CN102031870B - Foaming material filling box with reinforced layer and slurry leakage hole - Google Patents

Foaming material filling box with reinforced layer and slurry leakage hole Download PDF

Info

Publication number
CN102031870B
CN102031870B CN 201010554837 CN201010554837A CN102031870B CN 102031870 B CN102031870 B CN 102031870B CN 201010554837 CN201010554837 CN 201010554837 CN 201010554837 A CN201010554837 A CN 201010554837A CN 102031870 B CN102031870 B CN 102031870B
Authority
CN
China
Prior art keywords
leakage hole
filling box
slurry leakage
foam material
ribs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010554837
Other languages
Chinese (zh)
Other versions
CN102031870A (en
Inventor
徐焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010554837 priority Critical patent/CN102031870B/en
Publication of CN102031870A publication Critical patent/CN102031870A/en
Application granted granted Critical
Publication of CN102031870B publication Critical patent/CN102031870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a foaming material filling box with a reinforced layer and a slurry leakage hole and a manufacturing method thereof, belonging to the field of building construction. A main material of a body (2) of the filling box (1) is a light weight foaming material, the plane shape of the filling box (1) is rectangular, and the ratio of a long side to a short side is not more than 2; the upper surface of the body (2) is provided with the hard reinforced layer (3), the outer surface of the body is provided with an isolation layer (4); the hard reinforced layer (3) is located between the body (2) and the isolation layer (4); tangential angles or arc chamfers (5) are arranged at the peripheries of the upper surface and the lower surface of the filling box (1); and the middle part of the filling box (1) is provided with the vertical slurry leakage hole (6), the upper end of the slurry leakage hole (6) is in a big end up funnel shape, and the lower end of the slurry leakage hole (6) is in a big end down inverse funnel shape. In the invention, the sectional shape of the filling box meets the mechanical requirement, and the filling box is very convenient for production, transportation and installation, and has better structural reliability, shock resistance and crack resistance and favorable economical efficiency and applicability.

