CN205063526U - Assembled enclosure with preparation of building rubbish - Google Patents

Assembled enclosure with preparation of building rubbish Download PDF

Info

Publication number
CN205063526U
CN205063526U CN201520737663.1U CN201520737663U CN205063526U CN 205063526 U CN205063526 U CN 205063526U CN 201520737663 U CN201520737663 U CN 201520737663U CN 205063526 U CN205063526 U CN 205063526U
Authority
CN
China
Prior art keywords
wallboard
groove
tongue
wall column
grade beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520737663.1U
Other languages
Chinese (zh)
Inventor
温岳斌
蒙勇
黎之舜
周志荣
黄彭
杨和源
吕厚道
周振杰
黄维
申珊平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co
Original Assignee
GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co filed Critical GUANGXI CONSTRUCTION ENGINEERING GROUP THIRD CONSTRUCTION ENGINEERING Co
Priority to CN201520737663.1U priority Critical patent/CN205063526U/en
Application granted granted Critical
Publication of CN205063526U publication Critical patent/CN205063526U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses assembled enclosure with preparation of building rubbish relates to building technical field, including basis, wall post, grade beam, wallboard, pressure roof beam, capital gadget, fix a position in the ground basic bottom, and the wall post passes through the joggle to be connected on the basis, and the grade beam joggle is between adjacent two bases, and the wallboard joggle supports between adjacent two wall posts in the upside and the both sides reason of grade beam, presses the roof beam joggle on the wallboard, and capital gadget joggle is in wall post upper end. Wherein basis, wall post, grade beam, wallboard, pressure roof beam, capital gadget use building rubbish as the aggregate to cement, lime, fly ash mix to smash through the stirring and make shape for compound cementitious material. The utility model discloses assembled enclosure with preparation of building rubbish easy dismounting, sound construction, pleasing to the eye, the durable of appearance can use in repeated turnover, can effectively reduce construction cost.

Description

The Assembled enclosing wall that a kind of building waste makes
Technical field
The utility model relates to technical field of buildings, the enclosure wall particularly in a kind of building operations building site.
Background technology
In order to safe construction, building site needs to fence up with enclosure wall, and at present at construction site, great majority adopt brick enclosure wall and color steel watt partition enclosure wall, these two kinds of enclosure walls have the following disadvantages: what 1, brick enclosure wall adopted is medical disposable material, working procedure is more, long in time limit, and cost is high, the waste material removing enclosure wall generation after Practical Completion is more, increase waste discharge amount, cause environment pollution, do not meet country's " energy-saving and emission-reduction " policy; 2, color steel watt enclosure wall, easily damage, theftproof performance is poor, is only suitable for duration shorter work items.
Summary of the invention
The purpose of this utility model is the defect existed for prior art, provides the Assembled enclosing wall that a kind of building waste makes, this enclosure wall easy accessibility, sound construction, good looking appearance, durable in use, can repeat turnover use, effectively can reduce construction cost.
The technical scheme that the utility model adopts for achieving the above object is: the Assembled enclosing wall that a kind of building waste makes, comprise basis, wall column, grade beam, wallboard, pressure beam, bottom, basis is positioned in ground, the basic tenon of outstanding basic upper surface is embedded with in basis, basis tenon is provided with the fixed bolt hole run through, wall column is connected to basic upper surface, the center bottom of wall column caves inward the wall column tongue-and-groove be provided with for accommodating basic tenon, wall column bottom two lateral walls is provided with position relatively and run through the connecting screw hole of wall column tongue-and-groove, when basic tenon on basis is positioned in the wall column tongue-and-groove of wall column bottom, wall column is fixed on basic upper surface through the fixed bolt hole on connecting screw hole and basic tenon by standing screw, the connection push pedal for connecting grade beam is connected in the bottom of wall column relative both sides outer wall, the grade beam tongue-and-groove I caved inward is provided with on the downside of grade beam two ends, grade beam upper surface is provided with for accommodating wallboard and in the grade beam tongue-and-groove II of strip to lower recess, grade beam tongue-and-groove I joggle at grade beam two ends is outside the connection push pedal of wall column bottom, wallboard bottom joggle is in the grade beam tongue-and-groove II of grade beam upper surface, wallboard upper end is connected with the wallboard tenon of outstanding wallboard upper surface, pressure beam is provided with the pressure beam tongue-and-groove I relative with the wallboard tenon position of wallboard upper end, pressure beam is arranged on wallboard, and the wallboard tenon of wallboard upper end and the mutual joggle of pressure beam tongue-and-groove I of pressing beam.
Further technical scheme of the present utility model is: also comprise the capital gadget being connected to wall column upper end, wall column top is projecting the wall column suspension ring be embedded in wall column, capital gadget bottom surface caves inward in the position that the wall column suspension ring position with wall column top is relative and is provided with capital tongue-and-groove, when capital gadget is assemblied in wall column top, wall column suspension ring and the mutual joggle of capital tongue-and-groove.
Further technical scheme of the present utility model is: described basic upper surface is provided with two the basic tenons be arranged side by side, two basic tenons are respectively equipped with the fixed bolt hole that position is mutually corresponding, are connected with the basic suspension ring of being convenient to basis to mention on the top of two basic tenons.
Further technical scheme of the present utility model is: the grade beam tongue-and-groove I of described grade beam and grade beam tongue-and-groove II are formed by presetting channel-section steel in grade beam respectively, are also embedded with in grade beam tongue-and-groove II both sides of grade beam upper surface the grade beam suspension ring being convenient to grade beam to sling respectively.
Further technical scheme of the present utility model is: described pressure back end is arranged in the prominent part of the pressure beam suspension ring being embedded in and being convenient to pressure beam to sling in pressure beam, pressure beam bottom caves inward the pressure beam tongue-and-groove II being provided with and coordinating with wallboard upper end, and pressure beam tongue-and-groove II by presetting channel-section steel formation in pressure beam.
Further technical scheme of the present utility model is: the core bore being provided with evenly arrangement in described wallboard, and the both side edges of wallboard and upper and lower sides edge form corner protector respectively by shaped steel bound edge.
The Assembled enclosing wall that the utility model building waste makes has following beneficial effect: 1, enclosure wall of the present utility model adopts fabricated construction, and structural performance is good, durable in use, can repeat turnover and use, produce expense few, and no matter duration length all can use; 2, between each component of enclosure wall, assembling links employing joggle, and mounting or dismounting are convenient, and installation period is short; 3, the material of the utility model enclosure wall mainly uses building waste and flyash, turns waste into wealth, and saves material, meets country's " energy-saving and emission-reduction " policy, have good social benefit and environmental benefit.
Below in conjunction with drawings and Examples, the Assembled enclosing wall that the utility model building waste makes is further described.
Accompanying drawing explanation
Fig. 1 is the package assembly schematic diagram of the Assembled enclosing wall that the utility model building waste makes;
Fig. 2 is the top view on basis;
Fig. 3 is the lateral view on basis;
Fig. 4 is the elevation on basis;
Fig. 5 is the structural representation of wall column;
Fig. 6 is the A-A direction sectional view of Fig. 5;
Fig. 7 is the structural representation of grade beam;
Fig. 8 is the B-B direction sectional view of Fig. 7;
Fig. 9 is the structural representation of pressure beam;
Figure 10 is the C-C direction sectional view of Fig. 9;
Figure 11 is the D-D direction sectional view of Fig. 9;
Figure 12 is the structural representation of wallboard;
Figure 13 is the E-E direction sectional view of Figure 12;
Figure 14 is the front elevation view of capital gadget;
Figure 15 is the side elevational view of capital gadget;
Figure 16 is the upward view of capital gadget;
Element numbers illustrates: 1-basis, 11-basis tenon, 12-basis suspension ring, 13-fixed bolt hole, 2-grade beam, 21-grade beam suspension ring, 22-grade beam tongue-and-groove II, 23-grade beam tongue-and-groove I, 3-ground, 4-wallboard, 41-wallboard tenon, 42-corner protector, 43-core bore, 5-presses beam, and 51-presses beam tongue-and-groove I, 52-to press beam tongue-and-groove II, 53-to press beam suspension ring, 6-capital gadget, 61-capital tongue-and-groove, 7-wall column, 71-wall column suspension ring, 72-wall column tongue-and-groove, 73-standing screw, 74-connects push pedal, 75-connecting screw hole.
Detailed description of the invention
As shown in Fig. 1 to Figure 16, the Assembled enclosing wall that the utility model makes of building waste, comprise basis 1, wall column 7, grade beam 12, wallboard 4, pressure beam 5, basis 1 is the large cone-shaped in little upper end, bottom, 1 bottom, basis is positioned in ground 3, the basic tenon 11 of outstanding basic 1 upper surface is embedded with in basis 1, basis tenon 11 is provided with the fixed bolt hole 13 run through, and in the present embodiment, basis 1 upper surface is provided with two the basic tenons 11 be arranged side by side, two basic tenons 11 are respectively equipped with the fixed bolt hole 13 that position is mutually corresponding, the basic suspension ring 12 of being convenient to basis 1 to mention are connected with on the top of two basic tenons 11.
Wall column 7 is connected to basic 1 upper surface, the center bottom of wall column 7 caves inward the wall column tongue-and-groove 72 be provided with for accommodating basic tenon 11, wall column 7 bottom two lateral walls is provided with position relatively and run through the connecting screw hole 75 of wall column tongue-and-groove 72, when basic tenon 11 on basis 1 is positioned in the wall column tongue-and-groove 72 of wall column 7 bottom, wall column 7 is fixed on basic 1 upper surface through the fixed bolt hole 13 on connecting screw hole 75 and basic tenon 11 by standing screw 73, the connection push pedal 74 for connecting grade beam 12 is connected in the bottom of wall column 7 relative both sides outer wall, connecting push pedal 74 is one section of channel-section steel.
The grade beam tongue-and-groove I 23 caved inward is provided with on the downside of grade beam 12 two ends, grade beam 12 upper surface is provided with for accommodating wallboard 4 and in the grade beam tongue-and-groove II 22 of strip to lower recess, grade beam tongue-and-groove I 23 joggle at grade beam 12 two ends is outside the connection push pedal 74 of wall column 7 bottom, wallboard 4 bottom joggle is in the grade beam tongue-and-groove II 22 of grade beam 12 upper surface, the grade beam tongue-and-groove I 23 of grade beam 12 becomes by burying channel steel shape in grade beam 12 in advance underground respectively with grade beam tongue-and-groove II 22, when building grade beam 12, channel-section steel is preset in the position of grade beam tongue-and-groove I 23 and grade beam tongue-and-groove II 22 correspondence, the opening of channel-section steel outwardly, namely the groove of building shaping rear channel-section steel itself forms grade beam tongue-and-groove I 23 and grade beam tongue-and-groove II 22.The grade beam suspension ring 21 being convenient to grade beam 12 to sling also are embedded with respectively in grade beam tongue-and-groove II 22 both sides of grade beam 12 upper surface.
Wallboard 4 upper end is connected with the wallboard tenon 41 of outstanding wallboard 4 upper surface, the double suspension ring doing hanging screen plate 4 of wallboard tenon 41 are used, the core bore 43 of evenly arrangement is provided with in wallboard 4, core bore 43 be arranged so that the overall weight of wallboard 4 is effectively reduced, when making wallboard 4, use of loosing core is done with 45 steel pipes, when wallboard 4 final set, steel pipe is extracted out, be convenient to form core bore 43 cavity, the both side edges of wallboard 4 and upper and lower sides edge form corner protector 42 respectively by shaped steel bound edge, so that wallboard 4 is not easy when docking with other component the edge that collapses, and effectively improves its application life.
Pressure beam 5 is provided with the pressure beam tongue-and-groove I 51 relative with wallboard tenon 41 position of wallboard 4 upper end, and pressure beam 5 is arranged on wallboard 4, and the wallboard tenon 41 of wallboard 4 upper end and the mutual joggle of pressure beam tongue-and-groove I 51 of pressing beam 5.Pressure beam 5 top is arranged in the prominent part of the pressure beam suspension ring 53 being embedded in and being convenient to pressure beam 5 to sling in pressure beam 5, pressure beam 5 bottom caves inward the pressure beam tongue-and-groove II 52 being provided with and coordinating with wallboard 4 upper end, pressure beam tongue-and-groove II 52 by burying channel steel shape in advance underground in pressure beam 5, when building pressure beam 5, channel-section steel is preset in the position of pressure beam tongue-and-groove II 52 correspondence, channel-section steel opening down, namely the groove of building shaping rear channel-section steel itself forms pressure beam tongue-and-groove II 52.
The Assembled enclosing wall that the utility model building waste makes also comprises the capital gadget 6 being connected to wall column 7 upper end, wall column 7 top is projecting the wall column suspension ring 71 be embedded in wall column 7, the double tenon done when being connected with capital gadget 6 of wall column suspension ring 71, capital gadget 6 bottom surface caves inward in the position that wall column suspension ring 71 position with wall column 7 top is relative and is provided with capital tongue-and-groove 61, when capital gadget 6 is assemblied in wall column 7 top, wall column suspension ring 71 and capital tongue-and-groove 61 joggle mutually.
Install Assembled enclosing wall that the utility model building waste makes install below order carry out: basic earthwork excavation, installation foundation, installation wall column and grade beam tenon, grade beam is installed, wallboard is installed, the facing of pressing beam, erection column cresting part, wall is installed.
Enclosure wall Installation features: during (1) installation foundation, notice that the direction of basic tenon 11 and wall column, grade beam direction are consistent, in order to avoid affect subsequent installation; (2) when installing wall column, grade beam tenon, basis, wall column, grade beam tenon are linked together with bolt, screw rod requires to give prominence to grade beam tenon; (3) when installing wallboard, temporary fixed support wallboard, prevent wallboard from toppling over, and install pressure beam as early as possible, after installing pressure beam, the tenon be connected with pressure beam with timber wedge jam-pack wallboard, makes pressure beam and wallboard form entirety; (4), during erection column cresting part 6, the tenon be connected with capital gadget 6 with timber wedge jam-pack wall column, makes whole enclosure wall form entirety.
Enclosure wall remove, by installation opposite sequence one by one component carry out removing, clearing up classify and pile up, be transported to another building site and install and use.

Claims (6)

1. the Assembled enclosing wall made of building waste, it is characterized in that, comprise basis (1), wall column (7), grade beam (2), wallboard (4), pressure beam (5), (1) bottom, basis is positioned in ground (3), the basic tenon (11) of outstanding basis (1) upper surface is embedded with in basis (1), basis tenon (11) is provided with the fixed bolt hole (13) run through, wall column (7) is connected to basis (1) upper surface, the center bottom of wall column (7) caves inward the wall column tongue-and-groove (72) be provided with for accommodating basic tenon (11), wall column (7) bottom two lateral walls is provided with position relatively and run through the connecting screw hole (75) of wall column tongue-and-groove (72), when basic tenon (11) on basis (1) is positioned in the wall column tongue-and-groove (72) of wall column (7) bottom, wall column (7) is fixed on basis (1) upper surface through the fixed bolt hole (13) on connecting screw hole (75) and basic tenon (11) by standing screw (73), the connection push pedal (74) for connecting grade beam (2) is connected in the bottom of wall column (7) relative both sides outer wall, the grade beam tongue-and-groove I (23) caved inward is provided with on the downside of grade beam (2) two ends, grade beam (2) upper surface is provided with for accommodating wallboard (4) and in the grade beam tongue-and-groove II (22) of strip to lower recess, grade beam tongue-and-groove I (23) joggle at grade beam (2) the two ends connection push pedal (74) in wall column (7) bottom outward, wallboard (4) bottom joggle is in the grade beam tongue-and-groove II (22) of grade beam (2) upper surface, wallboard (4) upper end is connected with the wallboard tenon (41) of outstanding wallboard (4) upper surface, pressure beam (5) is provided with the pressure beam tongue-and-groove I (51) relative with wallboard tenon (41) position of wallboard (4) upper end, pressure beam (5) is arranged on wallboard (4), and the wallboard tenon (41) of wallboard (4) upper end and the mutual joggle of pressure beam tongue-and-groove I (51) of pressing beam (5).
2. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, also comprise the capital gadget (6) being connected to wall column (7) upper end, wall column (7) top is projecting the wall column suspension ring (71) be embedded in wall column (7), capital gadget (6) bottom surface caves inward in the position that wall column suspension ring (71) position with wall column (7) top is relative and is provided with capital tongue-and-groove (61), when capital gadget (6) is assemblied in wall column (7) top, wall column suspension ring (71) and capital tongue-and-groove (61) joggle mutually.
3. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, described basis (1) upper surface is provided with two the basic tenons (11) be arranged side by side, two basic tenons (11) are respectively equipped with the fixed bolt hole (13) that position is mutually corresponding, are connected with the basic suspension ring (12) of being convenient to basis (1) to mention on the top of two basic tenons (11).
4. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, the grade beam tongue-and-groove I (23) of described grade beam (2) and grade beam tongue-and-groove II (22) are formed by presetting channel-section steel in grade beam (2) respectively, are also embedded with in grade beam tongue-and-groove II (22) both sides of grade beam (2) upper surface the grade beam suspension ring (21) being convenient to grade beam (2) to sling respectively.
5. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, described pressure beam (5) top is arranged in the prominent part of the pressure beam suspension ring (53) being embedded in and being convenient to pressure beam (5) to sling in pressure beam (5), pressure beam (5) bottom caves inward the pressure beam tongue-and-groove II (52) being provided with and coordinating with wallboard (4) upper end, and pressure beam tongue-and-groove II (52) by presetting channel-section steel formation in pressure beam (5).
6. as claimed in claim 1 with the Assembled enclosing wall that building waste makes, it is characterized in that, be provided with the core bore (43) of evenly arrangement in described wallboard (4), the both side edges of wallboard (4) and upper and lower sides edge form corner protector (42) respectively by shaped steel bound edge.
CN201520737663.1U 2015-09-22 2015-09-22 Assembled enclosure with preparation of building rubbish Expired - Fee Related CN205063526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520737663.1U CN205063526U (en) 2015-09-22 2015-09-22 Assembled enclosure with preparation of building rubbish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520737663.1U CN205063526U (en) 2015-09-22 2015-09-22 Assembled enclosure with preparation of building rubbish

Publications (1)

Publication Number Publication Date
CN205063526U true CN205063526U (en) 2016-03-02

Family

ID=55390098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520737663.1U Expired - Fee Related CN205063526U (en) 2015-09-22 2015-09-22 Assembled enclosure with preparation of building rubbish

Country Status (1)

Country Link
CN (1) CN205063526U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201278A (en) * 2015-09-22 2015-12-30 广西建工集团第三建筑工程有限责任公司 Assembly type fence wall made of construction waste
CN113958191A (en) * 2021-10-26 2022-01-21 国家电网有限公司 Assembled enclosure wall structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201278A (en) * 2015-09-22 2015-12-30 广西建工集团第三建筑工程有限责任公司 Assembly type fence wall made of construction waste
CN113958191A (en) * 2021-10-26 2022-01-21 国家电网有限公司 Assembled enclosure wall structure

Similar Documents

Publication Publication Date Title
CN201339197Y (en) Self-pressure tower tube base
CN205063526U (en) Assembled enclosure with preparation of building rubbish
CN103343547B (en) Container type prefabricated house assembling steel reinforced concrete four patten and construction method
CN105201278A (en) Assembly type fence wall made of construction waste
CN204475529U (en) The syndeton of a kind of assembling type outer wall and beam
CN205604429U (en) Cistern of steel construction
CN104652608A (en) Assembly type exterior wall and beam connecting structure
CN204456279U (en) Novel all-in-one board house formula moves pump house
CN201649123U (en) Assembly integrated counterfort retaining wall
CN203429655U (en) Assembly type steel reinforced concrete single-double column foundation for container prefabricated house
CN205530324U (en) Cold-formed thin-wall section steel micro pile
CN204457079U (en) Enclosure upright post
CN103669596B (en) Prefabricated reinforced concrete column beam-to-column joint structure
CN209277287U (en) A kind of assembly concrete-filled steel tube wall frame building integrated morphology
CN207863840U (en) A kind of prefabricated door pillar in construction site
CN208456101U (en) A kind of housing construction scaffold
CN210117661U (en) Assembled culvert channel cap stone
CN204753932U (en) Can assemble into floor that ceiling takes shape
CN204899034U (en) Prefabricated wall post
CN205743275U (en) Assembled enclosing wall
CN2880959Y (en) Building construction material
CN204457076U (en) A kind of green assembled light enclosure wall
CN204326307U (en) The module wall that a kind of building construction uses
CN204457074U (en) Combined enclosing wall component
CN204983140U (en) Removal glass steel base reinforced structure for house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20180922