489B (en) Continuous conveying method for support plate bogie continuous feeding plate conveying device
CN101845908B (en) Tower type three-dimensional garage and lifting system thereof
CN205709740U (en) A kind of side suspension type lane stacker
CN105836670A (en) Trolley for wallboard installing
CN104528526B (en) Prefabricated non-slag rail plate air turning device
CN207877063U (en) A kind of cargo lift anti-slip device
CN208070608U (en) Building waste clears system
CN203048449U (en) Self-propelled brick loading machine for brick yard
CN206071169U (en) A kind of parking systems
CN206255769U (en) A kind of driving for overturning die cap
CN210480526U (en) Lifting device using steel structure elevator shaft as vertical transportation channel
CN202465162U (en) Small electric lifting feeding machine for building
CN2675629Y (en) Vertical elevator
CN2780900Y (en) Carrying device and auxiliary mechanism
CN107401304A (en) A kind of double-deck stereo lugs
CN202937278U (en) Rapid duct piece back conveying mechanism for subway shield tunnel construction
CN104058236A (en) Efficient original wool feeding device with traveling crane
CN104912369B (en) A kind of AisleStack three-dimensional parking device and vehicle access method
CN212892867U (en) Portable simple loading and transporting platform
CN211850704U (en) A suspension type moving platform for steel construction installation
CN204685046U (en) Premix device
CN203269444U (en) Household lifting device
CN208182415U (en) A kind of building waste automatic transportation equipment
CN208802589U (en) A kind of organic garbage treatment feeding device
CN207016318U (en) A kind of inlet and outlet device of Cargo Lift elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

Termination date: 20190326