CN208009467U - A kind of foundation bolt installation control device - Google Patents
A kind of foundation bolt installation control device Download PDFInfo
- Publication number
- CN208009467U CN208009467U CN201820402035.1U CN201820402035U CN208009467U CN 208009467 U CN208009467 U CN 208009467U CN 201820402035 U CN201820402035 U CN 201820402035U CN 208009467 U CN208009467 U CN 208009467U
- Authority
- CN
- China
- Prior art keywords
- foundation bolt
- control device
- bolt
- fixed frame
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model is related to a kind of foundation bolts to install control device, include the positioning mold and locating support for controlling building foundation pre-embedded anchoring bolts position;The positioning mold includes positioning plate, abutment sleeve and location nut;The locating support includes fixed frame, sliding bar and telescopic supporting rod;The sliding bar is bolted to connection with fixed frame;The positioning plate is bolted to connection with sliding bar;The foundation bolt installs control device reasonable design, simple in structure, has the horizontal relative position, pre-buried height and verticality of controllably foot bolt, accelerates the construction speed at scene, high recycling rate, it is good in economic efficiency the advantages that.
Description
Technical field
The utility model is related to the realm of building construction, specifically a kind of foundation bolt installs control device.
Background technology
Steel-structure factory building engineering in general is required for pre-embedded anchoring bolts, and traditional embedding anchor bolts mode is by every
Foundation bolt first carries out spot welding with reinforcement foundation according to setting-out situation and fixes, and then adjusts every lower margin by horizon rule again
The verticality of bolt, this installation method can not effectively control under every steel column due to being influenced greatly by reinforcing bar and template installation
Horizontal relative position, pre-buried height and verticality of each foundation bolt etc., cause later stage steel column difficult to install, and construction quality is not
Phenomena such as easy to control.
Utility model content
In order to solve the above problem present in the prior art, the utility model provides a kind of foundation bolt installation control
Device, it can efficiently control the horizontal relative position, pre-buried height and verticality of foundation bolt, while can accelerate scene
Construction speed and high recycling rate, saved project cost, have good economic benefit.
The technical solution of the utility model is as follows:
A kind of foundation bolt installation control device, includes the positioning mould for controlling building foundation pre-embedded anchoring bolts position
Has and is used to support the locating support of positioning mold;The positioning mold includes horizontally disposed positioning plate and multiple positioning
Nut;The positioning plate is provided through multiple location holes up and down, right above and below the installation site of the location hole and foundation bolt
It answers;The foundation bolt is upwardly extended across location hole from top to bottom, and the upper end is threadedly coupled with location nut;The positioning
Holder includes the telescopic supporting rod that horizontally disposed fixed frame, two sliding bars and multiple upper ends are fixedly connected with fixed frame;
Fixed frame opposite sides side is provided through No.1 sliding groove parallel to each other up and down, and the sliding bar both ends are equal up and down
It is provided through No.1 limit hole, No.1 locking device passes through No.1 sliding groove with No.1 limit hole that two sliding bars are parallel solid
It is scheduled on fixed frame;Two sliding bars are provided through No. two sliding grooves up and down along its length, and the positioning plate is opposite
Both sides are provided through No. two limit holes up and down, and No. two locking devices pass through No. two sliding grooves and No. two limit holes by positioning plate
It is horizontally fixed on two sliding bars;The No.1 sliding groove and No. two sliding grooves are orthogonal.
Further, the positioning plate lower end is vertically fixed multiple positioning for controlling foundation bolt installation verticality
Sleeve;The abutment sleeve is coaxially disposed and interconnects with location hole.
Further, the telescopic supporting rod includes that screw rod and support tube is turned up;The height-regulating screw rod upper end and fixation
Frame is fixed vertically, and lower end is embedded in support tube, and the height-regulating screw rod is threadedly coupled with support tube.
Further, the No.1 locking device includes No.1 bolt and No.1 nut;The No.1 bolt is from top to bottom
It sequentially passes through No.1 sliding groove and No.1 limit hole and is fitted close with No.1 nut.
Further, No. two locking devices include No. two bolts and No. two nuts;No. two bolts are from top to bottom
It sequentially passes through No. two sliding grooves and No. two limit holes and is fitted close with No. two nuts.
The utility model has the advantages that:
1, a kind of foundation bolt of the utility model installs control device, can effectively control the opposite position of level of foundation bolt
It sets.According to site operation demand, the peace of sliding bar and positioning plate is adjusted respectively by No.1 locking device and No. two locking devices
Holding position, to control embedding anchor bolts positions from two dimensions of level, and prefabricated abutment sleeve can control and be adjacent to
Relative position between foot bolt.
2, a kind of foundation bolt of the utility model installs control device, can effectively control the pre-buried height of foundation bolt.It adjusts
Retractable support pole length is adjusted in the cooperation position of high screw rod and support tube, preliminary to adjust foundation bolt mounting height, mutually solely
It is changeable to erect the telescopic supporting rod set, is suitable for rough construction site, and adjust foundation bolt and location nut
Cooperation position can further control the pre-buried height of foundation bolt.
3, a kind of foundation bolt of the utility model installs control device, can effectively control the vertical degree of foundation bolt.Vertically
The abutment sleeve of setting can run-off the straight when pre-buried of operative constraint foundation bolt, effectively control embedding anchor bolts after it is vertical
Degree.
4, a kind of foundation bolt of the utility model installs control device, and cost of investment is low.Foundation bolt installation control dress
Set simple in structure, production material is easy to get, and can be mass, and cost of investment is low.
5, a kind of foundation bolt of the utility model installs control device, and utilization benefit is good.Prefabricated foundation bolt installation
Control device is easy to operate, can effectively control foundation bolt installation site, accelerates site operation progress, high recycling rate, warp
It helps profitable.
Description of the drawings
Fig. 1 is the structural schematic diagram that a kind of foundation bolt of the utility model installs control device;
Fig. 2 is the structural schematic diagram that a kind of foundation bolt of the utility model installs control device mounting foot bolt;
Fig. 3 is the positioning rack structure schematic diagram that a kind of foundation bolt of the utility model installs control device;
Fig. 4 is the positioning mold structural schematic diagram that a kind of foundation bolt of the utility model installs control device.
Reference numeral is expressed as in figure:
1, foundation bolt;2, positioning mold;20, positioning plate;200, location hole;201, No. two limit holes;21, spiral shell is positioned
It is female;22, abutment sleeve;3, locating support;30, fixed frame;300, No.1 sliding groove;31, sliding bar;310, No.1 limit hole;
311, No. two sliding grooves;32, telescopic supporting rod;320, screw rod is turned up;321, support tube;33, No.1 locking device;330, No.1
Bolt;331, No.1 nut;34, No. two locking devices;340, No. two bolts;341, No. two nuts;4, building foundation.
Specific implementation mode
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
Referring to Fig. 1 to Fig. 4, a kind of foundation bolt installation control device, including it is used to control 4 pre-buried lower margin spiral shell of building foundation
The positioning mold 2 of 1 position of bolt and the locating support 3 for being used to support positioning mold 2;The positioning mold 2 includes horizontally disposed
Positioning plate 20 and multiple location nuts 21;About 20 positioning plate is provided through multiple location holes 200, the positioning
Hole 200 is corresponding up and down with the installation site of foundation bolt 1;The foundation bolt 1 prolongs across location hole 200 upwards from top to bottom
It stretches, and the upper end is threadedly coupled with location nut 21, the outer diameter of the location nut 21 is more than the internal diameter of location hole 200;It is described
Locating support 3 includes that 30, two sliding bars 31 of horizontally disposed fixed frame and multiple upper ends are fixedly connected with fixed frame 30
Telescopic supporting rod 32;30 opposite sides side of the fixed frame is provided through No.1 sliding groove 300 parallel to each other, institute up and down
It states 31 both ends of sliding bar and is provided through No.1 limit hole 310 up and down, No.1 locking device 33 passes through 300 He of No.1 sliding groove
No.1 limit hole 310 is fixed on two sliding bars 31 are parallel on fixed frame 30;Two sliding bars 31 along its length on
Under be provided through No. two sliding grooves 311,20 opposite sides of the positioning plate is provided through No. two limit holes 201 up and down,
No. two locking devices 34 pass through No. two sliding grooves 311 and No. two limit holes 201 that positioning plate 20 is horizontally fixed on two sliding bars 31
On;The No.1 sliding groove 300 and No. two sliding grooves 311 are orthogonal, to realize that two vertical direction of level adjust positioning mould
The position of tool 2.
As shown in Figure 1, Figure 2 and Figure 4,20 lower end of the positioning plate is vertically fixed multiple for controlling the peace of foundation bolt 1
Fill the abutment sleeve 22 of verticality;The abutment sleeve 22 is coaxially disposed and interconnects with location hole 200.
As depicted in figs. 1 and 2, the telescopic supporting rod 32 includes that screw rod 320 and support tube 321 is turned up;The height-regulating
320 upper end of screw rod is fixed vertically with fixed frame 30, and lower end is embedded in support tube 321, the height-regulating screw rod 320 and support tube 321
It is threadedly coupled.
As shown in Figure 1 to Figure 3, the No.1 locking device 33 includes No.1 bolt 330 and No.1 nut 331;Described one
Number bolt 330 sequentially passes through No.1 sliding groove 300 and No.1 limit hole 310 and is fitted close with No.1 nut 331 from top to bottom,
It is fixed on two sliding bars 31 are parallel on fixed frame 30.
As shown in Figures 1 to 4, No. two locking devices 34 include No. two bolts 340 and No. two nuts 341;Described two
Number bolt 340 sequentially passes through No. two sliding grooves 311 and No. two limit holes 201 and is fitted close with No. two nuts 341 from top to bottom,
Positioning plate 20 is horizontally fixed on two sliding bars 31.
The operation principle of the utility model:
A kind of foundation bolt of the utility model installs control device in use, locating support 3 is placed on lower margin spiral shell first
1 pre-buried position of bolt, by tentatively adjusting the relative position change adjusting telescopic supporting rod 32 that screw rod 320 is turned up with support tube 321
Length, to meet the pre-buried height of foundation bolt 1, and independently arranged telescopic supporting rod 32 is changeable mutually, is suitable for recessed
The construction site of convex injustice;Then, foundation bolt 1 is passed through to abutment sleeve 22, location hole 200 and location nut 21 from the bottom up
Cooperation, so that foundation bolt 1 is hung on positioning mold 2, being fixed on the abutment sleeve 22 of 20 lower end of positioning plate vertically can effectively control
The pre-buried verticality of foundation bolt 1 processed;Secondly according to live practice of construction demand, sliding bar is controlled by No.1 locking device 33
31 with the fixed position of fixed frame 30, the fixed position of positioning plate 20 and sliding bar 31 is controlled by No. two locking devices 34, from
And the pre-buried horizontal relative position of foundation bolt 1 is accurately adjusted in two dimensions of level;Again according to pre- needed for foundation bolt 1
The height buried, the relative position that the screw thread by adjusting 1 upper end of foundation bolt coordinates with location nut 21, further controls lower margin
The mounting height of bolt 1;Finally to the end of site operation, after foundation bolt 1 is stably fixed on building foundation 4, you can unscrewing
The foundation bolt is installed control device and is quickly removed on the foundation bolt 1 after pre-buried by location nut 21;Therefore, according to
The upper step, abutment sleeve 22 can effectively control moving horizontally for foundation bolt 1, the location nut 21 and gravity of upper end cooperation
Effect can effectively control foundation bolt 1 and move up and down, to the pre-buried horizontal relative position of effectively control foundation bolt 1, vertically
Height and verticality, and be not easy to change 1 pre-buried position of foundation bolt because of construction in later period, pre-buried accuracy is high;According to live institute
Need the type of pre-embedded anchoring bolts 1, can prefabricated corresponding positioning mold 2 so that the position of abutment sleeve 22 and 1 institute of foundation bolt
It needs pre-buried position to correspond, effectively accelerates site operation progress, and profit can be repeated several times in foundation bolt installation control device
With saving use cost has good economic benefit.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every
Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is applied directly or indirectly in
Other related technical areas are equally included in the patent within the scope of the utility model.
Claims (5)
1. a kind of foundation bolt installs control device, it is characterised in that:Including being used to control building foundation(4)Pre-embedded anchoring bolts
(1)The positioning mold of position(2)And it is used to support positioning mold(2)Locating support(3);The positioning mold(2)Including
Horizontally disposed positioning plate(20)And multiple location nuts(21);The positioning plate(20)It is provided through multiple positioning up and down
Hole(200), the location hole(200)With foundation bolt(1)Installation site it is corresponding up and down;The foundation bolt(1)From it is lower to
On across location hole(200)It upwardly extends, and the upper end and location nut(21)It is threadedly coupled;The locating support(3)Including
Horizontally disposed fixed frame(30), two sliding bars(31)And multiple upper ends and fixed frame(30)The retractable support being fixedly connected
Bar(32);The fixed frame(30)Opposite sides side is provided through No.1 sliding groove parallel to each other up and down(300), described
Sliding bar(31)Both ends are provided through No.1 limit hole up and down(310), No.1 locking device(33)Across No.1 sliding groove
(300)With No.1 limit hole(310)By two sliding bars(31)It is parallel to be fixed on fixed frame(30)On;Two sliding bars(31)
It is provided through No. two sliding grooves up and down along its length(311), the positioning plate(20)Opposite sides runs through up and down to be set
It is equipped with No. two limit holes(201), No. two locking devices(34)Across No. two sliding grooves(311)With No. two limit holes(201)It will determine
Position plate(20)It is horizontally fixed on two sliding bars(31)On;The No.1 sliding groove(300)With No. two sliding grooves(311)It hangs down mutually
Directly.
2. a kind of foundation bolt as described in claim 1 installs control device, it is characterised in that:The positioning plate(20)Lower end
It is vertically fixed multiple for controlling foundation bolt(1)The abutment sleeve of verticality is installed(22);The abutment sleeve(22)With
Location hole(200)It is coaxially disposed and interconnects.
3. a kind of foundation bolt as described in claim 1 installs control device, it is characterised in that:The telescopic supporting rod(32)
Including screw rod is turned up(320)And support tube(321);The height-regulating screw rod(320)Upper end and fixed frame(30)It is vertical fixed,
Lower end is embedded in support tube(321), the height-regulating screw rod(320)With support tube(321)It is threadedly coupled.
4. a kind of foundation bolt as described in claim 1 installs control device, it is characterised in that:The No.1 locking device
(33)Including No.1 bolt(330)With No.1 nut(331);The No.1 bolt(330)No.1 cunning is sequentially passed through from top to bottom
Dynamic slot(300)And No.1 limit hole(310)And with No.1 nut(331)It is fitted close.
5. a kind of foundation bolt as described in claim 1 installs control device, it is characterised in that:No. two locking devices
(34)Including No. two bolts(340)With No. two nuts(341);No. two bolts(340)No. two cunnings are sequentially passed through from top to bottom
Dynamic slot(311)And No. two limit holes(201)And with No. two nuts(341)It is fitted close.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820402035.1U CN208009467U (en) | 2018-03-23 | 2018-03-23 | A kind of foundation bolt installation control device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820402035.1U CN208009467U (en) | 2018-03-23 | 2018-03-23 | A kind of foundation bolt installation control device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208009467U true CN208009467U (en) | 2018-10-26 |
Family
ID=63890645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820402035.1U Active CN208009467U (en) | 2018-03-23 | 2018-03-23 | A kind of foundation bolt installation control device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208009467U (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629594A (en) * | 2018-12-29 | 2019-04-16 | 国家电网有限公司 | Foundation bolt alignment device |
CN109944270A (en) * | 2019-04-04 | 2019-06-28 | 河北建设勘察研究院有限公司 | A kind of photo-thermal power station tower foundation foundation bolt fast-positioning device |
CN110761419A (en) * | 2019-10-29 | 2020-02-07 | 袁建华 | Construction method for three-dimensional positioning accuracy of prefabricated house foundation connecting piece |
CN111502307A (en) * | 2020-05-01 | 2020-08-07 | 重庆交通大学 | Multidirectional positioning device and positioning method for underground embedded steel pipe column |
CN111676818A (en) * | 2020-06-04 | 2020-09-18 | 中铁六局集团有限公司 | Multifunctional die body structure of bridge supporting pad stone and operation method |
CN112112189A (en) * | 2019-06-21 | 2020-12-22 | 航天长征化学工程股份有限公司 | Foundation bolt fixing mechanism |
CN112482796A (en) * | 2020-11-18 | 2021-03-12 | 中铁大桥局集团有限公司 | Railway sound barrier embedded part accurate positioning device and construction method |
CN112663658A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool for embedded part of assembly type building |
CN112663651A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool suitable for assembled building embedded part |
CN113006288A (en) * | 2021-03-03 | 2021-06-22 | 重庆科技学院 | Integral positioning device for embedded counter-force ground anchor and construction method |
CN113107002A (en) * | 2021-03-23 | 2021-07-13 | 中铁十六局集团有限公司 | Bearing platform embedded bolt |
CN113404079A (en) * | 2021-06-02 | 2021-09-17 | 中交(昆明)建设有限公司 | Lamp pole foundation installation adjusting device and construction method |
CN113565125A (en) * | 2021-09-01 | 2021-10-29 | 上海电力设计院有限公司 | Foundation bolt positioning device suitable for power transmission tower |
CN114703888A (en) * | 2022-06-07 | 2022-07-05 | 中国二十二冶集团有限公司 | Mounting rack for direct-buried embedded foundation bolt |
CN114960787A (en) * | 2022-05-31 | 2022-08-30 | 南京海骏绿建科技有限公司 | Construction device and method for leveling plant foundation |
CN115305947A (en) * | 2022-08-10 | 2022-11-08 | 中国十七冶集团有限公司 | Foundation bolt fast positioning and mounting device for producing basic short column of steel structure factory building |
CN115492403A (en) * | 2022-10-09 | 2022-12-20 | 浙江省一建建设集团有限公司 | Combined type precise positioning construction device for tower footing steel latticed column |
CN115506393A (en) * | 2022-10-09 | 2022-12-23 | 中国建筑第八工程局有限公司 | Embedded bolt positioning and mounting device and construction method thereof |
CN116025171A (en) * | 2022-12-30 | 2023-04-28 | 中铁五局集团有限公司 | Construction method for positioning and mounting ultra-long screw |
-
2018
- 2018-03-23 CN CN201820402035.1U patent/CN208009467U/en active Active
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629594A (en) * | 2018-12-29 | 2019-04-16 | 国家电网有限公司 | Foundation bolt alignment device |
CN109944270A (en) * | 2019-04-04 | 2019-06-28 | 河北建设勘察研究院有限公司 | A kind of photo-thermal power station tower foundation foundation bolt fast-positioning device |
CN112112189A (en) * | 2019-06-21 | 2020-12-22 | 航天长征化学工程股份有限公司 | Foundation bolt fixing mechanism |
CN112112189B (en) * | 2019-06-21 | 2024-10-18 | 航天长征化学工程股份有限公司 | Rag bolt fixed establishment |
CN110761419A (en) * | 2019-10-29 | 2020-02-07 | 袁建华 | Construction method for three-dimensional positioning accuracy of prefabricated house foundation connecting piece |
CN111502307A (en) * | 2020-05-01 | 2020-08-07 | 重庆交通大学 | Multidirectional positioning device and positioning method for underground embedded steel pipe column |
CN111676818A (en) * | 2020-06-04 | 2020-09-18 | 中铁六局集团有限公司 | Multifunctional die body structure of bridge supporting pad stone and operation method |
CN111676818B (en) * | 2020-06-04 | 2022-04-12 | 中铁六局集团有限公司 | Multifunctional die body structure of bridge supporting pad stone |
CN112663658A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool for embedded part of assembly type building |
CN112663651A (en) * | 2020-06-19 | 2021-04-16 | 杨春娥 | Embedded positioning tool suitable for assembled building embedded part |
CN112482796A (en) * | 2020-11-18 | 2021-03-12 | 中铁大桥局集团有限公司 | Railway sound barrier embedded part accurate positioning device and construction method |
CN113006288A (en) * | 2021-03-03 | 2021-06-22 | 重庆科技学院 | Integral positioning device for embedded counter-force ground anchor and construction method |
CN113006288B (en) * | 2021-03-03 | 2022-09-23 | 重庆科技学院 | Integral positioning device for embedded counter-force ground anchor and construction method |
CN113107002A (en) * | 2021-03-23 | 2021-07-13 | 中铁十六局集团有限公司 | Bearing platform embedded bolt |
CN113404079A (en) * | 2021-06-02 | 2021-09-17 | 中交(昆明)建设有限公司 | Lamp pole foundation installation adjusting device and construction method |
CN113565125A (en) * | 2021-09-01 | 2021-10-29 | 上海电力设计院有限公司 | Foundation bolt positioning device suitable for power transmission tower |
CN114960787A (en) * | 2022-05-31 | 2022-08-30 | 南京海骏绿建科技有限公司 | Construction device and method for leveling plant foundation |
CN114703888A (en) * | 2022-06-07 | 2022-07-05 | 中国二十二冶集团有限公司 | Mounting rack for direct-buried embedded foundation bolt |
CN115305947A (en) * | 2022-08-10 | 2022-11-08 | 中国十七冶集团有限公司 | Foundation bolt fast positioning and mounting device for producing basic short column of steel structure factory building |
CN115305947B (en) * | 2022-08-10 | 2023-08-25 | 中国十七冶集团有限公司 | Quick positioning and mounting device for foundation bolts for production of foundation short columns of steel structure factory buildings |
CN115492403A (en) * | 2022-10-09 | 2022-12-20 | 浙江省一建建设集团有限公司 | Combined type precise positioning construction device for tower footing steel latticed column |
CN115506393A (en) * | 2022-10-09 | 2022-12-23 | 中国建筑第八工程局有限公司 | Embedded bolt positioning and mounting device and construction method thereof |
CN116025171A (en) * | 2022-12-30 | 2023-04-28 | 中铁五局集团有限公司 | Construction method for positioning and mounting ultra-long screw |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208009467U (en) | A kind of foundation bolt installation control device | |
CN202731297U (en) | Adjustable beam form support jacking bracket apparatus | |
CN210766774U (en) | Positioning device for steel reinforcement cage and lattice column | |
CN201991241U (en) | Steel structural upright column foundation bolt positioning device | |
CN103498555B (en) | Adjustable large-area terrace slot steel template system and construction method thereof | |
CN104895279A (en) | Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure | |
CN207794608U (en) | A kind of adjustable support for shuttering of movement for groove construction column | |
CN106760615A (en) | A kind of ruggedized construction and its construction method for shear wall concrete replacement | |
CN206815369U (en) | Built-in fitting Fast Installation precise adjusting device | |
CN110670873B (en) | Support system of steel formwork of ultrahigh large-section concrete column and construction method | |
CN106958233B (en) | For pouring the hydraulic self-lifting formula cantilever form construction method of Arch Dam Concrete | |
CN212052207U (en) | Concrete strickles device for construction | |
CN110939261B (en) | Double outer scaffold of dish knot formula structure of encorbelmenting | |
CN203347247U (en) | Preinstallation floor type support for brick masonry inner wire box | |
CN110409320A (en) | A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope | |
CN202865867U (en) | Pre-buried screw spatial locator | |
CN206784605U (en) | A kind of wall extends embedded iron parts installation structure | |
CN102653947B (en) | Underground embedded steel component limiting straightening construction method | |
CN203160707U (en) | Adjustable t-shaped controller | |
CN206001411U (en) | A kind of adjustable light pole base apparatuses | |
CN209211486U (en) | The fixed bracket of recyclable pre-embedded anchoring bolts | |
CN204597304U (en) | A kind of distributing box fixing device for installing | |
CN218493144U (en) | Steel construction stand pre-buried clamping screw positioner | |
CN202544394U (en) | Early-dismounting template system | |
CN205804905U (en) | Adjustable concrete pavement template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |