CN207656129U - Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering - Google Patents
Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering Download PDFInfo
- Publication number
- CN207656129U CN207656129U CN201721721075.4U CN201721721075U CN207656129U CN 207656129 U CN207656129 U CN 207656129U CN 201721721075 U CN201721721075 U CN 201721721075U CN 207656129 U CN207656129 U CN 207656129U
- Authority
- CN
- China
- Prior art keywords
- hammering
- welding
- polish
- polishes
- strike
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Cleaning In General (AREA)
Abstract
The utility model is related to ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering, including support baseboard, rotating device and after welding treatment device, the rotating device is connected with support baseboard, and after welding treatment device is installed on the spinning device;The after welding treatment device include hammering support plate, hammer mechanism, polish support plate, polish electronic sliding block group, polish telescopic putter, polish support push rod, polish mechanism, strike off support plate, scraper mechanism, two strike off electronic sliding block and strike off telescopic putter.The utility model can solve it is existing it is low with existing working efficiency when steel pipe after welding treatment to flange, need manually to carry out postwelding hammering to flange and steel pipe, the problems such as the artificial butt welding point of needs is polished, artificial after welding treatment effect difference;It may be implemented to eliminate stress to carrying out solder joint hammering after flange and steel-pipe welding automatically, polish solder joint, the function that the welding slag between flange and steel pipe is thoroughly removed.
Description
Technical field
The utility model is related to flange welding apparatus field, more particularly to ring flange welds in a kind of chemical pipeline installing engineering
Connect automation after welding treatment equipment.
Background technology
Flanged joint is exactly that two pipelines, pipe fitting or equipment are first individually fixed on a ring flange, then at two
Flange gasket is added between ring flange, and it is dismountable that two ring flanges are finally tensed to the one kind for making it combine closely with bolt
The step of connector, flange are all to be attached by welding with steel pipe, flange welding is as follows, first fixes flange
Firmly, then to carrying out welding preceding grinding process at the chamfering of flange so that the welding section of flange polishes smooth, and is conducive to increase welding
Effect, then steel pipe is placed on flange and is fixed, manually the interface of flange and steel pipe is welded with electric welding equipment
Action, when welding, have to uniform welding, and rotatable parts movement is steady, ensure the quality of welding, will be to steel after welding
Pipe and the solder joint of flange carry out after welding treatment, and after welding treatment includes hammering to eliminate stress when welding, to steel pipe and flange it
Between solder joint to carry out polishing processing, stomata, the welding slag etc. that generate when welding are disposed, this working method be primarily present with
Lower problem:Multiple fixation can not be carried out when to flange and steel-pipe welding to flange, and flange is fixed and is loosely easy to make welding
At influence, polishing effect is bad before needing the polishing before manually being welded to flange and being welded to flange, can not be welded automatically
Action, human weld is very big to human injury, and the exhaust gas that when welding generates can damage human body with flash of light, after flange and steel pipe welding
Working efficiency is low when processing, needs manually to carry out postwelding hammering to flange and steel pipe, and artificial butt welding point is needed to be polished and people
Work after welding treatment effect is poor.
Utility model content
To solve the above-mentioned problems, it is automatic to provide ring flange welding in a kind of chemical pipeline installing engineering for the utility model
Change after welding treatment equipment, can solve it is existing it is low with existing working efficiency when steel pipe after welding treatment to flange, need manually it is right
The problems such as flange and steel pipe carry out postwelding hammering, the artificial butt welding point of needs is polished, artificial after welding treatment effect difference;It can be real
Now stress is eliminated to carrying out solder joint hammering after flange and steel-pipe welding, polish solder joint, the welding slag between flange and steel pipe automatically
The function of being thoroughly removed, with work efficiency is high, carry out postwelding hammering to flange and steel pipe automatically, automatic butt welding point carries out
It polishes, carry out the advantages that after welding treatment effect is good automatically.
To achieve the goals above, the utility model uses following technical scheme, method in a kind of chemical pipeline installing engineering
Blue disk Automation of Welding after welding treatment equipment, including support baseboard, rotating device and after welding treatment device, the rotating device
It is connected with support baseboard, after welding treatment device is installed on the spinning device.
As a kind of optimal technical scheme of the utility model, the rotating device include electric rotating machine, rotating shaft,
It rotates gear, rotatable connection frame, support gear, rotary chute and rotation supporting rod, electric rotating machine and branch is mounted on by motor set
It supports at the top of the right end of bottom plate, the output shaft of electric rotating machine is connected by shaft coupling with the bottom of rotating shaft, rotating shaft
Top by bearing be mounted on rotatable connection frame on, the lower end for the frame that is rotatably connected is connected with support baseboard, rotation gear pacify
On the middle part of rotating shaft, support gear is located at the left side of rotation gear, and support gear is meshed with rotation gear, supports
The middle part of gear is hollow-core construction, and support gear is located at the flange welded is needed on same axial line, supports the bottom of gear
On rotary chute is installed, support and be symmetrically arranged with rotation supporting rod below gear, rotate supporting rod bottom be mounted on branch
It supports on bottom plate, the top for rotating supporting rod is slide block structure, and slide block structure and the rotary chute for rotating supporting rod are in mating connection,
When specific works, support gear can be driven to be rotated by controlling the rotation of electric rotating machine first so that on support gear
The after welding treatment device of installation carries out after welding treatment to flange and steel pipe.
As a kind of optimal technical scheme of the utility model, the after welding treatment device includes hammering support plate, hammer
Mechanism is hit, support plate is polished, polishes electronic sliding block group, polish telescopic putter, polish support push rod, polish mechanism, strike off support
Plate, scraper mechanism, two strike off electronic sliding block and strike off telescopic putter, hammering support plate be mounted on rotating device left back end
On, it hammers and hammer mechanism is installed on the medial surface of support plate;The hammer mechanism includes hammering motor, hammering shaft, hammer
Connecting plate, hammering cam, hammering ear mount, hammering connecting rod, hammering restoring spring, tup and hammering spring are hit, hammering motor passes through electricity
Machine set is mounted on the medial surface of hammering support plate, and the output shaft for hammering motor is connected by shaft coupling with the left end of hammering shaft
It connects, the right end for hammering shaft is mounted on by bearing on hammering connecting plate, and hammering connecting plate is connected with support gear, hammering cam peace
In hammering shaft, hammering ear mount is located at the right side of hammering connecting plate, and hammering ear mount is mounted on support gear, and hammering connecting rod is logical
It crosses axis pin to be mounted in hammering ear mount, the left end bottom for hammering connecting rod is equipped with hammering restoring spring, hammers the bottom of restoring spring
Portion is mounted on support gear, and the right end for hammering connecting rod is equipped with tup by hinge;The tup is rubber hammer, rubber material
Steel pipe and flange are damaged when the tup of matter can prevent tup from hammering, hammering spring is mounted between hammering connecting rod and tup, mill
Flat support plate is located at the right side of hammering support plate, polishes support plate installation on the spinning device, polishes electronic sliding block group and be mounted on
It polishes on the medial surface of support plate, polishes to be equipped in electronic sliding block group and polish telescopic putter, polish on the top of telescopic putter
It is equipped with and polishes mechanism;It is described polish mechanism include arc pressuring plate, polish supporting rack, polish link, polishing sliding slot, two
It is a to polish slide bar, polish push rod, polish motor, polish shaft and polish rotor, polish link be mounted on polish telescopic putter
Top on, polish to be equipped on the front side of link and polish supporting rack, arc pressuring plate is mounted on the front side for polishing supporting rack
On top, the bottom for polishing push rod is mounted on and polishes on link, polishes to be equipped on the top of push rod and polishes motor, polishes electricity
The output shaft of machine is connected by shaft coupling with shaft is polished, and is polished to be provided on the bottom of shaft and is polished rotor, and shaft is polished
Upper to be symmetrically installed by bearing there are two slide bar is polished, two positions for polishing slide bar are symmetrical, and the outside for polishing slide bar is to slide
Block structure polishes the slide block structure of slide bar and polishes that sliding slot is in mating connection, polishes sliding slot and be mounted on the inside for polishing supporting rack
It on wall, polishes to be provided with below the middle part of telescopic putter and polishes support push rod, polish and be provided with arc panel at the top of support push rod,
It strikes off support plate and is located at the right side for polishing support plate, strike off support plate installation on the spinning device, scraper mechanism, which is located at, strikes off branch
The front side of fagging;The scraper mechanism includes striking off belt, striking off link, strike off cleaning board, strike off expansion plate, the company of striking off
Spring is connect, recycling box is struck off and strikes off adjusting push rod, it is four-wheel transmission belt to strike off belt, strikes off and is symmetrically installed on the side of belt
Link is struck off, the rear end of link is struck off and is connected at the top of telescopic putter with striking off, cleaning board is struck off and is mounted on and strike off
On belt, the leading flank for striking off cleaning board is provided with square groove, strikes off and is both provided with sliding slot on cleaning board at left and right sides of square groove, and
It is arc surface to strike off in the middle part of the front side of cleaning board, strikes off expansion plate by striking off connecting spring mounted on the square groove for striking off cleaning board
Interior, the left and right ends for striking off expansion plate are slide block structure, and the slide block structure for striking off expansion plate is set with square groove on cleaning board is struck off
The sliding slot set is in mating connection, each strikes off and is respectively mounted on the bottom of link there are one adjusting push rod is struck off, strikes off adjusting and push away
It is equipped on the top of bar and strikes off recycling box, the inside for striking off recycling box is globoidal structure, and strikes off to be provided in recycling box and incline
Skewed slot is mounted on one group at left and right sides of scraper mechanism and strikes off telescopic putter, and two groups of positions for striking off telescopic putter are symmetrical,
Strike off telescopic putter and be mounted on by striking off electronic sliding block and struck off on the medial surface of support plate, when specific works, when to flange with
After steel-pipe welding, control hammering motor is rotated first, and hammering motor can drive hammering cam to be rotated so that
Hammering connecting rod can swing up and down under the action of hammering cam with hammering restoring spring, and tup is with hammering connecting rod hinged
Under the action of, tup can beat the solder joint between flange and steel pipe completely, can eliminate the stress of solder joint, and then control polishes
Solder joint of the mechanism between flange and steel pipe carries out polishing action, and elongation polishes support push rod, and polishing support push rod can be to mill
Flat telescopic putter provides support force, and elongation polishes telescopic putter so that arc pressuring plate touch the side of steel pipe, and control polishes electricity
Movable slider group is moved so that the bottom for polishing supporting rack touch the upper surface of flange, and elongation polishes push rod and opens and polishes
Motor, the solder joint between flange and steel pipe can be carried out to polish action by polishing rotor so that soldered ball, the welding slag generated when welding
Equal sundries are disposed of, and two polish slide bar and can play the role of support and limit when polishing rotor rotation, prevent from polishing
Rotor damages flange and steel pipe, finally controls scraper mechanism and clears up steel pipe and the residue on flange, control is struck off electronic
Sliding block, which carries out movement, can adjust the height of scraper mechanism, adjust and strike off the length of telescopic putter and can control the position of scraper mechanism
It sets so that the cleaning board that strikes off in scraper mechanism is located at suitable height and position, and the length that adjusting push rod is struck off in adjusting makes
The lateral wall of flange can be touched by striking off recycling box, and striking off recycling box can return to striking off the residue that cleaning board scrapes off
It receives, it is four-wheel transmission belt to strike off belt so that strike off cleaning board and steel pipe can be carried out at the same time with flange and struck off, when striking off cleaning
When plate strikes off the curved surfaces of steel pipe, striking off expansion plate and can be shunk on cleaning board is struck off, strikes off middle part on front side of cleaning board
Arc surface can coordinate the curved surfaces of steel pipe, when striking off cleaning board and striking off flange upper surface, strike off scraping on cleaning board
Except expansion plate can stretch out under the active force for striking off connecting spring so that strike off cleaning board and strike off expansion plate in same flat
Face strikes off cleaning board and can dispose the residue of flange upper surface with expansion plate is struck off, so as to complete to flange and steel pipe
Between solder joint carry out after welding treatment work, after welding treatment device the solder joint between flange and steel pipe can be carried out hammering disappears
De-stress polishes solder joint so that the solder joint between flange and steel pipe is smooth, and the welding slag between flange and steel pipe carries out thoroughly clear
It removes.
When work, when needing to carry out after welding treatment work to flange and steel pipe, first by controlling turning for electric rotating machine
It is dynamic that support gear can be driven to be rotated so that the after welding treatment device installed on support gear welds flange and steel pipe
Post-processing, control hammering motor are rotated, and hammering motor can drive hammering cam to be rotated so that hammering connecting rod can
It swings up and down under the action of hammering cam with hammering restoring spring, tup and hammering connecting rod are under the action of hinged, hammer
Head can beat the solder joint between flange and steel pipe completely, can eliminate the stress of solder joint, the tup of rubber material can prevent
Damage steel pipe and flange when tup hammers, then control polish solder joint of the mechanism between flange and steel pipe and carry out polishing action,
Elongation polishes support push rod, and support force can be provided to polishing telescopic putter by polishing support push rod, and elongation polishes telescopic putter, makes
The side that arc pressuring plate touch steel pipe is obtained, control polishes electronic sliding block group and moved so that polish the bottom patch of supporting rack
The firmly upper surface of flange, elongation, which polishes push rod and opens, polishes motor, and polishing rotor can be to the solder joint between flange and steel pipe
It carries out polishing action so that the sundries such as soldered ball, welding slag for generating when welding are disposed of, and two polish slide bar and polishing can turn
Knife plays the role of support and limit when rotating, and prevents from polishing rotor damage flange and steel pipe, finally controls scraper mechanism by steel
Pipe is cleared up with the residue on flange, and control, which strikes off electronic sliding block and carries out movement, can adjust the height of scraper mechanism, adjusting
The position of scraper mechanism can be controlled by striking off the length of telescopic putter so that the cleaning board that strikes off in scraper mechanism is located at suitably
Height and position adjust and strike off the length for adjusting push rod and allow and strike off the lateral wall that recycling box touch flange, strike off recycling
Box can be recycled to striking off the residue that cleaning board scrapes off, and it is four-wheel transmission belt to strike off belt so that striking off cleaning board can
It is struck off with being carried out at the same time with flange to steel pipe, when striking off cleaning board and striking off the curved surfaces of steel pipe, strikes off scraping on cleaning board
Except expansion plate can be shunk, the curved surfaces of steel pipe can be coordinated by striking off the arc surface at middle part on front side of cleaning board, clear when striking off
When sweeping plate and striking off flange upper surface, striking off expansion plate and can be stretched out under the active force for striking off connecting spring on cleaning board is struck off,
So that strike off cleaning board and strike off expansion plate and be in same plane, strike off cleaning board with strike off expansion plate can be by flange upper surface
Residue dispose, so as to complete between flange and steel pipe solder joint carry out after welding treatment work, after welding treatment device
Hammering can be carried out to the solder joint between flange and steel pipe and eliminates stress, polish solder joint so that the solder joint between flange and steel pipe
Smoothly, the welding slag between flange and steel pipe thoroughly removes, and may be implemented automatically to being welded after flange and steel-pipe welding
Point hammering eliminates stress, polishes solder joint, the function that the welding slag between flange and steel pipe is thoroughly removed.
The beneficial effects of the utility model are:
One, the utility model can solve it is existing to flange and steel pipe after welding treatment when existing working efficiency is low, needs
Postwelding hammering manually is carried out to flange and steel pipe, needs artificial butt welding point to be polished, the problems such as artificial after welding treatment effect difference;
It may be implemented to eliminate stress to carrying out solder joint hammering after flange and steel-pipe welding automatically, polish solder joint, between flange and steel pipe
The function that is thoroughly removed of welding slag, have that work efficiency is high, automatically to flange and the hammering of steel pipe progress postwelding, automatic butt welding
Point is polished, carries out the advantages that after welding treatment effect is good automatically;
Two, the utility model is provided with rotating device, and rotating device can control after welding treatment device and surround steel pipe and method
Blue solder joint is at the uniform velocity rotated;
Three, the utility model is provided with after welding treatment device, and after welding treatment device can be to the weldering between flange and steel pipe
Point carries out hammering and eliminates stress, polishes solder joint so that the solder joint between flange and steel pipe is smooth, the weldering between flange and steel pipe
Slag is thoroughly removed.
Description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is the first structure schematic diagram of the utility model;
Fig. 2 is second structural schematic diagram of the utility model;
Fig. 3 is the structural schematic diagram between the utility model support gear, hammering support plate and hammer mechanism;
Fig. 4 is that the utility model polishes telescopic putter and polishes the structural schematic diagram between mechanism;
Fig. 5 is the utility model support gear, strikes off support plate, scraper mechanism, strikes off electronic sliding block and strike off flexible push away
Structural schematic diagram between bar.
Specific implementation mode
In order to make the technical means, creative features, achievement of purpose, and effectiveness of the utility model be easy to understand, under
Face combines and is specifically illustrating, and the utility model is expanded on further.It should be noted that in the absence of conflict, in the application
Feature in embodiment and embodiment can be combined with each other.
As shown in Figures 1 to 5, ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering, packet
Support baseboard 1, rotating device 5 and after welding treatment device 6 are included, the rotating device 5 is connected with support baseboard 1, at postwelding
Device 6 is managed to be mounted on rotating device 5.
The rotating device 5 includes electric rotating machine 51, rotating shaft 52, rotation gear 53, rotatable connection frame 54, support
Gear 55, rotary chute 56 and rotation supporting rod 57, electric rotating machine 51 are mounted on by motor set at the top of the right end of support baseboard 1
On, the output shaft of electric rotating machine 51 is connected by shaft coupling with the bottom of rotating shaft 52, and the top of rotating shaft 52 passes through
Bearing is mounted on rotatable connection frame 54, and the lower end of rotatable connection frame 54 is connected with support baseboard 1, and rotation gear 53 is mounted on
On the middle part of rotating shaft 52, support gear 55 is located at the left side of rotation gear 53, and support gear 55 is nibbled with rotation 53 phase of gear
It closes, the middle part of support gear 55 is hollow-core construction, and support gear 55 is located on same axial line with the flange welded is needed, supports
Rotary chute 56 is installed, the lower section of support gear 55 is symmetrically arranged with rotation supporting rod 57, rotation branch on the bottom of gear 55
The bottom of strut 57 is mounted on support baseboard 1, and the top of rotation supporting rod 57 is slide block structure, rotates the sliding block of supporting rod 57
Structure and rotary chute 56 are in mating connection, when specific works, can drive branch by controlling the rotation of electric rotating machine 51 first
Support gear 55 is rotated so that the after welding treatment device 6 installed on support gear 55 carries out after welding treatment to flange and steel pipe.
The after welding treatment device 6 include hammering support plate 61, hammer mechanism 62, polish support plate 63, polish it is electronic
Sliding block group 64 polishes telescopic putter 65, polishes support push rod 66, polish mechanism 67, strike off support plate 68, scraper mechanism 69, two
A to strike off electronic sliding block 610 and strike off telescopic putter 611, hammering support plate 61 is mounted on the left back end of rotating device 5, hammering
Hammer mechanism 62 is installed on the medial surface of support plate 61;The hammer mechanism 62 includes hammering motor 621, hammering shaft
622, connecting plate 623, hammering cam 624, hammering ear mount 625, hammering connecting rod 626, hammering restoring spring 627,628 and of tup are hammered
Spring 629 is hammered, hammering motor 621 is mounted on by motor set on the medial surface of hammering support plate 61, and the defeated of motor 621 is hammered
Shaft is connected by shaft coupling with the left end of hammering shaft 622, and the right end for hammering shaft 622 is mounted on hammering company by bearing
On plate 623, hammering connecting plate 623 is connected with support gear 55, and hammering cam 624 is mounted in hammering shaft 622, hammers ear mount
625 are located at the right side of hammering connecting plate 623, and hammering ear mount 625 is mounted on support gear 55, and hammering connecting rod 626 is pacified by axis pin
In hammering ear mount 625, the left end bottom of hammering connecting rod 626 is equipped with hammering restoring spring 627, hammers restoring spring 627
Bottom be mounted on support gear 55 on, hammering connecting rod 626 right end tup 628 is equipped with by hinge;The tup 628
For rubber hammer, damage steel pipe and flange when the tup 628 of rubber material can prevent tup 628 from hammering, hammering spring 629 is installed
Between hammering connecting rod 626 and tup 628, the right side that support plate 63 is located at hammering support plate 61 is polished, polishes the peace of support plate 63
On rotating device 5, polishes electronic sliding block group 64 and be mounted on the medial surface for polishing support plate 63, polish electronic sliding block group 64
On be equipped with and polish telescopic putter 65, polish to be equipped on the top of telescopic putter 65 and polish mechanism 67;Described polishes mechanism
67 include arc pressuring plate 671, polish supporting rack 672, polish link 673, polish sliding slot 674, two polish slide bar 675,
Push rod 676 is polished, motor 677 is polished, polish shaft 678 and polishes rotor 679, it is flexible mounted on polishing to polish link 673
It on the top of push rod 65, polishes to be equipped on the front side of link 673 and polishes supporting rack 672, arc pressuring plate 671 is mounted on mill
On at the top of the front side of flat supporting rack 672, the bottom of push rod 676 is polished mounted on polishing on link 673, polishes push rod 676
It is equipped on top and polishes motor 677, the output shaft for polishing motor 677 is connected by shaft coupling with shaft 678 is polished, and is polished
It is provided on the bottom of shaft 678 and polishes rotor 679, polished and be symmetrically installed by bearing there are two polishing slide bar in shaft 678
675, two positions for polishing slide bar 675 are symmetrical, and the outside for polishing slide bar 675 is slide block structure, polishes the sliding block of slide bar 675
Structure with polish that sliding slot 674 is in mating connection, polish sliding slot 674 and be mounted on the madial wall for polishing supporting rack 672, polish flexible
It is provided with below the middle part of push rod 65 and polishes support push rod 66, the top for polishing support push rod 66 is provided with arc panel, strikes off branch
Fagging 68 is located at the right side for polishing support plate 63, strikes off support plate 68 on rotating device 5, and scraper mechanism 69, which is located at, to be struck off
The front side of support plate 68;The scraper mechanism 69 includes striking off belt 691, striking off link 692, strike off cleaning board 693, scrape
Except expansion plate 694, connecting spring 695 is struck off, recycling box 696 is struck off and strikes off adjusting push rod 697, it is four-wheel to strike off belt 691
Transmission belt is struck off to be symmetrically installed on the side of belt 691 and strikes off link 692, strikes off the rear end of link 692 and stretches with striking off
The top of contracting push rod 611 is connected, and strikes off cleaning board 693 mounted on striking off on belt 691, strikes off the leading flank of cleaning board 693
It is provided with square groove, strikes off and is both provided with sliding slot on cleaning board 693 at left and right sides of square groove, and is struck off in the front side of cleaning board 693
Portion is arc surface, strikes off expansion plate 694 by striking off connecting spring 695 mounted on striking off in the square groove of cleaning board 693, strikes off and stretch
The left and right ends of contracting plate 694 are slide block structure, and the slide block structure for striking off expansion plate 694 is set with square groove on cleaning board 693 is struck off
The sliding slot set is in mating connection, each strikes off and is respectively mounted on the bottom of link 692 there are one striking off to adjust push rod 697, is struck off
It adjusts to be equipped on the top of push rod 697 and strikes off recycling box 696, the inside for striking off recycling box 696 is globoidal structure, and is struck off back
It receives and is provided with tipper on box 696, the left and right sides of scraper mechanism 69 is mounted on one group and strikes off telescopic putter 611, and two groups are scraped
Except the position of telescopic putter 611 is symmetrical, strike off telescopic putter 611 by strike off electronic sliding block 610 be mounted on strike off support plate
On 68 medial surface, when specific works, after to flange and steel-pipe welding, control hammering motor 621 is rotated first,
Hammering motor 621 can drive hammering cam 624 to be rotated so that hammering connecting rod 626 can be in hammering cam 624 and hammering
It swings up and down under the action of restoring spring 627, tup 628 and hammering connecting rod 626 are under the action of hinged, 628 energy of tup
Enough solder joints beaten completely between flange and steel pipe, can eliminate the stress of solder joint, then control polish mechanism 67 to flange with
Solder joint between steel pipe carries out polishing action, and elongation polishes support push rod 66, and polishing support push rod 66 can be to polishing flexible push away
Bar 65 provides support force, and elongation polishes telescopic putter 65 so that arc pressuring plate 671 touch the side of steel pipe, and control polishes electricity
Movable slider group 64 is moved so that the bottom for polishing supporting rack 672 touch the upper surface of flange, and elongation polishes push rod 676 simultaneously
Unlatching polishes motor 677, and the solder joint between flange and steel pipe can be carried out to polish action by polishing rotor 679 so that when welding
The sundries such as soldered ball, the welding slag of generation are disposed of, and two polish slide bar 675 and can play support when polishing rotor 679 and rotating
With the effect of limit, prevent from polishing rotor 679 and damage flange and steel pipe, finally control scraper mechanism 69 will steel pipe on flange
Residue is cleared up, and control, which strikes off electronic sliding block 610 and carries out movement, can adjust the height of scraper mechanism 69, and adjusting is struck off flexible
The length of push rod 611 can control the position of scraper mechanism 69 so that the cleaning board 693 that strikes off in scraper mechanism 69 is located at properly
Height and position, adjust and strike off the length for adjusting push rod 697 and allow and strike off the lateral wall that recycling box 696 touch flange,
Striking off recycling box 696 can recycle to striking off the residue that cleaning board 693 scrapes off, and it is four-wheel transmission belt to strike off belt 691,
To strike off cleaning board 693 and be carried out at the same time steel pipe with flange and strike off, when the arc table for striking off cleaning board 693 and striking off steel pipe
When face, striking off expansion plate 694 and can be shunk on cleaning board 693 is struck off, strikes off the arc surface energy at 693 front side middle part of cleaning board
The curved surfaces of steel pipe are enough coordinated to strike off striking off on cleaning board 693 when striking off cleaning board 693 and striking off flange upper surface and stretch
Contracting plate 694 can stretch out under the active force for striking off connecting spring 695 so that strike off cleaning board 693 and be in expansion plate 694 is struck off
Same plane strikes off cleaning board 693 and can dispose the residue of flange upper surface with expansion plate 694 is struck off, so as to complete
Solder joint between flange and steel pipe carries out the work of after welding treatment, and after welding treatment device 6 can be between flange and steel pipe
Solder joint carries out hammering and eliminates stress, polishes solder joint so that the solder joint between flange and steel pipe is smooth, between flange and steel pipe
Welding slag is thoroughly removed.
When work, when needing to carry out after welding treatment work to flange and steel pipe, first by controlling electric rotating machine 51
Rotation can drive support gear 55 to be rotated so that the after welding treatment device 6 installed on support gear 55 is to flange and steel
Pipe carries out after welding treatment, and control hammering motor 621 is rotated, and hammering motor 621 can drive hammering cam 624 to be revolved
Turn so that hammering connecting rod 626 can swing up and down under the action of hammering cam 624 with hammering restoring spring 627, tup
628 with hammering connecting rod 626 under the action of hinged, tup 628 can beat the solder joint between flange and steel pipe completely, can disappear
Except the stress of solder joint, damage steel pipe and flange when the tup 628 of rubber material can prevent tup 628 from hammering, then control are ground
Solder joint of the flattening mechanism 67 between flange and steel pipe carries out polishing action, and elongation polishes support push rod 66, polishes support push rod 66
Support force can be provided to polishing telescopic putter 65, elongation polishes telescopic putter 65 so that arc pressuring plate 671 touch steel pipe
Side, control polish electronic sliding block group 64 and are moved so that the bottom for polishing supporting rack 672 touch the upper surface of flange, stretches
Length, which polishes push rod 676 and opens, polishes motor 677, and the solder joint between flange and steel pipe can be polished by polishing rotor 679
Action so that the sundries such as soldered ball, welding slag for being generated when welding are disposed of, and two polish slide bar 675 and can polish rotor 679
Play the role of support and limit when rotation, prevents from polishing the damage flange of rotor 679 and steel pipe, finally controlling scraper mechanism 69 will
Steel pipe is cleared up with the residue on flange, and control, which strikes off electronic sliding block 610 and carries out movement, can adjust the height of scraper mechanism 69
Degree adjusts and strikes off the length of telescopic putter 611 and can control the position of scraper mechanism 69 so that striking off in scraper mechanism 69 is clear
It sweeps plate 693 and is located at suitable height and position, adjust to strike off the length for adjusting push rod 697 and allow and strike off recycling box 696 and paste
The firmly lateral wall of flange, striking off recycling box 696 can recycle to striking off the residue that cleaning board 693 scrapes off, and strike off belt
691 be four-wheel transmission belt so that strikes off cleaning board 693 and can be carried out at the same time with flange to steel pipe and struck off, when striking off cleaning board 693
When striking off the curved surfaces of steel pipe, striking off expansion plate 694 and can be shunk on cleaning board 693 is struck off, before striking off cleaning board 693
The arc surface of middle side part can coordinate the curved surfaces of steel pipe, when striking off cleaning board 693 and striking off flange upper surface, strike off cleaning
The expansion plate 694 that strikes off on plate 693 can stretch out under the active force for striking off connecting spring 695 so that strike off cleaning board 693 and scrape
Except expansion plate 694 is in same plane, strike off cleaning board 693 with strike off expansion plate 694 can be clear by the residue of flange upper surface
It removes, the work of after welding treatment is carried out so as to complete the solder joint between flange and steel pipe, after welding treatment device 6 can be to method
Solder joint between blue and steel pipe carries out hammering and eliminates stress, polishes solder joint so that the solder joint between flange and steel pipe is smooth, to method
Welding slag between blue and steel pipe is thoroughly removed, and is realized and is answered with solder joint hammering elimination is carried out after steel-pipe welding flange automatically
Power polishes solder joint, the function that the welding slag between flange and steel pipe is thoroughly removed, and solves existing to flange and steel pipe welding
Existing working efficiency is low when post-processing, needs manually to carry out postwelding hammering to flange and steel pipe, artificial butt welding point is needed to carry out
It polishes, the problems such as artificial after welding treatment effect difference, has reached purpose.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry
It should be appreciated that the present utility model is not limited to the above embodiments, the only explanation of the description in above embodiments and description
The principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model also have various changes
Change and improve, these various changes and improvements fall within the scope of the claimed invention.The requires of the utility model protects model
It encloses and is defined by the appending claims and its equivalent thereof.
Claims (6)
1. ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering, including support baseboard (1), rotation
Device (5) and after welding treatment device (6), it is characterised in that:The rotating device (5) is connected with support baseboard (1), postwelding
Processing unit (6) is mounted on rotating device (5);Wherein:
The after welding treatment device (6) includes hammering support plate (61), hammer mechanism (62), polishes support plate (63), polishes
Electronic sliding block group (64), polish telescopic putter (65), polish support push rod (66), polish mechanism (67), strike off support plate (68),
Scraper mechanism (69), two strike off electronic sliding block (610) and strike off telescopic putter (611), hammering support plate (61) be mounted on rotation
On the left back end of rotary device (5), hammer mechanism (62) is installed on the medial surface of hammering support plate (61), polishes support plate (63)
Positioned at the right side of hammering support plate (61), support plate (63) is polished on rotating device (5), polishes electronic sliding block group (64)
It on the medial surface for polishing support plate (63), polishes to be equipped on electronic sliding block group (64) and polishes telescopic putter (65), grind
It is equipped on the top of flat telescopic putter (65) and polishes mechanism (67), polished to be provided with below the middle part of telescopic putter (65) and polish
Push rod (66) is supported, polishes and is provided with arc panel at the top of support push rod (66), support plate (68) is struck off and is located at and polish support plate
(63) support plate (68) is struck off on rotating device (5) in right side, and scraper mechanism (69), which is located at, strikes off support plate (68)
Front side is mounted on one group at left and right sides of scraper mechanism (69) and strikes off telescopic putter (611), and two groups are struck off telescopic putter
(611) position is symmetrical, strike off telescopic putter (611) by strike off electronic sliding block (610) be mounted on strike off support plate (68)
Medial surface on.
2. ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering according to claim 1,
It is characterized in that:The rotating device (5) includes electric rotating machine (51), rotating shaft (52), rotation gear (53), rotation company
Frame (54), support gear (55), rotary chute (56) and rotation supporting rod (57), electric rotating machine (51) is connect to install by motor set
On at the top of the right end of support baseboard (1), bottom that the output shaft of electric rotating machine (51) passes through shaft coupling and rotating shaft (52)
It is connected, the top of rotating shaft (52) is mounted on by bearing on rotatable connection frame (54), the lower end of rotatable connection frame (54)
It is connected with support baseboard (1), rotation gear (53) is mounted on the middle part of rotating shaft (52), and support gear (55) is located at rotation
The left side of rotating disk (53), support gear (55) are meshed with rotation gear (53), and the middle part of support gear (55) is hollow knot
Structure supports and is equipped with rotary chute (56) on the bottom of gear (55), and rotation branch is symmetrically arranged with below support gear (55)
The bottom of strut (57), rotation supporting rod (57) is mounted on support baseboard (1), and the top of rotation supporting rod (57) is sliding block knot
Structure, the slide block structure and rotary chute (56) of rotation supporting rod (57) are in mating connection.
3. ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering according to claim 1,
It is characterized in that:The hammer mechanism (62) includes hammering motor (621), hammering shaft (622), hammering connecting plate (623), hammer
Hit cam (624), hammering ear mount (625), hammering connecting rod (626), hammering restoring spring (627), tup (628) and hammering spring
(629), hammering motor (621) is mounted on by motor set on the medial surface of hammering support plate (61), hammers the defeated of motor (621)
Shaft is connected by shaft coupling with the left end of hammering shaft (622), and the right end of hammering shaft (622) is mounted on hammer by bearing
It hits on connecting plate (623), hammering connecting plate (623) is connected with support gear (55), and hammering cam (624) is mounted on hammering shaft
(622) on, hammering ear mount (625) is located at the right side of hammering connecting plate (623), and hammering ear mount (625) is mounted on support gear (55)
On, hammering connecting rod (626) is mounted on by axis pin in hammering ear mount (625), and the left end bottom of hammering connecting rod (626) is equipped with hammer
Restoring spring (627) is hit, the bottom of hammering restoring spring (627) is mounted on support gear (55), the right side of hammering connecting rod (626)
End is equipped with tup (628) by hinge, and hammering spring (629) is mounted between hammering connecting rod (626) and tup (628).
4. ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering according to claim 1,
It is characterized in that:The mechanism (67) that polishes includes arc pressuring plate (671), polishes supporting rack (672), polishes link
(673), polish sliding slot (674), two polish slide bar (675), polish push rod (676), polish motor (677), polish shaft
(678) and rotor (679) is polished, polishes link (673) and be mounted on the top for polishing telescopic putter (65), polishes link
(673) it is equipped on front side and polishes supporting rack (672), arc pressuring plate (671) is mounted on the front side for polishing supporting rack (672)
On top, the bottom of push rod (676) is polished mounted on polishing on link (673), polishes and is equipped on the top of push rod (676)
Motor (677) is polished, the output shaft for polishing motor (677) is connected by shaft coupling with shaft (678) is polished, and shaft is polished
(678) it is provided on bottom and polishes rotor (679), polished and be symmetrically installed by bearing there are two polishing cunning in shaft (678)
Bar (675), two positions for polishing slide bar (675) are symmetrical, and the outside for polishing slide bar (675) is slide block structure, polishes slide bar
(675) slide block structure with polish that sliding slot (674) is in mating connection, polish sliding slot (674) and be mounted on and polish supporting rack (672)
On madial wall.
5. ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering according to claim 1,
It is characterized in that:The scraper mechanism (69) includes striking off belt (691), striking off link (692), strike off cleaning board
(693), expansion plate (694) is struck off, connecting spring (695) is struck off, strike off recycling box (696) and strikes off adjusting push rod (697), is scraped
Strike off link (692) except being symmetrically installed on the side of belt (691), strike off the rear end of link (692) with strike off it is flexible
Push rod is connected at the top of (611), strikes off cleaning board (693) mounted on striking off on belt (691), strikes off cleaning board (693)
Leading flank is provided with square groove, strikes off and is both provided with sliding slot at left and right sides of square groove on cleaning board (693), and strikes off cleaning board
(693) it is arc surface in the middle part of front side, strikes off expansion plate (694) and be mounted on by striking off connecting spring (695) and strike off cleaning board
(693) in square groove, the left and right ends for striking off expansion plate (694) are slide block structure, strike off the slide block structure of expansion plate (694)
The sliding slot that square groove is arranged on cleaning board (693) is in mating connection with striking off, and each strikes off and is respectively mounted on the bottom of link (692)
There are one striking off to adjust push rod (697), strikes off to be equipped on the top for adjusting push rod (697) and strike off recycling box (696), strike off back
The inside for receiving box (696) is globoidal structure, and strikes off and be provided with tipper in recycling box (696).
6. ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering according to claim 3,
It is characterized in that:The tup (628) is rubber hammer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721721075.4U CN207656129U (en) | 2017-12-12 | 2017-12-12 | Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721721075.4U CN207656129U (en) | 2017-12-12 | 2017-12-12 | Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207656129U true CN207656129U (en) | 2018-07-27 |
Family
ID=62940251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721721075.4U Active CN207656129U (en) | 2017-12-12 | 2017-12-12 | Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207656129U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109852786A (en) * | 2019-02-28 | 2019-06-07 | 重庆科技学院 | The after welding treatment device of oil-gas pipeline welding |
CN113787273A (en) * | 2021-10-08 | 2021-12-14 | 中国空气动力研究与发展中心低速空气动力研究所 | Welding correction system and method for aluminum alloy sheet |
-
2017
- 2017-12-12 CN CN201721721075.4U patent/CN207656129U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109852786A (en) * | 2019-02-28 | 2019-06-07 | 重庆科技学院 | The after welding treatment device of oil-gas pipeline welding |
CN113787273A (en) * | 2021-10-08 | 2021-12-14 | 中国空气动力研究与发展中心低速空气动力研究所 | Welding correction system and method for aluminum alloy sheet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107855696A (en) | Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering | |
CN107914195A (en) | Postwelding Intelligent treatment is equipped before a kind of pipeline engineering steel flange weldering | |
CN207606450U (en) | A kind of Pipe installing jointing ring flange automatic welding processing all-in-one machine | |
CN107877075A (en) | A kind of Pipe installing jointing ring flange automatic welding handles all-in-one | |
CN207656129U (en) | Ring flange Automation of Welding after welding treatment equipment in a kind of chemical pipeline installing engineering | |
CN206613815U (en) | A kind of abdomen arm robot for pipeline cleaning | |
CN108372453B (en) | A kind of petrochemical pipe inwall processing processing intelligent equipment | |
CN106238415B (en) | A kind of petroleum pipeline inner wall processor with cleaning, drying function | |
CN106247082B (en) | A kind of gasoline feed pipe road inner wall full automatic treatment robot | |
CN103627884B (en) | Automatic ultrasonic impact device for straight welding line in pipeline | |
CN107825049A (en) | A kind of petrochemical equipment installing engineering adpting flange Intelligent welding robot | |
CN207578070U (en) | Postwelding Intelligent treatment is equipped before a kind of pipeline engineering steel flange weldering | |
CN108723921A (en) | Hand-held pipeline-weld interface grinding device | |
CN105965364A (en) | Automatic rust-removing polisher for inner wall of petroleum pipeline | |
CN109175324A (en) | A kind of threeway flanged pipe clamps cleaning equipment automatically | |
CN110039266A (en) | A kind of pressure-resistant welding method of pressure vessel circumferential weld | |
CN112012666A (en) | Rotary drilling machine drill rod with self-telescopic concrete conveying pipe | |
CN107322232A (en) | A kind of large-size pipe automatic welding positioner | |
CN207656160U (en) | A kind of petrochemical equipment installing engineering connecting flange Intelligent welding robot | |
CN108406323A (en) | A kind of inner wall of the pipe integral intelligent processing equipment | |
CN108499997A (en) | A kind of stainless steel inside pipe wall cleaning device of machinery field | |
CN106239331B (en) | A kind of oil-piping inner wall intelligence drying rust-cleaning integrating machine | |
CN209224288U (en) | A kind of lower hopper that discharging effect is good | |
CN208644929U (en) | Hand-held pipeline-weld interface grinding device | |
CN103567878A (en) | Outer wall shot blasting and derusting machine for processing multi-tube-diameter large-size steel tubes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |