CN207498991U - A kind of exhaust valve pit - Google Patents

A kind of exhaust valve pit Download PDF

Info

Publication number
CN207498991U
CN207498991U CN201721532588.0U CN201721532588U CN207498991U CN 207498991 U CN207498991 U CN 207498991U CN 201721532588 U CN201721532588 U CN 201721532588U CN 207498991 U CN207498991 U CN 207498991U
Authority
CN
China
Prior art keywords
bottom plate
tee
blow
central bottom
main shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721532588.0U
Other languages
Chinese (zh)
Inventor
范远东
高仁超
胡陈
乔刚
雷秋寒
陈艳丽
郭放
郭青春
陈新佳
白崇宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INVESTIGATION AND DESIGN INSTITUTE OF WATER RESOURCES AND HYDROPOWER LIAONING PROVINCE
Original Assignee
INVESTIGATION AND DESIGN INSTITUTE OF WATER RESOURCES AND HYDROPOWER LIAONING PROVINCE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INVESTIGATION AND DESIGN INSTITUTE OF WATER RESOURCES AND HYDROPOWER LIAONING PROVINCE filed Critical INVESTIGATION AND DESIGN INSTITUTE OF WATER RESOURCES AND HYDROPOWER LIAONING PROVINCE
Priority to CN201721532588.0U priority Critical patent/CN207498991U/en
Application granted granted Critical
Publication of CN207498991U publication Critical patent/CN207498991U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of exhaust valve pits, including main shaft room, main shaft room itself bottom plate includes annular plate and central bottom plate, permanent subsiding crack is formed between the central bottom plate and annular plate, the central bottom plate passes through rubber water-proof band connection with annular plate, the central bottom plate opens up centre bore, which installs the upper branch mouth of blow-off tee, and blow-off tee is made to be connected with main shaft room.The upper branch mouth outer circumferential walls connection stiffening ring of the blow-off tee, stiffening ring are inlaid into central bottom plate again.The utility model avoids damaging pipeline or well room structure due to the differential settlement between pipeline and well room.The barrier performance higher of well room.Avoid the side slope safety stabilization and the adverse effect of basis disturbance that fluting generates over long distances.Has greater flexibility in mobilization.It is at low cost.

Description

A kind of exhaust valve pit
Technical field
The utility model is related to hydraulic and hydroelectric engineering field, specifically a kind of exhaust valve pit.
Background technology
1. traditional structure exhaust valve pit passes through the Pipeline Crossing Program well room side wall of side wall using main conduit's housing wall bushing Form.Between casing and main pipeline antiseepage is carried out by the way of cushion rubber and filling spunyarn.Since the buried depth of main pipeline is larger, one The partial failure of denier wall bushing and the rich groundwater of place construction area can cause the outer Groundwater infiltration well room of well to cause well Internal water accumulation.There was dampness in the air, and environment can then aggravate the corrosion of steel pipe, electromechanical equipment, shorten the working life;And the digging of traditional well room Pick depth requirements are excessively high, and the dispensings demand such as concrete, reinforcing bar of single valve pit is big, and infusion of financial resources is big.
2. the exhaust valve pit of traditional structure using pipeline with exhaust valve pit well room using rigid connection, pipeline with Being vented valve pit geological conditions, there is some difference, well room and the settling amount of the outside upper downstream line of well room is caused to will be different, such as Fruit pipeline overall stiffness is more than well room side wall concrete tensile strength, and side wall concrete can be caused to generate crack;If pipeline is whole Body rigidity is less than well room side wall concrete tensile strength, then the sedimentation of well room Outer Tube is different from blow-off tee in well room, if well Inside and outside pipeline settling amount difference is excessive, can cause bell and spigot to be caused to break by means of gyration due to being more than that pipeline socket is maximum allowable Bad leakage causes steel pipe to generate plastic deformation, so as to reduce pipeline useful life longevity.
Invention content
The purpose of this utility model is to provide a kind of exhaust valve pits, avoid due to uneven heavy between pipeline and well room It drops and pipeline or well room structure is damaged.The barrier performance higher of well room.Avoid the side slope peace that fluting generates over long distances The full adverse effect stablized and basis disturbs.Has greater flexibility in mobilization.It is at low cost.
In order to achieve the above objectives, the utility model employs following technical solution, a kind of exhaust valve pit, including main shaft Room, main shaft room itself bottom plate include annular plate and central bottom plate, are formed between the central bottom plate and annular plate Permanent subsiding crack, for the central bottom plate with annular plate by rubber water-proof band connection, the central bottom plate opens up centre bore, should Centre bore installs the upper branch mouth of blow-off tee, and blow-off tee is made to be connected with main shaft room.
The upper branch mouth outer circumferential walls connection stiffening ring of the blow-off tee, stiffening ring are inlaid into central bottom plate again.
Described rubber fastening band one end is sealed to be fixed in annular plate, and the other end is sealed to be fixed on central bottom plate It is interior, and naked leakage part arc-shaped shape of the rubber fastening band in permanent subsiding crack.
Main shaft room bottom four corners are fixed on column foundation upper end, and the blow-off tee is in addition to upper branch mouth, also there are one tool Zuo Zhukou and right main mouth, Zuo Zhukou and You Zhukou are all connected with main pipeline.
The utility model compared with prior art, has the advantages that:
1)Structure stress:
It is that a rigidity is whole, while blow-off tee that blow-off tee is coupled by box foundation structure exhaust valve pit with well room It is connect with its upstream and downstream main pipeline using bell and spigot or welding form.Due to pipeline with exhaust valve pit be it is relatively independent, only One connecting portion is blow-off tee top manifold, which is independent rectangular underplate concrete, is mixed with surrounding floor Be equipped with permanent subsiding crack between solidifying soil, the rubber fastening band used is for flexible material, with larger permission deflection, avoid due to Differential settlement between pipeline and well room and pipeline or well room structure are damaged;
2)Well room antiseepage:
The main shaft room of column foundation structure air bleeding valve is located at more than main pipeline crest level, and the thickness of earth-fill cover of well room bottom plate is generally Less than 1.5m, under normal circumstances higher than phreatic line, and well room is prevented using rubber fastening band and well room outer wall cladding pitch The dual seepage control measure of water coiled material makes the barrier performance higher of well room;
3)Work progress is stable on excavation slope and foundation bearing capacity influences:
The utility model exhaust independent column foundation of valve pit, main shaft cell structure and main pipeline are substantially independent, Pipe installing with Well room construction can be completely independent progress, be influenced without cross-operation.This kind of structural gap valve pit construction is avoided and is opened over long distances The side slope safety that slot generates stablizes and the adverse effect of basis disturbance;
4)Analysis of Time-limit:
The independent column foundation of column foundation structure exhaust valve pit is completely independent progress with main shaft room with Pipe installing, and there is no friendships Job execution is pitched, and Pipe installing progress synchronous with well room construction can be selected according to live practice of construction situation or will have been pacified Tubulature road backfills in advance, carries out well room construction after arranging foundation pit secondary excavation according to construction, has more in mobilization Big flexibility;
5)Investment analysis:
Relatively traditional exhaust valve pit, novel exhaust valve pit well room are shallow compared with conventional air valve pit.The concrete of single valve pit It is few compared with traditional valve pit with quantity of reinforcement, it is compared by calculating, engineering uses novel valve pit, compared to using traditional valve pit, quantities Reduce 50%.
Description of the drawings
Fig. 1 is a kind of air bleeding valve well construction schematic diagram of the utility model;
Fig. 2 is the side view of Fig. 1.
In figure:Main shaft room 1, column foundation 2, blow-off tee 3, permanent subsiding crack 4, rubber fastening band 5, stiffening ring 6.
Specific embodiment
Detailed description and technology contents in relation to the utility model, cooperation description of the drawings is as follows, however attached drawing is only to refer to With purposes of discussion, not it is used for limiting the utility model.
As shown in attached drawing 1, Fig. 2, a kind of exhaust valve pit, including main shaft room 1, main shaft room itself bottom plate includes edge bottom Plate and central bottom plate form permanent subsiding crack 4, the central bottom plate and edge bottom between the central bottom plate and annular plate Plate is connected by rubber fastening band 5, and the central bottom plate opens up centre bore, which installs the upper branch mouth of blow-off tee 3, makes Blow-off tee is connected with main shaft room.
The upper branch mouth outer circumferential walls connection stiffening ring 6 of the blow-off tee, stiffening ring is inlaid into central bottom plate again.
Described rubber fastening band one end is sealed to be fixed in annular plate, and the other end is sealed to be fixed on central bottom plate It is interior, and naked leakage part arc-shaped shape of the rubber fastening band in permanent subsiding crack.
Main shaft room bottom four corners are fixed on 2 upper end of column foundation, and the blow-off tee is in addition to upper branch mouth, also there are one tool Zuo Zhukou and right main mouth, Zuo Zhukou and You Zhukou are all connected with main pipeline.
It is that a rigidity is whole, while blow-off tee that blow-off tee is coupled by box foundation structure exhaust valve pit with well room It is connect with its upstream and downstream main pipeline using bell and spigot or welding form.Pipeline is relatively independent with exhaust valve pit, is uniquely connected Socket part position is blow-off tee top manifold, which is independent rectangular underplate concrete, with surrounding floor concrete Between be equipped with permanent subsiding crack, the rubber fastening band used is flexible material.
1)Structure stress:
It is that a rigidity is whole, while blow-off tee that blow-off tee is coupled by box foundation structure exhaust valve pit with well room It is connect with its upstream and downstream main pipeline using bell and spigot or welding form.Due to pipeline with exhaust valve pit be it is relatively independent, only One connecting portion is blow-off tee top manifold, which is independent rectangular underplate concrete, is mixed with surrounding floor Be equipped with permanent subsiding crack between solidifying soil, the rubber fastening band used is for flexible material, with larger permission deflection, avoid due to Differential settlement between pipeline and well room and pipeline or well room structure are damaged.
2)Well room antiseepage:
The main shaft room of column foundation structure air bleeding valve is located at more than main pipeline crest level, and the thickness of earth-fill cover of well room bottom plate is generally Less than 1.5m, under normal circumstances higher than phreatic line, and well room is prevented using rubber fastening band and well room outer wall cladding pitch The dual seepage control measure of water coiled material makes the barrier performance higher of well room.
3)Work progress is stable on excavation slope and foundation bearing capacity influences:
The utility model exhaust independent column foundation of valve pit, main shaft cell structure and main pipeline are substantially independent, Pipe installing with Well room construction can be completely independent progress, be influenced without cross-operation.This kind of structural gap valve pit construction is avoided and is opened over long distances The side slope safety that slot generates stablizes and the adverse effect of basis disturbance.
4)Analysis of Time-limit:
The independent column foundation of column foundation structure exhaust valve pit is completely independent progress with main shaft room with Pipe installing, and there is no friendships Job execution is pitched, and Pipe installing progress synchronous with well room construction can be selected according to live practice of construction situation or will have been pacified Tubulature road backfills in advance, carries out well room construction after arranging foundation pit secondary excavation according to construction, has more in mobilization Big flexibility.
5)Investment analysis:
Relatively traditional exhaust valve pit, novel exhaust valve pit well room are shallow compared with conventional air valve pit.The concrete of single valve pit It is few compared with traditional valve pit with quantity of reinforcement, it is compared by calculating, engineering uses novel valve pit, compared to using traditional valve pit, quantities Reduce 50%.
The above is only the preferred embodiment of the present invention, non-to limit the scope of the claims of the utility model, He uses the equivalence changes of the utility model patent spirit, should all belong to the scope of the claims of the utility model.

Claims (4)

1. a kind of exhaust valve pit, including main shaft room, which is characterized in that main shaft room itself bottom plate include annular plate and in Heart bottom plate, forms permanent subsiding crack between the central bottom plate and annular plate, the central bottom plate passes through rubber with annular plate Glue sealing band connection, the central bottom plate open up centre bore, the centre bore install blow-off tee upper branch mouth, make blow-off tee with Main shaft room connects.
A kind of 2. exhaust valve pit according to claim 1, which is characterized in that the upper branch mouth outer circumferential walls of the blow-off tee Stiffening ring is connected, stiffening ring is inlaid into central bottom plate again.
3. a kind of exhaust valve pit according to claim 1 or 2, which is characterized in that described rubber fastening band one end is sealed It is fixed in annular plate, the other end is sealed to be fixed in central bottom plate, and rubber fastening band is naked in permanent subsiding crack Leak the arc-shaped shape in part.
4. a kind of exhaust valve pit according to claim 1 or 2, which is characterized in that main shaft room bottom four corners are fixed on Column foundation upper end, the blow-off tee is in addition to upper branch mouth, and also there are one Zuo Zhukou and right main mouth, Zuo Zhukou and You Zhukou for tool It is all connected with main pipeline.
CN201721532588.0U 2017-11-16 2017-11-16 A kind of exhaust valve pit Active CN207498991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721532588.0U CN207498991U (en) 2017-11-16 2017-11-16 A kind of exhaust valve pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721532588.0U CN207498991U (en) 2017-11-16 2017-11-16 A kind of exhaust valve pit

Publications (1)

Publication Number Publication Date
CN207498991U true CN207498991U (en) 2018-06-15

Family

ID=62504457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721532588.0U Active CN207498991U (en) 2017-11-16 2017-11-16 A kind of exhaust valve pit

Country Status (1)

Country Link
CN (1) CN207498991U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630467A (en) * 2017-11-16 2018-01-26 辽宁省水利水电勘测设计研究院 One kind exhaust valve pit
CN114960747A (en) * 2022-06-13 2022-08-30 北京韩建河山管业股份有限公司 Large-diameter PCCP exhaust valve chamber and construction process thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630467A (en) * 2017-11-16 2018-01-26 辽宁省水利水电勘测设计研究院 One kind exhaust valve pit
CN114960747A (en) * 2022-06-13 2022-08-30 北京韩建河山管业股份有限公司 Large-diameter PCCP exhaust valve chamber and construction process thereof
CN114960747B (en) * 2022-06-13 2024-02-27 北京韩建河山管业股份有限公司 Large-caliber PCCP (prestressed concrete cylinder pipe) exhaust valve chamber and construction process thereof

Similar Documents

Publication Publication Date Title
CN205917610U (en) Prefabricated assembled concrete box culvert
CN102535441A (en) Construction method of underground diaphragm wall
CN207498991U (en) A kind of exhaust valve pit
CN107268688A (en) I-shaped steel joint of diaphragm wall reinforces the construction method of sealing
CN107630467A (en) One kind exhaust valve pit
CN205387716U (en) Communication tower pipe pile foundation
CN108119701A (en) Recirculated water GRP pipe construction
CN207003602U (en) Urban discharging pipeline anti-leakage structure
CN212983913U (en) Pressure-bearing downcomer well back cover is from waterproof one-way water outlet layer board piece of burying
CN206245447U (en) A kind of anti-floating plastic inspection well
CN214143998U (en) Sewage collecting pipe network arrangement structure for households along river
CN203284787U (en) Composite pipe well precipitation system
CN204021618U (en) A kind of subterranean reservoir structure
CN107288141A (en) A kind of contrary sequence method seamless flexible water construction technology
CN202913497U (en) Planomural winding pipeline plate-strip used for repairing rainy sewer pipeline
CN206545284U (en) A kind of subsided rest room
CN105970910A (en) Well point plastic draining pipe film coating type vacuum preloading and dewatering preloading combined power consolidation method
CN112924105A (en) Device and method for waterproof detection of joint of comprehensive pipe gallery
CN106812167B (en) The method of pile foundation reparation
CN220813928U (en) Combined underwater pipeline connecting vertical shaft
CN103953075B (en) Self Balance Test Method of Foundation Pile load box squeezing unit and mud-jacking technology
CN221142982U (en) Soy sauce flavor type white spirit bottom pot water inspection well
CN217460466U (en) Aqueduct groove body expansion joint water stop structure
CN212956621U (en) Integrative inspection shaft of running water pipeline in severe cold, high groundwater level district
CN218787367U (en) Anti device that subsides of pipeline of going out to house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fan Yuandong

Inventor after: Chen Xinjia

Inventor after: Bai Chongyu

Inventor after: Gao Renchao

Inventor after: Hu Chen

Inventor after: Qiao Gang

Inventor after: Lei Qiuhan

Inventor after: Chen Yanli

Inventor after: Guo Fang

Inventor after: Liu Zhihong

Inventor after: Guo Qingchun

Inventor before: Fan Yuandong

Inventor before: Bai Chongyu

Inventor before: Gao Renchao

Inventor before: Hu Chen

Inventor before: Qiao Gang

Inventor before: Lei Qiuhan

Inventor before: Chen Yanli

Inventor before: Guo Fang

Inventor before: Guo Qingchun

Inventor before: Chen Xinjia

CB03 Change of inventor or designer information