CN208072980U - A kind of integral type mortar leakage prevention packing material - Google Patents

A kind of integral type mortar leakage prevention packing material Download PDF

Info

Publication number
CN208072980U
CN208072980U CN201820501103.XU CN201820501103U CN208072980U CN 208072980 U CN208072980 U CN 208072980U CN 201820501103 U CN201820501103 U CN 201820501103U CN 208072980 U CN208072980 U CN 208072980U
Authority
CN
China
Prior art keywords
pedestal
baffle
channel flow
buried channel
integral type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820501103.XU
Other languages
Chinese (zh)
Inventor
徐公科
李传忠
王慧子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Antaike Engineering Material Co Ltd
Original Assignee
Shandong Antaike Engineering Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Antaike Engineering Material Co Ltd filed Critical Shandong Antaike Engineering Material Co Ltd
Priority to CN201820501103.XU priority Critical patent/CN208072980U/en
Application granted granted Critical
Publication of CN208072980U publication Critical patent/CN208072980U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Building Environments (AREA)

Abstract

The utility model is related to a kind of integral type mortar leakage prevention packing materials, including pedestal, it further include baffle, the flexible material of pedestal is made and is adapted with the inside dimension of pre-buried channel flow, the width of the baffle and pre-buried channel flow is adapted, the baffle is connect by connecting neck with pedestal, and the width of the connection neck and the opening of pre-buried channel flow are adapted, and grid cloth is arranged in the one end of the pedestal far from baffle.The beneficial effects of the utility model are:By the improvement of structure, the infiltration for effectivelying prevent pre-buried channel flow concrete during the installation process can be disposably filled, and can disposably reject, so that packing material is may be reused, reduce cost.

Description

A kind of integral type mortar leakage prevention packing material
Technical field
The utility model is related to packing material field, specifically a kind of integral type mortar leakage prevention packing material.
Background technology
Pre-buried channel flow is that one kind is widely used in high ferro, subway, building curtain wall project, for replacing building for traditional anchor bolt Build connecting elements.Existing pre-buried channel flow, in order to prevent pre-buried channel flow spillage phenomenon occurs in the installation process of concrete, in advance It buries and usually requires filled and process in conduit, and the adhesive tape being equipped at the Plastic cap and conduit opening face of channel ends is interior to ensure Portion's density.
The pre-buried channel flow filled and process of early stage uses polystyrene foam, and sharp ironware is used when rejecting, is on the one hand easy Pre-buried channel flow face coat is scratched, another aspect polystyrene foam quality is more crisp, and foam is difficult whole complete taking-up, bothersome to take Power, working efficiency are low.
The later stage material of pre-buried channel flow filled and process improves to some extent, and has stronger pull resistance compared with polystyrene foam Can, the case where filled and process is difficult to reject can be solved substantially, but during product final packaging, still needs to steep by filling Three foam, plug, adhesive tape steps complete the installation of all packing materials, in product installation forming in use, also needing by removing Adhesive tape rejects two steps of foam, and operating process is cumbersome, and working efficiency is relatively low.Meanwhile in pre-buried channel flow installation process, because The variation of care environments temperature, alkaline environment, directly affects the viscosity of adhesive tape, and when tearing-off adhesive tape is possible to can be to pre-buried channel flow Coating adversely affects.
Utility model content
It, can be with by the improvement of structure the purpose of this utility model is to provide a kind of integral type mortar leakage prevention packing material Disposable filling effectively prevent the infiltration of pre-buried channel flow concrete during the installation process, and can disposably reject, and makes filling material Material may be reused, and reduce cost.
The utility model is realized using technical solution below:
A kind of integral type mortar leakage prevention packing material, including pedestal, further include baffle, the flexible material of pedestal be made and It is adapted with the inside dimension of pre-buried channel flow, the width of the baffle and pre-buried channel flow is adapted, and the baffle is by connecting neck It is connect with pedestal, the width of the connection neck and the opening of pre-buried channel flow are adapted, one end setting of the pedestal far from baffle Grid cloth.
Rubber magnetic sheet is arranged close to the side of pedestal in the baffle.
The connection neck is made of elastic material.
The grid cloth is made of elastic material, and several separation troughs are arranged close to one end of grid cloth in the pedestal.
The closed cavity of setting in the pedestal.
The pedestal is made of flame retardant flexible material.
The utility model has the beneficial effects that:
1, the utility model is integral type, and integral type has better seal after filling, can effectively prevent built-in groove The infiltration of road concrete during the installation process is, it can be achieved that disposable filling, improves working efficiency;Pedestal 1 uses flexible material system At can once reject, so that packing material is may be reused, reduce cost.
2, rubber magnetic sheet, rubber magnetic sheet adsorption tank road open metal is arranged close to the side of pedestal in the utility model baffle Face is also prevented from original adhesive tape because of care environments temperature, alkaline environment in addition to having better seal than original adhesive tape Variation, influences the viscosity of adhesive tape, avoids being possible to that the coating of pre-buried channel flow can be adversely affected when tearing-off adhesive tape.
3, the utility model connection neck is made of elastic material, is provided to baffle into pre-buried channel flow by elastic material Pulling force can increase leakproofness.
4, several separation troughs are arranged close to one end of grid cloth in the utility model pedestal, increase the bending performance of pedestal, energy Enough be conducive to out of pre-buried channel flow once reject pedestal.
5, the closed cavity of setting in the utility model pedestal, when by pedestal by being rejected in pre-buried channel flow, can increase bottom The deformation of seat, can be conducive to out of pre-buried channel flow once reject pedestal.
6, the utility model pedestal is made of flame retardant flexible material, disclosure satisfy that the fire resistant requirements of construction-engineering project.
Description of the drawings
Attached drawing 1 is the structural schematic diagram of embodiment 1.
Attached drawing 2 is the structural schematic diagram of embodiment 2.
Attached drawing 3 is the use state reference chart of the utility model.
Label as shown in the figure:1, pedestal;2, baffle;3, neck is connected;4, grid cloth;5, rubber magnetic sheet;6, separation trough;7, empty Chamber;8, pre-buried channel flow.
Specific implementation mode
With reference to the drawings and specific embodiments, the utility model is described in further detail.It should be understood that these embodiments are only used for Illustrate the utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, having read the utility model instruction Content after, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms are equally fallen In the scope of the appended claims of the present application.
A kind of integral type mortar leakage prevention packing material, including pedestal 1 further include baffle 2,1 flexible material system of the pedestal It is adapted at and with the inside dimension of pre-buried channel flow 8, the width of the baffle 2 and pre-buried channel flow 8 is adapted, and the baffle 2 is logical It crosses connection neck 3 to connect with pedestal 1, the opening of the width and pre-buried channel flow 8 of the connection neck 3 is adapted, and connects neck 3 by built-in groove The opening in road 8 seals.Grid cloth 4 is arranged in the one end of the pedestal 1 far from baffle 2, and grid cloth 4 can enhance the tough of the packing material Property, it prevents longer packing material to be broken during rejecting, whole tensile strength is improved, to realize packing material Recycling, reduce production cost.It, will be pre-buried by manually filling in pedestal 1 inside pre-buried channel flow 8 when pre-buried channel flow 8 dispatches from the factory Conduit 8 is filled, and baffle 2 is attached on the metal covering of 8 opening of pre-buried channel flow, and pre-buried channel flow 8 can be effectively prevent in installation process The infiltration of middle concrete when rejecting, is held baffle 2 by pedestal 1 by being pulled out in pre-buried channel flow 8, is not had to by other tools, Convenient and efficient and noresidue, disposable reject improves working efficiency, while will not injure the face coat of pre-buried channel flow 8.
Further, for the baffle 2 close to the side of pedestal 1 setting rubber magnetic sheet 5, rubber magnetic sheet 5 adsorbs conduit opening Metal covering is also prevented from original adhesive tape because of care environments temperature, alkaline ring in addition to having better seal than original adhesive tape The variation in border influences the viscosity of adhesive tape, also can avoid being possible to that unfavorable shadow can be caused to the coating of pre-buried channel flow 8 when tearing-off adhesive tape It rings.
Further, the connection neck 3 is made of elastic material, is provided to baffle 2 to pre-buried channel flow 8 by elastic material Interior pulling force can increase leakproofness.
Further, the grid cloth 4 is made of elastic material, and the pedestal 1 is several close to the setting of one end of grid cloth 4 Separation trough 6 increases the bending performance of pedestal 1, can be conducive to out of pre-buried channel flow 8 once reject pedestal 1.
Further, the closed cavity 7 of setting in the pedestal 1, when by pedestal 1 by being rejected in pre-buried channel flow 8, Neng Gouzeng Add the deformation of pedestal 1, can be conducive to out of pre-buried channel flow 8 once reject pedestal 1.
Further, the pedestal 1 is made of flame retardant flexible material, disclosure satisfy that the fire resistant requirements of construction-engineering project.
Embodiment 1:
A kind of integral type mortar leakage prevention packing material, including pedestal 1 further include baffle 2, and pedestal 1 is whole to use XPE materials, Chemical property is stablized, material softness plasticity number, and tensile strength is high, and fire proofing is made convenient for fire retardant is added, meets engineering The fire resistant requirements of project, in addition, using the flexibility of XPE materials, it is fine-tuning caused by not being bonded between pre-buried channel flow 8 and pedestal Error, it is ensured that leakproofness after final products molding.And the inside dimension of pedestal 1 and pre-buried channel flow 8 is adapted, the baffle 2 with The width of pre-buried channel flow 8 is adapted, and the baffle 2 is connect by connecting neck 3 with pedestal 1, and the connection neck 3 is by elastic material system At the opening of the width and pre-buried channel flow 8 of the connection neck 3 is adapted, and grid is arranged in the one end of the pedestal 1 far from baffle 2 Cloth 4, the grid cloth 4 are made of elastic material, and several separation troughs 6 are arranged close to one end of grid cloth 4 in the pedestal 1.
Embodiment 2:
A kind of integral type mortar leakage prevention packing material, including pedestal 1, the closed cavity 7 of the interior setting of the pedestal 1 further include Baffle 2,1 flexible material of the pedestal are made and are adapted with the inside dimension of pre-buried channel flow 8, the baffle 2 and built-in groove The width in road 8 is adapted, and the baffle 2 is connect by connecting neck 3 with pedestal 1, and the baffle 2 is arranged close to the side of pedestal 1 The opening of rubber magnetic sheet 5, the width and pre-buried channel flow 8 of the connection neck 3 is adapted, and the one end of the pedestal 1 far from baffle 2 is set Set grid cloth 4.Rubber magnetic sheet adsorption tank road open metal face can also prevent in addition to having better seal than original adhesive tape Only original adhesive tape influences the viscosity of adhesive tape because of care environments temperature, the variation of alkaline environment, and have can when also can avoid tearing-off adhesive tape The coating of pre-buried channel flow can be adversely affected.

Claims (6)

1. a kind of integral type mortar leakage prevention packing material, including pedestal, it is characterised in that:Further include baffle, the pedestal is flexible Material is made and is adapted with the inside dimension of pre-buried channel flow, and the width of the baffle and pre-buried channel flow is adapted, the baffle It is connect with pedestal by connecting neck, the width of the connection neck and the opening of pre-buried channel flow are adapted, and the pedestal is far from baffle One end be arranged grid cloth.
2. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:The baffle is close to pedestal Side be arranged rubber magnetic sheet.
3. a kind of integral type mortar leakage prevention packing material according to claim 1 or 2, it is characterised in that:The connection neck by Elastic material is made.
4. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:The grid cloth is by elasticity Material is made, and several separation troughs are arranged close to one end of grid cloth in the pedestal.
5. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:Setting is close in the pedestal The cavity closed.
6. a kind of integral type mortar leakage prevention packing material according to claim 1, it is characterised in that:The pedestal is by fire-retardant soft Property material is made.
CN201820501103.XU 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material Active CN208072980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820501103.XU CN208072980U (en) 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820501103.XU CN208072980U (en) 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material

Publications (1)

Publication Number Publication Date
CN208072980U true CN208072980U (en) 2018-11-09

Family

ID=64040440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820501103.XU Active CN208072980U (en) 2018-04-10 2018-04-10 A kind of integral type mortar leakage prevention packing material

Country Status (1)

Country Link
CN (1) CN208072980U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532948A (en) * 2018-04-10 2018-09-14 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532948A (en) * 2018-04-10 2018-09-14 山东安泰克工程材料有限公司 A kind of integral type mortar leakage prevention packing material

Similar Documents

Publication Publication Date Title
CN208072980U (en) A kind of integral type mortar leakage prevention packing material
CN108532948A (en) A kind of integral type mortar leakage prevention packing material
CN216584859U (en) High elasticity antistatic foam convenient to assemble
CN206961557U (en) A kind of flat cable for being used for outdoor pre-buried installation
CN209238226U (en) A kind of outer water cuts appearance coating barrier structure and its production mould
CN202480469U (en) Single-sided release paper
CN201042912Y (en) Grid structure on side surface of internal wall of anti-punctured tire
CN206110567U (en) Compound stone material board
CN207926117U (en) A kind of anti-clogging embedded junction box
CN109322458A (en) A kind of seamless interfacing plate
CN207672819U (en) The bright frame system of glass curtain wall
CN208535329U (en) Fireproof blocking block vacuum encapsulation structure
CN201496091U (en) Plastic coated fabric negative pressure air duct
CN217272471U (en) Anti-frost-crack polymer plastic pipeline for building cold water
CN209535690U (en) Hose glass glue bottle with scraping
CN203624279U (en) Clay bin capable of preventing material sticking
CN205296595U (en) Plastics tile
CN210362803U (en) Replace traditional packing carton with fire-retardant glass fiber emulsion felt
CN208717220U (en) A kind of creep self-adhesion polymer membranes
CN219487967U (en) Environment-friendly anti-deformation paper gift box
CN209414809U (en) A kind of bellows of charged line
CN109025045A (en) A kind of double glass magnesium clean boards of craft and construction method
CN214131508U (en) Double-end dust suppression sleeve is transported to material
CN207074568U (en) A kind of water-proof wire bundle
CN220303140U (en) Air pipe heat-insulating rock wool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Integrated slurry-leaking-preventing filling material

Effective date of registration: 20191225

Granted publication date: 20181109

Pledgee: Qingdao financing guarantee Centre Limited

Pledgor: SHANDONG ANTAIKE ENGINEERING MATERIAL CO., LTD.

Registration number: Y2019370010053

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20201127

Granted publication date: 20181109

Pledgee: Qingdao financing guarantee Centre Ltd.

Pledgor: SHANDONG ANTAIKE ENGINEERING MATERIAL Co.,Ltd.

Registration number: Y2019370010053

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A kind of integrated anti leakage filling material

Effective date of registration: 20201202

Granted publication date: 20181109

Pledgee: Qingdao financing guarantee Centre Ltd.

Pledgor: SHANDONG ANTAIKE ENGINEERING MATERIAL Co.,Ltd.

Registration number: Y2020370010049

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220221

Granted publication date: 20181109

Pledgee: Qingdao financing guarantee Centre Ltd.

Pledgor: SHANDONG ANTAIKE ENGINEERING MATERIAL Co.,Ltd.

Registration number: Y2020370010049