CN211548680U - A scaffolding for building construction - Google Patents

A scaffolding for building construction Download PDF

Info

Publication number
CN211548680U
CN211548680U CN201921940123.8U CN201921940123U CN211548680U CN 211548680 U CN211548680 U CN 211548680U CN 201921940123 U CN201921940123 U CN 201921940123U CN 211548680 U CN211548680 U CN 211548680U
Authority
CN
China
Prior art keywords
rod
groove
support rod
fixedly installed
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921940123.8U
Other languages
Chinese (zh)
Inventor
许有才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongsheng Global Construction Group Co ltd
Original Assignee
Jiangxi Zhongsheng Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zhongsheng Construction Group Co ltd filed Critical Jiangxi Zhongsheng Construction Group Co ltd
Priority to CN201921940123.8U priority Critical patent/CN211548680U/en
Application granted granted Critical
Publication of CN211548680U publication Critical patent/CN211548680U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型公开了一种建筑施工用脚手架,包括底座,底座顶部的两侧均固定安装有一级支撑杆,一级支撑杆的顶部设置有二级支撑杆,二级支撑杆的顶部设置有三级支撑杆,三级支撑杆的顶部固定安装有支撑面,支撑面的顶部固定安装有围栏,底座的内部设置有移动装置,底座的内部设置有固定装置。本实用新型通过底座与一级支撑杆之间为焊接,增加结构的稳定,保证作业人员的安全,通过一级支撑杆与二级支撑杆之间的配合实现对支撑面的辅助升高,通过设置三级支撑杆用于对支撑面进行辅助固定,从而增加支撑面的结构稳定,通过设置围栏用于对作业人员进行保护,增加安全,同时解决了脚手架搭建危险影响施工进度的问题。

Figure 201921940123

The utility model discloses a scaffolding for building construction, which comprises a base, two sides of the top of the base are fixedly installed with primary support rods, the top of the primary support rod is provided with a secondary support rod, and the top of the secondary support rod is provided with three The top of the tertiary support rod is fixedly installed with a support surface, the top of the support surface is fixedly installed with a fence, the interior of the base is provided with a moving device, and the interior of the base is provided with a fixing device. Through the welding between the base and the primary support rod, the utility model increases the stability of the structure and ensures the safety of operators. The tertiary support rods are used for auxiliary fixing of the support surface, thereby increasing the structural stability of the support surface. The fence is used to protect the operators and increase safety, and at the same time solve the problem that the danger of scaffolding construction affects the construction progress.

Figure 201921940123

Description

一种建筑施工用脚手架A scaffolding for building construction

技术领域technical field

本实用新型涉及脚手架技术领域,具体为一种建筑施工用脚手架。The utility model relates to the technical field of scaffolding, in particular to a scaffolding for building construction.

背景技术Background technique

脚手架指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架,建筑界的通用术语,指建筑工地上用在外墙、内部装修或层高较高无法直接施工的地方,主要为了施工人员上下干活或外围安全网维护及高空安装构件等,说白了就是搭架子,脚手架制作材料通常有:竹、木、钢管或合成材料等,有些工程也用脚手架当模板使用,此外在广告业、市政、交通路桥、矿山等部门也广泛被使用,现有脚手架在使用时往往都需要现场进行搭建,由于施工环境的恶劣在搭建脚手架的同时伴随着危险,由于脚手架是现场搭建的其结构稳定性较差容易造成危险。Scaffolding refers to the various supports erected on the construction site for workers to operate and solve vertical and horizontal transportation. A general term in the construction industry refers to the use of external walls, interior decoration or high storey heights on construction sites where direct construction cannot be performed, mainly for construction purposes. Personnel work up and down or maintenance of peripheral safety nets and high-altitude installation components, etc., to put it bluntly, is to build scaffolding. Scaffolding materials usually include: bamboo, wood, steel pipe or synthetic materials, etc. Some projects also use scaffolding as a template. In addition, in the advertising industry , municipal, traffic roads and bridges, mines and other departments are also widely used. The existing scaffolding often needs to be built on site when it is used. Due to the harsh construction environment, the construction of scaffolding is accompanied by danger. Because the scaffold is built on site, its structure is stable. Poor sex is easy to cause danger.

实用新型内容Utility model content

本实用新型的目的在于提供一种建筑施工用脚手架,具备快速的将脚手架投入使用的优点,解决了脚手架搭建危险影响施工进度的问题。The purpose of the utility model is to provide a scaffolding for building construction, which has the advantages of quickly putting the scaffolding into use, and solves the problem that the construction of the scaffolding is dangerous and affects the construction progress.

为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:

一种建筑施工用脚手架,包括底座,所述底座顶部的两侧均固定安装有一级支撑杆,所述一级支撑杆的顶部设置有二级支撑杆,所述二级支撑杆的顶部设置有三级支撑杆,所述三级支撑杆的顶部固定安装有支撑面,所述支撑面的顶部固定安装有围栏,所述底座的内部设置有移动装置,所述底座的内部设置有固定装置。A scaffolding for building construction includes a base, first-level support rods are fixedly installed on both sides of the top of the base, the top of the first-level support rod is provided with a second-level support rod, and the top of the second-level support rod is provided with a A tertiary support rod, the top of the tertiary support rod is fixedly installed with a support surface, the top of the support surface is fixedly installed with a fence, the interior of the base is provided with a moving device, and the interior of the base is provided with a fixing device.

优选的,所述一级支撑杆之间固定安装有第一横杆,所述二级支撑杆之间固定安装有第二横杆,所述第二横杆的底部固定安装有第一液压杆,所述第一液压杆的输出端贯穿第二横杆并与支撑面的底部固定连接。Preferably, a first transverse rod is fixedly installed between the primary support rods, a second transverse rod is fixedly installed between the secondary support rods, and a first hydraulic rod is fixedly installed at the bottom of the second transverse rod , the output end of the first hydraulic rod penetrates the second transverse rod and is fixedly connected with the bottom of the supporting surface.

优选的,所述一级支撑杆的内部开设有第三凹槽,所述第三凹槽的内部固定安装有第三液压杆,所述第三液压杆的顶部与二级支撑杆的底部固定连接,所述二级支撑杆的内部开设有第二凹槽,所述三级支撑杆经第二凹槽贯穿至二级支撑杆的内部。Preferably, a third groove is opened inside the primary support rod, a third hydraulic rod is fixedly installed inside the third groove, and the top of the third hydraulic rod is fixed to the bottom of the secondary support rod connection, a second groove is opened inside the secondary support rod, and the tertiary support rod penetrates into the interior of the secondary support rod through the second groove.

优选的,所述移动装置包括第二液压杆、第一凹槽和万向轮,所述底座顶部的两侧均开设有第一凹槽,所述第一凹槽的顶部固定安装有第二液压杆,所述第二液压杆的底部固定安装有万向轮。Preferably, the moving device includes a second hydraulic rod, a first groove and a universal wheel, both sides of the top of the base are provided with a first groove, and a second groove is fixedly installed on the top of the first groove A hydraulic rod, a universal wheel is fixedly installed on the bottom of the second hydraulic rod.

优选的,所述固定装置包括螺纹、钎杆和通槽,所述底座内部的两侧均开设有通槽,所述通槽的内部设置有钎杆,所述钎杆的表面与通槽的内部均开设有螺纹,所述钎杆与通槽经过螺纹转动连接。Preferably, the fixing device includes a thread, a drill rod and a through groove, a through groove is formed on both sides of the inside of the base, a drill rod is arranged inside the through groove, and the surface of the drill rod is in contact with the through groove. The insides are all provided with threads, and the drill rods and the through grooves are rotatably connected through threads.

与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the present utility model are as follows:

1、本实用新型通过底座与一级支撑杆之间为焊接,增加结构的稳定,保证作业人员的安全,通过一级支撑杆与二级支撑杆之间的配合实现对支撑面的辅助升高,通过设置三级支撑杆用于对支撑面进行辅助固定,从而增加支撑面的结构稳定,通过设置围栏用于对作业人员进行保护,增加安全,通过设置移动装置方便对整体进行移动,通过设置固定装置用于对脚手架与地面进行固定,增加脚手架的稳定,同时解决了脚手架搭建危险影响施工进度的问题。1. The utility model increases the stability of the structure by welding between the base and the primary support rod, ensures the safety of operators, and realizes the auxiliary lifting of the supporting surface through the cooperation between the primary support rod and the secondary support rod. , by setting a three-level support rod for auxiliary fixing of the support surface, thereby increasing the structural stability of the support surface, by setting up a fence to protect the operator and increase safety, by setting a mobile device to facilitate the overall movement, by setting The fixing device is used to fix the scaffolding and the ground, increasing the stability of the scaffolding, and at the same time solving the problem that the construction of the scaffolding is dangerous and affects the construction progress.

2、本实用新型通过设置第一横杆用于增加一级支撑杆之间的稳定,通过设置第二横杆用于增加二级支撑杆之间的稳定,同时与第一液压杆配合实现对支撑面的升高,从而满足作业需要,通过设置第三凹槽根据作业需要将二级支撑杆顶出,从而将支撑面升高,通过第二液压杆将万向轮顶出,通过万向轮将脚手架移动至所需位置,节省了工人的劳动量,增加了施工进度,通过转动钎杆将钎杆的底部插入地面内部从而将脚手架与地面进行固定,增加稳定性。2. The utility model is used to increase the stability between the first-level support rods by setting the first crossbar, and is used to increase the stability between the second-level support rods by setting the second crossbar, and at the same time cooperates with the first hydraulic rod to achieve the The support surface is raised to meet the operation needs. By setting the third groove, the secondary support rod is pushed out according to the operation needs, so as to raise the support surface, and the universal wheel is pushed out through the second hydraulic rod. The wheel moves the scaffolding to the required position, which saves the labor of workers and increases the construction progress. By turning the drill rod, the bottom of the drill rod is inserted into the ground to fix the scaffold to the ground and increase the stability.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型截面结构示意图;Fig. 2 is the cross-sectional structure schematic diagram of the utility model;

图3为本实用新型图2中A处的局部放大图。FIG. 3 is a partial enlarged view of A in FIG. 2 of the present utility model.

图中:1、底座;2、一级支撑杆;3、第一横杆;4、二级支撑杆;5、第二横杆;6、三级支撑杆;7、第一液压杆;8、移动装置;801、第二液压杆;802、第一凹槽;803、万向轮;9、固定装置;901、螺纹;902、钎杆;903、通槽;10、第三液压杆;11、第二凹槽;12、第三凹槽;13、围栏;14、支撑面。In the figure: 1. Base; 2. Primary support rod; 3. First cross rod; 4. Secondary support rod; 5. Second cross rod; 6. Tertiary support rod; 7. First hydraulic rod; 8 801, the second hydraulic rod; 802, the first groove; 803, the universal wheel; 9, the fixing device; 901, the thread; 902, the drill rod; 903, the through groove; 10, the third hydraulic rod; 11. Second groove; 12. Third groove; 13. Fence; 14. Support surface.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

在本申请文件的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本专利和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本专利的限制。在本申请文件的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“设置”应做广义理解,例如,可以是固定相连、设置,也可以是可拆卸连接、设置,或一体地连接、设置。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本专利中的具体含义。In the description of this application document, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal" , "top", "bottom", "inside", "outside" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing this patent and simplifying the description, rather than indicating or It is implied that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as a limitation of this patent. In the description of this application document, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected", "connected" and "arranged" should be understood in a broad sense, for example, it may be a fixed connection, The setting can also be a detachable connection and setting, or an integral connection and setting. For those of ordinary skill in the art, the specific meanings of the above terms in this patent can be understood according to specific situations.

请参阅图1-3,一种建筑施工用脚手架,包括底座1,底座1顶部的两侧均固定安装有一级支撑杆2,底座1与一级支撑杆2之间为焊接,增加结构的稳定,保证作业人员的安全,一级支撑杆2的顶部设置有二级支撑杆4,通过一级支撑杆2与二级支撑杆4之间的配合实现对支撑面14的辅助升高,二级支撑杆4的顶部设置有三级支撑杆6,通过设置三级支撑杆6用于对支撑面14进行辅助固定,从而增加支撑面14的结构稳定,三级支撑杆6的顶部固定安装有支撑面14,支撑面14的顶部固定安装有围栏13,通过设置围栏13用于对作业人员进行保护,增加安全,底座1的内部设置有移动装置8,底座1的内部设置有固定装置9,通过设置移动装置8方便对整体进行移动,通过设置固定装置9用于对脚手架与地面进行固定,增加脚手架的稳定,一级支撑杆2之间固定安装有第一横杆3,通过设置第一横杆3用于增加一级支撑杆2之间的稳定,二级支撑杆4之间固定安装有第二横杆5,通过设置第二横杆5用于增加二级支撑杆4之间的稳定,同时与第一液压杆7配合实现对支撑面14的升高,从而满足作业需要,第二横杆5的底部固定安装有第一液压杆7,第一液压杆7的输出端贯穿第二横杆5并与支撑面14的底部固定连接,一级支撑杆2的内部开设有第三凹槽12,第三凹槽12的内部固定安装有第三液压杆10,第三液压杆10的顶部与二级支撑杆4的底部固定连接,二级支撑杆4的内部开设有第二凹槽11,三级支撑杆6经第二凹槽11贯穿至二级支撑杆4的内部,通过设置第三凹槽12根据作业需要将二级支撑杆4顶出,从而将支撑面14升高,移动装置8包括第二液压杆801、第一凹槽802和万向轮803,底座1顶部的两侧均开设有第一凹槽802,第一凹槽802的顶部固定安装有第二液压杆801,第二液压杆801的底部固定安装有万向轮803,通过第二液压杆801将万向轮803顶出,通过万向轮803将脚手架移动至所需位置,节省了工人的劳动量,增加了施工进度,固定装置9包括螺纹901、钎杆902和通槽903,底座1内部的两侧均开设有通槽903,通槽903的内部设置有钎杆902,钎杆902的表面与通槽903的内部均开设有螺纹901,钎杆902与通槽903经过螺纹901转动连接,通过转动钎杆902将钎杆902的底部插入地面内部从而将脚手架与地面进行固定,增加稳定性。Please refer to Figure 1-3, a scaffolding for building construction, including a base 1, a first-level support rod 2 is fixedly installed on both sides of the top of the base 1, and the base 1 and the first-level support rod 2 are welded to increase the stability of the structure , to ensure the safety of the operators, the top of the primary support rod 2 is provided with a secondary support rod 4, through the cooperation between the primary support rod 2 and the secondary support rod 4, the auxiliary lifting of the support surface 14 is realized. The top of the support rod 4 is provided with a tertiary support rod 6, which is used for auxiliary fixing of the support surface 14 by setting the tertiary support rod 6, thereby increasing the structural stability of the support surface 14, and the top of the tertiary support rod 6 is fixedly installed with a support Surface 14, the top of the support surface 14 is fixedly installed with a fence 13, and the fence 13 is used to protect the operator and increase safety. The moving device 8 is arranged to facilitate the movement of the whole. The fixing device 9 is used to fix the scaffolding and the ground to increase the stability of the scaffolding. The rod 3 is used to increase the stability between the primary support rods 2, and a second cross rod 5 is fixedly installed between the secondary support rods 4. By setting the second cross rod 5, it is used to increase the stability between the secondary support rods 4 At the same time, it cooperates with the first hydraulic rod 7 to achieve the lifting of the support surface 14, so as to meet the operation needs. The cross bar 5 is fixedly connected to the bottom of the support surface 14. A third groove 12 is opened inside the primary support bar 2, and a third hydraulic rod 10 is fixedly installed inside the third groove 12. The top is fixedly connected with the bottom of the secondary support rod 4, a second groove 11 is provided inside the secondary support rod 4, and the tertiary support rod 6 penetrates through the second groove 11 to the interior of the secondary support rod 4. The third groove 12 pushes out the secondary support rod 4 according to the operation needs, thereby raising the support surface 14. The moving device 8 includes a second hydraulic rod 801, a first groove 802 and a universal wheel 803. A first groove 802 is opened on both sides, a second hydraulic rod 801 is fixedly installed on the top of the first groove 802, and a universal wheel 803 is fixedly installed at the bottom of the second hydraulic rod 801. Push out to the wheel 803, and move the scaffold to the required position through the universal wheel 803, which saves the labor of workers and increases the construction progress. The fixing device 9 includes a thread 901, a drill rod 902 and a through groove 903. Both sides are provided with through grooves 903, the interior of the through groove 903 is provided with a drill rod 902, the surface of the drill rod 902 and the interior of the through groove 903 are both provided with threads 901, and the drill rod 902 and the through groove 903 are connected by rotation through the thread 901, By rotating the drill rod 902, the bottom of the drill rod 902 is inserted into the ground, so as to fix the scaffold and the ground, and increase the stability.

使用时,根据施工位置,通过第二液压杆801将万向轮803顶出,通过推动一级支撑杆2经过万向轮803将脚手架推至所需位置,通过转动钎杆902将钎杆902的底部插入地面,待工人上至支撑面14的顶部,根据施工的高度通过第三液压杆10进行调节,若是再高则通过第一液压杆7将支撑面14升高。When in use, according to the construction position, the universal wheel 803 is pushed out by the second hydraulic rod 801, the scaffolding is pushed to the desired position by pushing the primary support rod 2 through the universal wheel 803, and the drill rod 902 is pushed out by rotating the drill rod 902. The bottom of the construction is inserted into the ground, and when the worker goes to the top of the support surface 14, the third hydraulic rod 10 is used to adjust the construction height. If it is higher, the support surface 14 is raised by the first hydraulic rod 7.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (4)

1.一种建筑施工用脚手架,包括底座(1),其特征在于:所述底座(1)顶部的两侧均固定安装有一级支撑杆(2),所述一级支撑杆(2)的顶部设置有二级支撑杆(4),所述二级支撑杆(4)的顶部设置有三级支撑杆(6),所述三级支撑杆(6)的顶部固定安装有支撑面(14),所述支撑面(14)的顶部固定安装有围栏(13),所述底座(1)的内部设置有移动装置(8),所述底座(1)的内部设置有固定装置(9);所述一级支撑杆(2)之间固定安装有第一横杆(3),所述二级支撑杆(4)之间固定安装有第二横杆(5),所述第二横杆(5)的底部固定安装有第一液压杆(7),所述第一液压杆(7)的输出端贯穿第二横杆(5)并与支撑面(14)的底部固定连接。1. A scaffolding for building construction, comprising a base (1), characterized in that: both sides of the top of the base (1) are fixedly installed with a first-level support rod (2), and the first-level support rod (2) is A secondary support rod (4) is provided on the top, a tertiary support rod (6) is provided on the top of the secondary support rod (4), and a support surface (14) is fixedly installed on the top of the tertiary support rod (6). ), a fence (13) is fixedly installed on the top of the support surface (14), a moving device (8) is arranged inside the base (1), and a fixing device (9) is arranged inside the base (1) A first cross bar (3) is fixedly installed between the first-level support rods (2), and a second cross-bar (5) is fixedly installed between the second-level support rods (4). A first hydraulic rod (7) is fixedly installed at the bottom of the rod (5), and the output end of the first hydraulic rod (7) penetrates the second transverse rod (5) and is fixedly connected with the bottom of the support surface (14). 2.根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述一级支撑杆(2)的内部开设有第三凹槽(12),所述第三凹槽(12)的内部固定安装有第三液压杆(10),所述第三液压杆(10)的顶部与二级支撑杆(4)的底部固定连接,所述二级支撑杆(4)的内部开设有第二凹槽(11),所述三级支撑杆(6)经第二凹槽(11)贯穿至二级支撑杆(4)的内部。2. A scaffolding for building construction according to claim 1, characterized in that: a third groove (12) is provided inside the first-level support rod (2), and the third groove (12) A third hydraulic rod (10) is fixedly installed in the interior, the top of the third hydraulic rod (10) is fixedly connected with the bottom of the secondary support rod (4), and the interior of the secondary support rod (4) is provided with The second groove (11), the tertiary support rod (6) penetrates through the second groove (11) to the inside of the secondary support rod (4). 3.根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述移动装置(8)包括第二液压杆(801)、第一凹槽(802)和万向轮(803),所述底座(1)顶部的两侧均开设有第一凹槽(802),所述第一凹槽(802)的顶部固定安装有第二液压杆(801),所述第二液压杆(801)的底部固定安装有万向轮(803)。3. A scaffolding for construction according to claim 1, characterized in that: the moving device (8) comprises a second hydraulic rod (801), a first groove (802) and a universal wheel (803) , both sides of the top of the base (1) are provided with a first groove (802), a second hydraulic rod (801) is fixedly installed on the top of the first groove (802), and the second hydraulic rod A universal wheel (803) is fixedly installed at the bottom of (801). 4.根据权利要求1所述的一种建筑施工用脚手架,其特征在于:所述固定装置(9)包括螺纹(901)、钎杆(902)和通槽(903),所述底座(1)内部的两侧均开设有通槽(903),所述通槽(903)的内部设置有钎杆(902),所述钎杆(902)的表面与通槽(903)的内部均开设有螺纹(901),所述钎杆(902)与通槽(903)经过螺纹(901)转动连接。4. A scaffolding for building construction according to claim 1, characterized in that: the fixing device (9) comprises a thread (901), a drill rod (902) and a through groove (903), and the base (1) ) inside both sides are provided with through grooves (903), the interior of the through groove (903) is provided with a drill rod (902), the surface of the drill rod (902) and the interior of the through groove (903) are provided with A thread (901) is provided, and the drill rod (902) and the through groove (903) are rotatably connected through the thread (901).
CN201921940123.8U 2019-11-12 2019-11-12 A scaffolding for building construction Expired - Fee Related CN211548680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921940123.8U CN211548680U (en) 2019-11-12 2019-11-12 A scaffolding for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921940123.8U CN211548680U (en) 2019-11-12 2019-11-12 A scaffolding for building construction

Publications (1)

Publication Number Publication Date
CN211548680U true CN211548680U (en) 2020-09-22

Family

ID=72500824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921940123.8U Expired - Fee Related CN211548680U (en) 2019-11-12 2019-11-12 A scaffolding for building construction

Country Status (1)

Country Link
CN (1) CN211548680U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113134674A (en) * 2021-03-11 2021-07-20 哈尔滨工业大学 Auxiliary heating and chilling combined stirring friction material increasing device and method
CN114105055A (en) * 2021-12-09 2022-03-01 枣庄矿业(集团)有限责任公司田陈煤矿 A special vehicle for monorail crane installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113134674A (en) * 2021-03-11 2021-07-20 哈尔滨工业大学 Auxiliary heating and chilling combined stirring friction material increasing device and method
CN113134674B (en) * 2021-03-11 2022-07-08 哈尔滨工业大学 Auxiliary heating and chilling combined stirring friction material increasing device and method
CN114105055A (en) * 2021-12-09 2022-03-01 枣庄矿业(集团)有限责任公司田陈煤矿 A special vehicle for monorail crane installation

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN204455829U (en) Bridge-collision-avoidance wall construction equipment
CN201056828Y (en) Liftable worktable for building construction
CN209011528U (en) An all-steel attached lifting scaffold
CN106012824A (en) Movable bridge anti-collision guardrail construction operation trolley
CN211548680U (en) A scaffolding for building construction
CN203487803U (en) Safety protection structure for elevator shaft construction
CN204590555U (en) Assembling elevator hoistway construction platform
CN203097316U (en) Foldable hydraulic lifting support secure channel for high altitude construction
CN107696005B (en) lifting operation platform for building construction
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN214885283U (en) Movable triangular operation frame for underground narrow space
CN206697838U (en) Line maintenance aerial work platform
CN105756067B (en) A kind of method of horizontal temporary support support replacement in deep basal pit
CN210369827U (en) Scaffold for building external wall construction
CN205894632U (en) Spiral arm over -and -under type mobile scaffold
CN101670994A (en) Lifting working platform for construction
CN209261192U (en) A portable scaffolding
CN210080386U (en) A processing device for ensuring the uniform size of the ends of scaffolding poles
CN207314793U (en) Operating platform between a kind of regularization precast stair
CN209353221U (en) A movable cantilever work platform for side guardrail construction
CN101942806B (en) Bridge girder erection machine protective guard
CN206769335U (en) A kind of high stability scaffold for building
CN220686833U (en) Protection device for small-sized hole of outer wall of climbing frame aluminum mould system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Plot 10, Zone B, Jiangxi Hundred Billion Building Technology Industrial Park, Nanchang County, Nanchang City, Jiangxi Province, 330000

Patentee after: Zhongsheng Global Construction Group Co.,Ltd.

Address before: Plot 10, Zone B, Jiangxi Hundred Billion Building Technology Industrial Park, Nanchang County, Nanchang City, Jiangxi Province, 330000

Patentee before: Jiangxi Zhongsheng Construction Group Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922

CF01 Termination of patent right due to non-payment of annual fee