CN207876636U - A kind of big plate green compact deviation-rectifying system of ceramics - Google Patents
A kind of big plate green compact deviation-rectifying system of ceramics Download PDFInfo
- Publication number
- CN207876636U CN207876636U CN201820190211.XU CN201820190211U CN207876636U CN 207876636 U CN207876636 U CN 207876636U CN 201820190211 U CN201820190211 U CN 201820190211U CN 207876636 U CN207876636 U CN 207876636U
- Authority
- CN
- China
- Prior art keywords
- green compact
- detector
- deviation
- plate
- rectifying system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000919 ceramic Substances 0.000 title claims abstract description 21
- 238000001514 detection method Methods 0.000 claims abstract description 22
- 238000007689 inspection Methods 0.000 claims description 4
- 238000012937 correction Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000033001 locomotion Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000005693 optoelectronics Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Control Of Conveyors (AREA)
Abstract
The utility model discloses a kind of big plate green compact deviation-rectifying systems of ceramics, rack including pipeline, the deviation correcting device that rack is provided with detection device, is electrically connected with detection device, deviation correcting device includes for abutting the first plate of green compact return, driving the first plate closer or far from the first Power Component of green compact, and the first Power Component is connect with rack.A kind of big plate green compact deviation-rectifying system of ceramics of the utility model, can detect the green compact return whether green compact deflect and make deflection automatically.
Description
Technical field
The utility model is related to the production equipment of the big plate of architectural pottery more particularly to a kind of ceramics big plate green compact correction systems
System.
Background technology
In the prior art, the big plate of ceramics is a kind of novel product in architectural pottery.It is usually used to improve production efficiency
Transmission belt conveys the green compact of big plate automatically.But green compact are easy to happen the phenomenon that wandering off in transmission process, that is,
Green compact can deflect in transmission process.To make green compact return, typically carried out by worker's visual monitoring and hand push green compact
Return.
However, worker's monitoring can not find and correct in time green compact deflection.
Utility model content
The utility model aims to solve the problem that above-mentioned mentioned technical problem, provides a kind of big plate green compact deviation-rectifying system of ceramics,
The green compact return whether green compact deflect and make deflection can be detected automatically.
The utility model is realized through the following technical scheme:
A kind of big plate green compact deviation-rectifying system of ceramics, includes the rack of pipeline, and rack is provided with detection device, is filled with detection
Set the deviation correcting device of electrical connection, deviation correcting device include for abut the first plate of green compact return, drive the first plate close or
The first Power Component far from green compact, the first Power Component are connect with rack.
Preferably, the quantity of the first plate is two, and two the first plates are set successively along the conveying direction perpendicular to green compact
It sets.
Further, the first plate is connect with housing slide, and the glide direction of the first plate and the conveying direction of green compact are inclined
It installs.
Further, the first plate is provided with the first plane for abutting green compact, the conveying side of the first plane and green compact
To parallel.
Further, the first Power Component include the first motor of connection frame, connect first motor output shaft the
The circumferential direction of one disk, the first disk is hinged there are two first connecting rod, and two first connecting rods are hinged with first plate respectively.
Preferably, detection device includes the first frame body of connection frame, and the first frame body is provided with the first inspection of detection green compact
Device and the second detector are surveyed, the first detector and the second detector are set gradually along the conveying direction perpendicular to green compact.
Further, the first frame body is additionally provided with third detector, the first detector, the second detector, third detector
On same straight line.
Further, the alarm that rack or the first frame body are provided with controller, are electrically connected with the controller, controller and
One detector and the electrical connection of the second detector.
Further, the first frame body is provided with the first rail groove for installing the first detector, the length of first rail groove
The conveying direction biasing for spending direction and green compact is arranged.
Further, the first frame body is provided with the first sliding block for installing the first detector, by the first sliding block and rack
Fixed first bolt is adjusted, the glide direction of the first sliding block and the conveying direction biasing of green compact are arranged.
Advantageous effect is:Compared with prior art, a kind of big plate green compact deviation-rectifying system of ceramics of the utility model is by setting
Detection device is set, instead of personal monitoring, can find the case where green compact deflect in time, meanwhile, avoid worker's cognizance hierarchy from generating
Omission, the allowable range of unified green compact deflection;In addition, also by the way that deviation correcting device is arranged, can to the green compact that deflect from
Dynamic correction, makes green compact return and return is consistent, meanwhile, deviation correcting device makes green compact self-return, it is possible to reduce green compact it is broken and
Reduce labor intensity.
Description of the drawings
It is required in being described below to embodiment in order to illustrate more clearly of the technical scheme in the embodiment of the utility model
Attached drawing to be used briefly describes.
Obviously, described attached drawing is a part of the embodiment of the utility model, rather than whole embodiments, this field
Technical staff without creative efforts, can also be obtained according to these attached drawings other design schemes and attached
Figure.
Fig. 1 is a kind of structural schematic diagram of the big plate green compact deviation-rectifying system of ceramics of the utility model;
Fig. 2 is the structural schematic diagram of detection device in Fig. 1;
Fig. 3 is the structural schematic diagram of deviation correcting device in Fig. 1.
Specific implementation mode
The technique effect of the design of the utility model, concrete structure and generation is carried out below with reference to embodiment and attached drawing
It clearly and completely describes, to be completely understood by the purpose of this utility model, feature and effect.
Obviously, described embodiment is a part of the embodiment of the utility model, rather than whole embodiments, is based on
The embodiments of the present invention, other implementations that those skilled in the art is obtained without creative efforts
Example, belongs to the scope of protection of the utility model.
In addition, all connection relations being previously mentioned in text, not singly refer to component and directly connect, and referring to can be according to specific reality
Situation is applied, by adding or reducing connection auxiliary, to form more preferably connection structure.Each technology in the utility model is special
Sign, can be with combination of interactions under the premise of not conflicting conflict.
As shown in Figure 1, a kind of big plate green compact deviation-rectifying system of ceramics, includes the rack 1 of pipeline, rack 1 is provided with detection
Device 2, the deviation correcting device 3 being electrically connected with detection device 2.
The present embodiment is provided with detection device 2, instead of personal monitoring, can find the case where green compact deflect in time.And
And by the setting to detection device 2, the allowable range of unified green compact deflection is avoided because of the cognizance hierarchy between different workers
And the green compact beyond range of deflection are omitted.
In addition, the present embodiment is provided with deviation correcting device 3, it can be after detection device 2 finds green compact deflection, by corresponding
Program error correct device 3 acts, and makes deviation correcting device 3 to the green compact automatic deviation correction that deflects, and then make green compact return.
Moreover, the correction action repetition of deviation correcting device 3 is consistent, the return of green compact can be made consistent, manual deviation rectification is avoided to produce
Raw difference.
In addition, deviation correcting device 3 makes green compact self-return, instead of manual deviation rectification, labor intensity and human cost are saved,
Meanwhile also reduce manual deviation rectification make green compact it is broken ask condition.
Specifically, as shown in Figure 1 and Figure 2, the first frame body 21 of rack 1 of the detection device 2 including connection pipeline, first
Frame body 21 is provided with the first detector 22 and the second detector 23 of detection green compact, 23 edge of the first detector 22 and the second detector
Conveying direction perpendicular to green compact is set gradually.
First detector 22 and the second detector 23 can be the sensors that need not be in direct contact with green compact, as grating,
Optoelectronic switch can also be the sensor being in direct contact, such as gravity sensor.
When green compact deflect, there are angles namely green compact edge with the conveying direction of green compact for each side of green compact
The side of conveying direction side is inclined.
Green compact can be introduced into the first detector 22 and the second detector 23 detection zone of one of those, subsequently into another
One detection zone.
Since the first detector 22 and the second detector 23 detect the signal existence time difference of green compact, when can pass through
Between poor, conveyer belt conveying speed, the first detector 22 at a distance from the second detector 23, calculate the amount of deflection of green compact, in turn
Calculate the deflection angle of green compact, it is determined whether the action of deviation correcting device 3 is made to rectify a deviation.
However, it is possible to the situation that the diagonal line that will appear very special situation namely green compact is parallel with conveying direction.
Diagonal line to solve green compact is parallel with conveying direction and can not confirm the case where whether green compact deflect, the first frame body
21 are additionally provided with third detector 24, and the first detector 22, the second detector 23, third detector 24 are on same straight line.
That is, when setting is there are three when detector, if green compact deflect, green compact will not enter three detectors simultaneously
Detection zone.
After avoiding green compact from deflecting 90 °, green compact can not confirm whether green compact are inclined into the detection zone of detector simultaneously
Turn, the first detector 22, the second detector 23, third detector 24 maximum distance between green compact length dimension and broad-ruler
Between very little.
If green compact are squares, it should be ensured that green compact, which deflect 90 °, does not influence technique.
To avoid centering capacity range of the green compact amount of deflection beyond deviation correcting device 3 that green compact is caused to be damaged during correction
Alarm bad, that rack 1 or the first frame body 21 are provided with controller, are electrically connected with the controller, controller and the first detector 22
It is electrically connected with the second detector 23.
Alarm is emergency alarm bell or alarm lamp, and when detecting that the amount of deflection of green compact is larger, it is dynamic that controller controls alarm
Make, operative employee is prompted to be rectified a deviation manually.
To adapt to the green compact of different size, the first frame body 21 is provided with the first rail groove for installing the first detector 22
25, the conveying direction biasing of the length direction and green compact of first rail groove 25 is arranged.Thus the first detector 22 may be mounted at
The different location of first rail groove 25 carries out position adjustment.
As the replacement orientation of setting first rail groove 25, lead to the first inspection to avoid frequently dismounting the first detector 22
Survey the setting angle variation of device 22, the first frame body 21 is provided with the first sliding block 26 for installing the first detector 22, by first
Sliding block 26 adjusts fixed first bolt 27 with rack 1, and the glide direction of the first sliding block 26 and the conveying direction biasing of green compact are set
It sets.
Elastic first bolt 27 is adjusted the position of the first detector 22 to adjust 26 position of the first sliding block,
It is convenient and efficient.
Second detector 23, third detector 24 mounting structure be referred to the first detector 22 mounting structure it is real
It applies, does not have difficulty.
For deviation correcting device 3, as shown in Figure 1, Figure 3, deviation correcting device 3 include for abut the first plate 4 of green compact return,
First Power Component 5 of first plate 4 closer or far from green compact, the first Power Component 5 is driven to be connect with rack 1.
The forms of motion of first plate 4 can be mobile or swing, for the relative position of the first plate 4 and green compact,
First plate 4 can be located on the conveying direction of green compact, can also be on the conveying direction perpendicular to green compact.
First plate 4 is located on the conveying direction of green compact, then the first plate 4 is moved up and down or swung.
When detecting green compact deflection, the first plate 4 declines, and then green compact are abutted with the first plate 4, then in conveyer belt
Conveying effect under, the side of green compact be bonded with the first plate 4, and then green compact return, completion rectify a deviation, then the first plate 4 carries
It rises, green compact continue to convey.
However, the first plate 4 is rectified a deviation on the conveying direction of green compact, green compact can be made to stop mobile a period of time,
The interval of green compact on pipeline is caused to widen, this also results in the transfer efficiency of pipeline low.
To reduce influence to transfer efficiency, the first plate 4 can be in pipeline side, namely in pipeline perpendicular to defeated
Send the side in direction.
Multiple idler wheels can be set on first plate 4, green compact need not be made to stop movement.
First plate 4 pushes green compact movement, green compact gradually to turn round, and green compact become face from point contact with the first plate 4 and contact,
And then green compact return, then 4 return of the first plate.
That is, the maximum position that the first plate 4 is moved towards green compact makes the position reference of green compact.
That is, the first plate 4 can also make the green compact of offset carry out return.
However, only relying on the promotion of first plate 4 to realize green compact return, the width of pipeline can be increased, also not
It can be to carrying out return towards the green compact far from the offset of 4 direction of the first plate.
To reduce the ability for conveying line width while making deviation correcting device 3 that there is the green compact return for making offset, the first plate 4
Quantity is two, and two the first plates 4 are set gradually along the conveying direction perpendicular to green compact, and then pass through two the first plates 4
Clamping realize green compact return.
The clamping of two the first plates 4 realizes that the return of green compact can also make the centering of green compact position.
To avoid the first plate 4 from deflecting when moving in turn it cannot be guaranteed that the direction of green compact, the first plate 4 and rack
1 is slidably connected, and the moving direction of the first plate 4 determines.
Green compact stop the time of conveying when rectifying a deviation to reduce, and the glide direction of the first plate 4 and the conveying direction of green compact are inclined
It installs.
That is, the moving direction of the first plate 4 is not limited to along the conveying direction perpendicular to green compact.
It is parallel with the first plate 4 and still there are angle, the first plates with conveying direction to avoid after green compact return green compact
Part 4 is provided with the first plane for abutting green compact, and the first plane is parallel with the conveying direction of green compact.
First plate 4 can be provided with the rubber cushion for contacting green compact, avoid green compact from being contacted with the first plate 4 and damaged.
For the first Power Component 5, the first Power Component 5 can be cylinder or hydraulic cylinder.
To ensure that the displacement distance of two the first plates 4 is equal and then deviation correcting device 3 has the ability for making green compact centering, the
One Power Component 5 includes the first disk 51 of the output shaft of the first motor of connection frame 1, connection first motor, the first disk 51
Circumferential hinged there are two first connecting rod 52, two first connecting rods 52 are hinged with first plate 4 respectively.
Deviation correcting device 3 can make green compact centering, can also be reduced to correction when the green compact to different size convey
The adjustment of device 3.
First Power Component 5 can be set to the bottom of pipeline, save occupied space.
Above example is not limited to the embodiment technical solution of itself, can be incorporated between embodiment new
Embodiment.Above example is only to illustrate the technical solution of the utility model and is not intended to limit it, all without departing from this
Any modification of utility model spirit and scope or equivalent replacement should all cover the range in technical solutions of the utility model
It is interior.
Claims (10)
1. a kind of big plate green compact deviation-rectifying system of ceramics, includes the rack (1) of pipeline, which is characterized in that rack (1) is provided with inspection
To survey device (2), the deviation correcting device (3) that is electrically connected with detection device (2), and deviation correcting device (3) includes for abutting green compact return
First plate (4), drive the first plate (4) closer or far from green compact the first Power Component (5), the first Power Component (5) with
Rack (1) connects.
2. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 1, which is characterized in that first plate (4)
Quantity be two, two the first plates (4) set gradually along the conveying direction perpendicular to green compact.
3. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 2, which is characterized in that first plate (4)
It is slidably connected with rack (1), the glide direction of the first plate (4) and the conveying direction biasing of green compact are arranged.
4. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 3, which is characterized in that first plate (4)
It is provided with the first plane for abutting green compact, the first plane is parallel with the conveying direction of green compact.
5. according to a kind of any big plate green compact deviation-rectifying system of ceramics of claim 2~4, which is characterized in that described first
Power Component (5) includes the first disk (51) of the output shaft of the first motor of connection frame (1), connection first motor, the first disk
(51) circumferential direction is hinged there are two first connecting rod (52), and two first connecting rods (52) are hinged with first plate (4) respectively.
6. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 1, which is characterized in that the detection device (2)
The first frame body (21) including connection frame (1), the first frame body (21) are provided with the first detector (22) and the of detection green compact
Two detectors (23), the first detector (22) and the second detector (23) are set gradually along the conveying direction perpendicular to green compact.
7. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 6, which is characterized in that first frame body (21)
It is additionally provided with third detector (24), the first detector (22), the second detector (23), third detector (24) are in always
On line.
8. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 6, which is characterized in that the rack (1) or the
The alarm that one frame body (21) is provided with controller, is electrically connected with the controller, controller and the first detector (22) and the second inspection
Device (23) is surveyed to be electrically connected.
9. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 6, which is characterized in that first frame body (21)
It is provided with for installing the first rail grooves (25) of the first detector (22), the length direction of first rail groove (25) and green compact
Conveying direction biasing setting.
10. the big plate green compact deviation-rectifying system of a kind of ceramics according to claim 6, which is characterized in that first frame body
(21) it is provided with the first sliding block (26) for installing the first detector (22), adjusts the first sliding block (26) and rack (1) admittedly
Fixed the first bolt (27), the glide direction of the first sliding block (26) and the conveying direction biasing of green compact are arranged.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820190211.XU CN207876636U (en) | 2018-02-02 | 2018-02-02 | A kind of big plate green compact deviation-rectifying system of ceramics |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820190211.XU CN207876636U (en) | 2018-02-02 | 2018-02-02 | A kind of big plate green compact deviation-rectifying system of ceramics |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207876636U true CN207876636U (en) | 2018-09-18 |
Family
ID=63509778
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820190211.XU Active CN207876636U (en) | 2018-02-02 | 2018-02-02 | A kind of big plate green compact deviation-rectifying system of ceramics |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207876636U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109702885A (en) * | 2019-02-27 | 2019-05-03 | 鹰牌陶瓷实业(河源)有限公司 | A kind of blank correction mechanism of the big plate of ceramics |
| CN112938422A (en) * | 2021-02-09 | 2021-06-11 | 无锡来诺斯科技有限公司 | Monitoring and deviation rectifying device and method for film sticking machine |
| CN115401504A (en) * | 2022-10-20 | 2022-11-29 | 立之达(徐州)智能装备有限公司 | Position adjusting device for workpiece on conveying mechanism for numerical control machine tool |
-
2018
- 2018-02-02 CN CN201820190211.XU patent/CN207876636U/en active Active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109702885A (en) * | 2019-02-27 | 2019-05-03 | 鹰牌陶瓷实业(河源)有限公司 | A kind of blank correction mechanism of the big plate of ceramics |
| CN112938422A (en) * | 2021-02-09 | 2021-06-11 | 无锡来诺斯科技有限公司 | Monitoring and deviation rectifying device and method for film sticking machine |
| CN112938422B (en) * | 2021-02-09 | 2022-04-12 | 无锡来诺斯科技有限公司 | Film laminating machine monitoring and rectifying device and rectifying method |
| CN115401504A (en) * | 2022-10-20 | 2022-11-29 | 立之达(徐州)智能装备有限公司 | Position adjusting device for workpiece on conveying mechanism for numerical control machine tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207876636U (en) | A kind of big plate green compact deviation-rectifying system of ceramics | |
| CN104019758A (en) | System and method for automatic detection of warping deformation of mobile phone shell | |
| CN207215086U (en) | A kind of Portable non-contact rail tunnel Clearance Detection | |
| CN103458671A (en) | Counterpoint assembly machine | |
| CN103496590A (en) | Material sucking mechanism | |
| CN114166743B (en) | Method for judging defects of concave surface of magnetic shoe surface defect inspection system | |
| CN109489616A (en) | A kind of flatness detecting device | |
| CN208224390U (en) | A kind of detection device for touch screen | |
| CN106429301A (en) | Belt monitoring early warning device based on ultrasonic waves | |
| CN101943593B (en) | Laser and monocular vision-based bunker level measuring device and method | |
| CN210386625U (en) | Plate sorting equipment | |
| CN108861419B (en) | A multifunctional belt conveyor inspection system | |
| CN219155619U (en) | Belt conveyor deviation monitoring device | |
| CN209640236U (en) | A kind of full-automatic AI intelligent detection equipment of photovoltaic semi-finished product undesired component | |
| CN215984383U (en) | Tile size detection device | |
| WO2022062056A1 (en) | Pcb automatic ocr code reading device | |
| CN214583003U (en) | Mobile hard disk shell flatness detection device | |
| CN208223382U (en) | A kind of position detecting device | |
| CN211602291U (en) | Electric pile detection device and fuel cell electric pile assembly system with same | |
| CN115655159A (en) | Efficient defect detection device for lithium battery coating surface | |
| CN212111176U (en) | Device for visually detecting and marking defects of cement bricks | |
| CN207850307U (en) | A kind of laser detecting frock | |
| CN210534296U (en) | Detection apparatus for LED lamp plate | |
| CN119757352B (en) | Automatic track-changing device and its operation method for steel box girder crack detection vehicle | |
| CN206930272U (en) | Turbine rotor specification detection means |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Delifeng smart home Co.,Ltd. Assignor: GUANGDONG GOLD CERAMICS Co.,Ltd. Contract record no.: X2022440000042 Denomination of utility model: A deviation correction system for ceramic slab Granted publication date: 20180918 License type: Common License Record date: 20220616 |
|
| EE01 | Entry into force of recordation of patent licensing contract |