CN207597441U CN201721649288.0U CN201721649288U CN207597441U CN 207597441 U CN207597441 U CN 207597441U CN 201721649288 U CN201721649288 U CN 201721649288U CN 207597441 U CN207597441 U CN 207597441U
Authority
CN
China
Prior art keywords
wall
pouring concrete
water
steel plate
construction joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721649288.0U
Other languages
Chinese (zh)
Inventor
陈新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan State Heng Architectural Design Co Ltd
Original Assignee
Sichuan State Heng Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan State Heng Architectural Design Co Ltd filed Critical Sichuan State Heng Architectural Design Co Ltd
Priority to CN201721649288.0U priority Critical patent/CN207597441U/en
Application granted granted Critical
Publication of CN207597441U publication Critical patent/CN207597441U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of basement side wall horizontal construction joint water proof structure, its key points of the technical solution are that:Including wall, wall includes first pouring concrete and rear pouring concrete, and steel plate water stopper is equipped in wall, and one end of steel plate water stopper is located in first pouring concrete, and the other end of steel plate water stopper is located in rear pouring concrete;The upstream face of wall is provided with waterproof construction, and waterproof construction includes the first waterproof layer and fish tail and waterproof layer that are set gradually from the upstream face of wall;The back side of wall is provided with mortar cover, and vertical steel plate water stopper is set by being sewed in divergence, extends the seepage paths of underground water, and set waterproof construction in the upstream face of wall, has achieved the effect that waterproof.

