CN207647137U - A kind of movable operation platform for indoor high-rise working - Google Patents

A kind of movable operation platform for indoor high-rise working Download PDF

Info

Publication number
CN207647137U
CN207647137U CN201721563917.8U CN201721563917U CN207647137U CN 207647137 U CN207647137 U CN 207647137U CN 201721563917 U CN201721563917 U CN 201721563917U CN 207647137 U CN207647137 U CN 207647137U
Authority
CN
China
Prior art keywords
holder
bar
movable operation
steel pipe
rise working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721563917.8U
Other languages
Chinese (zh)
Inventor
胡锋
许仕达
秦智宇
张晨宇
程江龙
齐加云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Water Conservancy and Hydropower Construction Group Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201721563917.8U priority Critical patent/CN207647137U/en
Application granted granted Critical
Publication of CN207647137U publication Critical patent/CN207647137U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of movable operation platforms for indoor high-rise working, wherein, the holder that cross section is rectangle is vertically installed on operating platform pedestal, cradle top is equipped with platform, vertically cat ladder, base bottom are equipped with traveling wheel and height-adjustable supporting leg for setting among internal stent.The utility model solves common movable operation platform in current construction and cannot be satisfied the tall and big interior space high-rise working problem of architectural engineering.It is not limited by scaffolding height, it is connected firmly, overall stability is good, bearing capacity is high, safe and reliable, convenient transfer is flexible, materials facility, processing, installation, use, convenient disassembly are suitable in various floor height rooms especially tall and big indoor canopy finishing and top electromechanics installation and maintenance activity.Transfer is efficiently quick, greatly speeds up construction speed.

Description

A kind of movable operation platform for indoor high-rise working
Technical field
The utility model is related to movable operation platform, the mobile operation of more particularly, to indoor high-rise working is flat Platform.
Background technology
When floor height is little, indoor canopy finishing and top mechanical and electric equipment installation etc. are usually using mobile for architectural engineering room Operating platform carries operation.Common movable operation platform holder generally uses gate-type frame or spigot-and-socket steel pipe frame, operating platform Area be no more than 10 ㎡, based on safety requirements is stablized, specification is by its height limitation within 5m.As Building technology develops, Modern large public building develops towards large span, high spatial, and interior net storey height degree is set up to more than ten meters to ceiling finish and top Standby installation equal-height position operation brings great challenge, conventional mobile operating platform to cannot be satisfied construction needs;And according to full Hall scaffold then needs to put into a large amount of frame materials and takes, tears artificial, heavy workload, construction cost height, long construction period open.
Invention content
The shortcomings that the purpose of the utility model is to overcome prior arts, provide it is a kind of it is safe and reliable, using flexible, Not by height limitation and greatly speed up the movable operation platform that construction speed is used for indoor high-rise working.
Technical solution used by the utility model is:
A kind of movable operation platform for indoor high-rise working of the utility model, including pedestal, at the bottom The holder that cross section is rectangle is vertically installed on seat, platform, the bottom are installed at the top of the holder Seat includes the well shape pedestal bottom frame being made of the side bar being firmly connected to each other, in the middle position of the well shape structure of pedestal bottom frame Side bar between right-angled intersection be connected with intermediate beam, on the side bar and the edge respectively of the position of each upright bar of corresponding holder Vertical direction is welded with multiple guide piles, and a joint steel pipe is vertically welded with respectively at every side bar both ends, described Holder depth-width ratio be not more than 2, the holder is firmly connected to each other and is formed by more upright bars and horizon bar, the holder Inserting is connect one by one with guide pile for upright bar;It is continuously fixed with up and down in the upright bar of every side of the holder and horizon bar outer wall Multiple oblique bridgings, and bottom between two upright bars being oppositely arranged positioned at holder corner point, in, top setting three Horizontal cross brace, wherein the oblique scissors strut member positioned at stent outer lower part using double steel pipe and stretches out holder and pedestal bottom frame On joint steel pipe connected with fastener;The platform includes horizontally spaced more supporting steels for being fixed on cradle top Pipe, the more supporting steel pipes are connected by the upright bar of fastener and holder, and banding fixed is spaced on the supporting steel pipe There are more supporting square timbers, horizontally disposed landing slab to be fixed on supporting square timber top surface, is opened among the landing slab There is manhole, guardrail is installed in the landing slab surrounding, close mesh safety net is linked on the inside of the guardrail, described is more Root supporting steel pipe and Duo Gen supporting square timbers are arranged in manhole surrounding, and the cat ladder is arranged vertically in internal stent Between, the cat ladder passes to the manhole of platform from base top surface, and the cat ladder includes the vertical side rod in both sides, in the both sides Between the upper and lower every being fixed with more intermediate lateral treadles, bottom, middle part and the top of the cat ladder by fastener between vertical side rod Portion is respectively fixed with horizontally disposed additional cross-bar, and the horizon bar of the additional cross-bar and holder is connected by fastener It connects;Bottom at four joints of the side bar of pedestal bottom frame and bottom is separately installed with walking at the joint of intermediate beam Wheel, a height-adjustable supporting leg is separately installed in the both ends bottom of each side bar.
The utility model has the beneficial effects that:
The movable operation platform for indoor high-rise working of the utility model, solves common movable operation platform It cannot be satisfied the tall and big interior space high-rise working problem of architectural engineering.With common mobile gate-type or spigot-and-socket steel pipe frame operating platform Body is compared, and the operating platform pedestal of the utility model is welded using shaped steel, has larger strength and stiffness;Substantially increase carrying Ability and stability;Supporting leg is set on pedestal, increases job stability;Holder uses fastener type steel pipe frame, upright bar and pedestal On guide pile using inserting connect, ensure accurate positioning, stable connection;The vertical scissors strut member in stent outer lower part is prolonged outward It stretches and widens, form lateral support while expanding frame body floor space, holder scaffolding height can be greatly increased, and improve stability; Pedestal is movable type, and walking opinion uses universal wheel, can make any direction movement, is conveniently operated platform transfer.Separately in platform manhole Place adds removable cover, can prevent people, object from falling, and avoids manhole from interfering personnel's action, ensures construction safety, and improves work effect Rate.It is not limited, is connected firmly, overall stability is good, carrying energy by scaffolding height in short, the operating platform of the utility model has Power is high, safe and reliable, convenient transfer is flexible, materials facility, and the outstanding advantages such as processing, installation, use, convenient disassembly are fitted For being especially tall and big indoor canopy finishing and top electromechanics installation and maintenance activity in various floor height rooms.It is full compared to tradition Hall scaffold operating platform, using the operating platform of the utility model can largely save frame material and take, tear open it is artificial, save input, Reduce cost, pacify, tear open, shift efficiently it is quick, greatly speed up construction speed.
Description of the drawings
Fig. 1 is a kind of stereochemical structure of movable operation platform schematic diagram for indoor high-rise working of the utility model Schematic diagram;
Fig. 2 is pedestal bottom frame and supporting leg connecting node full-page proof schematic diagram in structure shown in Fig. 1;
Fig. 3 is the assembling schematic diagram of pedestal in structure shown in Fig. 1, traveling wheel, supporting leg;
Fig. 4 is the stereoscopic schematic diagram of pedestal in structure shown in Fig. 1
Fig. 5 is the structural schematic diagram of supporting leg in structure shown in Fig. 1;
Fig. 6 is the platform stereoscopic schematic diagram in structure shown in Fig. 1;
Fig. 7 is the cat ladder structural schematic diagram in structure shown in Fig. 1.
Specific implementation mode
The utility model is described in detail in the following with reference to the drawings and specific embodiments.
A kind of movable operation platform for indoor high-rise working of the utility model as shown in drawings, including pedestal 3, the holder 2 that cross section is rectangle is vertically installed on the pedestal, is equipped at the top of the holder 2 Platform 1, the pedestal 3 includes the well shape pedestal bottom frame 31 being made of the side bar 31-1 being firmly connected to each other, in pedestal bottom frame Right-angled intersection is connected with intermediate beam 31-2 between the side bar 31-1 of the middle position of 31 well shape structure, in the side bar 31-1 is upper and the position of each upright bar 21 of corresponding holder 2 is vertically welded with multiple guide pile 31-4 respectively, at every The both ends side bar 31-1 (preferably away from end 50-80mm) are vertically welded with a joint steel pipe 31-3 respectively.Preferably Joint steel pipe is higher by side bar back 200-250mm.
The holder depth-width ratio is not more than 2, and the holder 2 is firmly connected to each other by more upright bars 21 and horizon bar 22 Composition.Inserting is connect one by one with guide pile 31-4 for the upright bar 21 of the holder 2.
It is preferably continuously fixed with up and down on 22 outer wall of upright bar 21 and horizon bar of every side of the holder 2 multiple oblique Bottom to bridging 23, and between two upright bars 21 being oppositely arranged positioned at 2 corner point of holder, in, top setting three Horizontal cross brace 24.Wherein it is located at 23 rod piece of oblique bridging of 2 outer lower portion of holder using double steel pipe and stretches out holder and bottom Joint steel pipe 31-3 on seat bottom frame 31 is connected with fastener.
The platform 1 includes horizontally spaced more supporting steel pipes 11 for being fixed on 2 top of holder, and described is more Root supporting steel pipe 11 is connect by fastener with the upright bar 21 of holder 2, and the spacing of preferred two adjacent supporting steel pipes 11≤ 1.2m, interval banding fixed has more supporting square timbers 12 on the supporting steel pipe 11, preferred two adjacent support sides Wood arrangement spacing≤300mm, horizontally disposed landing slab 13 are fixed on 12 top surface of supporting square timber, and fixed form can adopt With iron nail paving nail in 12 top surface of supporting square timber.It is provided with manhole 14 among the landing slab 13, in the landing slab 13 4 Guardrail 16 is installed in week, close mesh safety net 17 is linked in 16 inside of guardrail.The more supporting steel pipes 11 and more Root supporting square timber 12 is arranged in 14 surrounding of manhole, avoids manhole.It preferably is provided with removable cover at manhole 14, for obstructed Manhole 14 is closed when row.
The cat ladder 4 is arranged vertically among internal stent, holder load when ensureing construction personnel or more Equilibrium prevents from tilting.The cat ladder 4 passes to the manhole 14 of platform 1 from 3 top surface of pedestal.The cat ladder 4 includes that both sides are vertical Side rod 41, between the upper and lower every being fixed with more intermediate lateral treadles 42 by fastener between the vertical side rod in the described both sides 41.Institute Bottom, middle part and the top for the cat ladder 4 stated are respectively fixed with horizontally disposed additional cross-bar 43, the additional cross-bar 43 are connect with the horizon bar of holder by fastener.
Bottom at four joints of the side bar 31-1 of pedestal bottom frame 31 and bottom difference at the joint of intermediate beam Traveling wheel 32 is installed, a height-adjustable supporting leg 33, the height are separately installed in the both ends bottom of each side bar 31-1 Spend end 150mm-180mm of the adjustable legs 33 preferably away from each side bar 31-1.
As a kind of embodiment of the utility model, the height-adjustable supporting leg 33 includes spike plate 33-3, It is fixed with jackscrew 33-2, the jackscrew 33-2 among the spike plate 33-3 and vertically passes through the side bar being correspondingly arranged 31-1, the jackscrew 33-2 are fixedly linked respectively by the upper flange and lower wing plate of nut 33-1 and side bar 31-1.Preferably Handle 33-4 is installed at the top of the jackscrew 33-2.
The assembling of this operating platform is using steps are as follows:
(1) pedestal 3 is in place:Pedestal 3 is moved into boundary of works area, screwing 33 jackscrew 33-2 of supporting leg makes spike plate 33-3 supports ground 3 leveling of pedestal is supported and is fixed by face.
(2) holder 2, cat ladder 4 are set up:First one by one by 21 sets of insertion guide pile 31-4 of rack rod so that rack rod 21 Installation on the base 3, is then installed horizon bar 22, horizontal cross brace 24 and oblique bridging 23, is connected by fastener.Wherein prop up The oblique bridging of frame outer lower portion 23 downwardly and outwardly stretches out holder 2, by the joint steel pipe 31- of rod end and the both ends bottom frame side bar 31-1 3 are connected with fastener.Cat ladder 4 is set up progress with holder 2 and is set up, and additional cross-bar 43 is connected and fixed by fastener and holder 2.
(3) platform 1 is set up.
(4) construction personnel enters platform through cat ladder, manhole, is used in combination the tools such as jack, pulley that will construct by platform manhole Material tool is hoisted to platform;
(5) manhole removable cover is covered, the electromechanical installation in top or ceiling finish or maintenance activity are carried out;
(5) after completing a position construction, construction personnel withdraws platform, and ground is returned to through cat ladder;
(6) reversion handle pine moves back supporting leg jackscrew;
(7) operating platform is transferred to subsequent work place, repeats aforementioned process.

Claims (7)

1. a kind of movable operation platform for indoor high-rise working, including pedestal, it is characterised in that:On the pedestal The holder that cross section is rectangle is vertically installed, platform, the pedestal packet are installed at the top of the holder The well shape pedestal bottom frame being made of the side bar being firmly connected to each other is included, on the side of the middle position of the well shape structure of pedestal bottom frame Right-angled intersection is connected with intermediate beam between beam, and on the side bar and the position of each upright bar of corresponding holder is respectively along vertical Direction is welded with multiple guide piles, and a joint steel pipe, the branch are vertically welded with respectively at every side bar both ends Frame depth-width ratio is not more than 2, and the holder is firmly connected to each other and is formed by more upright bars and horizon bar, the upright bar of the holder Inserting is connect one by one with guide pile;It is continuously fixed with up and down in the upright bar of every side of the holder and horizon bar outer wall multiple Oblique bridging, and bottom between two upright bars being oppositely arranged positioned at holder corner point, in, top setting three it is horizontal Bridging, wherein the oblique scissors strut member positioned at stent outer lower part using double steel pipe and is stretched out on holder and pedestal bottom frame Joint steel pipe is connected with fastener;The platform includes horizontally spaced more supporting steel pipes for being fixed on cradle top, The more supporting steel pipes are connected by the upright bar of fastener and holder, and interval banding fixed has more on the supporting steel pipe Root supporting square timber, horizontally disposed landing slab are fixed on supporting square timber top surface, and people is provided among the landing slab Hole is equipped with guardrail in the landing slab surrounding, and close mesh safety net, the more branch are linked on the inside of the guardrail It supports steel pipe and Duo Gen supporting square timbers is arranged in manhole surrounding, cat ladder is arranged vertically among internal stent, and described climbs Ladder passes to the manhole of platform from base top surface, and the cat ladder includes the vertical side rod in both sides, the vertical side rod in both sides it Between between the upper and lower every being fixed with more intermediate lateral treadles by fastener, bottom, middle part and the top of the cat ladder are fixed respectively There is a horizontally disposed additional cross-bar, the horizon bar of the additional cross-bar and holder is connected by fastener;At pedestal bottom Bottom at four joints of the side bar of frame and bottom is separately installed with traveling wheel at the joint of intermediate beam, in each side bar Both ends bottom is separately installed with a height-adjustable supporting leg.
2. the movable operation platform according to claim 1 for indoor high-rise working, it is characterised in that:Every connection Steel pipe is apart from every side bar end 50-80mm.
3. the movable operation platform according to claim 2 for indoor high-rise working, it is characterised in that:Every connection Steel pipe is higher by side bar back 200-250mm.
4. the movable operation platform according to claim 1 for indoor high-rise working, it is characterised in that:Adjacent two Spacing≤1.2m of root supporting steel pipe, adjacent two supporting square timbers arrange spacing≤300mm.
5. the movable operation platform according to claim 1 for indoor high-rise working, it is characterised in that:Described It is provided with removable cover at manhole, closes manhole when for no thoroughfare.
6. the movable operation platform for indoor high-rise working according to one of claim 1,2 or 4, feature exist In:Height-adjustable supporting leg 150mm-180mm away from the end of each side bar.
7. the movable operation platform according to claim 6 for indoor high-rise working, it is characterised in that:The height It includes spike plate to spend adjustable legs, jackscrew is fixed among the spike plate, the jackscrew vertically passes through The side bar being correspondingly arranged, the jackscrew are fixedly linked respectively by the upper flange and lower wing plate of nut and side bar.
CN201721563917.8U 2017-11-21 2017-11-21 A kind of movable operation platform for indoor high-rise working Active CN207647137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721563917.8U CN207647137U (en) 2017-11-21 2017-11-21 A kind of movable operation platform for indoor high-rise working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721563917.8U CN207647137U (en) 2017-11-21 2017-11-21 A kind of movable operation platform for indoor high-rise working

Publications (1)

Publication Number Publication Date
CN207647137U true CN207647137U (en) 2018-07-24

Family

ID=62890595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721563917.8U Active CN207647137U (en) 2017-11-21 2017-11-21 A kind of movable operation platform for indoor high-rise working

Country Status (1)

Country Link
CN (1) CN207647137U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441081A (en) * 2018-12-25 2019-03-08 上海建工七建集团有限公司 Telescopic steel construction operating platform and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441081A (en) * 2018-12-25 2019-03-08 上海建工七建集团有限公司 Telescopic steel construction operating platform and its installation method

Similar Documents

Publication Publication Date Title
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN107419893A (en) A kind of elevator steel platform and preparation method thereof
CN202055497U (en) Movable combination scaffold for construction works
RU2011141929A (en) MOBILE MODULAR SCAFFOLDING SYSTEM FOR CONSTRUCTION WORKS AND METHOD OF ITS INSTALLATION
CN206233546U (en) A kind of elevator hoistways workbench
CN201165752Y (en) Moveable building construction platform
CN207647137U (en) A kind of movable operation platform for indoor high-rise working
CN205046827U (en) Mobilizable slope operation construction platform
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN110565937A (en) Door type integral lifting steel platform
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN203462736U (en) Operating platform for lift shaft structural steel construction
CN207177246U (en) A kind of elevated truss Mobile operating platform
CN205955165U (en) Elevator shaft operation platform
CN205976396U (en) Portable operation platform that indoor construction and installation used
CN215101546U (en) Chinese ancient architecture pavilion maintenance and roof lifting device
CN211257773U (en) Door type integral lifting steel platform
CN209989034U (en) A hoisting frame for factory building piping erection
CN209891688U (en) High building quick-building safe construction foot rest
CN210500860U (en) Secondary structure constructional column top bar planting assistor
CN210616901U (en) Precast beam prestressing force stretch-draw platform
CN202081639U (en) Steel truss tool type supporting structure for concrete framework industrial building templates
CN215594807U (en) Multifunctional construction scaffold
JP2005163355A (en) Horizontally moving scaffold
CN104695694A (en) Worm and gear lead screw lifting type attached scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200429

Address after: No. fifty-two Dongting Road, Hexi District, Tianjin

Patentee after: Water conservancy and Hydropower Construction Group Co., Ltd. of China Construction Sixth Engineering Bureau

Address before: 300451 No. 72, Hangzhou Road, Tianjin, Tanggu

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CORP., Ltd.

TR01 Transfer of patent right