CN207863840U - A kind of prefabricated door pillar in construction site - Google Patents

A kind of prefabricated door pillar in construction site Download PDF

Info

Publication number
CN207863840U
CN207863840U CN201820173399.7U CN201820173399U CN207863840U CN 207863840 U CN207863840 U CN 207863840U CN 201820173399 U CN201820173399 U CN 201820173399U CN 207863840 U CN207863840 U CN 207863840U
Authority
CN
China
Prior art keywords
door pillar
cylinder
construction site
door
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820173399.7U
Other languages
Chinese (zh)
Inventor
南凯
王辉
赵楚军
王芸爽
夏强
刘根利
骆千千
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering New Building Materials Co Ltd
Original Assignee
Shaanxi Construction Engineering New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering New Building Materials Co Ltd filed Critical Shaanxi Construction Engineering New Building Materials Co Ltd
Priority to CN201820173399.7U priority Critical patent/CN207863840U/en
Application granted granted Critical
Publication of CN207863840U publication Critical patent/CN207863840U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a kind of prefabricated door pillars in construction site, including door pillar cylinder and the door pillar basis immediately below door pillar cylinder and for the inserting of door pillar cylinder, and door pillar cylinder and door pillar basis are precast concrete;Door pillar cylinder middle inside is provided with cavity;Door pillar cylinder top is provided with the top hole passed through for lamps and lanterns power supply pipeline;Door pillar cylinder lower part is provided with the lower part hole being pierced by for lamps and lanterns power supply pipeline;Multiple mounting plates for construction site door installation temporarily are from top to bottom provided on the side side wall of door pillar cylinder;Door pillar basis top is reserved with the groove inserted for door pillar cylinder bottom, and door pillar basis top is provided with the spool preformed groove for being pierced by for lamps and lanterns power supply pipeline and being connected to groove, and spool preformed groove is located on the outside of groove.Prefabricated door pillar cylinder and door pillar basis only need to be lifted in place and be assembled, simple installation at the construction field (site) by the utility model, and can be repeatedly used in turn, substantially cost-effective, reduce the generation of industrial refuse.

Description

A kind of prefabricated door pillar in construction site
Technical field
The utility model belongs to the prefabricated door pillar in technical field of building construction more particularly to a kind of construction site.
Background technology
With the continuous development of building trade, live temporary construction also increasingly require it is quick for installation, easy, with dress with The features such as.Generally, it before being constructed, needs to establish temporary construction fence and keeps apart construction site and external environment, enclosing Side is equipped with worker person and the interim of vehicle discrepancy uses door.Currently, construction site is generally used with the door pillar of door temporarily Construction site is formed with brick, this cannot not only improve production efficiency, can also cause the waste of certain manpower and materials.Moreover, After the completion of construction, it is bound to remove construction site with door pillar, causes certain environmental pollution, and cause to provide The waste in source.It is therefore proposed that a kind of quick for installation, easy, energy saving and environmentally friendly construction site door pillar builds work for China The development of industry has the prodigious meaning.
Utility model content
The technical problem to be solved by the utility model is to the deficiencies in for the above-mentioned prior art, provide a kind of construction Live prefabricated door pillar only need at the construction field (site) lift prefabricated door pillar cylinder and door pillar basis in place and group Dress, simple installation, and can repeatedly be used in turn, it is substantially cost-effective, reduce the generation of industrial refuse.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of construction site assembled is pre- Door pillar processed, it is characterised in that:Door pillar basis including door pillar cylinder and immediately below door pillar cylinder and for the inserting of door pillar cylinder, The door pillar cylinder and door pillar basis are precast concrete, and the door pillar cylinder is cube rod;On the inside of the door pillar cylinder Middle part is provided with cavity from the bottom to top, and the cavity lower end is concordant with door pillar cylinder lower end, and the height of the cavity is less than door pillar The height of cylinder;Door pillar cylinder top is provided with the top hole passed through for lamps and lanterns power supply pipeline, the top hole and sky Chamber is connected to;Door pillar cylinder lower part is provided with the lower part hole for being pierced by and being connected to cavity for the lamps and lanterns power supply pipeline;It is described Multiple mounting plates for construction site door installation temporarily are from top to bottom provided on the side side wall of door pillar cylinder, it is multiple described Mounting plate is laid on same vertical plane;
Door pillar basis top is reserved with the groove inserted for door pillar cylinder bottom, and door pillar basis top is provided with The spool preformed groove for being pierced by for the lamps and lanterns power supply pipeline and being connected to groove, the spool preformed groove are located on the outside of groove.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The door pillar basis is cuboidal Rim of a cup basis.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The cross section of the groove is rectangle, The cross-sectional area of the groove gradually decreasees from top to bottom.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The cross section ruler of the groove lower end It is very little identical as door pillar cylinder lower face size.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The construction site temporarily use door with It is attached by hinge between the mounting plate;The mounting plate is iron plate, is embedded with to mounting plate in the door pillar cylinder The embedded bar being fixed.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:Door pillar basis upper end is embedded with Nail is hung for assembled lifting.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The cavity is cylindrical cavity.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The cavity is prefabricated by PVC pipes Molding cavity, the PVC pipes are laid in door pillar cylinder.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The both sides upper end of the door pillar cylinder It is embedded with anchor rod, the anchor rod is laid along the short transverse of door pillar cylinder.
A kind of prefabricated door pillar in above-mentioned construction site, it is characterised in that:The upper end of the door pillar cylinder is arranged There is Lamp holder.
The utility model has the following advantages compared with prior art:
1, the utility model is by lifting to construction site and using door pillar temporarily prefabricated door pillar cylinder and door pillar basis Design position, later stage install without supporting, simple installation.
2, the utility model can be mass-produced in production and processing, and production process uses standardized production pattern, ensure Final product quality, good appearance.
3, it after the completion of the utility model is to be onstructed, reuses convenient for removing, using turnover rate height, and can substantially save Construction cost reduces the generation of industrial refuse.
In conclusion the utility model only need at the construction field (site) lift prefabricated door pillar cylinder and door pillar basis in place And assemble, simple installation, and can repeatedly be used in turn, it is substantially cost-effective, reduce the generation of industrial refuse.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model door pillar cylinder.
The structural schematic diagram on Fig. 3 the utility model door pillar basis.
Fig. 4 is the A-A sectional views of Fig. 3.
Reference sign:
1-anchor rod;2-cavitys;3-top holes;
4-mounting plates;5-embedded bars;6-spool preformed grooves;
7-hang nail;8-grooves;9-door pillar cylinders;
10-door pillars basis;11-lower part holes;12-Lamp holders.
Specific implementation mode
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the utility model include door pillar cylinder 9 and immediately below door pillar cylinder 9 and For the door pillar basis 10 that door pillar cylinder 9 inserts, the door pillar cylinder 9 and door pillar basis 10 are precast concrete, the door Column cylinder 9 is cube rod;9 middle inside of door pillar cylinder is provided with cavity 2,2 lower end of the cavity and door pillar from the bottom to top 9 lower end of cylinder is concordant, and the height of the cavity 2 is less than the height of door pillar cylinder 9;9 top of door pillar cylinder is provided with for lamps and lanterns The top hole 3 that power supply pipeline passes through, the top hole 3 are connected to cavity 2;9 lower part of door pillar cylinder is provided with described in confession The lower part hole 11 that lamps and lanterns power supply pipeline is pierced by and is connected to cavity 2;It is from top to bottom set on the side side wall of the door pillar cylinder 9 Multiple mounting plates 4 for construction site door installation temporarily are equipped with, multiple mounting plates 4 are laid on same vertical plane;
Basic 10 tops of the door pillar are reserved with the groove 8 inserted for 9 bottom of door pillar cylinder, basic 10 tops of the door pillar It is provided with the spool preformed groove 6 for being pierced by and being connected to groove 8 for the lamps and lanterns power supply pipeline, the spool preformed groove 6 is located at recessed 8 outside of slot.
In actual use, by lifting the prefabricated door pillar cylinder 9 and door pillar basis 10 to construction site The interim door pillar design position for using door, later stage install without supporting, simple installation.
In actual use, by the way that the door pillar cylinder 9 to be mounted in the groove 8 on the door pillar basis 10, wood is then used Wedge carries out filling positioning, last earth backing at the gap on the door pillar cylinder 9 Yu the door pillar basis 10.
The door pillar cylinder 9 and the door pillar basis 10 are precast concrete, preferably reinforced concrete precast member, It can be mass-produced when production and processing, production process uses standardized production pattern, ensures final product quality, good appearance.It waits applying It after the completion of work, is reused convenient for removing, using turnover rate height, and can substantially save construction cost, reduce industrial refuse It generates.
Especially, it should be noted that 9 side of door pillar cylinder is prefabricated with for ornamental pattern, the effect of the pattern Design can once produce completion in factory.
In actual use, it is provided with cavity 2 in the door pillar cylinder 9, is in order to for mitigating the door pillar cylinder 9 Weight can mitigate up to 1.5 tons of dead weight.
In the present embodiment, the door pillar basis 10 is cuboidal rim of a cup basis.
In the present embodiment, the cross section of the groove 8 is rectangle, and the cross-sectional area of the groove 8 is gradual from top to bottom Reduce.
In the present embodiment, the cross sectional dimensions of 8 lower end of the groove is identical as 9 lower face size of the door pillar cylinder.
In the present embodiment, the construction site is attached between door and the mounting plate 4 by hinge temporarily;It is described Mounting plate 4 is iron plate, and the embedded bar 5 that mounting plate 4 is fixed is embedded in the door pillar cylinder 9.
In actual use, the mounting plate 4 uses the hinge of door to install temporarily for the ease of construction site, generally by the conjunction Page is welded on mounting plate 4, and setting embedded bar 5 is then to make to apply in order to which mounting plate 4 to be preferably fixed on door pillar cylinder 9 Installed temporarily with door safer in work scene.
In the present embodiment, basic 10 upper ends of the door pillar are embedded with hangs nail 7 for assembled lifting.
In actual use, nail 7 is hung for assembled lifting by being embedded in the upper end on door pillar basis 10, to be lifted by crane Installation, using hang nail mode can to avoid because earth backing cover it is incomplete caused by hanging ring reinforcing steel bars exposed phenomenon, and the later stage will not knock Hack foot.
In the present embodiment, the cavity 2 is cylindrical cavity.
In the present embodiment, the cavity 2 is by the prefabricated profiled cavity of PVC pipes, and the PVC pipes are laid in door pillar column In body 9.
In the present embodiment, the both sides upper end of the door pillar cylinder 9 is embedded with anchor rod 1, and the anchor rod 1 is along door pillar column The short transverse of body 9 is laid.
In the present embodiment, the upper end of the door pillar cylinder 9 is provided with Lamp holder 12.
In actual use, it is provided with the Lamp holder installed for construction site lighting lamp on the door pillar cylinder 9 12, the cross section of Lamp holder 12 is round or rectangle.
When the utility model is used, only prefabricated door pillar cylinder 9 and door pillar basis 10 need to be hung respectively at the construction field (site) It is attached to position and assembles, carry out filling positioning at the gap on the door pillar cylinder 9 Yu the door pillar basis 10 with timber wedge, finally exist On the door pillar basis 10 earth backing to the door pillar basis 10 completely by map combining.
The above is only the preferred embodiment of the utility model, not imposed any restrictions to the utility model, every Any simple modification, change and equivalent structure made by above example are changed according to the utility model technical spirit, still Belong in the protection domain of technical solutions of the utility model.

Claims (10)

1. a kind of prefabricated door pillar in construction site, it is characterised in that:Including door pillar cylinder (9) and it is located at door pillar cylinder (9) immediately below and basic (10) for the door pillar of door pillar cylinder (9) inserting, the door pillar cylinder (9) and door pillar basic (10) are Precast concrete, the door pillar cylinder (9) are cube rod;Door pillar cylinder (9) middle inside is arranged free from the bottom to top Chamber (2), cavity (2) lower end is concordant with door pillar cylinder (9) lower end, and the height of the cavity (2) is less than door pillar cylinder (9) Highly;Door pillar cylinder (9) top is provided with the top hole (3) passed through for lamps and lanterns power supply pipeline, the top hole (3) with Cavity (2) is connected to;Door pillar cylinder (9) lower part, which is provided with, to be pierced by and is connected to down with cavity (2) for the lamps and lanterns power supply pipeline Portion's hole (11);From top to bottom it is provided with that multiple door is pacified temporarily for construction site on the side side wall of the door pillar cylinder (9) The mounting plate (4) of dress, multiple mounting plates (4) are laid on same vertical plane;
Basic (10) top of the door pillar is reserved with the groove (8) inserted for door pillar cylinder (9) bottom, and the door pillar is basic (10) Top is provided with the spool preformed groove (6) for being pierced by and being connected to groove (8) for the lamps and lanterns power supply pipeline, the spool preformed groove (6) it is located on the outside of groove (8).
2. a kind of prefabricated door pillar in construction site described in accordance with the claim 1, it is characterised in that:The door pillar basis (10) it is cuboidal rim of a cup basis.
3. according to a kind of prefabricated door pillar in construction site as claimed in claim 1 or 2, it is characterised in that:The groove (8) cross section is rectangle, and the cross-sectional area of the groove (8) gradually decreasees from top to bottom.
4. a kind of prefabricated door pillar in construction site described in accordance with the claim 3, it is characterised in that:The groove (8) The cross sectional dimensions of lower end is identical as door pillar cylinder (9) the lower face size.
5. according to a kind of prefabricated door pillar in construction site as claimed in claim 1 or 2, it is characterised in that:The construction Scene is attached between door and the mounting plate (4) by hinge temporarily;The mounting plate (4) is iron plate, the door pillar It is embedded with the embedded bar (5) that mounting plate (4) is fixed in cylinder (9).
6. according to a kind of prefabricated door pillar in construction site as claimed in claim 1 or 2, it is characterised in that:The door pillar Basic (10) upper end is embedded with hangs nail (7) for assembled lifting.
7. according to a kind of prefabricated door pillar in construction site as claimed in claim 1 or 2, it is characterised in that:The cavity (2) it is cylindrical cavity.
8. the prefabricated door pillar in a kind of construction site according to claim 7, it is characterised in that:The cavity (2) For by the prefabricated profiled cavity of PVC pipes, the PVC pipes are laid in door pillar cylinder (9).
9. according to a kind of prefabricated door pillar in construction site as claimed in claim 1 or 2, it is characterised in that:The door pillar The both sides upper end of cylinder (9) is embedded with anchor rod (1), and the anchor rod (1) is laid along the short transverse of door pillar cylinder (9).
10. according to a kind of prefabricated door pillar in construction site as claimed in claim 1 or 2, it is characterised in that:The door pillar The upper end of cylinder (9) is provided with Lamp holder (12).
CN201820173399.7U 2018-01-31 2018-01-31 A kind of prefabricated door pillar in construction site Expired - Fee Related CN207863840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820173399.7U CN207863840U (en) 2018-01-31 2018-01-31 A kind of prefabricated door pillar in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820173399.7U CN207863840U (en) 2018-01-31 2018-01-31 A kind of prefabricated door pillar in construction site

Publications (1)

Publication Number Publication Date
CN207863840U true CN207863840U (en) 2018-09-14

Family

ID=63460474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820173399.7U Expired - Fee Related CN207863840U (en) 2018-01-31 2018-01-31 A kind of prefabricated door pillar in construction site

Country Status (1)

Country Link
CN (1) CN207863840U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109514692A (en) * 2018-12-29 2019-03-26 湖南天泽建材有限公司 Armored concrete landscape lampstand and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109514692A (en) * 2018-12-29 2019-03-26 湖南天泽建材有限公司 Armored concrete landscape lampstand and preparation method thereof
CN109514692B (en) * 2018-12-29 2024-04-26 湖南天泽建材有限公司 Reinforced concrete landscape lamp post and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN208792737U (en) For hanging the detachable connecting part of external platform hanging girder steel
CN103556648B (en) Removable assembled steel case single footing
CN207863840U (en) A kind of prefabricated door pillar in construction site
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN202596184U (en) Lifting node for assembly type large wallboard
CN108547383B (en) Hoisting and inclined strut integrated embedded part and using method
CN205976733U (en) Can have enough to meet need encloses fender temporarily
CN210395437U (en) Utility tunnel and prefabricated pipe thereof with self-repairing function
CN204800838U (en) A built -up plate for parapet production
CN205063526U (en) Assembled enclosure with preparation of building rubbish
CN210758391U (en) Prefabricated component demoulding horizontal hoisting assembly capable of being recycled
CN205711974U (en) A kind of Retaining Wall
CN202519586U (en) Steel-wood combination type clear water concrete bridge pier formwork structure
CN105201278A (en) Assembly type fence wall made of construction waste
CN211229781U (en) Novel prefabricated hollow enclosure
CN204626774U (en) A kind of rapidly-assembled C type lightweight inner partition wall plate
CN203666706U (en) Simple two-wheel lever transportation tool
CN203247771U (en) Novel supporting column provided with steel structure
CN201151954Y (en) Steel column and concrete column connection structure
CN215803087U (en) Safe operation platform for open caisson
CN204753619U (en) Assembled tower crane basis seat
CN205600927U (en) Immature soil brickmaking machine
CN205777484U (en) Elevator Integral lifting core
CN104085045A (en) Slurry blocking die of inner flying ring of solid square pile
CN210421820U (en) Wall embedded part for outdoor painting of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180914

CF01 Termination of patent right due to non-payment of annual fee