CN205976733U - Can have enough to meet need encloses fender temporarily - Google Patents

Can have enough to meet need encloses fender temporarily Download PDF

Info

Publication number
CN205976733U
CN205976733U CN201620955981.XU CN201620955981U CN205976733U CN 205976733 U CN205976733 U CN 205976733U CN 201620955981 U CN201620955981 U CN 201620955981U CN 205976733 U CN205976733 U CN 205976733U
Authority
CN
China
Prior art keywords
enclosing
enough
enclose
holder
meet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620955981.XU
Other languages
Chinese (zh)
Inventor
李帛谦
迟鹏骋
宫克
杨俱玮
邓蓉
李晓曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620955981.XU priority Critical patent/CN205976733U/en
Application granted granted Critical
Publication of CN205976733U publication Critical patent/CN205976733U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a can have enough to meet need encloses fender temporarily, include: enclose the fender frame, bulkhead, detachably install in enclose and keep off on the frame, and enclose the fender counter weight, through a connection structure detachably install in enclose and keep off the frame bottom, a connection structure including install in enclose and keep off in the counter weight and the centre gripping enclose the first holder that keeps off the frame, further be equipped with on the first holder and be used for fixing enclose the first mounting that keeps off the frame. The utility model discloses an enclose keep off the frame through a connection structure with enclose the counter weight dismantlement formula of keeping off and link to each other, make the utility model discloses instrumentization, can all transsexuals high reduces the input cost by a wide margin, to enclose the fender installation rate fast, efficient temporarily, and ordinary work post can install according to the drawing, enclose temporarily and keep off firm stability, can satisfy the purpose of sealing and separating construction region, enclose to keep off accords with green construction concept and elegant appearance temporarily.

Description

Temporary construction fence can be had enough to meet the need
Technical field
This utility model is related to the realm of building construction and in particular to one kind can have enough to meet the need temporary construction fence.
Background technology
In recent years, the lifting requiring with safety construction, construction site and extraneous isolation and construction place The division of interior construction area is all safeguarded using temporary construction fence.And the masonry enclosed structure commonly using at present or steel, ferrum All there is the features such as long construction period, irremovable, wasting of resources in the enclosed structure that product is welded.It is known that masonry Structure temporary construction fence is purely disposable input, becomes the no recycling value of building waste, belong to the wasting of resources after dismounting;And Although material carries out arrangement and can be used in turn after steel, ironwork are welded temporary construction fence dismounting, material wastage rate is too Greatly, and cycle of constructing is also very long.There is the component that main reason is that temporary construction fence of shortcoming in both the above temporary construction fence Unified standard, enclosing mounting process do not unify mechanization.
And the raising with social development and the level of the productive forces, the theory of green construction deeply built the heart of concrete people In, the resources conservation of temporary facility also becomes the theme melody of building field with converting in week, therefore solves above-mentioned temporary construction fence Shortcoming is extremely urgent.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, provides one kind can have enough to meet the need temporary construction fence, is used for applying The division in work area domain and going along with sb. to guard him.
The technical scheme realizing above-mentioned purpose is:There is provided one kind can have enough to meet the need temporary construction fence, including:
Enclosing framework;
Surrounding baffle, is removably installed on described enclosing framework;And
Enclosing counterweight, is removably installed in described enclosing base of frame by the first attachment structure;Described first connection Structure includes being installed in described enclosing counterweight and clamping the first holder of described enclosing framework, and described first holder is enterprising One step is provided with the first fixture for fixing described enclosing framework.
This utility model can have enough to meet the need the beneficial effect of temporary construction fence:
Enclosing framework of the present utility model is connected with enclosing counterweight dismountable by the first attachment structure so that this practicality is new Type tool, can revolving height, input cost is greatly reduced;Temporary construction fence installation rate is fast, efficiency high, and common work post can be pressed Drawing is installed;Temporary construction fence more stable and stronger, the purpose that disclosure satisfy that closing and separate construction area;Temporary construction fence meets green Color construction concept and elegant in appearance.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, and described first holder is arranged at institute for opposition State two the first L-type plate bodys in enclosing counterweight;First side side plate of two described first L-type plate bodys is fixed on described enclosing joins Weight, the second side side plate of two described first L-type plate bodys is pressed against the both sides of described enclosing framework to clamp described enclosing framework.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, the second side of two described first L-type plate bodys Side plate is provided with corresponding first fixing hole, and described enclosing framework is provided with the first perforation corresponding to described first fixing hole, Described first fixture wears and is fixed on described first fixing hole and described first perforation.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, and described enclosing framework includes vertical rod and cross bar, Described cross bar is removably attachable to described vertical rod by the second attachment structure;Described second attachment structure includes being installed on described On cross bar and clamp the second holder of described vertical rod, described second holder is further provided with for fixing described vertical rod Second fixture.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, and described second holder is arranged at institute for opposition State two the second L-type plate bodys on cross bar;First side side plate of two described second L-type plate bodys is fixed on described cross bar, two Second side side plate of described second L-type plate body is pressed against the both sides of described vertical rod to clamp described vertical rod.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, the second side of two described second L-type plate bodys Side plate is provided with corresponding second fixing hole, and described vertical rod is provided with the second perforation corresponding to described second fixing hole, described Second fixture wears and is fixed on described second fixing hole and described second perforation.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, described enclosing framework and described enclosing counterweight it Between be provided with enclosing diagonal brace.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, described enclosing diagonal brace one end be articulated with described in enclose Gear framework, the other end is removably attachable to described enclosing counterweight by the 3rd attachment structure;Described 3rd attachment structure includes It is installed in described enclosing counterweight and clamps the 3rd holder of described enclosing diagonal brace, described 3rd holder is further provided with For fixing the 3rd fixture of described enclosing diagonal brace.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, and described 3rd holder is arranged at institute for opposition State two the 3rd L-type plate bodys in enclosing counterweight;First side side plate of two described 3rd L-type plate bodys is fixed on described enclosing joins Weight, the second side side plate of two described 3rd L-type plate bodys is pressed against the both sides of described enclosing diagonal brace to clamp described enclosing diagonal brace.
This utility model can have enough to meet the need further improvement is that of temporary construction fence, the second side of two described 3rd L-type plate bodys Side plate is provided with corresponding 3rd fixing hole, and described enclosing diagonal brace is provided with the 3rd perforation corresponding to described 3rd fixing hole, Described 3rd fixture wears and is fixed on described 3rd fixing hole and described 3rd perforation.
Brief description
Fig. 1 can have enough to meet the need temporary construction fence elevation for this utility model.
Fig. 2 can have enough to meet the need temporary construction fence side view for this utility model.
Fig. 3 is enlarged drawing at Figure 1A.
Fig. 4 is enlarged drawing at Figure 1B.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refer to Fig. 1, Fig. 2 and Fig. 3, Fig. 1 shows that this utility model can have enough to meet the need temporary construction fence elevation;Fig. 2 shows This utility model can have enough to meet the need temporary construction fence side view;Fig. 3 shows enlarged drawing at Figure 1A.
This utility model is intended to provide one kind can have enough to meet the need temporary construction fence, in construction, for construction area The going along with sb. to guard him and dividing of domain, it includes:Enclosing framework, removably install with enclosing framework on surrounding baffle 4 and pass through first Attachment structure is removably installed in the enclosing counterweight 1 of enclosing base of frame.This enclosing framework is removably installed in enclosing and joins Go up, to reach the purpose being used in turn temporarily again.
Below by way of preferred embodiment, said modules are described in detail:
The carrying of enclosing counterweight 1 for convenience, arranges hanger 11 in enclosing counterweight 1.Enclosing counterweight 1 is new as this practicality The basic component of type, on the one hand needs to have corresponding weight to lower the center of gravity it is ensured that stability of the present utility model;The opposing party Environmental protection is wanted in face in terms of selection.Preferably, enclosing counterweight 1 is precast concrete block, hanger 11 is embedded in prefabricated for one end Hoisting round steel hanger 11 in concrete block.
Enclosing framework includes vertical rod 2 and cross bar 3.Preferably, column 2 and cross bar 3 adopt the zinc-plated square steel of 60*40*1.5 Pipe.General enclosing structure all includes enclosing framework and surrounding baffle, and surrounding baffle 4 is located at the back of the body of enclosing framework in the present embodiment Side, is followed closely in the vertical rod 2 and cross bar 3 of enclosing framework by self threading pin.Preferably, surrounding baffle 4 is arranged side by side in enclosing for polylith The steel plate of framework dorsal part, or monoblock is arranged at the steel plate of enclosing framework dorsal part.
As shown in figure 3, after enclosing counterweight 1 is provided with, needing to be detachably connected fence framework in enclosing counterweight 1, enclosing Gear framework is installed in enclosing counterweight 1 by the first attachment structure, and the first attachment structure includes being installed in enclosing counterweight 1 and pressing from both sides Hold the first holder 6 of enclosing framework, the first holder 6 is further provided with the first fixture 7 for fixing enclosing framework.
Specifically, the first holder 6 is that opposition is arranged at two the first L-type plate bodys in enclosing counterweight 1;Two L First side side plate 61 of template body is fixed on enclosing counterweight 1, and the second side side plate 62 of two the first L-type plate bodys is pressed against enclosing frame The both sides of frame are to clamp enclosing framework.Preferably, the first L-type plate body is angle steel.
Perforation is offered, this first L-type plate body wears this by self threading pin 8 on first side side plate of this first L-type plate body Bore a hole and be inserted in enclosing counterweight 1.
Second side side plate 62 of two the first L-type plate bodys is provided with corresponding first fixing hole, and it is right that enclosing framework is provided with First perforation of the first fixing hole described in Ying Yu, the first fixture 7 wears and is fixed on the first fixing hole and the first perforation.For As shown in Figure 1, enclosing counterweight 1 located at vertical rod 2 bottom of enclosing framework when, this first perforation is in vertical rod 2.Preferably, First fixture is 7 to wearing bolt.
Refer to Fig. 4, Fig. 4 shows enlarged drawing at Figure 1B.Cross bar 3 is removably attachable to stand by the second attachment structure Bar 2;Second attachment structure includes the second holder 9 being installed on cross bar 3 and clamping vertical rod 2, on the second holder 9 further It is provided with the second fixture 10 for fixing vertical rod 2.
The structure of the second attachment structure, function are with reference to the first attachment structure.Specifically, the second holder 9 opposition setting Two the second L-type plate bodys on cross bar;First side side plate 91 of two the second L-type plate bodys is fixed on cross bar 3, two the 2nd L Second side side plate 92 of template body is pressed against the both sides of vertical rod 2 to clamp vertical rod 2.Preferably, the second L-type plate body selects angle steel.
In the same manner, the second side side plate 92 of two the second L-type plate bodys is provided with corresponding second fixing hole, and vertical rod 2 is provided with Corresponding to the second perforation of the second fixing hole, the second fixture 10 wears and is fixed on the second fixing hole and the second perforation.Preferably , the second fixture 10 is to wearing bolt.
Preferably, angle steel is fixed on cross bar by self threading pin 11, or, in cross bar 3 and the punching of angle steel corresponding position, utilize Bolt is fixed.
As shown in Fig. 2 in order to strengthen the support strength between enclosing framework and enclosing counterweight 1, in enclosing framework and enclosing It is provided with enclosing diagonal brace 5 between counterweight 1.One end of this enclosing diagonal brace 5 is articulated with enclosing framework, and the other end passes through the 3rd attachment structure It is removably attachable to enclosing counterweight 1;3rd attachment structure includes being installed in enclosing counterweight 1 and clamp the 3rd of enclosing diagonal brace Holder, the 3rd holder is further provided with the 3rd fixture for fixing enclosing diagonal brace 5.
Its principle of work and power (therefore does not illustrate, this area in detail with reference to the first attachment structure and the second attachment structure Personnel have been able to obtain function, structure of the 3rd attachment structure etc. in accordance with the above).
3rd holder is two the 3rd L-type plate bodys that opposition is arranged in enclosing counterweight 1;Two the 3rd L-type plate bodys First side side plate is fixed on enclosing counterweight 1, and the second side side plate of two the 3rd L-type plate bodys is pressed against the both sides of enclosing diagonal brace to press from both sides Hold described enclosing diagonal brace 5.
Second side side plate of two the 3rd L-type plate bodys is provided with corresponding 3rd fixing hole, and enclosing diagonal brace is provided with correspondence In the 3rd perforation of the 3rd fixing hole, the 3rd fixture wears and is fixed on the 3rd fixing hole and the 3rd perforation.
This utility model can have enough to meet the need having the beneficial effect that of temporary construction fence:
Enclosing framework of the present utility model is connected with enclosing counterweight dismountable by the first attachment structure so that this practicality is new Type tool, can revolving height, input cost is greatly reduced;Temporary construction fence installation rate is fast, efficiency high, and common work post can be pressed Drawing is installed;Temporary construction fence more stable and stronger, the purpose that disclosure satisfy that closing and separate construction area;Temporary construction fence meets green Color construction concept and elegant in appearance.
Above in association with accompanying drawing embodiment, this utility model is described in detail, those skilled in the art can root According to described above, this utility model is made with many variations example.Thus, some details in embodiment should not be constituted to this practicality New restriction, this utility model is by the scope being defined using appended claims as protection domain of the present utility model.

Claims (10)

1. one kind can have enough to meet the need temporary construction fence it is characterised in that including:
Enclosing framework;
Surrounding baffle, is removably installed on described enclosing framework;And
Enclosing counterweight, is removably installed in described enclosing base of frame by the first attachment structure;Described first attachment structure Including the first holder being installed in described enclosing counterweight and clamping described enclosing framework, on described first holder further It is provided with the first fixture for fixing described enclosing framework.
2. according to claim 1 have enough to meet the need temporary construction fence it is characterised in that:Described first holder is arranged at for opposition Two the first L-type plate bodys in described enclosing counterweight;First side side plate of two described first L-type plate bodys is fixed on described enclosing Counterweight, the second side side plate of two described first L-type plate bodys is pressed against the both sides of described enclosing framework to clamp described enclosing frame Frame.
3. according to claim 2 have enough to meet the need temporary construction fence it is characterised in that:The second of two described first L-type plate bodys Side side plate is provided with corresponding first fixing hole, and what described enclosing framework was provided with corresponding to described first fixing hole first wears Hole, described first fixture wears and is fixed on described first fixing hole and described first perforation.
4. according to claim 1 have enough to meet the need temporary construction fence it is characterised in that:Described enclosing framework includes vertical rod and horizontal stroke Bar, described cross bar is removably attachable to described vertical rod by the second attachment structure;Described second attachment structure includes being installed on On described cross bar and clamp the second holder of described vertical rod, described second holder is further provided with described vertical for fixing Second fixture of bar.
5. according to claim 4 have enough to meet the need temporary construction fence it is characterised in that:Described second holder is arranged at for opposition Two the second L-type plate bodys on described cross bar;First side side plate of two described second L-type plate bodys is fixed on described cross bar, and two Second side side plate of individual described second L-type plate body is pressed against the both sides of described vertical rod to clamp described vertical rod.
6. according to claim 5 have enough to meet the need temporary construction fence it is characterised in that:The second of two described second L-type plate bodys Side side plate is provided with corresponding second fixing hole, and described vertical rod is provided with the second perforation corresponding to described second fixing hole, institute State the second fixture and wear and be fixed on described second fixing hole and described second perforation.
7. according to claim 1 have enough to meet the need temporary construction fence it is characterised in that:Described enclosing framework and described enclosing counterweight Between be provided with enclosing diagonal brace.
8. according to claim 7 have enough to meet the need temporary construction fence it is characterised in that:Described enclosing diagonal brace one end is articulated with described Enclosing framework, the other end is removably attachable to described enclosing counterweight by the 3rd attachment structure;Described 3rd attachment structure bag Include the 3rd holder being installed in described enclosing counterweight and clamping described enclosing diagonal brace, described 3rd holder sets further There is the 3rd fixture for fixing described enclosing diagonal brace.
9. according to claim 8 have enough to meet the need temporary construction fence it is characterised in that:Described 3rd holder is arranged at for opposition Two the 3rd L-type plate bodys in described enclosing counterweight;First side side plate of two described 3rd L-type plate bodys is fixed on described enclosing Counterweight, the both sides that the second side side plate of two described 3rd L-type plate bodys is pressed against described enclosing diagonal brace are oblique to clamp described enclosing Support.
10. according to claim 9 have enough to meet the need temporary construction fence it is characterised in that:The second of two described 3rd L-type plate bodys Side side plate is provided with corresponding 3rd fixing hole, and what described enclosing diagonal brace was provided with corresponding to described 3rd fixing hole the 3rd wears Hole, described 3rd fixture wears and is fixed on described 3rd fixing hole and described 3rd perforation.
CN201620955981.XU 2016-08-26 2016-08-26 Can have enough to meet need encloses fender temporarily Expired - Fee Related CN205976733U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620955981.XU CN205976733U (en) 2016-08-26 2016-08-26 Can have enough to meet need encloses fender temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620955981.XU CN205976733U (en) 2016-08-26 2016-08-26 Can have enough to meet need encloses fender temporarily

Publications (1)

Publication Number Publication Date
CN205976733U true CN205976733U (en) 2017-02-22

Family

ID=58036911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620955981.XU Expired - Fee Related CN205976733U (en) 2016-08-26 2016-08-26 Can have enough to meet need encloses fender temporarily

Country Status (1)

Country Link
CN (1) CN205976733U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217912A (en) * 2017-06-01 2017-09-29 中铁城建集团第二工程有限公司 It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction
CN108252569A (en) * 2018-01-04 2018-07-06 中国华冶科工集团有限公司 A kind of Rapid Combination enclosing and construction method
CN109458041A (en) * 2018-12-07 2019-03-12 天津天禄通建材科技有限公司 A kind of assembled architecture enclosing
CN110259264A (en) * 2019-07-03 2019-09-20 中冶天工集团有限公司 One kind facing side hole regularization railing and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217912A (en) * 2017-06-01 2017-09-29 中铁城建集团第二工程有限公司 It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction
CN107217912B (en) * 2017-06-01 2019-06-14 中铁城建集团第二工程有限公司 A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction
CN108252569A (en) * 2018-01-04 2018-07-06 中国华冶科工集团有限公司 A kind of Rapid Combination enclosing and construction method
CN109458041A (en) * 2018-12-07 2019-03-12 天津天禄通建材科技有限公司 A kind of assembled architecture enclosing
CN109458041B (en) * 2018-12-07 2024-12-20 湖北德合信通建设工程有限公司 Assembled building enclosure
CN110259264A (en) * 2019-07-03 2019-09-20 中冶天工集团有限公司 One kind facing side hole regularization railing and construction method

Similar Documents

Publication Publication Date Title
CN205976733U (en) Can have enough to meet need encloses fender temporarily
CN206016225U (en) One kind is without counterweight fixture type gondola-hanging mechanism
CN207332288U (en) Rod-pulling type hanging basket suspension device on roof frame girder
CN206800622U (en) A kind of assembled integral concrete shear force wall balcony attachment structure
CN201176366Y (en) Hook structure for suspensing transportation device added in buildings
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN203783243U (en) Assembled fender
CN211007292U (en) Stable form assembled PC component
CN207863840U (en) A kind of prefabricated door pillar in construction site
CN203296470U (en) Finalization fence
CN207499592U (en) A kind of construction place bounding wall guardrail structure
CN206873894U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN214091338U (en) Combined building safety enclosure
CN212562406U (en) Overhanging scaffold
CN210194906U (en) Concrete formwork for fabricated building
CN210758391U (en) Prefabricated component demoulding horizontal hoisting assembly capable of being recycled
CN208456101U (en) A kind of housing construction scaffold
CN201151954Y (en) Steel column and concrete column connection structure
CN205116212U (en) Built -in fitting is used in generating set installation
CN205888976U (en) Adjustability mud door sealing circle installation frock
CN206035088U (en) Municipal works are with construction rail
CN111535581A (en) Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position
CN209114976U (en) A kind of dismountable environment protection fence
CN106917498A (en) A kind of Portable scaffold
CN211817785U (en) Scaffold for building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222