CN207905336U - A kind of construction site new type scaffold - Google Patents
A kind of construction site new type scaffold Download PDFInfo
- Publication number
- CN207905336U CN207905336U CN201820135008.2U CN201820135008U CN207905336U CN 207905336 U CN207905336 U CN 207905336U CN 201820135008 U CN201820135008 U CN 201820135008U CN 207905336 U CN207905336 U CN 207905336U
- Authority
- CN
- China
- Prior art keywords
- fixed
- overstriking
- vertical pole
- brace
- close
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a kind of construction site new type scaffolds, it is whole solid with No.1 overstriking including scaffold, the lower end of the scaffold entirety is installed with firm banking, and one end of firm banking is installed with fixing bolt plate, one end of the fixing bolt plate is installed with set square close to the position of scaffold entirety side, the solid side of the No.1 overstriking is installed with fixed vertical pole, and the leading exterior surface of fixed vertical pole is installed with fixed transverse rod close to the solid intermediate position of No.1 overstriking, the leading exterior surface of the fixed transverse rod is installed with brace close to the position of firm banking one end, and position of the inner surface of fixed transverse rod below brace is equipped with fixed screw.A kind of construction site new type scaffold described in the utility model is equipped with set square, Work protection plate and safety rope, can improve the stability of scaffold, and can improve the safety of staff's work, brings better prospect of the application.
Description
Technical field
The utility model is related to scaffold field, more particularly to a kind of construction site new type scaffold.
Background technology
Scaffold refers to construction site as operation and solves vertically and horizontally to transport the various holders set up, architecture field
Refer to and is used in exterior wall and interior decoration or the higher place that can not directly construct of floor height on construction site;Existing scaffold is using
When there are certain drawbacks, the fixed effect of traditional scaffold is not strong, it can not be made preferably to be fixed with ground, use tool
There is limitation, the safety used is relatively low, and certain influence is brought using process to people, for this purpose, it is proposed that a kind of
Construction site new type scaffold.
Utility model content
The main purpose of the utility model is to provide a kind of construction site new type scaffolds, can effectively solve background
The problems in technology.
To achieve the above object, the technical solution that the utility model is taken is:
A kind of construction site new type scaffold, including scaffold are whole solid with No.1 overstriking, the scaffold entirety
Lower end is installed with firm banking, and one end of firm banking is installed with fixing bolt plate, one end of the fixing bolt plate
It is installed with set square close to the position of scaffold entirety side, the solid side of the No.1 overstriking is installed with fixed vertical
Bar, and the leading exterior surface of fixed vertical pole is installed with fixed transverse rod, the fixation close to the solid intermediate position of No.1 overstriking
The leading exterior surface of cross bar is installed with brace close to the position of firm banking one end, and the inner surface of fixed transverse rod is close to tiltedly
Position below bar is equipped with fixed screw, and the upper end of the fixed vertical pole is installed with No. two close to the position of brace one end
Overstriking fixed link, and the lower end of fixed vertical pole is installed with standing plate, the lower end of the standing plate is installed with work and prevents
Backplate, and the upper end of standing plate is installed with rope fixed link close to the position of fixed vertical pole side, the standing plate it is upper
Side is equipped with fender rod, and position of the side of rope fixed link above fixed vertical pole is equipped with sliding groove, the sliding
The lower end of slot is movably installed with safety rope, and the lower end of No. two overstriking fixed links passes through the solid upper end of No.1 overstriking and fixed bottom
The upper end of seat is fixedly connected, and one end of No. two overstriking fixed links is fixed by one end and one end of fixing bolt plate of set square
Connection.
Preferably, the quantity of the fixing bolt plate, set square, brace and fixed steelring is two groups, and brace and fixation
Every group of quantity of steel ring is two.
Preferably, the quantity of the fixed vertical pole, fixed transverse rod and fixed screw is three groups, and fixed vertical pole with it is solid
Every group of quantity for determining screw is six.
Preferably, the inner surface of the brace is installed with reinforcing pile close to the position of No. two overstriking fixed link one end,
The quantity of reinforcing pile is four groups.
Preferably, the upper end of the sliding groove is installed with cableway fixed link close to the position of rope fixed link upper end,
And the quantity of sliding groove is two groups.
Preferably, position of the outer surface of the brace above fixed transverse rod is equipped with fixed steelring, and fixed steel
The inner surface of circle is fixedly connected by the outer surface of the outer surface fixed transverse rod of brace.
Compared with prior art, the utility model has the advantages that:The construction site new type scaffold uses
Set square can preferably fix scaffold with ground, improve the fixed effect of scaffold, use to improving scaffold
Safety enables staff preferably to work using Work protection plate, and can prevent staff from working when turns forward
And danger is generated, staff can preferably be connect with safety equipment using safety rope, while not influencing work, further
The safety of staff's work is improved, whole device is easy to operate, easy to use, and fixed and safety effect is relative to tradition
Mode is more preferable.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of construction site new type scaffold of the utility model.
Fig. 2 is a kind of partial view of construction site new type scaffold of the utility model.
In figure:1, scaffold is whole;2, firm banking;3, fixing bolt plate;4, set square;5, No.1 overstriking fixed link;6、
Fixed vertical pole;7, fixed transverse rod;8, brace;9, fixed screw;10, fixed steelring;11, No. two overstriking fixed links;12, it stands
Plate;13, Work protection plate;14, rope fixed link;15, fender rod;16, cableway fixed link;17, sliding groove;18, safety rope.
Specific implementation mode
To make the technical means, creative features, achievement of purpose, and effectiveness of the utility model be easy to understand, below
In conjunction with specific implementation mode, the utility model is expanded on further.
As shown in Figs. 1-2, a kind of construction site new type scaffold, including scaffold whole 1 and No.1 overstriking solid 5, foot
The lower end of hand cradle whole 1 is installed with firm banking 2, and one end of firm banking 2 is installed with fixing bolt plate 3, fixed
One end of bolt plate 3 is installed with set square 4 close to the position of whole 1 side of scaffold, and peace is fixed in the side of No.1 overstriking solid 5
Equipped with fixed vertical pole 6, and position of the leading exterior surface of fixed vertical pole 6 among No.1 overstriking solid 5 is installed with fixation
The leading exterior surface of cross bar 7, fixed transverse rod 7 is installed with brace 8, and fixed transverse rod 7 close to the position of 2 one end of firm banking
Inner surface fixed screw 9 is installed close to the position of the lower section of brace 8, the position of the upper end of fixed vertical pole 6 close to 8 one end of brace
No. two overstriking fixed links 11 are installed with, and the lower end of fixed vertical pole 6 is installed with standing plate 12, the lower end of standing plate 12
It is installed with Work protection plate 13, and the upper end of standing plate 12 is installed with rope close to the position of 6 side of fixed vertical pole
The top of fixed link 14, standing plate 12 is equipped with fender rod 15, and the side of rope fixed link 14 is close to 6 top of fixed vertical pole
Position is equipped with sliding groove 17, and the lower end of sliding groove 17 is movably installed with safety rope 18, and the lower end of No. two overstriking fixed links 11 is logical
The upper end for crossing No.1 overstriking solid 5 is fixedly connected with the upper end of firm banking 2, and one end of No. two overstriking fixed links 11 passes through set square
4 one end is fixedly connected with one end of fixing bolt plate 3.
Fixing bolt plate 3, set square 4, brace 8 and the quantity of fixed steelring 10 are two groups, and brace 8 and fixed steelring 10
Every group of quantity be two, improve the symmetry of scaffold whole 1, its use made more to stablize;Fixed vertical pole 6, fixed transverse rod 7
Quantity with fixed screw 9 is three groups, and fixed vertical pole 6 and every group of quantity with fixed screw 9 are six, can be better
Fixed vertical pole 6 is fixed with fixed transverse rod 7, improves fixed effect;The inner surface of brace 8 is close to No. two 11 one end of overstriking fixed link
Position be installed with reinforcing pile, the quantity of reinforcing pile is four groups, can increase the fixed effect of No. two overstriking fixed links 11;
The upper end of sliding groove 17 is installed with cableway fixed link 16, and the number of sliding groove 17 close to the position of 14 upper end of rope fixed link
Amount is two groups, improves the safety that people use;Position of the outer surface of brace 8 above fixed transverse rod 7 is equipped with fixation
Steel ring 10, and the inner surface of fixed steelring 10 is fixedly connected by the outer surface of the outer surface fixed transverse rod 7 of brace 8, can be incited somebody to action
Brace 8 is preferably fixed with fixed transverse rod 7, to improve the safety that people use.
It should be noted that the utility model is a kind of construction site new type scaffold, firm banking 2 is fixed on ground
Face, and being reinforced using fixing bolt plate 3, using No.1 overstriking solid 5 and No. two overstriking fixed links 11 by the upper end of scaffold whole 1 and
Both sides are fixed, and are fixed fixed vertical pole 6 with fixed transverse rod 7 using fixed screw 9, and improve stability, and cooperation brace 8 adds
Gu and it is even closer so that brace 8, fixed vertical pole 6 is connect with fixed transverse rod 7 by fixed steelring 10, use is more stable, in conjunction with three
Gusset 4 improves the fixed effect of scaffold whole 1 and ground, and so that staff is stood by standing plate 12 and work, lead to above
It crosses Work protection plate 13 to protect the working face of staff, improves the safety that scaffold whole 1 uses, coordinate rope
Fixed link 14 fixes cableway fixed link 16, and so that safety rope 18 is moved by sliding groove 17, and safety rope 18 is fastened and is being worked
On the body of personnel, the safety of staff's work is improved, it is more practical.
The advantages of basic principles and main features and the utility model of the utility model have been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the present utility model is not limited to the above embodiments, described in above embodiments and description
Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also
It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model
Claimed range is defined by the appending claims and its equivalent thereof.
Claims (6)
1. a kind of construction site new type scaffold, including scaffold whole (1) and No.1 overstriking are admittedly (5), it is characterised in that:Institute
The lower end for stating scaffold whole (1) is installed with firm banking (2), and one end of firm banking (2) is installed with fixation
One end of bolt plate (3), the fixing bolt plate (3) is installed with set square (4) close to the position of whole (1) side of scaffold,
The side of the No.1 overstriking solid (5) is installed with fixed vertical pole (6), and the leading exterior surface of fixed vertical pole (6) is close to one
The intermediate position of number overstriking solid (5) is installed with fixed transverse rod (7), and the leading exterior surface of the fixed transverse rod (7) is close to solid
The position for determining pedestal (2) one end is installed with brace (8), and position of the inner surface of fixed transverse rod (7) below brace (8)
It sets and fixed screw (9) is installed, the upper end of the fixed vertical pole (6) is installed with No. two close to the position of brace (8) one end
Overstriking fixed link (11), and the lower end of fixed vertical pole (6) is installed with standing plate (12), the lower end of the standing plate (12) is solid
Dingan County is equipped with Work protection plate (13), and the upper end of standing plate (12) is installed with close to the position of fixed vertical pole (6) side
Rope fixed link (14) is equipped with fender rod (15) above the standing plate (12), and the side of rope fixed link (14) is leaned on
Position above nearly fixed vertical pole (6) is equipped with sliding groove (17), and the lower end of the sliding groove (17) is movably installed with safety rope
(18), the lower end of No. two overstriking fixed links (11) is solid by the upper end of No.1 overstriking solid (5) and the upper end of firm banking (2)
Fixed connection, one end of No. two overstriking fixed links (11) is fixed by one end and one end of fixing bolt plate (3) of set square (4)
Connection.
2. a kind of construction site new type scaffold according to claim 1, it is characterised in that:The fixing bolt plate (3),
Set square (4), brace (8) and the quantity of fixed steelring (10) are two groups, and every group of number of brace (8) and fixed steelring (10)
Amount is two.
3. a kind of construction site new type scaffold according to claim 1, it is characterised in that:The fixed vertical pole (6),
Fixed transverse rod (7) and the quantity of fixed screw (9) are three groups, and fixed vertical pole (6) and every group of quantity with fixed screw (9)
It is six.
4. a kind of construction site new type scaffold according to claim 1, it is characterised in that:The brace (8) it is interior
Surface is installed with reinforcing pile close to the position of No. two overstriking fixed link (11) one end, and the quantity of reinforcing pile is four groups.
5. a kind of construction site new type scaffold according to claim 1, it is characterised in that:The sliding groove (17)
Upper end is installed with cableway fixed link (16) close to the position of rope fixed link (14) upper end, and the quantity of sliding groove (17) is
Two groups.
6. a kind of construction site new type scaffold according to claim 1, it is characterised in that:Outside the brace (8)
Position of the surface above fixed transverse rod (7) is equipped with fixed steelring (10), and the inner surface of fixed steelring (10) pass through it is oblique
The outer surface of the outer surface fixed transverse rod (7) of bar (8) is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820135008.2U CN207905336U (en) | 2018-01-26 | 2018-01-26 | A kind of construction site new type scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820135008.2U CN207905336U (en) | 2018-01-26 | 2018-01-26 | A kind of construction site new type scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207905336U true CN207905336U (en) | 2018-09-25 |
Family
ID=63565084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820135008.2U Expired - Fee Related CN207905336U (en) | 2018-01-26 | 2018-01-26 | A kind of construction site new type scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207905336U (en) |
-
2018
- 2018-01-26 CN CN201820135008.2U patent/CN207905336U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188888U (en) | Mobile portable crawling ladder | |
CN207245138U (en) | Boat scaffold adjustable in pitch | |
CN207905336U (en) | A kind of construction site new type scaffold | |
CN211548680U (en) | Scaffold for building construction | |
CN206048160U (en) | A kind of height-adjustable split heads | |
CN108775138A (en) | A kind of scaffold for building with function of seismic resistance | |
CN207003970U (en) | A kind of building scaffold being easily installed | |
CN205460566U (en) | Transformer that stability is high overhauls uses safety belt lift kits | |
CN108708544A (en) | A kind of intelligentized multi-use architecture construction hanging basket | |
CN209568970U (en) | A kind of upper people's ladder of spigot-and-socket push-and-pull | |
CN204174915U (en) | Scaffold | |
CN208152532U (en) | A kind of construction scaffold | |
CN206562750U (en) | A kind of door-type scaffold being moved easily | |
CN207228603U (en) | One kind is used for interior decoration scaffold | |
CN205396963U (en) | Base is put things in good order to whole steel pipe on scaffold | |
CN209179478U (en) | Jumping formwork truss | |
CN206530280U (en) | A kind of combined type hanging ladder platform | |
CN208220148U (en) | A kind of construction safety scaffold that stability is good | |
CN206971679U (en) | A kind of safe anti-falling scaffold | |
CN205259558U (en) | Novel scaffold for fitment | |
CN206091857U (en) | Wind power generation tower section of thick bamboo flange plane measurement auxiliary fixtures | |
CN205822744U (en) | A kind of simple portable retractable operation platform | |
CN206189829U (en) | Auto -lock lifting foot hand rack | |
CN218406336U (en) | Safe and stable scaffold | |
CN218149592U (en) | Construction is with building scaffold who has anti falling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180925 Termination date: 20200126 |