Description

A kind of foam material filling box with enhancement Layer and slurry leakage hole
(1) technical field
The present invention relates to the packing material in a kind of reinforced concrete hollow floor structure, especially a kind of expanded material aeration tank with enhancement Layer and slurry leakage hole and preparation method thereof belongs to buildings in general structure field.
(2) background technology
At building field, along with the large-span concrete structure is increasing, increasing floor adopts the hollow floor structure technology.Sometimes in order to reduce dead load or to strengthen concrete insulation, heat insulation, sound insulation, damping effect, need to place some lightweight fillers in the concrete the inside.Replace the part concrete substantially can not affect the stress performance of structure with lightweight filler, but the deadweight that can greatly alleviate structure.
From the construction angle, when packing material is tubulose or bar-shaped time construction most convenient, concrete is easily built closely knit." structural member for concrete thin-wall cylinder " arranged, and (ZL98231113.3) " fibre reinforced hollow thin-wall tube for filling in bar reinforced concrete and manufacture method thereof " (ZL99115649.8) and " having the light porous material obturator that the multiple section shape is used for concrete " early stage correlation technique such as (ZL02293406.5), but these technology have certain limitation, larger such as ZL98231113.3 and the formed packing material deadweight of ZL99115649.8, and north of china in winter can't be in outdoor production; The mortar class separation layer intensity such as cement paste is lower in the obturator of ZL02293406.5, often need to strengthen with reinforcing cage in the construction.I " a kind of light foam material filling member with reinforced hard " also once proposed (ZL200420077923.9) and " a kind of pin-connected panel with a plurality of cavitys is filled pipe " (ZL200420077924.3).Although ZL200420077923.9 also has very high practical value, ZL200420077924.3 is the convenient suitability for industrialized production that realizes again, but these two technology and foregoing technology all also belong to the category of filling pipe or filler rod, hollow building cover hollow rate with these Material Fillings is less, and the macroeconomic type is relatively poor.
In hollow building cover, the floor hollow rate maximum of filling with casing undoubtedly, dead load is the lightest.In the prior art, " a kind of shuttering member " that Mr. Qiu Zeyou is arranged preferably (ZL200310100971.5), " a kind of shuttering member " (ZL200310100972.X), " a kind of shuttering member " (ZL200310100969.8), " a kind of hollow component used for concrete " (ZL03118393.X), " a kind of hollow component used for concrete " (ZL03147388.1), " a kind of light carcass mould member for in-situ casting " (ZL03157893.4), " a kind of filling concrete in situ lightweight member " (ZL200310121942.7).Also have Cheng Wen Mr. Rang " thin wall box for filling cement building roof " (ZL01245232.7), Mr.'s Wang Benmiao " thin wall box in-situ poured concrete hollow slab thin-wall box body " (ZL02282207.0), " casing (fillet) " (ZL200530117113.1) with " casing (right angle) " (ZL200530117112.7) etc.
In these technology, as: ZL200310100972.X, ZL03118393.X, ZL03147388.1, ZL200310100969.8, ZL03157893.4, the filling box section configuration mostly is greatly the rectangular enclosure member, is unfavorable for eliminating the stress concentration phenomenon of hollowcore slab inner corner portion.ZL200310100971.5, ZL200310121942.7 have chamfering, ZL01245232.7 box body basic configuration is the housing of cuboid, its end face is outer convex surface, this concentrates very beneficial for the stress of eliminating hollow tile floor slab one side, but when this box volume was too large, the concrete of bottom half was not easy closely knit.The thin-wall box body of ZL02282207.0 is tabular, sealed into top, bottom panel by perisporium, at the casing axis of centres to hollow section is set, connect box top, bottom panel, the centre bore of hollow section runs through top, bottom panel, and concrete can be closely knit with the concreting below the casing by the hollow section centre bore.The progress of ZL02282207.0 is to have invented centre bore to solve the closely knit problem of concreting, but in the implementation process, because center-hole diameter less (usually less than 150mm) is relatively more difficult toward the interior concrete placing of centre bore; If center-hole diameter is increased, then cause undoubtedly the hollow rate of structure to reduce; Simultaneously since this technology mainly for inorganic coagulation material (GRC class), because of the moulding process restriction, the filling box section configuration still be rectangle, still there are the concentrated phenomenon of stress in casing and centre bore bight.In ZL200530117113.1 and ZL200530117112.7, the upper and lower surface design of casing is become cambered surface, but this shape still is suitable for GRC class material.And the outstanding shortcoming of GRC class filling box is: pipeline installation is inconvenient in large, the easy breakage of material deadweight, the superstructure.
In above-mentioned numerous technology, different shortcomings is arranged respectively, in this case, develop a kind of lightweight foam material that is applicable to, reasonable stress, easy construction be used for the product that concrete is filled, become urgent problem in the current hollow building cover.
(3) summary of the invention
In the prior art, the problem such as have that the hollow building cover hollow rate is low, structure stress is unreasonable, the packing material cost is higher or construction is inconvenient, the object of the present invention is to provide a kind of foam material filling box with enhancement Layer and slurry leakage hole, this filling box cross sectional shape is relatively more perfect, can eliminate packing material stress concentration phenomenon on every side as far as possible, under the prerequisite that guarantees structure stress, can improve as much as possible the hollow rate of superstructure, can guarantee the concrete quality again, simultaneously this production, transportation and installation is all very convenient, and the anti shock and vibration performance is good.
On the basis of existing technology, for achieving the above object, the technical solution used in the present invention is: a kind of foam material filling box with enhancement Layer and slurry leakage hole is provided, the body master material of filling box is lightweight foam material, the flat shape of filling box is rectangle, its long limit is less than or equal to 2 with the ratio of minor face size, at the upper surface of body flat shape being arranged is the reinforced hard of annular, the external surface of body has separation layer, reinforced hard is between body and separation layer, there are corner cut or camber line chamfering in the upper and lower surface border of filling box, there is a vertical mortar leakage hole at the middle part of filling box, the upper end of slurry leakage hole is up big and down small infundibulate, the lower end of slurry leakage hole is the up-small and down-big infundibulate of falling, the invention is characterized in that body is assembled up and down by two or more member units, each member unit is by sidewall, face the wall and meditate and the ribs formation, ribs position in the adjacent members unit is corresponding and mutually be close to one by one, at the middle part of member unit one hole is arranged, be connected sidewall by ribs between the sidewall of hole and the sidewall of border, facing the wall and meditating with ribs all is the heavy wall of thickness 〉=25mm.
The flat shape that the invention is characterized in slurry leakage hole is rectangle, polygon, circle, ellipse or composite figure.
The invention is characterized in that slurry leakage hole upper and lower side funnel section both sides are shaped as oblique line, stepped line, camber line or assemble line.
The invention is characterized in that body master material lightweight foam material is extruded sheet, polystyrene foam plastics, Vestolit, polyurethane foam plastics.
The invention is characterized in that reinforced hard master material is cement mortar, hard plastic sheet, density board, pottery or the sheet metal of built-in grid cloth.
The invention is characterized in that separation layer master material is plastic adhesive tape, polyurethane coating, emulsion paint or elastic composite coating.
The preparation method of a kind of foam material filling box with enhancement Layer and slurry leakage hole of the present invention is: the body of producing lightweight foam material, corner cut or camber line chamfering are wanted in the upper and lower surface border of body, have a slurry leakage hole at the middle part of body, the upper and lower side of slurry leakage hole all is infundibulate, at the upper surface of body reinforced hard is installed, the external surface of body is pasted or is smeared separation layer.
Body is assembled up and down by two or more member units in the preparation method of a kind of foam material filling box with enhancement Layer and slurry leakage hole of the present invention, each member unit by sidewall, face the wall and meditate and ribs consists of, ribs position in the adjacent members unit is corresponding and mutually be close to one by one, at the middle part of member unit one hole is arranged, be connected by ribs between the sidewall of hole and the sidewall of border, sidewall, face the wall and meditate and ribs all is the heavy wall of thickness 〉=25mm.
After adopting such scheme, the present invention compared with prior art has following beneficial effect:
Engineering practice shows, maximum with the hollow building cover hollow rate that the casing of square-section is filled, but in this structure, the phenomenon that the bight of casing has stress to concentrate, the concrete thickness that adds solid rib between the concrete on the upper and lower surface of upper box and casing has a sudden change, because the inhomogeneities of concrete shrinkage, the crack easily appears in the plate surface concrete at these positions.Among the present invention corner cut or camber line chamfering are carried out in the upper and lower surface border of filling box, phenomenon concentrated, that abrupt changes in thickness do not occur on the one hand eliminates stress; Concrete on casing top is a dome shaped cover on the other hand, can greatly strengthen the ability that flooring bears point load, and the corner cut of lower box or chamfering can make things convenient for concrete.The upper and lower surface of casing major part is plane but not outer convex surface, the one, make the hollow rate of superstructure as far as possible large, the 2nd, between the upper and lower surface of casing and steel bar stress, isolated material is installed during convenient construction, make between steel bar stress and the casing and can effectively isolate, guarantee the safety of structure.Open a vertical mortar leakage hole at the filling box middle part, the upper end of slurry leakage hole is up big and down small infundibulate, and the lower end of slurry leakage hole is the up-small and down-big infundibulate of falling.The upper hopper of slurry leakage hole can guarantee under the slurry leakage hole cross dimension is tried one's best little prerequisite, greatly accelerates the speed that concrete flows into slurry leakage hole; Lower funnel can guarantee that then the coarse aggregate in the concrete can be rapidly and flow to without barrier the bottom of casing; Speed of application is accelerated in being arranged on of upper and lower funnel when guaranteeing concrete pouring quality.Behind the concrete formation, the concrete in the slurry leakage hole, being equivalent to has increased a joint pin between the upper and lower surperficial concrete slab of casing, and the joint pin upper and lower side all is with enlarged footing, and its mechanical mechanism is identical with cap in the slab column system.So this slurry leakage hole with upper and lower funnel, in floor use procedure in future, the partial pressing and the punch resistant capability that increase flooring also are very helpful.In casing, adopt lightweight foam material, then widened the range of application of this material in hollow building cover, overcome the shortcoming of pipeline installation inconvenience in large, the easy breakage of traditional GRC class tank material deadweight, the superstructure.When producing with the mould compacting, in order to save material, body can be made into cavity structure, but because the intensity of lightweight foam material own is lower, the thin-walled box that as the GRC class material wall thickness is no more than 10mm can't be produced, wall thickness 〉=25mm member unit can only be produced.In the adjacent members unit, the position of ribs is corresponding and be close to one by one, and ribs not only plays a part reinforced sidewall and faces the wall and meditates, and more plays a part external force is directly transmitted from top to bottom.A kind of foam material filling box with enhancement Layer and slurry leakage hole of the present invention, production, transportation and installation are all very convenient, and the anti shock and vibration performance is good.Hollow building cover span with this product formation is large, lightweight, sound insulation, good heat-insulation effect, and reliability of structure, shock resistance, crack resistance are also better.The present invention has good economy and applicability, and the development of Building technology is played a driving role.
The present invention will be further described below in conjunction with accompanying drawing.
(4) description of drawings
Fig. 1 is the vertical cross section organigram of filling box of the present invention.
Fig. 2 is filling box top view of the present invention.
Fig. 3 is the member unit vertical cross section figure that forms body among the present invention.
Fig. 4 is the member unit horizontal sectional drawing that forms body among the present invention.
Fig. 5 is the flat shape schematic diagram of slurry leakage hole among the present invention.
Fig. 6 is slurry leakage hole upper and lower side funnel section both sides lines shape schematic diagram among the present invention.
Among the figure: 1. filling box, 2. body, 3. reinforced hard, 4. separation layer, 5. corner cut or camber line chamfering, 6. slurry leakage hole, 7. member unit, 8. sidewall is is 9. faced the wall and meditated, 10. ribs.
The present invention realizes in such a way:
(5) specific embodiment
At Fig. 1, in embodiment illustrated in fig. 2, the main material of body (2) of filling box (1) is lightweight foam material, the flat shape of filling box (1) is rectangle, its long limit is less than or equal to 2 with the ratio of minor face size, at the upper surface of body (2) flat shape being arranged is the reinforced hard (3) of annular, the external surface of body has separation layer (4), reinforced hard (3) is positioned between body (2) and the separation layer (4), there are corner cut or camber line chamfering (5) in the upper and lower surface border of filling box (1), there is a vertical mortar leakage hole (6) at the middle part of filling box (1), the upper end of slurry leakage hole (6) is up big and down small infundibulate, and the lower end of slurry leakage hole (6) is the up-small and down-big infundibulate of falling.Because the intensity of lightweight foam material own is lower, and filling box bears larger external force again in work progress, the upper surface of filling box is main stress surface, and the purpose that reinforced hard is set is exactly the intensity that strengthens body, satisfies construction requirement.The water absorption rate of lightweight foam material itself is usually all larger, and the purpose that separation layer is set is exactly the moisture of avoiding in the bulk absorption concrete, causes concrete strength to reduce.
At Fig. 3, in embodiment illustrated in fig. 4, body (2) is assembled up and down by two or more member units (7), each member unit (7) is by sidewall (8), face the wall and meditate (9) and ribs (10) consists of, ribs (10) position in the adjacent members unit (7) is corresponding and mutually be close to one by one, one hole (10) is arranged at the middle part of member unit, be connected sidewall (8) by ribs (10) between the sidewall of hole and the sidewall of border (8), face the wall and meditate (9) and ribs (10) all is the heavy wall of thickness 〉=25mm.
Fig. 2, Fig. 4, embodiment illustrated in fig. 5 in, the flat shape of slurry leakage hole (6) is rectangle, polygon, circle, ellipse or composite figure.
Fig. 1, Fig. 3, embodiment illustrated in fig. 6 in, slurry leakage hole (6) upper and lower side funnel section both sides lines are shaped as oblique line, stepped line, camber line or assemble line.
In the embodiment shown in fig. 1, the main material lightweight foam material of body (2) is extruded sheet, polystyrene foam plastics, Vestolit, polyurethane foam plastics.
In the embodiment shown in fig. 1, the main material of reinforced hard (3) is cement mortar, hard plastic sheet, density board, pottery or the sheet metal of built-in grid cloth.
In the embodiment shown in fig. 1, the main material of separation layer (4) is plastic adhesive tape, polyurethane coating, emulsion paint or elastic composite coating.
In Fig. 1-embodiment illustrated in fig. 4, the preparation method of a kind of foam material filling box with enhancement Layer and slurry leakage hole of the present invention is: the body (2) of producing lightweight foam material, corner cut or camber line chamfering (5) are wanted in the upper and lower surface border of body, have a slurry leakage hole (6) at the middle part of body, the upper and lower side of slurry leakage hole all is infundibulate, at the upper surface of body reinforced hard (3) is installed, the external surface of body is pasted or is smeared separation layer (4).Body (2) is assembled up and down by two or more member units (7), each member unit (7) is by sidewall (8), face the wall and meditate (9) and ribs (10) consists of, ribs (10) position in the adjacent members unit (7) is corresponding and mutually be close to one by one, one hole (10) is arranged at the middle part of member unit, be connected sidewall (8) by ribs (10) between the sidewall of hole and the sidewall of border (8), face the wall and meditate (9) and ribs (10) all is the heavy wall of thickness 〉=25mm.

Claims (8)

1. foam material filling box with enhancement Layer and slurry leakage hole, the main material of body (2) of filling box (1) is lightweight foam material, the flat shape of filling box (1) is rectangle, its long limit is less than or equal to 2 with the ratio of minor face size, at the upper surface of body (2) flat shape being arranged is the reinforced hard (3) of annular, the external surface of body has separation layer (4), reinforced hard (3) is positioned between body (2) and the separation layer (4), there are corner cut or camber line chamfering (5) in the upper and lower surface border that it is characterized in that filling box (1), there is a vertical mortar leakage hole (6) at the middle part of filling box (1), the upper end of slurry leakage hole (6) is up big and down small infundibulate, the lower end of slurry leakage hole (6) is the up-small and down-big infundibulate of falling, body (2) is assembled up and down by two or more member units (7), each member unit (7) is by sidewall (8), face the wall and meditate (9) and ribs (10) consists of, ribs (10) position in the adjacent members unit (7) is corresponding and mutually be close to one by one, at the middle part of member unit one hole is arranged, be connected sidewall (8) by ribs (10) between the sidewall of hole and the sidewall of border (8), face the wall and meditate (9) and ribs (10) all is the heavy wall of thickness 〉=25mm.
2. a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1, the flat shape that it is characterized in that slurry leakage hole (6) is rectangle, polygon, circle, ellipse or composite figure.
3. a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1 is characterized in that slurry leakage hole (6) upper and lower side funnel section both sides are shaped as oblique line, stepped line, camber line or assemble line.
4. a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1 is characterized in that the main material lightweight foam material of body (2) is extruded sheet, polystyrene foam plastics, Vestolit, polyurethane foam plastics.
5. a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1 is characterized in that the main material of reinforced hard (3) is cement mortar, hard plastic sheet, density board, pottery or the sheet metal of built-in grid cloth.
6. a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1 is characterized in that the main material of separation layer (4) is plastic adhesive tape, polyurethane coating, emulsion paint or elastic composite coating.
7. the preparation method of a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1, it is characterized in that: the body (2) of producing lightweight foam material, corner cut or camber line chamfering (5) are wanted in body upper and lower surface border, have a slurry leakage hole (6) at the middle part of body, the upper and lower side of slurry leakage hole all is infundibulate, at the upper surface of body reinforced hard (3) is installed, the external surface of body is pasted or is smeared separation layer (4).
8. the preparation method of a kind of foam material filling box with enhancement Layer and slurry leakage hole according to claim 1, it is characterized in that: body (2) is assembled up and down by two or more member units (7), each member unit (7) is by sidewall (8), face the wall and meditate (9) and ribs (10) consists of, ribs (10) position in the adjacent members unit (7) is corresponding and mutually be close to one by one, at the middle part of member unit one hole is arranged, be connected sidewall (8) by ribs (10) between the sidewall of hole and the sidewall of border (8), face the wall and meditate (9) and ribs (10) all is the heavy wall of thickness 〉=25mm.
CN 201010554837 2010-11-23 2010-11-23 Foaming material filling box with reinforced layer and slurry leakage hole Active CN102031870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010554837 CN102031870B (en) 2010-11-23 2010-11-23 Foaming material filling box with reinforced layer and slurry leakage hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010554837 CN102031870B (en) 2010-11-23 2010-11-23 Foaming material filling box with reinforced layer and slurry leakage hole

Publications (2)

Publication Number Publication Date
CN102031870A CN102031870A (en) 2011-04-27
CN102031870B true CN102031870B (en) 2013-02-20

Family

ID=43885265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010554837 Active CN102031870B (en) 2010-11-23 2010-11-23 Foaming material filling box with reinforced layer and slurry leakage hole

Country Status (1)

Country Link
CN (1) CN102031870B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556767B (en) * 2013-11-14 2017-01-11 广东班高得绿色建工科技有限公司 Assembling method of lightweight solid-web type mandrel applied to cast-in-situ concrete hollow floor slab
CN104164935B (en) * 2014-08-27 2017-10-20 徐焱 A kind of foam material filling box with slurry leakage hole and conveyer trough
CN104453049B (en) * 2014-11-26 2017-05-17 徐焱 Hollow one-way plate with filling rods and filling boxes mixed for use
CN105220806A (en) * 2015-10-19 2016-01-06 徐焱 A kind of light material packing with wire lath surface layer
CN105239708B (en) * 2015-10-19 2017-10-20 徐焱 A kind of light material filling box with wire netting surface layer
CN105220815B (en) * 2015-10-23 2018-03-02 徐焱 A kind of filling box with bottom gas-permeable nets and upper discharge hole
CN105239710A (en) * 2015-11-02 2016-01-13 郭伍常 Combined metal filling box with slurry blocking pieces
CN105239709B (en) * 2015-11-02 2017-09-12 徐焱 A kind of permeability type combination filling box of use metal sheet
CN105297980B (en) * 2015-11-24 2017-09-05 徐焱 A kind of pin-connected panel is breathed freely filling box
CN105297981B (en) * 2015-11-24 2017-10-20 徐焱 A kind of hollow floor filled with ventilative case
CN105484418A (en) * 2016-01-11 2016-04-13 徐焱 Vertical assembly type ventilation filling box
CN105484419A (en) * 2016-01-11 2016-04-13 徐焱 Ventilating plastic box
CN108532948A (en) * 2018-04-10 2018-09-14 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material
CN117286978A (en) * 2023-11-24 2023-12-26 中铁二十二局集团轨道工程有限公司 Construction process of prestressed hollow slab

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001003898A1 (en) * 1999-07-12 2001-01-18 Febra Antonio Francisco Lost mould element for manufacturing reinforced concrete flat slabs
CN2467643Y (en) * 2001-03-16 2001-12-26 张海龄 Wire-mesh reinforcement
CN2474628Y (en) * 2001-04-16 2002-01-30 谢志祥 Three dimentional hollow network frame
CN2716400Y (en) * 2004-07-16 2005-08-10 徐焱 Light foaming material filling member with reinforced hard coating
CN101319531A (en) * 2007-06-07 2008-12-10 邱则有 Concrete pore-creating core
CN201874237U (en) * 2010-11-23 2011-06-22 徐焱 Foam material filling box with reinforced layer and slurry leakage hole

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001003898A1 (en) * 1999-07-12 2001-01-18 Febra Antonio Francisco Lost mould element for manufacturing reinforced concrete flat slabs
CN2467643Y (en) * 2001-03-16 2001-12-26 张海龄 Wire-mesh reinforcement
CN2474628Y (en) * 2001-04-16 2002-01-30 谢志祥 Three dimentional hollow network frame
CN2716400Y (en) * 2004-07-16 2005-08-10 徐焱 Light foaming material filling member with reinforced hard coating
CN101319531A (en) * 2007-06-07 2008-12-10 邱则有 Concrete pore-creating core
CN201874237U (en) * 2010-11-23 2011-06-22 徐焱 Foam material filling box with reinforced layer and slurry leakage hole

Also Published As

Publication number Publication date
CN102031870A (en) 2011-04-27

Similar Documents

Publication Publication Date Title
CN102031870B (en) Foaming material filling box with reinforced layer and slurry leakage hole
CN201874237U (en) Foam material filling box with reinforced layer and slurry leakage hole
CN202990200U (en) Cast-in-situ hollow floor
CN102261153B (en) Light material filling piece with hard base
CN101298793A (en) Hollow body for cast-in-situ hollow building roof
CN202990201U (en) Cast-in-place energy-saving hollow floor
CN107747378A (en) The body composite board processing method of Fast Installation heat insulation decorative load-bearing one
CN202577741U (en) Sintering-free mortar perlite hollow large wallboard
CN212295247U (en) Assembled light full precast slab
CN201762874U (en) Organic flame-retardant composite box for filling hollow floor slab
CN210798011U (en) Fireproof floor
CN202187463U (en) Light material filling member with hard seal cover
CN202954463U (en) Composite filled core mold for cast-in-place hollow floor system
CN202990199U (en) Composite filling mandrel used for hollow floor
CN202073231U (en) Light material filling piece with hard base
CN201043314Y (en) Hollow polyhedron filling block
CN206360166U (en) A kind of lightgage steel joist cast-in-situ non-bearing wall with linked hole and reinforcement
CN205444666U (en) Prefabricated thermal insulation wall component
CN206289833U (en) A kind of solid light precast body
CN206091008U (en) Cast -in -place hollow superstructure is with compound centre form of filling
CN215519426U (en) Light foaming cement core mould
CN112144722A (en) Fireproof floor
CN204590395U (en) A kind of heat-insulating wall block
CN214995210U (en) Assembled composite wall for prefabricated building
CN204040271U (en) A kind of foam material filling box with slurry leakage hole and conveyer trough

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant