CN203213346U - Connecting structure for assembling integral concrete frame and shear wall - Google Patents

Connecting structure for assembling integral concrete frame and shear wall Download PDF

Info

Publication number
CN203213346U
CN203213346U CN 201320223836 CN201320223836U CN203213346U CN 203213346 U CN203213346 U CN 203213346U CN 201320223836 CN201320223836 CN 201320223836 CN 201320223836 U CN201320223836 U CN 201320223836U CN 203213346 U CN203213346 U CN 203213346U
Authority
CN
China
Prior art keywords
wall
concrete
shear wall
horizontal connector
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201320223836
Other languages
Chinese (zh)
Inventor
潘金龙
马军卫
尹万云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN 201320223836 priority Critical patent/CN203213346U/en
Application granted granted Critical
Publication of CN203213346U publication Critical patent/CN203213346U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a connecting structure for assembling an integral concrete frame and shear wall, which comprises a precast concrete column, a precast H-shaped concrete superposed beam, precast concrete shear wall bodies, n-shaped horizonal connecting pieces, channel steel, bolts, a bolt sleeve and post-pouring concrete, wherein the channel steel is arranged at the upper sides and the lower sides of the precast concrete shear wall bodies, the connection between the precast concrete column and the precast concrete shear wall bodies and the connection between the precast concrete shear wall bodies are realized through the fixing of the n-shaped horizonal connecting pieces and the bolts, a plurality of holes are formed in the precast H-shaped concrete superposed beam, and after the structure is mounted, the post-pouring concrete is used for consolidating the connecting parts, so as to enable the column, the walls and the beam to form an integrated structure. Due to the adoption of the connecting structure for assembling the integral concrete frame and shear wall disclosed by the utility model, the wall bodies are easy to hoist, and accurate abutting of upper and lower wall bodies can be realized for fast assembly.

Description

A kind of assembled integral concrete frame-shear wall syndeton
Technical field
The utility model belongs to prefabricated assembled concrete technical field of structures in the civil engineering, and particularly a kind of syndeton of assembled integral concrete frame-shear wall mainly is applicable to the assembled integral frame shear wall structure.
Background technology
The prefabricated assembled concrete structure is as a kind of form of structure that meets industrialized production, it is fast to have speed of application, easy construction, reduce construction worker's labour intensity greatly, improve the job site environment, reduce noise pollution, reduce wet trade, advantages such as the easy control of product quality, prefabricated assembled building can effectively economize on resources and the energy simultaneously, improves the efficient of material aspect realization building energy conservation and structural performance, reduce site operation to the demand of place and ambient conditions, reduce the site operation quantity of labour force, reduce the harmful effect of building waste and Construction on Environment, improve building function and structural performance, effectively realize the Green Development requirement of " one environmental protection of four joints ", realize low energy consumption, the building course of low emission can promote the sound development of Building Trade in China, realizes predetermined target for energy-saving and emission-reduction.
Housing industrialization is an importance of industrialized building, can promote China's dwelling house performance quality comprehensively, improve the dwelling house durability, also can drive the upgrading of related industry simultaneously, bring huge follow-up economic and social benefit, adopting the prefabricated assembled concrete structure is the important channel of housing industrialization, house component is prefabricated in the factory, assemble the job site, the member batch production is made, speed of application is fast, economize on resources, reduce construction costs, satisfy the growing house needs of broad masses of the people, energy-saving and emission-reduction are present global top priorities, production by batch production, the constructional materials loss reduces 60%, and building energy conservation is more than 65%, and construction period shortens 70%, accomplished house building, " overall process " energy conservation of using, reduce the adverse effect to environment to greatest extent, especially can not be subjected to seasonal effect and accomplish " the annual construction " at very long northern area of the winter period of rest, improved construction efficiency greatly.
At present, design and construction to assembling frame construction, assembling shear wall structure etc. in all kinds of standards of China have clear and definite description, but the regulation to the assembling frame shear wall structure is less, and in the practice of construction, the accurate construction of levels shear wall structure is its technological difficulties and key.
The method of Chinese patent CN 102808465A employing reinforced bar sleeve perfusion mortar connects the reinforcing bar of levels, but the construction precision of this connection technological requirement prefabricated component is higher, bigger because of full wafer shear wall wall weight in the practice of construction, the reinforcing bar of levels is aimed at difficult control under the lifting state, and the reinforced bar sleeve of using in the construction is more, when relatively taking a lot of work during connection.
Summary of the invention
Technical problem to be solved in the utility model is to propose a kind of assembled integral concrete frame-shear wall syndeton, after using this structure, the construction easy operating of shear wall and frame part, construction back appearance looks elegant, this structure can be widely used in the assembled integral frame shear wall structure.
For realizing above-mentioned technical purpose, a kind of assembled integral concrete frame of the utility model-shear wall syndeton, it comprises precast concrete column, prefabricated H shape concrete folding beam, precast concrete shear wall body of wall, ∏ shape horizontal connector, channel-section steel, bolt, bolt sleeve and back pouring concrete, bolt sleeve is fixedly installed in the precast concrete column, described ∏ shape horizontal connector is connected and fixed the side that is arranged on precast concrete column by bolt, is fixedly installed on the precast concrete shear wall body of wall left and right sides by anchor bar; The ∏ shape horizontal connector position that is arranged on the ∏ shape horizontal connector of the precast concrete shear wall body of wall left and right sides and precast concrete column side is suitable, described channel-section steel is fixedly installed on concrete shear force wall body of wall both sides up and down, and has slotted eye on the channel-section steel web; Fixedly connected with bolt sleeve by ∏ shape horizontal connector, bolt between described precast concrete column and the precast concrete shear wall body of wall, connect by ∏ shape horizontal connector, bolt between the precast concrete shear wall body of wall, have a plurality of holes on the described prefabricated H shape concrete folding beam, have a plurality of holes on the described prefabricated H shape concrete folding beam, the pre-buried channel-section steel of lower floor's body of wall stretches out from hole, back pouring concrete is fixed with each connecting portion, thereby makes post-wall-beam form an overall structure.
Described ∏ shape horizontal connector comprises a web and two blocks of frange plates, and described frange plate is vertical with web, is fixedly connected by welding, and has slotted eye on the described frange plate.
Described prefabricated H shape concrete folding beam also arranges upper and lower tongue and groove, and the concrete shear force wall body of wall also arranges corresponding with it tongue and groove, and the tongue and groove cross section is funnel-form on the prefabricated H shape concrete folding beam, is convenient to back pouring concrete perfusion; Following tongue and groove under the beam and the rabbeted butt joint on the wall are built fixing by the back pouring concrete, back pouring concrete can form a wedge shearing resistance bolt under beam, increase integrality of wall.
Totally three kinds of described ∏ shape horizontal connector comprise the ∏ shape horizontal connector of not being with dowel, have circular hole at the web position, need during use to be connected on the pillar with bolt; Have dowel, the less ∏ shape horizontal connector of web width; Have dowel, ∏ shape horizontal connector that web width is bigger; When body of wall is installed, the ∏ shape horizontal connector that web width is little can pacify to advance in the big connector of web width just, three kinds of connectors are welded by general steel plate, have slotted eye at frange plate, when body of wall is installed, can finely tune body of wall, in order to avoid body of wall is installed difficulty, the ∏ shape horizontal connector for the treatment of left and right sides body of wall aim in place after, connect together with bolt.
Described a kind of assembled integral concrete frame-shear wall syndeton, it also comprises the steel plate of being with circular hole, the pre-buried channel-section steel that connects the levels body of wall connects by steel plate, bolt.
When body of wall is installed, with bolt ∏ shape horizontal connector is fixed on the side of post earlier, then body of wall is lifted installation, treat the body of wall hoisted in position, successively the ∏ shape horizontal connector on the post and the ∏ shape horizontal connector on the wall are fixed with bolt, in the fixed level connector, the accurate of channel-section steel of the lower floor's body of wall that stretches out on the channel-section steel of noting the body of wall bottom and the beam aimed at, and side is pasted two block plates before and after the channel-section steel web, and is by steel plate, the bolt of band circular hole that the levels body of wall is fixedly connected.After the installation of this layer body of wall, H shape superposed beam is installed in lifting, after the beam installation, shuttering is carried out in the ater-casting, hole waters the position after to whole body of wall and carries out concreting from the beam, thereby makes post-wall-beam form integral body, when waiting to build the bottom of tongue and groove to the superposed beam, finish the concreting of this layer, the construction of following one deck.
Adopt a kind of assembled integral concrete frame described in the utility model-shear wall syndeton, body of wall is easy to lifting, can realize the Dock With Precision Position of body of wall up and down, Fast Installation; Can effectively improve present assembled integral frame shear wall structure and locate a difficult problem difficult, that connection is difficult, construction is loaded down with trivial details, construction quality is not high when wall-beam-wall connects in work progress, and construction back wall-beam-wall appearance looks elegant, connect reliably, stressed reasonable, anti-seismic performance is good; What is more important, its technology is simple, easy construction, cost improve not obviously, and this new technology can be widely used in having wide future in engineering applications in the assembled integral frame shear wall structure.
Description of drawings
Fig. 1 is a kind of concrete frame-shear wall syndeton assembling schematic diagram that the utility model proposes.
Fig. 2 is the A-A sectional view.
Fig. 3 is the B-B sectional view.
Fig. 4 is H portion detailed construction schematic diagram.
Fig. 5 is the ∏ shape horizontal connector structural representation that has dowel.
Fig. 6 is I portion detailed construction schematic diagram.
Fig. 7 is K portion detailed construction schematic diagram.
Fig. 8 is the right, side view of Fig. 7.
Fig. 9 is round-meshed steel plate schematic diagram.
Figure 10 is the precast concrete column perspective view.
Figure 11 is precast concrete shear wall body of wall perspective view.
Figure 12 is prefabricated H shape concrete folding beam perspective view.
Figure 13 is the lateral view of Figure 12.
Figure 14 is the front view of Figure 12.
Figure 15 is the vertical view of Figure 12.
Among the figure: 1, precast concrete column 2, prefabricated H shape concrete folding beam 3, precast concrete shear wall body of wall 4, precast concrete laminated floor slab 5, back pouring concrete 6, ∏ shape horizontal connector 7, channel-section steel 8, have dowel, the ∏ shape horizontal connector 9 that web width is less, have dowel, the ∏ shape horizontal connector 10 that web width is bigger, not with the ∏ shape horizontal connector 11 of dowel, bolt sleeve 12, bolt 13, the steel plate 14 of band circular hole, web 15, frange plate 16, dowel 17, last tongue and groove 18, following tongue and groove 19, hole.
The specific embodiment
Referring to accompanying drawing, a kind of assembled integral concrete frame-shear wall syndeton, it comprises precast concrete column 1, prefabricated H shape concrete folding beam 2, precast concrete shear wall body of wall 3, precast concrete laminated floor slab 4, ∏ shape horizontal connector 6, channel-section steel 7, bolt 12, bolt sleeve 11 and back pouring concrete 5, bolt sleeve is fixedly installed in the precast concrete column
Described ∏ shape horizontal connector (8,9,10) comprises a web 14 and two blocks of frange plates 15, and described frange plate 15 is vertical with web 14, is fixedly connected by welding, and has slotted eye on the described frange plate 15.
Described prefabricated H shape concrete folding beam 2 also arranges tongue and groove 17 and following tongue and groove 18, and the concrete shear force wall body of wall also arranges corresponding with it tongue and groove, and tongue and groove 17 cross sections are funnel-form on the prefabricated H shape concrete folding beam, is convenient to back pouring concrete perfusion; Following tongue and groove 18 under the beam and the rabbeted butt joint on the wall are built fixing by the back pouring concrete, back pouring concrete can form a wedge shearing resistance bolt under beam, increase integrality of wall.
Totally three kinds of described ∏ shape horizontal connector comprise the ∏ shape horizontal connector 10 of not being with dowel 16, have circular hole at the web position, need during use to be connected on the pillar with bolt; Have dowel, the less ∏ shape horizontal connector 8 of web width; Have dowel, ∏ shape horizontal connector 9 that web width is bigger; When body of wall is installed, the ∏ shape horizontal connector that web width is little can pacify to advance in the big connector of web width just, three kinds of connectors are welded by general steel plate, have slotted eye at frange plate, when body of wall is installed, can finely tune body of wall, in order to avoid body of wall is installed difficulty, the ∏ shape horizontal connector for the treatment of left and right sides body of wall aim in place after, connect together with bolt.
Described a kind of assembled integral concrete frame-shear wall syndeton, it also comprises the steel plate 13 of being with circular hole, the pre-buried channel-section steel that connects the levels body of wall connects by steel plate, bolt.
When body of wall is installed, with bolt ∏ shape level is connected 10 sides that are fixed on post earlier, then body of wall 3 is lifted installation, treat the body of wall hoisted in position, successively that the ∏ shape horizontal connector 10 on the post is fixing with the ∏ shape horizontal connector 9 on the wall with bolt 12, in the fixed level connector, the accurate of channel-section steel of the lower floor's body of wall that stretches out on the channel-section steel of noting the body of wall bottom and the beam aimed at, and side is pasted two block plates 13 before and after the channel-section steel web, and is by steel plate 13, the bolt 12 of band circular hole that the levels body of wall is fixedly connected.After the installation of this layer body of wall, H shape superposed beam 2 is installed in lifting, after the beam installation, shuttering is carried out in the ater-casting, hole waters the position after to whole body of wall and carries out concreting from the beam, thereby makes post-wall-beam form integral body, when waiting to build the bottom of tongue and groove 17 to the superposed beam, finish the concreting of this layer, the construction of following one deck.
Adopt a kind of assembled integral concrete frame described in the utility model-shear wall syndeton, body of wall is easy to lifting, can realize the Dock With Precision Position of body of wall up and down, Fast Installation; Can effectively improve present assembled integral frame shear wall structure and locate a difficult problem difficult, that connection is difficult, construction is loaded down with trivial details, construction quality is not high when wall-beam-wall connects in work progress, and construction back wall-beam-wall appearance looks elegant, connect reliably, stressed reasonable, anti-seismic performance is good; What is more important, its technology is simple, easy construction, cost improve not obviously, and this new technology can be widely used in having wide future in engineering applications in the assembled integral frame shear wall structure.

Claims (6)

1. assembled integral concrete frame-shear wall syndeton, it comprises precast concrete column, prefabricated H shape concrete folding beam, precast concrete shear wall body of wall, ∏ shape horizontal connector, bolt, bolt sleeve and back pouring concrete; Bolt sleeve is fixedly installed in the precast concrete column, and described ∏ shape horizontal connector is connected and fixed the side that is arranged on precast concrete column by bolt, is fixedly installed on the precast concrete shear wall body of wall left and right sides by anchor bar; The ∏ shape horizontal connector position that is arranged on the ∏ shape horizontal connector of the precast concrete shear wall body of wall left and right sides and precast concrete column side is suitable, be connected by ∏ shape horizontal connector, bolt between precast concrete column and precast concrete shear wall and the body of wall, have a plurality of holes on the described prefabricated H shape concrete folding beam, after the structure installation, by the back pouring concrete that each connecting portion is fixed.
2. a kind of assembled integral concrete frame according to claim 1-shear wall syndeton, it is characterized in that described ∏ shape horizontal connector comprises web and two blocks of frange plates, described web at right angles is fixedly connected by welding with two blocks of frange plates respectively, and described frange plate has slotted eye.
3. a kind of assembled integral concrete frame according to claim 1-shear wall syndeton, it is characterized in that described prefabricated H shape concrete folding beam also arranges upper and lower tongue and groove, the concrete shear force wall body of wall also arranges corresponding with it tongue and groove, the tongue and groove cross section is funnel-form on the prefabricated H shape concrete folding beam, the following tongue and groove under the beam and the rabbeted butt joint on the wall.
4. a kind of assembled integral concrete frame according to claim 1-shear wall syndeton, it is characterized in that having elliptical aperture on the edge of a wing steel plate of described ∏ shape horizontal connector, comprise the ∏ shape horizontal connector of not being with dowel, have circular hole at the web position, need during use to be connected on the pillar with bolt; Have dowel, the less ∏ shape horizontal connector of web width; Have dowel, ∏ shape horizontal connector that web width is bigger.
5. a kind of assembled integral concrete frame according to claim 1-shear wall syndeton is characterized in that described precast concrete shear wall body of wall fixedly installs channel-section steel in both sides up and down, has slotted eye on the described channel-section steel web.
6. a kind of assembled integral concrete frame according to claim 1-shear wall syndeton is characterized in that it also comprises the steel plate of being with circular hole, and the pre-buried channel-section steel of levels body of wall is connected with bolt by the steel plate of band circular hole.
CN 201320223836 2013-04-28 2013-04-28 Connecting structure for assembling integral concrete frame and shear wall Withdrawn - After Issue CN203213346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320223836 CN203213346U (en) 2013-04-28 2013-04-28 Connecting structure for assembling integral concrete frame and shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320223836 CN203213346U (en) 2013-04-28 2013-04-28 Connecting structure for assembling integral concrete frame and shear wall

Publications (1)

Publication Number Publication Date
CN203213346U true CN203213346U (en) 2013-09-25

Family

ID=49202895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320223836 Withdrawn - After Issue CN203213346U (en) 2013-04-28 2013-04-28 Connecting structure for assembling integral concrete frame and shear wall

Country Status (1)

Country Link
CN (1) CN203213346U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243838A (en) * 2013-04-28 2013-08-14 中国十七冶集团有限公司 Connection structure of integrally assembled concrete frame and shear wall
CN103290952A (en) * 2013-05-13 2013-09-11 东南大学 Integrated assembled concrete frame and shear wall connection structure and construction method thereof
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN106049664A (en) * 2016-07-27 2016-10-26 浙江越宫钢结构有限公司 Veneer connecting high-rise assembly type house
CN106065662A (en) * 2016-07-27 2016-11-02 浙江越宫钢结构有限公司 The Super High prefabricated buildings that a kind of pair of plate connects
CN107542185A (en) * 2017-09-30 2018-01-05 沈阳建筑大学 Assemble frame-shear structure curved scissors type combination keyway attachment structure and assembly method
CN107642179A (en) * 2017-09-30 2018-01-30 沈阳建筑大学 Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN108104310A (en) * 2017-12-01 2018-06-01 沈阳建筑大学 Assembled frame-shear structure column splitlevel connection structure and assembling method
CN110439141A (en) * 2019-07-26 2019-11-12 广州大学 It is a kind of for fabricated shear wall can tolerance steel section jointing structure
CN113530013A (en) * 2021-08-24 2021-10-22 西安建筑科技大学 Horizontal joint connecting structure of assembled composite wallboard and construction method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243838A (en) * 2013-04-28 2013-08-14 中国十七冶集团有限公司 Connection structure of integrally assembled concrete frame and shear wall
CN103243838B (en) * 2013-04-28 2015-05-20 中国十七冶集团有限公司 Connection structure of integrally assembled concrete frame and shear wall
CN103290952A (en) * 2013-05-13 2013-09-11 东南大学 Integrated assembled concrete frame and shear wall connection structure and construction method thereof
CN105672355A (en) * 2016-03-17 2016-06-15 上海同预建筑科技有限公司 Plate type prefabricated concrete comprehensive pipe gallery
CN106049664A (en) * 2016-07-27 2016-10-26 浙江越宫钢结构有限公司 Veneer connecting high-rise assembly type house
CN106065662A (en) * 2016-07-27 2016-11-02 浙江越宫钢结构有限公司 The Super High prefabricated buildings that a kind of pair of plate connects
CN107542185A (en) * 2017-09-30 2018-01-05 沈阳建筑大学 Assemble frame-shear structure curved scissors type combination keyway attachment structure and assembly method
CN107642179A (en) * 2017-09-30 2018-01-30 沈阳建筑大学 Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN107542185B (en) * 2017-09-30 2023-12-01 新疆玉龙河建设工程有限公司 Bending shear type combined key slot connecting structure of assembly frame shear structure and assembly method
CN107642179B (en) * 2017-09-30 2023-12-08 新疆玉龙河建设工程有限公司 Key groove connecting structure of steel plate of assembled frame shear structure and assembling method
CN108104310A (en) * 2017-12-01 2018-06-01 沈阳建筑大学 Assembled frame-shear structure column splitlevel connection structure and assembling method
CN108104310B (en) * 2017-12-01 2023-12-05 新疆中联建设工程有限公司 Assembled frame shear structure column staggered connection structure and assembling method
CN110439141A (en) * 2019-07-26 2019-11-12 广州大学 It is a kind of for fabricated shear wall can tolerance steel section jointing structure
CN113530013A (en) * 2021-08-24 2021-10-22 西安建筑科技大学 Horizontal joint connecting structure of assembled composite wallboard and construction method thereof

Similar Documents

Publication Publication Date Title
CN103243838B (en) Connection structure of integrally assembled concrete frame and shear wall
CN203213346U (en) Connecting structure for assembling integral concrete frame and shear wall
CN103290952B (en) Assembled integral concrete frame-shear wall syndeton and construction method thereof
CN103243817B (en) A kind of assembled beam-column attachment means
CN204531066U (en) Assembly concrete-filled steel tube shear wall splits assembled syndeton
CN103306402B (en) Non-superimposition beam type fabricated frame-shear wall connection structure and construction method thereof
CN103883034B (en) A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN201635171U (en) Steel node prefabricating and assembling reinforced concrete frame structure
CN203866966U (en) Novel assembly type frame core tube steel structure residential housing system
CN105220792B (en) A kind of prefabricated concealed bracings energy-consuming shear wall and its assemble method
CN102477781A (en) Integrally assembled steel-concrete superposed component and manufacturing method thereof
CN105908965A (en) Assembly type concrete wall board, assembly type building and assembly method
CN110847699A (en) High-performance concrete prefabricated wall
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
CN203905214U (en) Assembled type blend coupled wall system
CN104060757B (en) Precast concrete frame supports shear wall wallboard
CN203373857U (en) Fabricated beam-column connecting device
CN108412036B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN103334492A (en) Prefabricated assembled type framework structure
CN103290966A (en) Floor slab component
CN103572891B (en) A kind of pregroove plate
CN203361332U (en) Prefabricated assembly type frame structure
CN203475609U (en) Connecting structure of composite floor slab and steel tube shear wall of building
CN202202415U (en) Side node of rectangular steel pipe concrete special-shaped column and steel beam framework

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130925

Effective date of abandoning: 20150520

AV01 Patent right actively abandoned

Granted publication date: 20130925

Effective date of abandoning: 20150520

RGAV Abandon patent right to avoid regrant