Description

A kind of basement side wall horizontal construction joint water proof structure
Technical field
The utility model is related to basement side wall construction field, more particularly to a kind of basement side wall horizontal construction joint waterproof Construction.
Background technology
In concreting process, because design or construction requirement are needed to be segmented and be poured, and first, after-pouring concrete Between the seam that is formed be known as construction joint.Construction joint is not a kind of " seam " of necessary being, it is only because first pouring coagulation Soil is more than the presetting period, as soon as and there are a faying face, the faying face referred to as construction joints between the concrete of after-pouring.
Basement side wall is located at Horizon hereinafter, being influenced by underground water, and the construction joint of basement side wall often becomes ground The shortcut that lower water penetrates into.According to《GB50108-2008》Middle requirement needs to do at waterproof the construction joint of basement side wall Reason, is met the requirements with the waterproofing grade for ensureing basement side wall.Wherein, underground component closely descends the side of water to be known as meeting water Face, corresponding thereto side be known as back side.
The China that Shen Qing Publication/Authorization Notice No. is CN203008144U, authorized announcement date is on 06 19th, 2013 is specially Profit discloses a kind of construction joint waterproof construction, it is characterized in that being shunk including binding agent, water expandable waterstop, nailing, compensation mixed Solidifying soil, concrete structure construction seam center setting water expandable waterstop, water expandable waterstop is pasted onto mixed by binding agent At the construction joint of Xtah Crude Clay structure, water expandable waterstop is fixed in concrete structure by nailing, concrete structure construction seam with Expansive concrete is set in the range of upper 20mm.
It is in place of the deficiencies in the prior art, the gap that underground water can be between expansive concrete and rear pouring concrete Middle infiltration shifts in the region of infiltration from construction joint, and there is no inherently solve the problems, such as waterproof.
Utility model content
The purpose of this utility model is to provide a kind of basement side wall horizontal construction joint water proof structure, by divergence It sews on and vertical steel plate water stopper is set, extend the seepage paths of underground water, and waterproof construction is set in the upstream face of wall, reach The effect of waterproof.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of basement side wall horizontal construction joint water proof structure, including wall, the wall includes first pouring concrete with after Pouring concrete, the wall is interior to be equipped with steel plate water stopper, and one end of the steel plate water stopper is located in the first pouring concrete, institute The other end for stating steel plate water stopper is located in the rear pouring concrete;The upstream face of the wall is provided with waterproof construction, described Waterproof construction includes the first waterproof layer and fish tail and waterproof layer that are set gradually from the upstream face of wall;The back side of the wall is set It is equipped with mortar cover.
Using above-mentioned technical proposal, the pore water pressure of earth lateral pressure and underground water directly acts on fish tail and waterproof layer On, reduce the damage of the first waterproof layer and wall;After underground water is penetrated into from fish tail and waterproof layer, the first waterproof layer is first passed through Blocking, the steel plate water stopper blocking being then located at again inside wall, reaches good waterproof effect.Secondly, steel plate water stopper It can strengthen the bonding strength of the two between first pouring concrete and rear pouring concrete, improve structural after the two connection Energy.Mortar cover is set there are two acting in the back side of wall, one is in order to reduce the water of back side, that is, underground In the indoor water penetration to construction joint in room, the second is complete in the structure of back side in order to improve first pouring concrete and rear pouring concrete Whole property.
Further preferably:Processing coating is equipped between elder generation's pouring concrete and rear pouring concrete.
Using above-mentioned technical proposal, concrete interface treating agent is smeared in the upper surface of first pouring concrete, reaches reduction first Float the fouls such as sand, dust for pouring concrete upper surface, improves the connectivity between first pouring concrete and rear pouring concrete, reduces underground The probability that water is permeated from construction joint, further improves waterproof effect.
Further preferably:Mortar articulamentum is had additional above the processing coating.
Using above-mentioned technical proposal, first pouring concrete upper surface is being laid with 1 after smearing concrete interface treating agent:1 Cement mortar forms mortar articulamentum.After laying, pouring concrete after being poured above mortar articulamentum so that after pour it is mixed Solidifying soil is closely connect by mortar with first pouring concrete, further strengthens the connectivity between first pouring concrete and rear pouring concrete Can, while the integral strength for improving wall, achieve the effect that reduce groundwater seepage.
Further preferably:The upper surface of elder generation's pouring concrete is provided with multiple grooves.
Using above-mentioned technical proposal, first pouring concrete upper surface is being laid with cement mortar after having smeared section inorganic agent, Then rear pouring concrete is poured so that connect, increase with first pouring concrete by groove after cement mortar and the mixing of rear pouring concrete The contact area of junction is added, so as to improve the bonding strength between first pouring concrete and rear pouring concrete, has also just improved The waterproof effect of wall.
Further preferably:Additional waterproofing layer is had additional between first waterproof layer and the upstream face of wall, it is described attached Waterproof layer is added to correspond to the junction setting of first pouring concrete and rear pouring concrete.
Using above-mentioned technical proposal, more waterproofs of additional waterproofing layer together, reduce between the first waterproof layer and wall The probability that underground water is penetrated into from construction joint, improves waterproof effect.
Further preferably:The steel plate water stopper is vertically arranged, and the midpoint of the steel plate water stopper is mixed positioned at first pouring The junction of solidifying soil and rear pouring concrete.
Using above-mentioned technical proposal, the steel plate water stopper being vertically arranged so that the actual height of steel plate water stopper is equal to resistance The effective height of underground water is kept off, the effective rate of utilization of steel plate water stopper is improved, embodies the theory to economize on resources.Steel plate is stopped Water band is evenly distributed to first pouring concrete and rear pouring concrete so that steel plate water stopper formerly can pour coagulation by pouring concrete with after Reach same waterproof effect in soil, reducing leads to that one end waterproof is had more than needed since the distribution of steel plate water stopper is uneven and one end is prevented Hydropenic situation.
Further preferably:The steel plate water stopper is provided at both ends with water fender;Stop on the water fender far from steel plate The direction of one end of water band to the upstream face close to wall is obliquely installed;And the end of water fender is simultaneously towards far from steel plate water stopper Dynamic direction setting.
Using above-mentioned technical proposal, water fender is close towards the upstream face of wall in the horizontal direction, and water fender is in vertical side Up towards the direction far from steel plate water stopper;So that the underground water for penetrating into the gas of wall is blocked in steel plate water stopper both ends Between water fender, waterproof effect is improved.
Further preferably:It is had additional in the wall and is provided with water expandable waterstop, the water expandable waterstop Set on the junction of first pouring concrete and rear pouring concrete, and the water expandable waterstop is set close to the upstream face of the wall It puts.
Using above-mentioned technical proposal, when underground water penetrates into wall by fish tail and waterproof layer, the first waterproof layer, additional waterproofing layer During the upstream face of body, water expandable waterstop starts to expand after encountering underground water, stops penetrating further into for underground water, improves The waterproof effect of construction joint.
In conclusion the utility model has the advantages that:
1st, by setting steel plate water stopper, extend the seepage paths of underground water, improve the waterproof effect of construction joint;
2nd, waterproof construction is set by the upstream face in wall, reduces the situation in Groundwater infiltration to wall, improve The waterproof effect of wall;
3rd, setting processing coating and mortar articulamentum between first pouring concrete and rear pouring concrete, improve first pouring concrete Bonding strength between rear pouring concrete;The situation that underground water is penetrated into from construction joint is reduced, improves the waterproof of construction joint Effect.
Description of the drawings
Fig. 1 is the overall structure diagram of embodiment.
In figure, 1, wall;11st, first pouring concrete;111st, groove;12nd, rear pouring concrete;2nd, steel plate water stopper;21st, water blocking Plate;3rd, coating is handled;4th, mortar articulamentum;5th, water expandable waterstop;6th, waterproof construction;61st, additional waterproofing layer;62nd, first Waterproof layer;63rd, fish tail and waterproof layer;7th, mortar cover.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:A kind of basement side wall horizontal construction joint water proof structure, as shown in Figure 1, wall 1, wall 1 includes being located at The first pouring concrete 11 of lower part and superposed rear pouring concrete 12.The junction of first pouring concrete 11 and rear pouring concrete 12 Middle part be equipped with the steel plate water stopper 2 that is vertically arranged, the midpoint of steel plate water stopper 2 is located at first pouring concrete 11 and rear pouring concrete 12 junction.When underground water is penetrated into from the construction joint on the upstream face of wall 1, steel plate water stopper 2 stops underground water In the side of the upstream face close to wall 1, waterproof is achieved the effect that.
In order to further improve waterproof effect, steel plate water stopper 2 is provided at both ends with water fender 21.Water fender 21 and steel plate Waterstop 2 is integrally set, and one end far from steel plate water stopper 2 is to be obliquely installed on water fender 21.The inclination of water fender 21 Direction is decomposed into horizontal direction and vertical direction on two-dimensional coordinate;Wherein, in the horizontal direction, water fender 21 is towards wall 1 Upstream face, in the vertical direction, water fender 21 is far from steel plate water stopper 2.
In order to strengthen the connectivity of first pouring concrete 11 and rear pouring concrete 12, the upper surface chisel of first pouring concrete 11 is equipped with Groove 111, and be disposed with processing coating 3 between first pouring concrete 11 and rear pouring concrete 12 from bottom to up and connected with mortar Layer 4.
It is penetrated into from construction joint to reduce underground water, water expandable waterstop 5 is had additional in wall 1.Water-swellable stops Water bar 5 is located at the junction of first pouring concrete 11 and rear pouring concrete 12, and is set close to the upstream face of wall 1.
In order to reduce upstream face of the underground water close to wall 1, waterproof construction 6 is provided on the upstream face of wall 1.Waterproof knot Structure 6 includes the additional waterproofing layer 61, the first waterproof layer 62 and the fish tail and waterproof layer 63 that are set gradually from the upstream face of wall 1.Its In, additional waterproofing layer 61 corresponds to the construction joint position setting of wall 1;Gluing connects 61 and first waterproof layer 62 of additional waterproofing layer successively It is connected on wall 1.In order to which the back side for reducing moisture from wall 1 is penetrated into wall 1, the back side of wall 1 has additional mortar Protective layer 7.
The work progress of the utility model is as follows,
The upper and lower ends of steel plate water stopper 2 are bent into water fender 21, and marked on steel plate water stopper 2 by S1 with tool Its point midway;
S2, in the position formwork supporting plate for needing to pour wall 1, casting concrete in a template;
Steel plate water stopper 2 is inserted into the concrete poured so that water fender 21 is far from steel plate water-stopping by S3 after pouring With 2 one end towards upstream face, while the midpoint of steel plate water stopper 2 is made to be located at the upper surface location of concrete poured, wait to mix First pouring concrete 11 is formed after solidifying soil solidification;
Multiple grooves 111 are dug out in S4, the upper surface of first pouring concrete 11 with tool, clear up the upper table of first pouring concrete 11 Face;
S5, the upper surface of first pouring concrete 11 smear a layer concrete interface treating agent, processing coating are formed after dry 3;
Water expandable waterstop 5, blend compounds water are placed in S6, the upper surface of first pouring concrete 11 close to one end of upstream face It is adhered on first pouring concrete 11;
S7 increases template, adapts it to the height of wall 1;
S8 is laid with 1 on processing coating 3:1 cement mortar forms mortar articulamentum 4, and Pouring concrete at the same time is waited to mix After solidifying soil solidification, pouring concrete 12 after formation, first pouring concrete 11 and rear pouring concrete 12 become complete wall 1;
S9, additional waterproofing layer 61 is pasted in the position that construction joint is corresponded on the upstream face of wall 1, on additional waterproofing layer 61 It pastes and is set with its first waterproof layer 62 with material, the first waterproof layer 62 by the overall height and overall length of wall 1;
S10 builds the shale hollow brick wall of 120mm thickness by laying bricks or stones in the outside of the first waterproof layer 62, as fish tail and waterproof layer 63, subtracts The destruction of the lateral pressure of few figure and the pore water pressure of underground water to waterproof construction 6.
This specific embodiment is only explanation to the utility model, is not the limitation to the utility model, ability Field technique personnel can as needed make the present embodiment the modification of no creative contribution after this specification is read, but As long as within the protection scope of the present utility model all protected by Patent Law.

Claims (8)

1. a kind of basement side wall horizontal construction joint water proof structure, including wall (1), the wall (1) includes first pouring concrete (11) and rear pouring concrete (12), which is characterized in that steel plate water stopper (2), the steel plate water stopper are equipped in the wall (1) (2) one end is located in the first pouring concrete (11), and the other end of the steel plate water stopper (2) is located at the rear pouring concrete (12) in;The upstream face of the wall (1) is provided with waterproof construction (6), and the waterproof construction (6) includes meeting from wall (1) The first waterproof layer (62) and fish tail and waterproof layer (63) that the water surface is set gradually;The back side of the wall (1) is provided with mortar guarantor Sheath (7).
2. a kind of basement side wall horizontal construction joint water proof structure according to claim 1, which is characterized in that described first to pour Processing coating (3) is equipped between concrete (11) and rear pouring concrete (12).
A kind of 3. basement side wall horizontal construction joint water proof structure according to claim 2, which is characterized in that the processing Mortar articulamentum (4) is had additional above coating (3).
4. a kind of basement side wall horizontal construction joint water proof structure according to claim 1, which is characterized in that described first to pour The upper surface of concrete (11) is provided with multiple grooves (111).
5. a kind of basement side wall horizontal construction joint water proof structure according to claim 1, which is characterized in that described first Additional waterproofing layer (61) is had additional between the upstream face of waterproof layer (62) and wall (1), the additional waterproofing layer (61) is corresponding first The junction of pouring concrete (11) and rear pouring concrete (12) is set.
A kind of 6. basement side wall horizontal construction joint water proof structure according to claim 1, which is characterized in that the steel plate Waterstop (2) is vertically arranged, and the midpoint of the steel plate water stopper (2) is located at first pouring concrete (11) and rear pouring concrete (12) Junction.
A kind of 7. basement side wall horizontal construction joint water proof structure according to claim 6, which is characterized in that the steel plate Waterstop (2) is provided at both ends with water fender (21);One end far from steel plate water stopper (2) is to close on the water fender (21) The direction of the upstream face of wall (1) is obliquely installed;And direction is moved in the end of water fender (21) towards far from steel plate water stopper (2) simultaneously Setting.
A kind of 8. basement side wall horizontal construction joint water proof structure according to claim 1, which is characterized in that the wall (1) have additional in and be provided with water expandable waterstop (5), the water expandable waterstop (5) set on first pouring concrete (11) and The junction of pouring concrete (12) afterwards, and the water expandable waterstop (5) is set close to the upstream face of the wall (1).
CN201721649288.0U 2017-11-30 2017-11-30 A kind of basement side wall horizontal construction joint water proof structure Active CN207597441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721649288.0U CN207597441U (en) 2017-11-30 2017-11-30 A kind of basement side wall horizontal construction joint water proof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721649288.0U CN207597441U (en) 2017-11-30 2017-11-30 A kind of basement side wall horizontal construction joint water proof structure

Publications (1)

Publication Number Publication Date
CN207597441U true CN207597441U (en) 2018-07-10

Family

ID=62761927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721649288.0U Active CN207597441U (en) 2017-11-30 2017-11-30 A kind of basement side wall horizontal construction joint water proof structure

Country Status (1)

Country Link
CN (1) CN207597441U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440777A (en) * 2018-11-23 2019-03-08 中国人民解放军63926部队 Underground structure concrete construction joint leaks advanced monitoring warning device and construction method
CN109736454A (en) * 2018-12-18 2019-05-10 安徽同济建设集团有限责任公司 A kind of hypogee connector construction joint waterproof construction
CN109778917A (en) * 2019-02-22 2019-05-21 中铁第六勘察设计院集团有限公司 A kind of cold seam waterproof construction of underground engineering construction and construction method
CN111549725A (en) * 2020-05-29 2020-08-18 大连理工大学 Waterproof horizontal water leakage structure for roller compacted concrete dam intermittent layer in severe cold area
CN113802615A (en) * 2021-08-20 2021-12-17 北京工业大学 Underground assembly superposed shear wall waterproof structure
CN114277838A (en) * 2021-12-20 2022-04-05 中铁二十五局集团第二工程有限公司 Comprehensive pipe gallery structure crossing underground shallow-buried buildings and construction process thereof
CN114718122A (en) * 2022-03-16 2022-07-08 中国五冶集团有限公司 Method for anti-seepage treatment of new and old structure underground corridor foundation connection construction joint
CN115182389A (en) * 2022-07-20 2022-10-14 华北水利水电大学 Subway Cheng Xin old concrete structure junction anti-seepage structure and construction process
CN115506416A (en) * 2022-09-26 2022-12-23 华北水利水电大学 Lining grouting waterproof structure for joint of new concrete and old concrete in underground engineering and construction process

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440777A (en) * 2018-11-23 2019-03-08 中国人民解放军63926部队 Underground structure concrete construction joint leaks advanced monitoring warning device and construction method
CN109736454A (en) * 2018-12-18 2019-05-10 安徽同济建设集团有限责任公司 A kind of hypogee connector construction joint waterproof construction
CN109778917A (en) * 2019-02-22 2019-05-21 中铁第六勘察设计院集团有限公司 A kind of cold seam waterproof construction of underground engineering construction and construction method
CN109778917B (en) * 2019-02-22 2024-02-09 中铁第六勘察设计院集团有限公司 Cold joint waterproof structure for underground engineering construction and construction method
CN111549725A (en) * 2020-05-29 2020-08-18 大连理工大学 Waterproof horizontal water leakage structure for roller compacted concrete dam intermittent layer in severe cold area
CN113802615A (en) * 2021-08-20 2021-12-17 北京工业大学 Underground assembly superposed shear wall waterproof structure
CN114277838A (en) * 2021-12-20 2022-04-05 中铁二十五局集团第二工程有限公司 Comprehensive pipe gallery structure crossing underground shallow-buried buildings and construction process thereof
CN114718122A (en) * 2022-03-16 2022-07-08 中国五冶集团有限公司 Method for anti-seepage treatment of new and old structure underground corridor foundation connection construction joint
CN115182389A (en) * 2022-07-20 2022-10-14 华北水利水电大学 Subway Cheng Xin old concrete structure junction anti-seepage structure and construction process
CN115182389B (en) * 2022-07-20 2024-02-09 华北水利水电大学 Water seepage prevention structure at junction of new and old concrete structures of subway engineering and construction process
CN115506416A (en) * 2022-09-26 2022-12-23 华北水利水电大学 Lining grouting waterproof structure for joint of new concrete and old concrete in underground engineering and construction process
CN115506416B (en) * 2022-09-26 2024-03-12 华北水利水电大学 Lining grouting waterproof structure of junction between new concrete and old concrete of underground engineering and construction process

Similar Documents

Publication Publication Date Title
CN207597441U (en) A kind of basement side wall horizontal construction joint water proof structure
CN111519665A (en) Gapless filling method for foundation post-cast strip
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN205653900U (en) Waterproof construction of basement bottom plate
CN106812219A (en) Filling wall top stuff up a crack construction method
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN108842816A (en) A kind of waterproofing for subway station structure and its construction technology
CN206529905U (en) Basement waterproofing is constructed
CN106884436B (en) A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
CN209129037U (en) One kind is for high-rise annex bottom plate post-poured strip waterproof structure
CN106869304A (en) Outer wall of basement waterproof construction and construction method in a kind of confined space
CN209555958U (en) A kind of pile-raft foundation structure based on the adaptive deformation adjustment device of stake top
CN210104811U (en) Basement pile-wall integrated waterproof structure system
CN204298860U (en) Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN207959202U (en) A kind of CFG bracing means
CN209538214U (en) A kind of late poured band structure of outer wall of basement
CN207277566U (en) A kind of water blocking sill and its seepage-proof structure
CN207812509U (en) Bottom plate post-poured strip waterproof structure
CN205000360U (en) Basement structure with waterproof structure
CN206655716U (en) A kind of tunnel drainage structure
CN206273919U (en) Toilet doorway waterproof construction
CN208733692U (en) A kind of construction of new-old concrete connects waterproof construction at raft
CN212176331U (en) Roof structure
CN107605055A (en) A kind of dash sill and its seepage-proof structure and construction method
CN209243781U (en) It is a kind of for underground engineering main body construction seam and post-cast strip waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant