CN208152532U - A kind of construction scaffold - Google Patents

A kind of construction scaffold Download PDF

Info

Publication number
CN208152532U
CN208152532U CN201820249689.5U CN201820249689U CN208152532U CN 208152532 U CN208152532 U CN 208152532U CN 201820249689 U CN201820249689 U CN 201820249689U CN 208152532 U CN208152532 U CN 208152532U
Authority
CN
China
Prior art keywords
upright bar
fixedly installed
outer vertical
vertical rod
horizontal rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820249689.5U
Other languages
Chinese (zh)
Inventor
杨长安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xiandai Architecture Engineering & Consulting Co Ltd
Original Assignee
Shanghai Xiandai Architecture Engineering & Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Xiandai Architecture Engineering & Consulting Co Ltd filed Critical Shanghai Xiandai Architecture Engineering & Consulting Co Ltd
Priority to CN201820249689.5U priority Critical patent/CN208152532U/en
Application granted granted Critical
Publication of CN208152532U publication Critical patent/CN208152532U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of construction scaffolds, including outer vertical rod and main upright bar, horizontal rod is fixedly installed in the middle part of the outer vertical rod, and one end of horizontal rod is fixedly connected with interior upright bar, longitudinal horizontal rod is fixedly installed in the middle part of the interior upright bar, the top of the main upright bar is fixedly installed with lateral diagonal brace, and main upright bar is fixedly installed with auxiliary pole far from the side of lateral diagonal brace, the top of the outer vertical rod and main upright bar is fixedly installed with foot guard plate, and railing is fixedly installed with above foot guard plate, the outer surface side of the foot guard plate is fixedly connected with throwing support, the upper end of the outer vertical rod is fixedly installed with bridging close to the side of foot guard plate.A kind of construction scaffold described in the utility model is equipped with and throws support, preferably fixes entire frame, so that safety is more reliable, in addition main upright bar can replace, is more convenient for building and safeguard, increases its own functionality, brings better prospect of the application.

Description

A kind of construction scaffold
Technical field
The utility model scaffold field, in particular to a kind of construction scaffold.
Background technique
Existing scaffold is in order to guarantee each work progress is gone on smoothly and is set up workbench, by the position set up point For external scaffolding, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;By structural form point For pole type scaffold, bridge scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula The scaffold of different purposes is selected in scaffold etc., different types of engineering construction;Existing scaffold exists centainly when in use The drawbacks of, the bearing capacity and stability of traditional scaffold are not high enough, and fastener is not distinguish according to rod piece type, fixed effect The phenomenon that poor, main upright bar is excessively weak, be easy to cause scaffold run-off the straight leads to occur scaffold collapsing in work progress Etc. accidents, there are security hidden trouble, the serious consequence that may cause casualties brings certain influence to user, is This, it is proposed that a kind of construction scaffold.
Utility model content
The main purpose of the utility model is to provide a kind of construction scaffolds, can effectively solve background technique The problems in.
To achieve the above object, the technical solution that the utility model is taken is:
A kind of construction scaffold, including outer vertical rod and main upright bar are fixedly installed with cross in the middle part of the outer vertical rod It is fixedly connected with interior upright bar to one end of horizon bar, and horizontal rod, is fixedly installed with longitudinal water in the middle part of the interior upright bar Flat bar, the top of the main upright bar is fixedly installed with lateral diagonal brace, and main upright bar is fixedly installed with far from the side of lateral diagonal brace The top of auxiliary pole, the outer vertical rod and main upright bar is fixedly installed with foot guard plate, and railing is fixedly installed with above foot guard plate, The outer surface side of the foot guard plate is fixedly connected with throwing support, and the upper end of the outer vertical rod is fixedly mounted close to the side of foot guard plate There is bridging, the horizontal rod is fixedly installed with right-angle coupler close to one end of auxiliary pole, and horizontal rod is close to horizontal It is fixedly installed with rotary buckle to the other end of diagonal brace, the outer surface lower end of the outer vertical rod is fixedly installed with backing plate, and backing plate Outer surface lower end be fixedly installed with pedestal.
Preferably, the quantity of the outer vertical rod is eight groups, and the quantity of the interior upright bar is seven groups, the horizontal rod Quantity is 24 groups, and the quantity of the longitudinal horizontal rod is 12 groups.
Preferably, the quantity of the railing is two groups, and is fixed between railing and outer vertical rod, main upright bar by right-angle coupler Connection.
Preferably, the quantity of the bridging is two groups, and is fixedly connected between bridging by rotary buckle.
It preferably, is welding between the auxiliary pole and main upright bar, by straight between the horizontal rod and main upright bar The connection of angle fastener fixing, the transverse direction diagonal brace are fixedly connected between interior upright bar, horizontal rod by rotary buckle.
It preferably, is welding between the outer vertical rod and backing plate, between backing plate and pedestal.
Compared with prior art, the utility model has the advantages that:The construction scaffold, is provided with throwing The one end for throwing support is fixed on the foot guard plate of scaffold by support, user when building scaffold, and the other end is by backing plate and inserts Pin fixes on the ground, plays the role of reinforcing protection for the fixation of entire scaffold, the rotary buckle of design bridging it Between, use between bridging and interior outer vertical rod, between lateral diagonal brace and interior outer vertical rod, have than traditional right-angle coupler preferably solid Phenomena such as determining effect, preventing the rod piece of tilted direction from sliding, auxiliary pole are arranged on the outside of main upright bar, reinforce the support of main upright bar Effect, while can be replaced when problem occurs for main upright bar as spare main upright bar spare, many peaces are reduced for user Full potential problem brings better Product Experience to user, and whole device is simple, easy to operate, fixed effect relative to Traditional approach is more preferable.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of construction scaffold of the utility model.
Fig. 2 is a kind of partial view of construction scaffold of the utility model.
Fig. 3 is the enlarged view in a kind of construction scaffold Fig. 2 of the utility model at A.
Fig. 4 is that a kind of right-angle coupler of construction scaffold of the utility model and auxiliary pole cooperate enlarged view.
In figure:1, outer vertical rod;2, interior upright bar;3, horizontal rod;4, longitudinal horizontal rod;5, railing;6, foot guard plate;7, it throws Support;8, lateral diagonal brace;9, main upright bar;10, auxiliary pole;11, bridging;12, rotary buckle;13, right-angle coupler;14, pedestal; 15, backing plate.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
As shown in Figs 1-4, a kind of construction scaffold, including outer vertical rod 1 and main upright bar 9, it is characterised in that:It is outer vertical The middle part of bar 1 is fixedly installed with horizontal rod 3, and one end of horizontal rod 3 is fixedly connected with interior upright bar 2, interior upright bar 2 Middle part is fixedly installed with longitudinal horizontal rod 4, and the top of main upright bar 9 is fixedly installed with lateral diagonal brace 8, and main upright bar 9 is far from laterally The side of diagonal brace 8 is fixedly installed with auxiliary pole 10, and the top of outer vertical rod 1 and main upright bar 9 is fixedly installed with foot guard plate 6, and keeps off foot The top of plate 6 is fixedly installed with railing 5, and the outer surface side of foot guard plate 6 is fixedly connected with throwing support 7, and the upper end of outer vertical rod 1 is close The side of foot guard plate 6 is fixedly installed with bridging 11, and horizontal rod 3 is fixedly installed with right angle close to one end of auxiliary pole 10 Fastener 13, and horizontal rod 3 is fixedly installed with rotary buckle 12 close to the other end of lateral diagonal brace 8, what rotary buckle 12 made Mounting rod is more convenient, and the outer surface lower end of outer vertical rod 1 is fixedly installed with backing plate 15, and the outer surface lower end of backing plate 15 is solid Dingan County is equipped with pedestal 14, so that scaffold entirety lower part is firm, improves security performance.
The quantity of outer vertical rod 1 is eight groups, and the quantity of interior upright bar 2 is seven groups, and the quantity of horizontal rod 3 is 24 groups, The quantity of longitudinal horizontal rod 4 is 12 groups;The quantity of railing 5 is two groups, and is passed through between railing 5 and outer vertical rod 1, main upright bar 9 Right-angle coupler 13 is fixedly connected, and fastener fixing connects so that whole more firm, is easily installed and is dismantled, saves manpower;Scissors The quantity of support 11 is two groups, and is fixedly connected between bridging 11 by rotary buckle 12, is further improved by bridging The stability of scaffold;It is welding between auxiliary pole 10 and main upright bar 9, passes through right angle button between horizontal rod 3 and main upright bar 9 Part 13 is fixedly connected, and is fixedly connected between lateral diagonal brace 8 and interior upright bar 2, horizontal rod 3 by rotary buckle 12;Outer vertical rod It is welding between 1 and backing plate 15, between backing plate 15 and pedestal 14, it, can be to avoid due to fixation by the welding with pedestal 14 Not tight and bring serious consequence.
It should be noted that the utility model is a kind of construction scaffold, pedestal 14 is passed through bolt by user It is fixed on the ground with bolt, in every group of outer vertical rod 1, interior upright bar 2, main upright bar 9 and throws pair of 7 bottom ends of support relative to pedestal 14 It answers on position by the way that installation backing plate 15 is welded and fixed, first main upright bar 9 is holded up and is fixed, fixes every group of outer vertical rod followed by holding up 1 is laid in top layer horizontal rod 3 with interior upright bar 2 by the fixed longitudinal horizontal rod 4 of right-angle coupler 13 and horizontal rod 3 Steel plate builds foot guard plate 6 in periphery, and railing 5 is fixedly mounted by right-angle coupler 13 on the top of every group of outer vertical rod 1, throws support 7 One end is fixed by welding on backing plate 15, and the other end is fixed by welding on foot guard plate 6, in the lateral surface of entire scaffold It is provided with bridging 11, bridging 11 is fixedly connected with two groups of outer vertical rods 1 by rotary buckle 12, passes through rotary buckle 12 Lateral diagonal brace 8 is fixedly connected with outer vertical rod 1, interior upright bar 2, horizontal rod 3, then is fixed on auxiliary pole 10 by welding The outside of main upright bar 9, when disassembly, only need to dismantle since the right-angle coupler 13 of top, and successively disassembly downwards is transversely and horizontally Bar 3 and longitudinal horizontal rod 4 complete convenient disassembly, fixed stable purpose, effectively increase the stability of its own, compared with It is practical.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. a kind of construction scaffold, including outer vertical rod (1) and main upright bar (9), it is characterised in that:The outer vertical rod (1) Middle part be fixedly installed with horizontal rod (3), and one end of horizontal rod (3) is fixedly connected with interior upright bar (2), it is described in It is fixedly installed in the middle part of upright bar (2) longitudinal horizontal rod (4), the top of the main upright bar (9) is fixedly installed with lateral diagonal brace (8), and main upright bar (9) is fixedly installed with auxiliary pole (10) far from the side of lateral diagonal brace (8), and the outer vertical rod (1) and master are vertical The top of bar (9) is fixedly installed with foot guard plate (6), and railing (5), the foot guard plate are fixedly installed with above foot guard plate (6) (6) outer surface side is fixedly connected with throwing support (7), and the upper end of the outer vertical rod (1) is close to the fixed peace in the side of foot guard plate (6) Equipped with bridging (11), the horizontal rod (3) is fixedly installed with right-angle coupler (13) close to the one end of auxiliary pole (10), and Horizontal rod (3) is fixedly installed with rotary buckle (12) close to the other end of lateral diagonal brace (8), outside the outer vertical rod (1) Surface lower end is fixedly installed with backing plate (15), and the outer surface lower end of backing plate (15) is fixedly installed with pedestal (14).
2. a kind of construction scaffold according to claim 1, it is characterised in that:The quantity of the outer vertical rod (1) It is eight groups, the quantity of the interior upright bar (2) is seven groups, and the quantity of the horizontal rod (3) is 24 groups, the longitudinal direction water The quantity of flat bar (4) is 12 groups.
3. a kind of construction scaffold according to claim 1, it is characterised in that:The quantity of the railing (5) is Two groups, and be fixedly connected between railing (5) and outer vertical rod (1), main upright bar (9) by right-angle coupler (13).
4. a kind of construction scaffold according to claim 1, it is characterised in that:The quantity of the bridging (11) It is two groups, and is fixedly connected between bridging (11) by rotary buckle (12).
5. a kind of construction scaffold according to claim 1, it is characterised in that:The auxiliary pole (10) and master are vertical It is welding between bar (9), is fixedly connected between the horizontal rod (3) and main upright bar (9) by right-angle coupler (13), it is described Lateral diagonal brace (8) is fixedly connected between interior upright bar (2), horizontal rod (3) by rotary buckle (12).
6. a kind of construction scaffold according to claim 1, it is characterised in that:The outer vertical rod (1) and backing plate It (15) is welding between, between backing plate (15) and pedestal (14).
CN201820249689.5U 2018-02-12 2018-02-12 A kind of construction scaffold Active CN208152532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820249689.5U CN208152532U (en) 2018-02-12 2018-02-12 A kind of construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820249689.5U CN208152532U (en) 2018-02-12 2018-02-12 A kind of construction scaffold

Publications (1)

Publication Number Publication Date
CN208152532U true CN208152532U (en) 2018-11-27

Family

ID=64382436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820249689.5U Active CN208152532U (en) 2018-02-12 2018-02-12 A kind of construction scaffold

Country Status (1)

Country Link
CN (1) CN208152532U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961197A (en) * 2022-06-15 2022-08-30 广州盈德建筑工程有限公司 Safe and reliable building outer double-row scaffold and building method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961197A (en) * 2022-06-15 2022-08-30 广州盈德建筑工程有限公司 Safe and reliable building outer double-row scaffold and building method thereof
CN114961197B (en) * 2022-06-15 2024-03-29 广州盈德建筑工程有限公司 Safe and reliable building outer double-row scaffold and erecting method thereof

Similar Documents

Publication Publication Date Title
CN201261942Y (en) Stand platform for cantilevered concrete structure construction
CN205775852U (en) Acting force conversion support for top of steel structure supporting jig frame
CN204001731U (en) A kind of shuttering supporting vertical rod base fixing device
CN208152532U (en) A kind of construction scaffold
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN211470603U (en) Telescopic tower crane passageway
CN206329024U (en) Hanging large-span steel-reinforced concrete structure construction steel platform
CN206289999U (en) A kind of new attaching scaffold
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN209703969U (en) A kind of tunnel multifunctional mobile scaffold
CN205330195U (en) Safety device of outer wall scaffold
CN208220153U (en) A kind of regulatable scaffold for building
CN208702128U (en) High and big die plate construction steel pipe scaffold fast dismounting device
CN208152524U (en) Dismountable moving scaffold
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN208456085U (en) Build builder's jack structure
CN207484921U (en) Assembled moving operating platform
CN207228603U (en) One kind is used for interior decoration scaffold
CN205677224U (en) A kind of scaffold being readily disassembled
CN204781932U (en) Superelevation zhongting concrete beam shaped steel formwork support platform
CN207110438U (en) A kind of high safety performance springboard for building
CN206189829U (en) Auto -lock lifting foot hand rack
CN207795262U (en) A kind of reassembling type tunnel movable Scaffold
CN205259558U (en) Novel scaffold for fitment
CN203640245U (en) Scaffold structure for building exterior wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant