CN108532948A - A kind of integral type mortar leakage prevention packing material - Google Patents

A kind of integral type mortar leakage prevention packing material Download PDF

Info

Publication number
CN108532948A
CN108532948A CN201810315754.4A CN201810315754A CN108532948A CN 108532948 A CN108532948 A CN 108532948A CN 201810315754 A CN201810315754 A CN 201810315754A CN 108532948 A CN108532948 A CN 108532948A
Authority
CN
China
Prior art keywords
pedestal
baffle
channel flow
buried channel
integral type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810315754.4A
Other languages
Chinese (zh)
Inventor
徐公科
李传忠
王慧子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Antaike Engineering Material Co Ltd
Original Assignee
Shandong Antaike Engineering Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Antaike Engineering Material Co Ltd filed Critical Shandong Antaike Engineering Material Co Ltd
Priority to CN201810315754.4A priority Critical patent/CN108532948A/en
Publication of CN108532948A publication Critical patent/CN108532948A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/005Strips for covering joints between form sections, e.g. to avoid burring or spilling of laitance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4107Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a kind of integral type mortar leakage prevention packing materials, including pedestal, it further include baffle, the flexible material of pedestal is made and is adapted with the inside dimension of pre-buried channel flow, the width of the baffle and pre-buried channel flow is adapted, the baffle is connect by connecting neck with pedestal, and the width of the connection neck and the opening of pre-buried channel flow are adapted, and grid cloth is arranged in the one end of the pedestal far from baffle.The beneficial effects of the present invention are:By the improvement of structure, the infiltration for effectivelying prevent pre-buried channel flow concrete during the installation process can be disposably filled, and can disposably reject, so that packing material is may be reused, reduce cost.

Description

A kind of integral type mortar leakage prevention packing material
Technical field
The present invention relates to packing material field, specifically a kind of integral type mortar leakage prevention packing material.
Background technology
Pre-buried channel flow is that one kind is widely used in high ferro, subway, building curtain wall project, for replacing building for traditional anchor bolt Build connecting elements.Existing pre-buried channel flow, in order to prevent pre-buried channel flow spillage phenomenon occurs in the installation process of concrete, in advance It buries and usually requires filled and process in conduit, and the adhesive tape being equipped at the Plastic cap and conduit opening face of channel ends is interior to ensure Portion's density.
The pre-buried channel flow filled and process of early stage uses polystyrene foam, and sharp ironware is used when rejecting, is on the one hand easy Pre-buried channel flow face coat is scratched, another aspect polystyrene foam quality is more crisp, and foam is difficult whole complete taking-up, bothersome to take Power, working efficiency are low.
The later stage material of pre-buried channel flow filled and process improves to some extent, and has stronger pull resistance compared with polystyrene foam Can, the case where filled and process is difficult to reject can be solved substantially, but during product final packaging, still needs to steep by filling Three foam, plug, adhesive tape steps complete the installation of all packing materials, in product installation forming in use, also needing by removing Adhesive tape rejects two steps of foam, and operating process is cumbersome, and working efficiency is relatively low.Meanwhile in pre-buried channel flow installation process, because The variation of care environments temperature, alkaline environment, directly affects the viscosity of adhesive tape, and when tearing-off adhesive tape is possible to can be to pre-buried channel flow Coating adversely affects.
Invention content
The purpose of the present invention is to provide a kind of integral type mortar leakage prevention packing materials can be primary by the improvement of structure Property filling effectively prevent the infiltration of pre-buried channel flow concrete during the installation process, and can disposably reject, make packing material can To reuse, cost is reduced.
The present invention is realized using technical solution below:
A kind of integral type mortar leakage prevention packing material, including pedestal, further include baffle, the flexible material of pedestal be made and It is adapted with the inside dimension of pre-buried channel flow, the width of the baffle and pre-buried channel flow is adapted, and the baffle is by connecting neck It is connect with pedestal, the width of the connection neck and the opening of pre-buried channel flow are adapted, one end setting of the pedestal far from baffle Grid cloth.
Rubber magnetic sheet is arranged close to the side of pedestal in the baffle.
The connection neck is made of elastic material.
The grid cloth is made of elastic material, and several separation troughs are arranged close to one end of grid cloth in the pedestal.
The closed cavity of setting in the pedestal.
The pedestal is made of flame retardant flexible material.
The beneficial effects of the invention are as follows:
1, the present invention is integral type, and integral type has better seal after filling, pre-buried channel flow can be effectively prevent to exist The infiltration of concrete is, it can be achieved that disposable filling, improves working efficiency in installation process;Pedestal 1 is made of flexible material can Once to reject, packing material is made to may be reused, reduces cost.
2, rubber magnetic sheet is arranged close to the side of pedestal in baffle of the present invention, and rubber magnetic sheet adsorption tank road open metal face is removed Have outside better seal than original adhesive tape, be also prevented from original adhesive tape because of care environments temperature, the variation of alkaline environment, The viscosity for influencing adhesive tape avoids being possible to that the coating of pre-buried channel flow can be adversely affected when tearing-off adhesive tape.
3, present invention connection neck is made of elastic material, and the drawing into pre-buried channel flow is provided to baffle by elastic material Power can increase leakproofness.
4, several separation troughs are arranged close to one end of grid cloth in pedestal of the present invention, increase the bending performance of pedestal, Neng Gouyou It is once rejected out of pre-buried channel flow conducive to by pedestal.
5, the closed cavity of setting in pedestal of the present invention, when by pedestal by being rejected in pre-buried channel flow, can increase pedestal Deformation can be conducive to out of pre-buried channel flow once reject pedestal.
6, pedestal of the present invention is made of flame retardant flexible material, disclosure satisfy that the fire resistant requirements of construction-engineering project.
Description of the drawings
Attached drawing 1 is the structural schematic diagram of embodiment 1.
Attached drawing 2 is the structural schematic diagram of embodiment 2.
Attached drawing 3 is the use state reference chart of the present invention.
Label as shown in the figure:1, pedestal;2, baffle;3, neck is connected;4, grid cloth;5, rubber magnetic sheet;6, separation trough;7, empty Chamber;8, pre-buried channel flow.
Specific implementation mode
With reference to the drawings and specific embodiments, the invention will be further described.It should be understood that these embodiments are merely to illustrate The present invention rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, this field Technical staff can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims Limited range.
A kind of integral type mortar leakage prevention packing material, including pedestal 1 further include baffle 2,1 flexible material system of the pedestal It is adapted at and with the inside dimension of pre-buried channel flow 8, the width of the baffle 2 and pre-buried channel flow 8 is adapted, and the baffle 2 is logical It crosses connection neck 3 to connect with pedestal 1, the opening of the width and pre-buried channel flow 8 of the connection neck 3 is adapted, and connects neck 3 by built-in groove The opening in road 8 seals.Grid cloth 4 is arranged in the one end of the pedestal 1 far from baffle 2, and grid cloth 4 can enhance the tough of the packing material Property, it prevents longer packing material to be broken during rejecting, whole tensile strength is improved, to realize packing material Recycling, reduce production cost.It, will be pre-buried by manually filling in pedestal 1 inside pre-buried channel flow 8 when pre-buried channel flow 8 dispatches from the factory Conduit 8 is filled, and baffle 2 is attached on the metal covering of 8 opening of pre-buried channel flow, and pre-buried channel flow 8 can be effectively prevent in installation process The infiltration of middle concrete when rejecting, is held baffle 2 by pedestal 1 by being pulled out in pre-buried channel flow 8, is not had to by other tools, Convenient and efficient and noresidue, disposable reject improves working efficiency, while will not injure the face coat of pre-buried channel flow 8.
Further, for the baffle 2 close to the side of pedestal 1 setting rubber magnetic sheet 5, rubber magnetic sheet 5 adsorbs conduit opening Metal covering is also prevented from original adhesive tape because of care environments temperature, alkaline ring in addition to having better seal than original adhesive tape The variation in border influences the viscosity of adhesive tape, also can avoid being possible to that unfavorable shadow can be caused to the coating of pre-buried channel flow 8 when tearing-off adhesive tape It rings.
Further, the connection neck 3 is made of elastic material, is provided to baffle 2 to pre-buried channel flow 8 by elastic material Interior pulling force can increase leakproofness.
Further, the grid cloth 4 is made of elastic material, and the pedestal 1 is several close to the setting of one end of grid cloth 4 Separation trough 6 increases the bending performance of pedestal 1, can be conducive to out of pre-buried channel flow 8 once reject pedestal 1.
Further, the closed cavity 7 of setting in the pedestal 1, when by pedestal 1 by being rejected in pre-buried channel flow 8, Neng Gouzeng Add the deformation of pedestal 1, can be conducive to out of pre-buried channel flow 8 once reject pedestal 1.
Further, the pedestal 1 is made of flame retardant flexible material, disclosure satisfy that the fire resistant requirements of construction-engineering project.
Embodiment 1:
A kind of integral type mortar leakage prevention packing material, including pedestal 1 further include baffle 2, and pedestal 1 is whole to use XPE materials, Chemical property is stablized, material softness plasticity number, and tensile strength is high, and fire proofing is made convenient for fire retardant is added, meets engineering The fire resistant requirements of project, in addition, using the flexibility of XPE materials, it is fine-tuning caused by not being bonded between pre-buried channel flow 8 and pedestal Error, it is ensured that leakproofness after final products molding.And the inside dimension of pedestal 1 and pre-buried channel flow 8 is adapted, the baffle 2 with The width of pre-buried channel flow 8 is adapted, and the baffle 2 is connect by connecting neck 3 with pedestal 1, and the connection neck 3 is by elastic material system At the opening of the width and pre-buried channel flow 8 of the connection neck 3 is adapted, and grid is arranged in the one end of the pedestal 1 far from baffle 2 Cloth 4, the grid cloth 4 are made of elastic material, and several separation troughs 6 are arranged close to one end of grid cloth 4 in the pedestal 1.
Embodiment 2:
A kind of integral type mortar leakage prevention packing material, including pedestal 1, the closed cavity 7 of the interior setting of the pedestal 1 further include Baffle 2,1 flexible material of the pedestal are made and are adapted with the inside dimension of pre-buried channel flow 8, the baffle 2 and built-in groove The width in road 8 is adapted, and the baffle 2 is connect by connecting neck 3 with pedestal 1, and the baffle 2 is arranged close to the side of pedestal 1 The opening of rubber magnetic sheet 5, the width and pre-buried channel flow 8 of the connection neck 3 is adapted, and the one end of the pedestal 1 far from baffle 2 is set Set grid cloth 4.Rubber magnetic sheet adsorption tank road open metal face can also prevent in addition to having better seal than original adhesive tape Only original adhesive tape influences the viscosity of adhesive tape because of care environments temperature, the variation of alkaline environment, and have can when also can avoid tearing-off adhesive tape The coating of pre-buried channel flow can be adversely affected.

Claims (6)

1. a kind of integral type mortar leakage prevention packing material, including pedestal, it is characterised in that:Further include baffle, the pedestal is flexible Material is made and is adapted with the inside dimension of pre-buried channel flow, and the width of the baffle and pre-buried channel flow is adapted, the baffle It is connect with pedestal by connecting neck, the width of the connection neck and the opening of pre-buried channel flow are adapted, and the pedestal is far from baffle One end be arranged grid cloth.
2. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:The baffle is close to pedestal Side be arranged rubber magnetic sheet.
3. a kind of integral type mortar leakage prevention packing material according to claim 1 or 2, it is characterised in that:The connection neck by Elastic material is made.
4. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:The grid cloth is by elasticity Material is made, and several separation troughs are arranged close to one end of grid cloth in the pedestal.
5. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:Setting is close in the pedestal The cavity closed.
6. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:The pedestal is by fire-retardant soft Property material is made.
CN201810315754.4A 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material Pending CN108532948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810315754.4A CN108532948A (en) 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810315754.4A CN108532948A (en) 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material

Publications (1)

Publication Number Publication Date
CN108532948A true CN108532948A (en) 2018-09-14

Family

ID=63479806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810315754.4A Pending CN108532948A (en) 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material

Country Status (1)

Country Link
CN (1) CN108532948A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023066654A1 (en) * 2021-10-21 2023-04-27 Fischerwerke Gmbh & Co. Kg Anchor rail comprising a filler element, and method for removing the filler element

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006002558A (en) * 2004-05-18 2006-01-05 Towa Sangyo Kk Concrete water-leakage preventive member and concrete water-leakage preventive construction method
CN102031870A (en) * 2010-11-23 2011-04-27 徐焱 Foaming material filling box with reinforced layer and slurry leakage hole
CN102261153A (en) * 2011-04-22 2011-11-30 徐焱 Light material filling piece with hard base
DE102013019732A1 (en) * 2013-11-27 2015-05-28 JORDAHL GmbH Process for the production of concrete components with integrated anchor rail
CN206386125U (en) * 2016-12-01 2017-08-08 北京建筑大学 A kind of inside interstitital texture of built-in groove
CN206655476U (en) * 2017-04-11 2017-11-21 山东天盾矿用设备有限公司 A kind of new built-in groove
CN208072980U (en) * 2018-04-10 2018-11-09 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006002558A (en) * 2004-05-18 2006-01-05 Towa Sangyo Kk Concrete water-leakage preventive member and concrete water-leakage preventive construction method
CN102031870A (en) * 2010-11-23 2011-04-27 徐焱 Foaming material filling box with reinforced layer and slurry leakage hole
CN102261153A (en) * 2011-04-22 2011-11-30 徐焱 Light material filling piece with hard base
DE102013019732A1 (en) * 2013-11-27 2015-05-28 JORDAHL GmbH Process for the production of concrete components with integrated anchor rail
CN206386125U (en) * 2016-12-01 2017-08-08 北京建筑大学 A kind of inside interstitital texture of built-in groove
CN206655476U (en) * 2017-04-11 2017-11-21 山东天盾矿用设备有限公司 A kind of new built-in groove
CN208072980U (en) * 2018-04-10 2018-11-09 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023066654A1 (en) * 2021-10-21 2023-04-27 Fischerwerke Gmbh & Co. Kg Anchor rail comprising a filler element, and method for removing the filler element

Similar Documents

Publication Publication Date Title
CN208072980U (en) A kind of integral type mortar leakage prevention packing material
CN108532948A (en) A kind of integral type mortar leakage prevention packing material
CN207921559U (en) Fire protection pipeline quick coupling
CN207965261U (en) A kind of novel indoor optic cable
CN206975279U (en) One kind is easy to install to safeguard cable splice closure
CN109856747A (en) A kind of buried optical fiber cables anticorrosive insulation set and preparation method thereof
CN216584859U (en) High elasticity antistatic foam convenient to assemble
CN205738761U (en) A kind of inner lining bag
CN108490557A (en) The dry type material water-proof material fill process of high water resistant Loose tube
CN210623858U (en) High-wear-resistance fire hose capable of being spliced quickly
CN206961557U (en) A kind of flat cable for being used for outdoor pre-buried installation
CN208938675U (en) A kind of cable with diamagnetic function of preventing fires
CN109322458A (en) A kind of seamless interfacing plate
CN209238226U (en) A kind of outer water cuts appearance coating barrier structure and its production mould
CN208329280U (en) A kind of architectural decorative glass attachment device
CN207329200U (en) A kind of plastic bottle closure of riveted
CN207672819U (en) The bright frame system of glass curtain wall
CN206178217U (en) Round fiber area
CN202480469U (en) Single-sided release paper
CN208535329U (en) Fireproof blocking block vacuum encapsulation structure
CN206110567U (en) Compound stone material board
CN209191115U (en) A kind of glue sealing structure of silica gel mould
CN207243698U (en) Mechanical winding glass reinforced plastic septic tank
CN201669197U (en) Improved glue dispensing device
CN209535690U (en) Hose glass glue bottle with scraping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180914