CN207597269U - 用于钢混组合梁整孔逐跨施工的拉索装置 - Google Patents
用于钢混组合梁整孔逐跨施工的拉索装置 Download PDFInfo
- Publication number
- CN207597269U CN207597269U CN201721738138.7U CN201721738138U CN207597269U CN 207597269 U CN207597269 U CN 207597269U CN 201721738138 U CN201721738138 U CN 201721738138U CN 207597269 U CN207597269 U CN 207597269U
- Authority
- CN
- China
- Prior art keywords
- cable tension
- line
- tension mechanism
- combination beam
- drag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 50
- 239000010959 steel Substances 0.000 title claims abstract description 50
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 18
- 230000007246 mechanism Effects 0.000 claims abstract description 21
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 abstract description 23
- 238000005496 tempering Methods 0.000 abstract description 4
- 239000004567 concrete Substances 0.000 description 15
- 238000009408 flooring Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 238000005755 formation reaction Methods 0.000 description 4
- 239000000725 suspension Substances 0.000 description 4
- 239000011178 precast concrete Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 102000006495 integrins Human genes 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721738138.7U CN207597269U (zh) | 2017-12-14 | 2017-12-14 | 用于钢混组合梁整孔逐跨施工的拉索装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721738138.7U CN207597269U (zh) | 2017-12-14 | 2017-12-14 | 用于钢混组合梁整孔逐跨施工的拉索装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207597269U true CN207597269U (zh) | 2018-07-10 |
Family
ID=62764313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721738138.7U Active CN207597269U (zh) | 2017-12-14 | 2017-12-14 | 用于钢混组合梁整孔逐跨施工的拉索装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207597269U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112127285A (zh) * | 2020-09-28 | 2020-12-25 | 贵州路桥集团有限公司 | 一种用于钢混组合梁整孔逐跨施工的拉索装置 |
-
2017
- 2017-12-14 CN CN201721738138.7U patent/CN207597269U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112127285A (zh) * | 2020-09-28 | 2020-12-25 | 贵州路桥集团有限公司 | 一种用于钢混组合梁整孔逐跨施工的拉索装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107938520B (zh) | 采用竖直拉索施工钢混组合梁的方法 | |
CN101586330B (zh) | 预应力砼连续梁桥挂篮后退施工方法 | |
CN202936736U (zh) | 一种斜拉桥组合梁施工桥面吊机 | |
CN103276662B (zh) | 大悬臂钢腹板脊骨箱梁节段 | |
CN108004927B (zh) | 双肢三角挂篮及大跨度连续刚构桥悬臂梁段施工方法 | |
CN201512345U (zh) | 多功能整体吊装架 | |
CN108004931B (zh) | 采用混合拉索施工钢混组合梁的方法 | |
CN101446074B (zh) | 钢桁梁桥顶面钢柔性拱的安装及合龙施工方法 | |
CN103938549A (zh) | 装配式波形钢斜腹板组合梁的施工方法 | |
CN103711067A (zh) | 一种少支架横向拼装波形钢腹板组合箱梁及施工方法 | |
CN110258352A (zh) | 两跨连做的钢混组合桥梁施工方法 | |
CN107022958A (zh) | 使用缆索吊机安装斜拉桥的中跨主梁的方法 | |
CN207597269U (zh) | 用于钢混组合梁整孔逐跨施工的拉索装置 | |
CN105019357B (zh) | 一种拱桥敞口格构式钢梁上异形预制桥面板的安装方法 | |
CN108004932A (zh) | 利用梁下运梁方式施工钢混组合梁的方法 | |
CN205382425U (zh) | 铁路t型桥梁加筑声屏障梁模板桁架车 | |
CN203307719U (zh) | 大悬臂钢腹板脊骨箱梁节段 | |
CN110409318B (zh) | 一种大跨度简支钢混结合梁拼装架设方法 | |
CN210368669U (zh) | 用于组合梁两跨连做的吊装设备 | |
CN110344334B (zh) | 采用背索式架桥机的两跨连做钢混组合桥梁施工方法 | |
CN205329550U (zh) | 悬索桥猫道系统 | |
CN112482317A (zh) | 一种门槽二期混凝土自爬升滑模浇筑系统及施工方法 | |
CN107974947B (zh) | 采用交叉式拉索施工钢混组合梁的方法 | |
CN110373990A (zh) | 双层结合钢桁梁整孔制造及架设施工方法 | |
CN214573768U (zh) | 一种门槽二期混凝土浇筑自爬升滑模浇筑系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230110 Address after: Southwest corner of the intersection of New 107 National Road and 327 National Road, Yuanyang County, Xinxiang City, Henan Province 453500 Patentee after: Henan Zhongding Zhijian Technology Co.,Ltd. Address before: 450052 No. 70 Longhai Middle Road, Erqi District, Zhengzhou City, Henan Province Patentee before: HENAN PROVINCIAL COMMUNICATIONS PLANNING & DESIGN INSTITUTE Co.,Ltd. Patentee before: Chang Xingwen Patentee before: Li Feiran |
|
TR01 | Transfer of patent right |