CN205577120U - Assembly component of light -duty pottery glass siding wall and floor - Google Patents

Assembly component of light -duty pottery glass siding wall and floor Download PDF

Info

Publication number
CN205577120U
CN205577120U CN201620405150.5U CN201620405150U CN205577120U CN 205577120 U CN205577120 U CN 205577120U CN 201620405150 U CN201620405150 U CN 201620405150U CN 205577120 U CN205577120 U CN 205577120U
Authority
CN
China
Prior art keywords
wallboard
pottery glass
floor
concrete
pottery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620405150.5U
Other languages
Chinese (zh)
Inventor
陈秋林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Lu Fang Building Materials Technology Co Ltd
Original Assignee
Hangzhou Lu Fang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Lu Fang Building Materials Technology Co Ltd filed Critical Hangzhou Lu Fang Building Materials Technology Co Ltd
Priority to CN201620405150.5U priority Critical patent/CN205577120U/en
Application granted granted Critical
Publication of CN205577120U publication Critical patent/CN205577120U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to an assembly component of light -duty pottery glass siding wall and floor. Upper tao bo concrete wallboard, lower floor's pottery glass concrete wallboard in all be equipped with the fabrication hole, have a perfect understanding fixedly mutually through the steel column core between upper taobo concrete wallboard and the lower floor pottery glass concrete wallboard, upper tao bo concrete wallboard, lower floor's pottery glass concrete wallboard between cast in situs have recessive collar tie beam, recessive collar tie beam one side is fixed with pottery glass concrete floor, upper tao bo concrete wallboard, lower floor's pottery glass concrete wallboard in the lengthwise position be equipped with wallboard owner muscle, the horizontal position is equipped with wallboard distribution muscle, and is close to recessive collar tie beam position and is equipped with the wallboard and strengthens the distribution muscle, the utility model discloses not only can be according to the different usage and the function of building, prepare out the pottery glass concrete material of different unit weights and intensity, the construction is simple and convenient moreover, and on -the -spot aggregate erection reduces on -the -spot wet trade volume and construction work volume, makes on -the -spot construction cycle weak point, the material resources of using manpower sparingly, reduction construction costs.

Description

A kind of light-duty pottery glass board wall and the mounting structure of floor
Technical field
This utility model relates to the mounting structure of a kind of light-duty pottery glass board wall and floor.
Background technology
From the traditional planned economy epoch to market economy times open now, the building industry of China experienced by countless change Move.China is as developing country, and building industry is in a series of big good opportunity period accelerated development, and reduction energy consumption, antidetonation subtract Calamity, protecting ecology and environment, improving people's work with quality of life is the most popular topic, uses new material, application new Technique;Improve construction quality, improve work efficiency;Reduce and pollute and waste, minimizing field operation, it is achieved civilized construction is current techniques Progressive important symbol;Strengthen key technology innovation and system of systems is integrated, it is achieved the industrialization of building construction, variation, work Industry, will be the development trend of New Century Architecture industry.Assembled architecture is the main flow of 21 century world architecture industry technology development, mesh The developing direction of front assembled architecture mainly uses steel construction or multilamellar that armored concrete is frame system or skyscraper (but the jointing of floor wallboard is for cast-in-place), and by steel construction or reinforced beam, post framework and supporting exterior wall, room The materials such as face, interior wall, floor all use prefabricated, can at the scene direct-assembling construction building be also difficult to disposably complete.Mesh Before have number of types of assembled sheet material on the market, such as ALC building block, ceramsite concrete blocks and ultralight steel construction etc., but application The most extensive.The most apparently, there is following reason: the first concept of people does not the most get a new look.Due to nearly tens Chinese cast-type way of always continuing to use over Nian, cast-in-place concept is deep-rooted in the minds of people, therefore will be by assembled-type house body System is promoted on a large scale, in addition it is also necessary to for a long time;Secondly, the technology of assemblingization is the most consummate.Due to domestic commonly used Cast-type way, the experience of this respect accumulation is the abundantest, and technology is the most consummate, therefore account for the market share is relatively big, This causes assembled system popularity rate at home the highest, and technology has to be strengthened;It addition, building materials industry and building industry production and construction are still Being in the extensive production stage, intensive degree is low, and production and construction are backward in technique, and labor productivity is low.These factors just Exist so that the application of assembled-type house system is the most extensive.Another important reason is cost.In the past few decades, China is in the state that low-grade laborers is superfluous, and same time housing industrialization technology does not has full maturity yet, the non-established practice of industry Modelling develops, and enterprise promotes relatively costly, not as using traditional handicraft in terms of economy.But along with the most domestic labour force The rising of cost, has had increasing Enterprise Consciousness to arrive the necessity of housing industrialization, has all started to promote assembled to build The development built.
Summary of the invention
The purpose of this utility model is to provide the mounting structure of a kind of light-duty pottery glass board wall and floor.
This utility model solves its above-mentioned technical problem and is used following technical scheme: a kind of light-duty pottery glass board wall with The mounting structure of floor, it is mainly configured with: upper strata Tao Bo concrete wall, pottery glass concrete building plate, steel column core, the main muscle of wallboard, fill sand Slurry, wallboard distributing reinforcement, wallboard strengthen distributing reinforcement, levelling clay, the main muscle of wallboard, wallboard distributing reinforcement, foam concrete, lower floor's pottery glass concrete wall Plate, ring-like stirrup, grout groove, fabrication hole, recessive collar tie beam, be all provided with in described upper strata Tao Bo concrete wall, lower floor's pottery glass concrete wall There is fabrication hole, connect fixing by steel column core between upper strata Tao Bo concrete wall and lower floor's pottery glass concrete wall;
Between described upper strata Tao Bo concrete wall, lower floor's pottery glass concrete wall, cast in situs has recessive collar tie beam, recessiveness collar tie beam one Side is fixed with pottery glass concrete building plate;
In described upper strata Tao Bo concrete wall, lower floor's pottery glass concrete wall, lengthwise position is provided with the main muscle of wallboard, and lateral attitude sets There is wallboard distributing reinforcement, and be provided with wallboard reinforcement distributing reinforcement near recessive collar tie beam position;
Described pottery glass concrete building plate lateral attitude is provided with the main muscle of wallboard, and lengthwise position is provided with wallboard distributing reinforcement.
Above-mentioned recessive collar tie beam is perfused with foam concrete with pottery glass concrete building plate seam crossing.
Above-mentioned fabrication hole is by after steel column core socket joint, and remaining space is filled mortar and is in the milk.
The reinforcing bar of above-mentioned recessive collar tie beam and the main muscle of wallboard connect drawknot.
Paved at above-mentioned recessive collar tie beam and upper strata Tao Bo concrete wall contact surface levelling clay.
Make a circle outside above-mentioned fabrication hole and be provided with ring-like stirrup from top to bottom.
Above-mentioned upper strata Tao Bo concrete wall, lower floor's pottery glass concrete wall both sides all have grout groove.
It is equipped with temporary support bar on above-mentioned upper strata Tao Bo concrete wall, glass concrete building plate of making pottery, lower floor's pottery glass concrete wall.
The beneficial effects of the utility model: not only can make different unit weight according to the different purposes of building and function With the pottery glass concrete material of intensity (preparing for structure or the load-carrying members of insulation according to it), and letter of constructing Just, field combinations is installed, and reduces situ wet workload and construction workload, makes that the site operation cycle is short, uses manpower and material resources sparingly, drops Low building cost.
Accompanying drawing explanation
Fig. 1 is the mounting structure overall structure figure of a kind of light-duty pottery glass board wall of this utility model and floor.
Fig. 2 is the mounting structure exploded perspective structure chart of a kind of light-duty pottery glass board wall of this utility model and floor.
1-upper strata Tao Bo concrete wall in figure, 2-makes pottery glass concrete building plate, and 3-steel column core, the main muscle of 4-wallboard, 5-fills mortar, 6- Wallboard distributing reinforcement, 7-wallboard strengthens distributing reinforcement, the levelling clay of 8-, the main muscle of 9-wallboard, 10-wallboard distributing reinforcement, 11-foam concrete, 12- Lower floor's pottery glass concrete wall, the ring-like stirrup of 13-, 14-grout groove, 15-fabrication hole, 16-recessiveness collar tie beam.
Detailed description of the invention
Detailed description of the invention of the present utility model is made a detailed explanation by 1-2 below in conjunction with the accompanying drawings.
Embodiment: the mounting structure of a kind of light-duty pottery glass board wall and floor, it is mainly configured with: upper strata Tao Bo concrete wall 1, Pottery glass concrete building plate 2, steel column core 3, the main muscle of wallboard 4, filling mortar 5, wallboard distributing reinforcement 6, wallboard strengthen distributing reinforcement 7, levelling clay 8, the main muscle of wallboard 9, wallboard distributing reinforcement 10, foam concrete 11, lower floor pottery glass concrete wall 12, ring-like stirrup 13, grout groove 14, fabrication hole 15, recessive collar tie beam 16, is equipped with fabrication hole 15, upper strata Tao Bo in described upper strata Tao Bo concrete wall 1, lower floor's pottery glass concrete wall 12 Connect fixing by steel column core 3 between concrete wall 1 and lower floor's pottery glass concrete wall 12;
Between described upper strata Tao Bo concrete wall 1, lower floor's pottery glass concrete wall 12, cast in situs has a recessive collar tie beam 16, recessive encloses Beam 16 side is fixed with pottery glass concrete building plate 2;
In described upper strata Tao Bo concrete wall 1, lower floor's pottery glass concrete wall 12, lengthwise position is provided with the main muscle of wallboard 4, horizontal position Install wallboard distributing reinforcement 6, and be provided with wallboard reinforcement distributing reinforcement 7 near recessive collar tie beam 16 position;
Described pottery glass concrete building plate 2 lateral attitude is provided with the main muscle of wallboard 9, and lengthwise position is provided with wallboard distributing reinforcement 10.
Described recessive collar tie beam 16 is perfused with foam concrete 11 with pottery glass concrete building plate 2 seam crossing.
Described fabrication hole 15 is by after steel column core 3 socket joint, and remaining space is filled mortar 5 and is in the milk.
The reinforcing bar of described recessive collar tie beam 16 and the main muscle of wallboard 9 connect drawknot.
Paved at described recessive collar tie beam 16 and upper strata Tao Bo concrete wall 1 contact surface levelling clay 8.
Make a circle outside described fabrication hole 15 and be provided with ring-like stirrup 13 from top to bottom.
Described upper strata Tao Bo concrete wall 1, lower floor's pottery glass concrete wall 12 both sides all have grout groove 14.
It is equipped with temporary support bar on described upper strata Tao Bo concrete wall 1, glass concrete building plate 2 of making pottery, lower floor's pottery glass concrete wall 12.
The actual construction scheme using concrete data below carries out the explanation of a case:
(1), first by pre-installation steel column core 3 in the fabrication hole 15 of the most mounted light concrete wallboard, and in fabrication hole 15 Pour into filling mortar 5, before initial set, off normal and the perpendicularity correction of steel column core 3 just and are shocked closely knit simultaneously.Other do not fill post The fabrication hole 15 of core seals with foam concrete 11.(note: the coupling part wearing steel column core 3 at fabrication hole 15 should set ring-shaped stirrup 13, ring The effect of u stirrup 13 is to ensure that steel column core 3 wallboard not cracking destruction when transmitting upper load, upper strata Tao Bo concrete wall 1, pottery Glass concrete building plate 2, connection end set reinforcement distributing reinforcement 7, increase the bulk strength of finished light pottery glass wallboard.)
(2) on upper strata Tao Bo concrete wall 1, pottery glass concrete building plate 2 contact surface, smear the levelling clay of one layer of 5mm.(clay is made Its contact surface is increased with the most effectively transmission upper load;2. the mortar leakage prevention when pouring recessive collar tie beam 16).
(3), finished product pottery glass concrete building plate 2 is shelved on lower floor's pottery glass concrete wall 12 of correspondence.Main for floor muscle is inserted wallboard In reserved main muscle, both main crosss dystopia of muscle and tendon open overlap, form the main muscle placed on the corner of square shape grid, as recessive collar tie beam 16 Main muscle, and bind by tied silk.
(4), check its wallboard, the off normal of floor, reinforcing bar and pipeline pre-buried errorless after pour into recessiveness with high-strength light concrete Collar tie beam 16 is interior and pours dense.
(5), after the intensity that the recessive collar tie beam 16 poured reaches 40%, top shingle nail, the mounting process of shingle nail are installed Wallboard is installed on the basis of Tong.

Claims (8)

1. a mounting structure for light-duty pottery glass board wall and floor, it is mainly configured with: upper strata Tao Bo concrete wall (1), pottery glass concrete Floor (2), steel column core (3), the main muscle of wallboard (4), filling mortar (5), wallboard distributing reinforcement (6), wallboard are strengthened distributing reinforcement (7), are looked for Flat clay (8), the main muscle of wallboard (9), wallboard distributing reinforcement (10), foam concrete (11), lower floor's pottery glass concrete wall (12), ring-like stirrup (13), grout groove (14), fabrication hole (15), recessive collar tie beam (16), it is characterised in that: upper strata Tao Bo concrete wall (1), lower floor's pottery glass It is equipped with fabrication hole (15) in concrete wall (12), between upper strata Tao Bo concrete wall (1) and lower floor's pottery glass concrete wall (12), passes through steel Post core (3) connects fixing;
Between described upper strata Tao Bo concrete wall (1), lower floor's pottery glass concrete wall (12), cast in situs has recessive collar tie beam (16), recessiveness Collar tie beam (16) side is fixed with pottery glass concrete building plate (2);
Described upper strata Tao Bo concrete wall (1), lower floor's pottery glass concrete wall (12) interior lengthwise position are provided with the main muscle of wallboard (4), laterally Position is provided with wallboard distributing reinforcement (6), and is provided with wallboard reinforcement distributing reinforcement (7) near recessive collar tie beam (16) position;
Described pottery glass concrete building plate (2) lateral attitude is provided with the main muscle of wallboard (9), and lengthwise position is provided with wallboard distributing reinforcement (10).
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described is hidden Property collar tie beam (16) with pottery glass concrete building plate (2) seam crossing be perfused with foam concrete (11).
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described work Skill hole (15) is by after steel column core (3) socket joint, and remaining space is filled mortar (5) and is in the milk.
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described is hidden Property collar tie beam (16) reinforcing bar and the main muscle of wallboard (9) connect drawknot.
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described is hidden Property collar tie beam (16) paved levelling clay (8) at Tao Bo concrete wall (1) contact surface of upper strata.
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described work Make a circle outside skill hole (15) and be provided with ring-like stirrup (13) from top to bottom.
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described is upper Layer pottery glass concrete wall (1), lower floor's pottery glass concrete wall (12) both sides all have grout groove (14).
A kind of light-duty pottery glass board wall the most according to claim 1 and the mounting structure of floor, it is characterised in that described is upper It is equipped with temporary support bar in layer pottery glass concrete wall (1), pottery glass concrete building plate (2), lower floor's pottery glass concrete wall (12).
CN201620405150.5U 2016-05-05 2016-05-05 Assembly component of light -duty pottery glass siding wall and floor Expired - Fee Related CN205577120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620405150.5U CN205577120U (en) 2016-05-05 2016-05-05 Assembly component of light -duty pottery glass siding wall and floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620405150.5U CN205577120U (en) 2016-05-05 2016-05-05 Assembly component of light -duty pottery glass siding wall and floor

Publications (1)

Publication Number Publication Date
CN205577120U true CN205577120U (en) 2016-09-14

Family

ID=56856218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620405150.5U Expired - Fee Related CN205577120U (en) 2016-05-05 2016-05-05 Assembly component of light -duty pottery glass siding wall and floor

Country Status (1)

Country Link
CN (1) CN205577120U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269087A (en) * 2017-07-27 2017-10-20 周兴和 The integrated building of high-grade earthquake can be resisted
CN107288350A (en) * 2017-07-07 2017-10-24 中国十七冶集团有限公司 A kind of quick socket joint device of assembled floor reserved steel bar
CN111561061A (en) * 2020-03-24 2020-08-21 河北工业大学 Assembled wallboard, wall structure and construction method of wall structure
CN111705947A (en) * 2020-05-07 2020-09-25 中建材创新科技研究院有限公司 Assembled wall and mounting method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288350A (en) * 2017-07-07 2017-10-24 中国十七冶集团有限公司 A kind of quick socket joint device of assembled floor reserved steel bar
CN107269087A (en) * 2017-07-27 2017-10-20 周兴和 The integrated building of high-grade earthquake can be resisted
CN111561061A (en) * 2020-03-24 2020-08-21 河北工业大学 Assembled wallboard, wall structure and construction method of wall structure
CN111705947A (en) * 2020-05-07 2020-09-25 中建材创新科技研究院有限公司 Assembled wall and mounting method thereof

Similar Documents

Publication Publication Date Title
US7882669B2 (en) Composite concrete shear wall for heat insulation
CN205577120U (en) Assembly component of light -duty pottery glass siding wall and floor
CN102031870B (en) Foaming material filling box with reinforced layer and slurry leakage hole
CN107313517B (en) Connecting node for laminated wall and laminated floor slab in middle layer
CN104612282B (en) Construction method of prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection
CN103590486B (en) Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method
CN104912230A (en) Modular assembly type composite wall and connecting mode thereof
CN104712079B (en) The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface
CN103924710A (en) Steel plate welding node structure of low-layer assembly type composite wall house
CN103993679A (en) Bolt connecting joint structure of low-rise fabricated composite wall house
CN103343572A (en) Novel prefabricated composite wallboard anti-seismic energy-saving rural residence structural system
CN206418663U (en) A kind of prefabricated combined wall board of novel fabricated H types
CN112695794A (en) Precast concrete L shape post rim of a cup basis
CN203821625U (en) Fiber cloth-reinforced mortar-free reinforced masonry shear wall
CN208105502U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN205116541U (en) Foaming light aggregate concrete partition plate
CN205576959U (en) Light -duty pottery glass siding wall and basic assembly component
CN204551801U (en) A kind of assembling out-hung panel
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house
CN114055597A (en) Fiber woven mesh reinforced ECC sandwich heat-insulation composite wallboard and manufacturing method thereof
CN211341890U (en) Reinforced anti-seismic floor slab of existing house prefabricated slab
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN205558475U (en) Light -duty assembled enclosure in villages and small towns
CN215670510U (en) Light-weight form-removal-free multifunctional wall body for prefabricated building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914

Termination date: 20180505