CN206386125U - A kind of inside interstitital texture of built-in groove - Google Patents

A kind of inside interstitital texture of built-in groove Download PDF

Info

Publication number
CN206386125U
CN206386125U CN201621315685.XU CN201621315685U CN206386125U CN 206386125 U CN206386125 U CN 206386125U CN 201621315685 U CN201621315685 U CN 201621315685U CN 206386125 U CN206386125 U CN 206386125U
Authority
CN
China
Prior art keywords
cavity
filler
cell body
built
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621315685.XU
Other languages
Chinese (zh)
Inventor
刘军
张豫湘
李天宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Civil Engineering and Architecture filed Critical Beijing University of Civil Engineering and Architecture
Priority to CN201621315685.XU priority Critical patent/CN206386125U/en
Application granted granted Critical
Publication of CN206386125U publication Critical patent/CN206386125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of inside interstitital texture of built-in groove, and it includes:Pour in section of jurisdiction, have with the pre-buried cell body for having perforate on hollow structure cavity and end face, and the pre-buried cell body in the cavity between the end face of perforate and the outer face of section of jurisdiction, the cavity, perforate and cavity filled with filler.A kind of inside interstitital texture of built-in groove of the present utility model, it is simple in construction, can be suitable for large-diameter shield construction.

Description

A kind of inside interstitital texture of built-in groove
Technical field
The utility model is related to Construction Technique of Underground Works field, is filled more particularly, to a kind of inside of built-in groove Structure.
Background technology
In underground engineering construction, in such as subway work, constructing tunnel, using chemistry more than the installation of pipeline or electromechanical equipment Bar planting or the mode for beating expansion bolt, but these modes are being required for the drilling on existing structure.It may be touched during drilling To structure reinforcing bars, certain damage is caused in itself to structure, influence structure durability.Also, under underground environment, easily by corruption Erosion, chemically-planted steel bar or to beat the service life of expansion bolt in itself limited is safeguarded or changed inconvenience, is also easy to influence body construction Safety.
Built-in groove technology obtains very big application in recent years.Built-in groove technology is to pour conduit into coagulation in pre-buried mode In soil, for contact net, signal of communication, electromechanical equipment fixation.Built-in groove technology shortens construction period, it is to avoid play expansion Damage of the bolt to tunnel segment structure, thus with application value in underground engineering.
At present, also there are some and limit in application of the built-in groove technology in subway tunnel.Due to pouring the mistake of built-in groove There is gap in Cheng Zhong, built-in groove and concrete junction, also, built-in groove cell body is less than concrete surface, easy ponding, and And, it is impossible to using the assembling machine of vacuum cap type, limit application of the built-in groove technology in large-diameter shield construction.
Utility model content
The utility model, which is provided, a kind of overcomes above mentioned problem or being applied to of solving the above problems at least in part The inside interstitital texture of built-in groove in large-diameter shield construction.
According to one side of the present utility model there is provided a kind of inside interstitital texture of built-in groove, it includes:Pour in pipe There is the end of perforate in piece, with the pre-buried cell body for having perforate on hollow structure cavity and end face, and the pre-buried cell body Filler is filled with cavity between face and the outer face of section of jurisdiction, the cavity, perforate and cavity.
On the basis of such scheme, depth and the sky of the pre-buried cell body in section of jurisdiction apart from section of jurisdiction outer face are poured The height of chamber is identical.
On the basis of such scheme, the height of the cavity is 2mm-5mm.
On the basis of such scheme, the filler is replaceable rubber type of material or mortar.
On the basis of such scheme, the filler in the perforate is covered with filling out in the Zone Full of perforate, the cavity Material is covered with the Zone Full of cavity.
On the basis of such scheme, the filler in the cavity is covered with the Zone Full of cavity.
On the basis of such scheme, the filler in the cavity is covered with the periphery of cavity and for in hollow cavity Hollow structure.
On the basis of such scheme, the filler in filler and cavity in the cavity and perforate is two be brought into close contact Part.
On the basis of such scheme, the position of center line of the upper surface of the filler of the cavity along cavity is provided with center line Mark.
A kind of inside interstitital texture for built-in groove that the application is proposed, its advantage is mainly as follows:
(1) pre-buried cell body pours the certain depth in section of jurisdiction, enhances the bond stress between pre-buried cell body and section of jurisdiction;
(2) in the cavity of interplanar formation where the outer face of the cavity of pre-buried cell body, perforate and outer face and section of jurisdiction Fill filler, it is to avoid enter concrete or ponding in built-in groove body, prevent that pre-buried cell body from being corroded;
(3) filler and the close and concordant degree between section of jurisdiction can be adjusted according to physical condition, is easy to vacuum cap type to spell The use of installation, extends application of the built-in groove technology in large-diameter shield construction;
(4) filling mode of the filler in cavity and cavity is various, is easy to suit measures to differing conditions in terms of time, and is filled out according to field condition Material;
(5) outer face of filler sets center line to identify, and is easy to the construction in later stage, enhances the accuracy of construction.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the inside interstitital texture of built-in groove according to the utility model embodiment;
Fig. 2 is a kind of top view of the inside interstitital texture of built-in groove according to the utility model embodiment;
Fig. 3 is a kind of structural representation of the inside interstitital texture of built-in groove according to the utility model embodiment.
Embodiment
With reference to the accompanying drawings and examples, embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
Embodiment 1
It is shown in Figure 1, a kind of inside interstitital texture of built-in groove, including the pre-buried cell body 2 in section of jurisdiction 3 is poured, in advance Bury the inner side of cell body 2 there is perforate, pre-buried cell body 2 on the cavity 5 with hollow structure, also, an end face of pre-buried cell body 2 On be provided between the plane where the outer face of the end face of perforate and section of jurisdiction 3 and form cavity 4, in cavity 4, perforate and cavity 5 Filled with filler 1.
Filler 1 is filled in cavity 4, perforate and cavity 5, in work progress, concrete or ponding is effectively prevent Corrode pre-buried cell body 2 in into pre-buried cell body 2, it is to avoid pre-buried cell body 2 is had undesirable effect.
Filler 1 is filled in cavity 5, when being poured in section of jurisdiction 3, can either effectively prevent concrete from entering pre-buried cell body 2 In, built-in groove internal water accumulation can be prevented again, reduce the corrosion rate of cell body.
Pre-buried cell body 2 is poured in section of jurisdiction 3, and pre-buried cell body 2 has a certain distance apart from the outer face of section of jurisdiction 3, also, should Distance is identical with the height of cavity 4.Pre-buried cell body 2 is poured in section of jurisdiction 3, it is ensured that pre-buried cell body 2 and the bond stress of section of jurisdiction 3, is had Effect improves the lifting intensity for pouring the pre-buried cell body 2 in section of jurisdiction 3.
The height of cavity 4 is 2mm-5mm.Pre-buried cell body 2 pours the certain depth in section of jurisdiction 3, with preferable bond stress, Meanwhile, avoid pre-buried cell body 2 to touch reinforcing bar or other pipelines in section of jurisdiction 3 again, cause potential safety hazard.
The filler 1 filled in cavity 5, perforate and cavity 4 can be changed.When in use or other reasonses, cavity 5 Occur damaging with the filler 1 filled in cavity 4 or during incomplete phenomenon, the filler 1 filled in cavity 5 and cavity 4 can be changed.
The filler 1 filled in cavity 5, perforate and cavity 4 is rubber type of material or mortar.Filled out in cavity 5 and cavity 4 Casting resin, it is to avoid the adverse effect that the cell body of concrete or the pre-buried cell body 2 of ponding is caused, reduces the corrosion rate of cell body.
The filler 1 that filler 1 in perforate is covered with the Zone Full of perforate, cavity 4 is covered with the Zone Full of cavity 4.Open Zone Full in hole is filled with filler 1, and concrete or ponding can be avoided to enter the inside of pre-buried cell body 2.
Filling filler 1, further enhances the sealing effect of pre-buried cell body 2, makes pre-buried cell body in Zone Full in cavity 4 2, which are provided with the end face of perforate, is all covered in below filler 1, and when without using pre-buried cell body, the packing material in cavity 4 makes Pre-buried cell body 2 is isolated with external environment condition, effectively reduces the probability that pre-buried cell body 2 is affected by the external environment and corroded.
In addition, the Zone Full in cavity 4 is filled with filler 1, make filler 1 in cavity 4 and the outer face of section of jurisdiction 3 neat It is flat;Meanwhile, the Zone Full in cavity 4 is filled with filler 1, makes filler 1 in cavity 4 and the section of jurisdiction 3 of the side of cavity 4 close Laminating, is easy to use the assembling machine of vacuum cap type during pipe sheet assembling, extends built-in groove technology in large-diameter shield Application in construction.
Filler 1 in cavity 5 is covered with the Zone Full of cavity 5.The filler 1 of filling, can either further increase in cavity 5 Strong sealing effect, it is to avoid concrete or ponding enter the inside of pre-buried cell body 2, can avoid again the medial surface of pre-buried cell body 2 with The contact of other materials, effectively reduces corrosion rate of the underground environment to pre-buried cell body 2.
In a specific embodiment, the filler 1 filled in cavity 5, perforate and cavity 4 completes for once filling.Chamber The filler 1 filled in body 5, perforate and cavity 4 is disposably completed by singlepass, has simplified operational sequence.
In another specific embodiment, the filler 1 filled in cavity 5 and perforate is with the filler 1 filled in cavity 4 The filler 1 filled in the two parts being brought into close contact, cavity 5 and perforate uses filling operation twice with the filler 1 filled in cavity 4 Complete.
Poured by pre-buried cell body 2 before section of jurisdiction 3, first fill the filler 1 in cavity 5 and perforate;By pre-buried cell body 2 After pouring in section of jurisdiction 3, according to the height of the cavity 4 formed, it will be filled with the mutually level filler of cavity 41 to cavity 4 In, the outer face of the filler 1 of cavity 4 is flushed with the outer face of section of jurisdiction 3.
Shown in Figure 2, the outer face of filler 1 is identified provided with center line in cavity 4, the filler identified provided with center line 1 end face is flushed with the outer face of section of jurisdiction 3.Center line mark 6 is layed in filler 1 along the position of center line of the filler 1 in cavity 4 Outer face on, on the end face of filler 1 set center line identify 6 color it is different from section of jurisdiction 3 and the color of filler 1, facilitate exist Drilling is accurately positioned when T-bolt or bearing are installed.
Embodiment 2
It is shown in Figure 3, a kind of inside interstitital texture of built-in groove, including the pre-buried cell body 2 in section of jurisdiction 3 is poured, in advance Bury the inner side of cell body 2 there is perforate, pre-buried cell body 2 on the cavity 5 with hollow structure, also, an end face of pre-buried cell body 2 On be provided between the plane where the outer face of the end face of perforate and section of jurisdiction 3 and form cavity 4, in cavity 4, perforate and cavity 5 Filled with filler 1.
Filler 1 is filled in cavity 4, perforate and cavity 5, in work progress, concrete or ponding is effectively prevent Corrode pre-buried cell body 2 in into pre-buried cell body 2, it is to avoid pre-buried cell body 2 is had undesirable effect.
Filler 1 is filled in cavity 5, when being poured in section of jurisdiction 3, can either effectively prevent concrete from entering pre-buried cell body 2 In, built-in groove internal water accumulation can be prevented again, reduce the corrosion rate of cell body.
Pre-buried cell body 2 is poured in section of jurisdiction 3, and pre-buried cell body 2 has a certain distance apart from the outer face of section of jurisdiction 3, also, should Distance is identical with the height of cavity 4.Ensure the bond stress of pre-buried cell body 2 and section of jurisdiction 3, effectively improve pour it is pre-buried in section of jurisdiction 3 The lifting intensity of cell body 2.
The height of cavity 4 is 2mm-5mm.Both ensured that pre-buried cell body 2 poured the certain depth in section of jurisdiction 3, with preferable Bond stress, meanwhile, avoid pre-buried cell body 2 to touch reinforcing bar or other pipelines in section of jurisdiction 3 again, cause potential safety hazard.
The filler 1 filled in cavity 5 and cavity 4 can be changed.When in use or other reasonses, cavity 5 and sky The filler 1 filled in chamber 4 occurs damaging or during incomplete phenomenon, can change the filler 1 filled in cavity 5 and cavity 4.
The filler 1 filled in cavity 5 and cavity 4 is rubber type of material or mortar.Filled out in cavity 5 and cavity 4 Material, it is to avoid the adverse effect that concrete or ponding are caused to the cell body of pre-buried cell body 2, reduces the corrosion rate of cell body.
The filler 1 that filler 1 in perforate is covered with the Zone Full of perforate, cavity 4 is covered with the Zone Full of cavity 4.Open Zone Full in hole is filled with filler 1, and concrete or ponding can be avoided to enter the inside of pre-buried cell body 2.
Filling filler 1, further enhances the sealing effect of pre-buried cell body 2, makes pre-buried cell body in Zone Full in cavity 4 2, which are provided with the end face of perforate, is all covered in below filler 1, and when without using pre-buried cell body, the packing material in cavity 4 makes Pre-buried cell body 2 is isolated with external environment condition, effectively reduces the probability that pre-buried cell body 2 is affected by the external environment and corroded.
In addition, the Zone Full in cavity 4 is filled with filler 1, make filler 1 in cavity 4 and the outer face of section of jurisdiction 3 neat It is flat;Meanwhile, the Zone Full in cavity 4 is filled with filler 1, makes filler 1 in cavity 4 and the section of jurisdiction 3 of the side of cavity 4 close Laminating, is easy to use the assembling machine of vacuum cap type during pipe sheet assembling, extends built-in groove technology in large-diameter shield Application in construction.
Filler 1 in cavity 5 is covered with the periphery of cavity 5 and is the hollow structure with hollow cavity 7.Filling out in cavity 5 Material 1 is covered with the periphery of cavity 5, can either further enhance sealing effect, it is to avoid concrete or ponding enter the interior of pre-buried cell body 2 Portion, can avoid contact of the medial surface of pre-buried cell body 2 with other materials again, effectively reduce underground environment to pre-buried cell body 2 Corrosion rate.
Meanwhile, the filler 1 in cavity 5 both reaches the purpose of filling cavity 5 using the hollow structure with hollow cavity 7, It is easy to operate when conveniently subsequently the filler 1 in cavity 5 being safeguarded or removed again.
In a specific embodiment, the filler 1 filled in cavity 5, perforate and cavity 4 completes for once filling.Chamber The filler 1 filled in body 5, perforate and cavity 4 is disposably completed by singlepass, has simplified operational sequence.
In another specific embodiment, the filler 1 filled in cavity 5 and perforate is with the filler 1 filled in cavity 4 The filler 1 filled in the two parts being brought into close contact, cavity 5 and perforate uses filling operation twice with the filler 1 filled in cavity 4 Complete.
Poured by pre-buried cell body 2 before section of jurisdiction 3, first fill the filler 1 in cavity 5 and perforate;By pre-buried cell body 2 After pouring in section of jurisdiction 3, according to the height of the cavity 4 formed, it will be filled with the mutually level filler of cavity 41 to cavity 4 In, the outer face of the filler 1 of cavity 4 is flushed with the outer face of section of jurisdiction 3.
Shown in Figure 2, the outer face of filler 1 is identified provided with center line in cavity 4, the filler identified provided with center line 1 outer face is flushed with the outer face of section of jurisdiction 3.Center line mark 6 is layed in along the position of center line of the filler 1 in cavity 4 fills out Set the color of center line mark 6 different from section of jurisdiction 3 and the color of filler 1 on the outer face of material 1, on the end face of filler 1, it is convenient Drilling is accurately positioned when installing T-bolt or bearing.
The inside interstitital texture of built-in groove of the present utility model, pours the tool of the pre-buried cell body 2 of certain depth in section of jurisdiction 3 There is filling filler 1 in the cavity 5 of hollow structure, meanwhile, filler 1 is filled in the perforate of pre-buried cell body 2, and, in built-in groove Body 2, which has, fills filler 1 to the outer face with section of jurisdiction 3 in the cavity formed between the end face of perforate and the outer face of section of jurisdiction 3 Flush, and set center line to identify 6 on the outer face of filler 1.
The bond stress of pre-buried cell body 2 and section of jurisdiction 3 is fully ensured that, simultaneously, it is to avoid concrete enters built-in groove in casting process Body 2, effectively reduces corrosion rate of the ponding to pre-buried cell body 2, in addition, being easy to being accurately positioned for the construction in later stage.
Finally, the present processes are only preferably embodiment, are not intended to limit protection domain of the present utility model. It is all it is of the present utility model spirit and principle within, any modification, equivalent substitution and improvements made etc. should be included in this reality Within new protection domain.

Claims (9)

1. the inside interstitital texture of a kind of built-in groove, it is characterised in that it includes:Pour in section of jurisdiction (3), with hollow structure There is the pre-buried cell body (2) of perforate on cavity (5) and end face, and the pre-buried cell body (2) has end face and the section of jurisdiction of perforate (3) filler (1) is filled with the cavity (4) between outer face, the cavity (5), perforate and cavity (4).
2. a kind of inside interstitital texture of built-in groove as claimed in claim 1, it is characterised in that:Pour pre-buried in section of jurisdiction (3) Depth of the cell body (2) apart from section of jurisdiction (3) outer face is identical with the height of the cavity (4).
3. a kind of inside interstitital texture of built-in groove as claimed in claim 2, it is characterised in that:The height of the cavity (4) For 2mm-5mm.
4. a kind of inside interstitital texture of built-in groove as claimed in claim 1, it is characterised in that:The filler (1) is can be more The rubber type of material or mortar changed.
5. the inside interstitital texture of any built-in groove as described in claim 1-4, it is characterised in that:Filling out in the perforate The filler (1) that material (1) is covered with the Zone Full of perforate, the cavity (4) is covered with the Zone Full of cavity (4).
6. a kind of inside interstitital texture of built-in groove as claimed in claim 5, it is characterised in that:Filling out in the cavity (5) Material (1) is covered with the Zone Full of cavity (5).
7. a kind of inside interstitital texture of built-in groove as claimed in claim 5, it is characterised in that:Filling out in the cavity (5) Material (1) is covered with the periphery of cavity (5) and is the hollow structure with hollow cavity (7).
8. a kind of inside interstitital texture of built-in groove as claimed in claims 6 or 7, it is characterised in that:The cavity (5) and open The two parts of filler (1) with the filler (1) in cavity (4) to be brought into close contact in hole.
9. a kind of inside interstitital texture of built-in groove as claimed in claim 5, it is characterised in that:The filler of the cavity (4) (1) position of center line of the upper surface along cavity (4) is provided with center line mark (6).
CN201621315685.XU 2016-12-01 2016-12-01 A kind of inside interstitital texture of built-in groove Expired - Fee Related CN206386125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621315685.XU CN206386125U (en) 2016-12-01 2016-12-01 A kind of inside interstitital texture of built-in groove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621315685.XU CN206386125U (en) 2016-12-01 2016-12-01 A kind of inside interstitital texture of built-in groove

Publications (1)

Publication Number Publication Date
CN206386125U true CN206386125U (en) 2017-08-08

Family

ID=59488889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621315685.XU Expired - Fee Related CN206386125U (en) 2016-12-01 2016-12-01 A kind of inside interstitital texture of built-in groove

Country Status (1)

Country Link
CN (1) CN206386125U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532948A (en) * 2018-04-10 2018-09-14 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material
CN112031817A (en) * 2019-06-04 2020-12-04 南通铁建建设构件有限公司 High-safety convenient installation shield segment with sliding groove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532948A (en) * 2018-04-10 2018-09-14 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material
CN112031817A (en) * 2019-06-04 2020-12-04 南通铁建建设构件有限公司 High-safety convenient installation shield segment with sliding groove

Similar Documents

Publication Publication Date Title
CN209145612U (en) A kind of anti-floating type section of jurisdiction for shield tunnel
CN104652418B (en) Diaphragm wall underground utilities position construction method
CN102535441A (en) Construction method of underground diaphragm wall
CN102767180A (en) Construction method for strengthening base of static-pressure anchor rod pile
CN104404983A (en) Horse riding type well device for pipe jacking construction and construction method thereof
CN206386125U (en) A kind of inside interstitital texture of built-in groove
CN102852141A (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN203514333U (en) Basement soleplate precipitation well mouth blocking sleeve
CN107268688A (en) I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
CN104099946B (en) Inspection-pit between a kind of Novel top pipeline section
CN106088115A (en) The method increasing Stability of Soil of High Side Slopes
CN104047423B (en) A kind of mould and construction method of wearing the accurate reserved opening of flooring plate
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN206468357U (en) A kind of covered structure of built-in groove
CN103343534A (en) Closed precipitation method for foundation pit construction
CN104089103A (en) Circulating water pipe lined with glass steel pipe and glass steel pipe lined method thereof
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN207498991U (en) A kind of exhaust valve pit
CN205636744U (en) Position slip casting device is connected with bottom plate in ground even wall
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN109056702A (en) The construction method of coercion underground continuous wall
CN104912057B (en) Construction method of underground continuous wall
CN104790380B (en) Underground diaphragm wall framework
CN109183800B (en) Construction process of preliminary grouting system
CN207538839U (en) The structure that a kind of quick solution tunnel collapses

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808