CN105201278A - Assembly type fence wall made of construction waste - Google Patents
Assembly type fence wall made of construction waste Download PDFInfo
- Publication number
- CN105201278A CN105201278A CN201510607851.7A CN201510607851A CN105201278A CN 105201278 A CN105201278 A CN 105201278A CN 201510607851 A CN201510607851 A CN 201510607851A CN 105201278 A CN105201278 A CN 105201278A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- groove
- tongue
- wall column
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention relates to the technical field of constructions, in particular to an assembly type fence wall made of construction waste. The assembly type fence wall comprises bases, wall columns, ground beams, wallboards, pressing beams and column top ornaments, wherein the bottom ends of the bases are located in a foundation, the wall columns are connected to the bases in a mortised mode, one ground beam is connected between every two adjacent bases in a mortised mode, the wallboards are connected to the upper side of the ground beams in a mortised mode, the two side edges of each wallboard are located between the corresponding two wall columns in an abutting-against mode, the pressing beams are connected to the wallboards in a mortised mode, and the column top ornaments are connected to the upper ends of the wall columns in a mortised mode. The bases, the wall columns, the ground beams, the wallboards, the pressing beams and the column top ornaments are formed by stirring, mixing, mashing and forming the construction waste as aggregate as well as cement, lime and flyash which serve as composite cementitious materials, and are each prepared from, by weight, 90-110 parts of cement, 30-40 parts of flyash, 15-30 parts of lime and 750-900 parts of construction waste. The assembly type fence wall made of the construction waste is convenient to assemble and disassemble, firm in structure, attractive in appearance, durable and capable of being circularly used repeatedly, and the construction cost can be effectively reduced.
Description
Technical field
The present invention relates to technical field of buildings, the enclosure wall particularly in a kind of building operations building site.
Background technology
In order to safe construction, building site needs to fence up with enclosure wall, and at present at construction site, great majority adopt brick enclosure wall and color steel watt partition enclosure wall, these two kinds of enclosure walls have the following disadvantages: what 1, brick enclosure wall adopted is medical disposable material, working procedure is more, long in time limit, and cost is high, the waste material removing enclosure wall generation after Practical Completion is more, increase waste discharge amount, cause environment pollution, do not meet country's " energy-saving and emission-reduction " policy; 2, color steel watt enclosure wall, easily damage, theftproof performance is poor, is only suitable for duration shorter work items.
Summary of the invention
The object of the invention is the defect existed for prior art, the Assembled enclosing wall that a kind of building waste makes is provided, this enclosure wall easy accessibility, sound construction, good looking appearance, durable in use, turnover use can be repeated, effectively can reduce construction cost.
The technical scheme that the present invention adopts for achieving the above object is: the Assembled enclosing wall that a kind of building waste makes, comprise basis, wall column, grade beam, wallboard, pressure beam, bottom, basis is positioned in ground, the basic tenon of outstanding basic upper surface is embedded with in basis, basis tenon is provided with the fixed bolt hole run through, wall column is connected to basic upper surface, the center bottom of wall column caves inward the wall column tongue-and-groove be provided with for accommodating basic tenon, wall column bottom two lateral walls is provided with position relatively and run through the connecting screw hole of wall column tongue-and-groove, when basic tenon on basis is positioned in the wall column tongue-and-groove of wall column bottom, wall column is fixed on basic upper surface through the fixed bolt hole on connecting screw hole and basic tenon by standing screw, the connection push pedal for connecting grade beam is connected in the bottom of wall column relative both sides outer wall, the grade beam tongue-and-groove I caved inward is provided with on the downside of grade beam two ends, grade beam upper surface is provided with for accommodating wallboard and in the grade beam tongue-and-groove II of strip to lower recess, grade beam tongue-and-groove I joggle at grade beam two ends is outside the connection push pedal of wall column bottom, wallboard bottom joggle is in the grade beam tongue-and-groove II of grade beam upper surface, wallboard upper end is connected with the wallboard tenon of outstanding wallboard upper surface, pressure beam is provided with the pressure beam tongue-and-groove I relative with the wallboard tenon position of wallboard upper end, pressure beam is arranged on wallboard, and the wallboard tenon of wallboard upper end and the mutual joggle of pressure beam tongue-and-groove I of pressing beam.
Further technical scheme of the present invention is: also comprise the capital gadget being connected to wall column upper end, wall column top is projecting the wall column suspension ring be embedded in wall column, capital gadget bottom surface caves inward in the position that the wall column suspension ring position with wall column top is relative and is provided with capital tongue-and-groove, when capital gadget is assemblied in wall column top, wall column suspension ring and the mutual joggle of capital tongue-and-groove.
Further technical scheme of the present invention is: described basic upper surface is provided with two the basic tenons be arranged side by side, two basic tenons are respectively equipped with the fixed bolt hole that position is mutually corresponding, are connected with the basic suspension ring of being convenient to basis to mention on the top of two basic tenons.
Further technical scheme of the present invention is: the grade beam tongue-and-groove I of described grade beam and grade beam tongue-and-groove II are formed by presetting channel-section steel in grade beam respectively, are also embedded with in grade beam tongue-and-groove II both sides of grade beam upper surface the grade beam suspension ring being convenient to grade beam to sling respectively.
Further technical scheme of the present invention is: described pressure back end is arranged in the prominent part of the pressure beam suspension ring being embedded in and being convenient to pressure beam to sling in pressure beam, pressure beam bottom caves inward the pressure beam tongue-and-groove II being provided with and coordinating with wallboard upper end, and pressure beam tongue-and-groove II by presetting channel-section steel formation in pressure beam.
Further technical scheme of the present invention is: the core bore being provided with evenly arrangement in described wallboard, and the both side edges of wallboard and upper and lower sides edge form corner protector respectively by shaped steel bound edge.
Further technical scheme of the present invention is: described basis, wall column, grade beam, wallboard, pressure beam, capital gadget are all take building waste as aggregate, with cement, lime, flyash for composite gelled material, be shaped through being uniformly mixed ramming, wherein the weight ratio of each material is 90 ~ 110 parts of cement, 30 ~ 40 parts of flyash, 15 ~ 30 parts of lime, 750 ~ 900 parts of building wastes.
Further technical scheme of the present invention is: wherein the weight ratio of each material is 100 parts of cement, 35 parts of flyash, 18 parts of lime, 825 parts of building wastes.
The Assembled enclosing wall that the present invention's building waste makes has following beneficial effect: 1, enclosure wall of the present invention adopts fabricated construction, and structural performance is good, durable in use, can repeat turnover and use, produce expense few, and no matter duration length all can use; 2, between each component of enclosure wall, assembling links employing joggle, and mounting or dismounting are convenient, and installation period is short; 3, the material of enclosure wall of the present invention mainly uses building waste and flyash, turns waste into wealth, and saves material, meets country's " energy-saving and emission-reduction " policy, have good social benefit and environmental benefit.
Below in conjunction with drawings and Examples, the Assembled enclosing wall that the present invention's building waste makes is further described.
Accompanying drawing explanation
Fig. 1 is the package assembly schematic diagram of the Assembled enclosing wall that the present invention's building waste makes;
Fig. 2 is the top view on basis;
Fig. 3 is the lateral view on basis;
Fig. 4 is the elevation on basis;
Fig. 5 is the structural representation of wall column;
Fig. 6 is the A-A direction sectional view of Fig. 5;
Fig. 7 is the structural representation of grade beam;
Fig. 8 is the B-B direction sectional view of Fig. 7;
Fig. 9 is the structural representation of pressure beam;
Figure 10 is the C-C direction sectional view of Fig. 9;
Figure 11 is the D-D direction sectional view of Fig. 9;
Figure 12 is the structural representation of wallboard;
Figure 13 is the E-E direction sectional view of Figure 12;
Figure 14 is the front elevation view of capital gadget;
Figure 15 is the side elevational view of capital gadget;
Figure 16 is the upward view of capital gadget;
Element numbers illustrates: 1-basis, 11-basis tenon, 12-basis suspension ring, 13-fixed bolt hole, 2-grade beam, 21-grade beam suspension ring, 22-grade beam tongue-and-groove II, 23-grade beam tongue-and-groove I, 3-ground, 4-wallboard, 41-wallboard tenon, 42-corner protector, 43-core bore, 5-presses beam, and 51-presses beam tongue-and-groove I, 52-to press beam tongue-and-groove II, 53-to press beam suspension ring, 6-capital gadget, 61-capital tongue-and-groove, 7-wall column, 71-wall column suspension ring, 72-wall column tongue-and-groove, 73-standing screw, 74-connects push pedal, 75-connecting screw hole.
Detailed description of the invention
As shown in Fig. 1 to Figure 16, the Assembled enclosing wall that the present invention makes of building waste, comprise basis 1, wall column 7, grade beam 12, wallboard 4, pressure beam 5, basis 1 is the large cone-shaped in little upper end, bottom, 1 bottom, basis is positioned in ground 3, the basic tenon 11 of outstanding basic 1 upper surface is embedded with in basis 1, basis tenon 11 is provided with the fixed bolt hole 13 run through, and in the present embodiment, basis 1 upper surface is provided with two the basic tenons 11 be arranged side by side, two basic tenons 11 are respectively equipped with the fixed bolt hole 13 that position is mutually corresponding, the basic suspension ring 12 of being convenient to basis 1 to mention are connected with on the top of two basic tenons 11.
Wall column 7 is connected to basic 1 upper surface, the center bottom of wall column 7 caves inward the wall column tongue-and-groove 72 be provided with for accommodating basic tenon 11, wall column 7 bottom two lateral walls is provided with position relatively and run through the connecting screw hole 75 of wall column tongue-and-groove 72, when basic tenon 11 on basis 1 is positioned in the wall column tongue-and-groove 72 of wall column 7 bottom, wall column 7 is fixed on basic 1 upper surface through the fixed bolt hole 13 on connecting screw hole 75 and basic tenon 11 by standing screw 73, the connection push pedal 74 for connecting grade beam 12 is connected in the bottom of wall column 7 relative both sides outer wall, connecting push pedal 74 is one section of channel-section steel.
The grade beam tongue-and-groove I 23 caved inward is provided with on the downside of grade beam 12 two ends, grade beam 12 upper surface is provided with for accommodating wallboard 4 and in the grade beam tongue-and-groove II 22 of strip to lower recess, grade beam tongue-and-groove I 23 joggle at grade beam 12 two ends is outside the connection push pedal 74 of wall column 7 bottom, wallboard 4 bottom joggle is in the grade beam tongue-and-groove II 22 of grade beam 12 upper surface, the grade beam tongue-and-groove I 23 of grade beam 12 becomes by burying channel steel shape in grade beam 12 in advance underground respectively with grade beam tongue-and-groove II 22, when building grade beam 12, channel-section steel is preset in the position of grade beam tongue-and-groove I 23 and grade beam tongue-and-groove II 22 correspondence, the opening of channel-section steel outwardly, namely the groove of building shaping rear channel-section steel itself forms grade beam tongue-and-groove I 23 and grade beam tongue-and-groove II 22.The grade beam suspension ring 21 being convenient to grade beam 12 to sling also are embedded with respectively in grade beam tongue-and-groove II 22 both sides of grade beam 12 upper surface.
Wallboard 4 upper end is connected with the wallboard tenon 41 of outstanding wallboard 4 upper surface, the double suspension ring doing hanging screen plate 4 of wallboard tenon 41 are used, the core bore 43 of evenly arrangement is provided with in wallboard 4, core bore 43 be arranged so that the overall weight of wallboard 4 is effectively reduced, when making wallboard 4, use of loosing core is done with 45 steel pipes, when wallboard 4 final set, steel pipe is extracted out, be convenient to form core bore 43 cavity, the both side edges of wallboard 4 and upper and lower sides edge form corner protector 42 respectively by shaped steel bound edge, so that wallboard 4 is not easy when docking with other component the edge that collapses, and effectively improves its application life.
Pressure beam 5 is provided with the pressure beam tongue-and-groove I 51 relative with wallboard tenon 41 position of wallboard 4 upper end, and pressure beam 5 is arranged on wallboard 4, and the wallboard tenon 41 of wallboard 4 upper end and the mutual joggle of pressure beam tongue-and-groove I 51 of pressing beam 5.Pressure beam 5 top is arranged in the prominent part of the pressure beam suspension ring 53 being embedded in and being convenient to pressure beam 5 to sling in pressure beam 5, pressure beam 5 bottom caves inward the pressure beam tongue-and-groove II 52 being provided with and coordinating with wallboard 4 upper end, pressure beam tongue-and-groove II 52 by burying channel steel shape in advance underground in pressure beam 5, when building pressure beam 5, channel-section steel is preset in the position of pressure beam tongue-and-groove II 52 correspondence, channel-section steel opening down, namely the groove of building shaping rear channel-section steel itself forms pressure beam tongue-and-groove II 52.
The Assembled enclosing wall that the present invention's building waste makes also comprises the capital gadget 6 being connected to wall column 7 upper end, wall column 7 top is projecting the wall column suspension ring 71 be embedded in wall column 7, the double tenon done when being connected with capital gadget 6 of wall column suspension ring 71, capital gadget 6 bottom surface caves inward in the position that wall column suspension ring 71 position with wall column 7 top is relative and is provided with capital tongue-and-groove 61, when capital gadget 6 is assemblied in wall column 7 top, wall column suspension ring 71 and capital tongue-and-groove 61 joggle mutually.
Install Assembled enclosing wall that the present invention building waste makes install below order carry out: basic earthwork excavation, installation foundation, installation wall column and grade beam tenon, grade beam is installed, wallboard is installed, the facing of pressing beam, erection column cresting part, wall is installed.
Enclosure wall Installation features: during (1) installation foundation, notice that the direction of basic tenon 11 and wall column, grade beam direction are consistent, in order to avoid affect subsequent installation; (2) when installing wall column, grade beam tenon, basis, wall column, grade beam tenon are linked together with bolt, screw rod requires to give prominence to grade beam tenon; (3) when installing wallboard, temporary fixed support wallboard, prevent wallboard from toppling over, and install pressure beam as early as possible, after installing pressure beam, the tenon be connected with pressure beam with timber wedge jam-pack wallboard, makes pressure beam and wallboard form entirety; (4), during erection column cresting part 6, the tenon be connected with capital gadget 6 with timber wedge jam-pack wall column, makes whole enclosure wall form entirety.
Enclosure wall remove, by installation opposite sequence one by one component carry out removing, clearing up classify and pile up, be transported to another building site and install and use.
The Assembled enclosing wall that the present invention makes of building waste, wherein basis, wall column, grade beam, wallboard, pressure beam, capital gadget are all take building waste as aggregate, with cement, lime, flyash for composite gelled material, be shaped through being uniformly mixed ramming, wherein the weight ratio of each material is 90 ~ 110 parts of cement, 30 ~ 40 parts of flyash, 15 ~ 30 parts of lime, 750 ~ 900 parts of building wastes.According to silicate cement hydration product property, infiltrate flyash and pulverized limestone, more C-S-H gel can be formed, play the effect increasing calcium, impel product strength to improve and performance improvement.In the present embodiment, when making basis, wall column, grade beam, wallboard, pressure beam, capital gadget, first make template, need arrangement of reinforcement reinforcing bar is located in a template, then by weight by 100 parts of cement, 35 parts of flyash, 18 parts of lime, 825 parts of building wastes, mixing and water adding stirs and is poured in template again.
The original weight ratio of cement, flyash, lime, building waste four kinds is through that proportioning test repeatedly obtains.The weight ratio of certain cement, flyash, lime, building waste is also not limited to the amount cited by the present embodiment, as long as all can reach the requirement of common buildings building site to enclosure wall intensity within the scope of the invention.
Claims (8)
1. the Assembled enclosing wall made of building waste, it is characterized in that, comprise basis (1), wall column (7), grade beam (2), wallboard (4), pressure beam (5), (1) bottom, basis is positioned in ground (3), the basic tenon (11) of outstanding basis (1) upper surface is embedded with in basis (1), basis tenon (11) is provided with the fixed bolt hole (13) run through, wall column (7) is connected to basis (1) upper surface, the center bottom of wall column (7) caves inward the wall column tongue-and-groove (72) be provided with for accommodating basic tenon (11), wall column (7) bottom two lateral walls is provided with position relatively and run through the connecting screw hole (75) of wall column tongue-and-groove (72), when basic tenon (11) on basis (1) is positioned in the wall column tongue-and-groove (72) of wall column (7) bottom, wall column (7) is fixed on basis (1) upper surface through the fixed bolt hole (13) on connecting screw hole (75) and basic tenon (11) by standing screw (73), the connection push pedal (74) for connecting grade beam (2) is connected in the bottom of wall column (7) relative both sides outer wall, the grade beam tongue-and-groove I (23) caved inward is provided with on the downside of grade beam (2) two ends, grade beam (2) upper surface is provided with for accommodating wallboard (4) and in the grade beam tongue-and-groove II (22) of strip to lower recess, grade beam tongue-and-groove I (23) joggle at grade beam (2) the two ends connection push pedal (74) in wall column (7) bottom outward, wallboard (4) bottom joggle is in the grade beam tongue-and-groove II (22) of grade beam (2) upper surface, wallboard (4) upper end is connected with the wallboard tenon (41) of outstanding wallboard (4) upper surface, pressure beam (5) is provided with the pressure beam tongue-and-groove I (51) relative with wallboard tenon (41) position of wallboard (4) upper end, pressure beam (5) is arranged on wallboard (4), and the wallboard tenon (41) of wallboard (4) upper end and the mutual joggle of pressure beam tongue-and-groove I (51) of pressing beam (5).
2. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, also comprise the capital gadget (6) being connected to wall column (7) upper end, wall column (7) top is projecting the wall column suspension ring (71) be embedded in wall column (7), capital gadget (6) bottom surface caves inward in the position that wall column suspension ring (71) position with wall column (7) top is relative and is provided with capital tongue-and-groove (61), when capital gadget (6) is assemblied in wall column (7) top, wall column suspension ring (71) and capital tongue-and-groove (61) joggle mutually.
3. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, described basis (1) upper surface is provided with two the basic tenons (11) be arranged side by side, two basic tenons (11) are respectively equipped with the fixed bolt hole (13) that position is mutually corresponding, are connected with the basic suspension ring (12) of being convenient to basis (1) to mention on the top of two basic tenons (11).
4. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, the grade beam tongue-and-groove I (23) of described grade beam (2) and grade beam tongue-and-groove II (22) are formed by presetting channel-section steel in grade beam (2) respectively, are also embedded with in grade beam tongue-and-groove II (22) both sides of grade beam (2) upper surface the grade beam suspension ring (21) being convenient to grade beam (2) to sling respectively.
5. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, described pressure beam (5) top is arranged in the prominent part of the pressure beam suspension ring (53) being embedded in and being convenient to pressure beam (5) to sling in pressure beam (5), pressure beam (5) bottom caves inward the pressure beam tongue-and-groove II (52) being provided with and coordinating with wallboard (4) upper end, and pressure beam tongue-and-groove II (52) by presetting channel-section steel formation in pressure beam (5).
6. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, be provided with the core bore (43) of evenly arrangement in described wallboard (4), the both side edges of wallboard (4) and upper and lower sides edge form corner protector (42) respectively by shaped steel bound edge.
7. as claimed in claim 2 with the Assembled enclosing wall that building waste makes, it is characterized in that, described basis (1), wall column (7), grade beam (2), wallboard (4), pressure beam (5), capital gadget (6) are all take building waste as aggregate, with cement, lime, flyash for composite gelled material, be shaped through being uniformly mixed ramming, wherein the weight ratio of each material is 90 ~ 110 parts of cement, 30 ~ 40 parts of flyash, 15 ~ 30 parts of lime, 750 ~ 900 parts of building wastes.
8., as claimed in claim 7 with the Assembled enclosing wall that building waste makes, it is characterized in that, wherein the weight ratio of each material is 100 parts of cement, 35 parts of flyash, 18 parts of lime, 825 parts of building wastes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510607851.7A CN105201278A (en) | 2015-09-22 | 2015-09-22 | Assembly type fence wall made of construction waste |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510607851.7A CN105201278A (en) | 2015-09-22 | 2015-09-22 | Assembly type fence wall made of construction waste |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105201278A true CN105201278A (en) | 2015-12-30 |
Family
ID=54949204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510607851.7A Pending CN105201278A (en) | 2015-09-22 | 2015-09-22 | Assembly type fence wall made of construction waste |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105201278A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109236033A (en) * | 2018-09-14 | 2019-01-18 | 拓暄建设科技有限公司 | A kind of building prefabrication Assembled enclosing wall and its production technology |
CN114482694A (en) * | 2022-01-27 | 2022-05-13 | 桃江诚友绿色装配式建筑科技有限公司 | Assembled concrete greening construction enclosure wall |
CN114893065A (en) * | 2022-01-25 | 2022-08-12 | 桃江诚友绿色装配式建筑科技有限公司 | Recycled aggregate concrete multi-ribbed sandwich movable enclosing wall |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1072160A (en) * | 1992-08-15 | 1993-05-19 | 张维一 | Non-burning blocks with building refuse and manufacture method thereof |
CN1477075A (en) * | 2002-08-19 | 2004-02-25 | 胡永忠 | Building wastes strap board and production method |
CN101302087A (en) * | 2007-05-08 | 2008-11-12 | 顾佳勋 | Building block made from garbage and used for filler wall and production process thereof |
CN202000744U (en) * | 2011-03-28 | 2011-10-05 | 湖州立方新材料有限公司 | Mounting structure of fence |
CN203022422U (en) * | 2012-07-20 | 2013-06-26 | 天津凯淳建材发展有限公司 | Enclosure with prefabricated structure |
CN203188682U (en) * | 2012-12-20 | 2013-09-11 | 湖南送变电勘察设计咨询有限公司 | Light and environment-friendly assembly type combined enclosure |
CN203924897U (en) * | 2014-04-24 | 2014-11-05 | 中国建筑第六工程局有限公司 | Enclosing structure for building site |
CN204112860U (en) * | 2014-09-24 | 2015-01-21 | 窦秀香 | Detachable enclosure wall |
CN204475978U (en) * | 2015-02-12 | 2015-07-15 | 杜昌君 | A kind of assembling column of Assembled surrounding wall |
CN205063526U (en) * | 2015-09-22 | 2016-03-02 | 广西建工集团第三建筑工程有限责任公司 | Assembled enclosure with preparation of building rubbish |
-
2015
- 2015-09-22 CN CN201510607851.7A patent/CN105201278A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1072160A (en) * | 1992-08-15 | 1993-05-19 | 张维一 | Non-burning blocks with building refuse and manufacture method thereof |
CN1477075A (en) * | 2002-08-19 | 2004-02-25 | 胡永忠 | Building wastes strap board and production method |
CN101302087A (en) * | 2007-05-08 | 2008-11-12 | 顾佳勋 | Building block made from garbage and used for filler wall and production process thereof |
CN202000744U (en) * | 2011-03-28 | 2011-10-05 | 湖州立方新材料有限公司 | Mounting structure of fence |
CN203022422U (en) * | 2012-07-20 | 2013-06-26 | 天津凯淳建材发展有限公司 | Enclosure with prefabricated structure |
CN203188682U (en) * | 2012-12-20 | 2013-09-11 | 湖南送变电勘察设计咨询有限公司 | Light and environment-friendly assembly type combined enclosure |
CN203924897U (en) * | 2014-04-24 | 2014-11-05 | 中国建筑第六工程局有限公司 | Enclosing structure for building site |
CN204112860U (en) * | 2014-09-24 | 2015-01-21 | 窦秀香 | Detachable enclosure wall |
CN204475978U (en) * | 2015-02-12 | 2015-07-15 | 杜昌君 | A kind of assembling column of Assembled surrounding wall |
CN205063526U (en) * | 2015-09-22 | 2016-03-02 | 广西建工集团第三建筑工程有限责任公司 | Assembled enclosure with preparation of building rubbish |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109236033A (en) * | 2018-09-14 | 2019-01-18 | 拓暄建设科技有限公司 | A kind of building prefabrication Assembled enclosing wall and its production technology |
CN114893065A (en) * | 2022-01-25 | 2022-08-12 | 桃江诚友绿色装配式建筑科技有限公司 | Recycled aggregate concrete multi-ribbed sandwich movable enclosing wall |
CN114482694A (en) * | 2022-01-27 | 2022-05-13 | 桃江诚友绿色装配式建筑科技有限公司 | Assembled concrete greening construction enclosure wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201206328Y (en) | Preform formwork of cast-in-place concrete rib floor | |
CN105971159B (en) | A kind of masonry shell mechanism in 3D printing reinforced masonry shear wall | |
CN203213346U (en) | Connecting structure for assembling integral concrete frame and shear wall | |
CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
CN201952942U (en) | Bearing structure and house structure | |
CN111535347A (en) | Prefabricated slab tire membrane nested connection structure and construction method | |
CN105201278A (en) | Assembly type fence wall made of construction waste | |
CN210598410U (en) | Recycled concrete assembled enclosure wall | |
CN103343547B (en) | Container type prefabricated house assembling steel reinforced concrete four patten and construction method | |
CN205577120U (en) | Assembly component of light -duty pottery glass siding wall and floor | |
CN205063526U (en) | Assembled enclosure with preparation of building rubbish | |
CN201224941Y (en) | Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building | |
CN201649123U (en) | Assembly integrated counterfort retaining wall | |
CN202596025U (en) | Preformed frame light big wall plate | |
CN205530324U (en) | Cold-formed thin-wall section steel micro pile | |
CN204551765U (en) | Buffer isolator between building structure | |
CN212129215U (en) | Counterfort type retaining wall capable of being constructed quickly | |
CN201554035U (en) | Horseshoe pre-cast block-type wall board structure used in reinforced earth retaining walls | |
CN204825958U (en) | Concrete foundation for outdoor distributing box | |
CN212294718U (en) | Prefabricated plate child membrane nested connection structure | |
CN205712826U (en) | A kind of damping precast stair | |
CN204899034U (en) | Prefabricated wall post | |
CN217079310U (en) | Truss floor board with reinforcing bar protective layer | |
CN100489232C (en) | Light permanent carcass for filling concrete | |
CN204000958U (en) | A kind of novel ater-casting place braced structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151230 |