CN201512345U - 多功能整体吊装架 - Google Patents

多功能整体吊装架 Download PDF

Info

Publication number
CN201512345U
CN201512345U CN2009203121290U CN200920312129U CN201512345U CN 201512345 U CN201512345 U CN 201512345U CN 2009203121290 U CN2009203121290 U CN 2009203121290U CN 200920312129 U CN200920312129 U CN 200920312129U CN 201512345 U CN201512345 U CN 201512345U
Authority
CN
China
Prior art keywords
main couple
undercarriage
multifunctional integral
length
mast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203121290U
Other languages
English (en)
Inventor
向兴
吴伟先
蒋正才
李开顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway Erju Co Ltd
Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, Xinyun Emgineering Co Ltd of China Railway No 2 Engineering Group Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN2009203121290U priority Critical patent/CN201512345U/zh
Application granted granted Critical
Publication of CN201512345U publication Critical patent/CN201512345U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种多功能整体吊装架,包括主桁架,所述主桁架的上架和下架通过竖拉杆进行固定,在主桁架的上架上固定设置若干根上横梁,在主桁架的下架上固定设置若干根下横梁,主桁架的上架的长度比下架的长度短;上横梁的长度比下横梁的长度短,上横梁和下横梁的两端通过斜杆固定连接;在主桁架的下架两侧固定设置有次桁架。本实用新型的优点是:增加了钢筋吊装的截面刚度,保证了钢筋骨架、预埋件、预应力管道坐标在钢筋的吊装过程中不发生较大变形;对桥梁钢筋的吊装作业起到快捷、安全、高效的作用,提高了整体施工生产效率,确保了桥梁预制钢筋工程的施工质量。

Description

多功能整体吊装架
技术领域
本实用新型涉及桥梁预制技术领域,尤其是涉及一种吊装装置。
背景技术
目前,随着我国客运专线铁路和城际轨道交通工程建设的飞速发展,为了保证轨道工程持久稳定的高平顺性,客运专线铁路的建设标准越来越高、施工技术要求越来越新、施工质量管理越来越严。高架桥梁作为客运专线和城际轨道交通工程的主要结构物,桥梁的预制质量是客运专线铁路和城际轨道交通工程建设的关键。
客运专线和城际轨道交通工程项目的高架桥梁占建设项目的比重越来越大,桥梁建设的发展日新月异,梁体结构设计需满足发展需要,具有截面设计尺寸大、结构自重大、附属结构设施预埋件多等特点,保安全、保质量、高效率地施工显得尤为重要。桥梁钢筋工程作为桥梁预制的关键控制工序,桥梁的预埋件、预应力管道定位等都在钢筋工程中完成。保证在钢筋吊装的过程中钢筋骨架、预埋件及预应力管道坐标不发生较大变形,这是钢筋工程施工质量控制的关键。
现有的施工方法通常是在钢筋预扎架上定位绑扎钢筋骨架的底、腹板钢筋,并吊入制梁台座模型,再安装内模、绑扎面筋、安装端模的施工流程。其存在的不足之处为:对于箱梁的预制施工,容易使钢筋骨架发生变形,施工工序多,交叉作业环节多,施工的工效不高,施工质量不能得到有效的控制,增加了设备及人工的投入,经济效益不理想。
实用新型内容
本实用新型克服了现有技术中的缺点,提供了一种多功能整体吊装架,对桥梁钢筋的吊装作业起到快捷、安全、高效的作用,提高了整体施工生产效率,确保了桥梁预制钢筋工程的施工质量。
本实用新型的技术方案是:一种多功能整体吊装架,包括主桁架,所述主桁架的上架和下架通过竖拉杆进行固定,在主桁架的上架上固定设置若干根上横梁,在主桁架的下架上固定设置若干根下横梁,主桁架的上架的长度比下架的长度短;上横梁的长度比下横梁的长度短,上横梁和下横梁的两端通过斜杆固定连接;在主桁架的下架两侧固定设置有次桁架。
所述主桁架的上架和下架均采用二根或二根以上的20#工字钢。
所述主桁架采用斜拉杆对角焊接成三角形结构。
所述斜拉杆为10#工字钢。
所述次桁架采用两根10#工字钢,长度与主桁架下架的长度相等。
在所述下横梁、主桁架的下架和次桁架上设置有若干个吊环,在吊环上设置起吊钢丝绳,起吊钢丝绳上设置有吊钩。
所述吊钩为双钩。
在多功能整体吊装架的顶面和侧面覆盖有一层铁皮。
与现有技术相比,本实用新型的优点是:
1、增加了钢筋吊装的截面刚度,保证了钢筋骨架、预埋件、预应力管道坐标在钢筋的吊装过程中不发生较大变形;
2、对桥梁钢筋的吊装作业起到快捷、安全、高效的作用,提高了整体施工生产效率,确保了桥梁预制钢筋工程的施工质量;
3、通过采用不同的吊点可以吊装内模,也可整体吊装钢筋内模,以减少特殊吊具的投入,有效降低成本和提高工作效率;
4、在多功能整体吊装架顶面和侧面加一层铁皮,在小到中雨的情况下,仍能维持钢筋的绑扎,防止雨水对钢筋的锈蚀。在高温天气施工时,太阳光不能直接照射钢筋绑扎区域,防止作业人员中暑,改善了作业人员的作业环境。
5、成本合理的投入、质量有效的控制、生产效率的提高,考虑采用梁体钢筋和内模整体吊装入模的施工方法。在钢筋和内模的吊装过程中,对吊装桁架的截面刚度及起吊挂点进行设计,重点解决钢筋骨架、预埋件、预应力管道定位容易发生变形等问题,从而做到了桥梁预制作业标准化、程序化、工厂化,提高了工作效率,减少了人力资源,综合成本的经济指标得到了有效的控制。
附图说明
本实用新型将通过例子并参照附图的方式说明,其中:
图1是多功能整体吊装架的平面图;
图2是多功能整体吊装架的纵断面图;
图3是多功能整体吊装架的横断面图。
具体实施方式
本说明书中公开的所有特征,或公开的所有方法或过程中的步骤,除了互相排斥的特征和/或步骤以外,均可以以任何方式组合。
本说明书(包括任何附加权利要求、摘要和附图)中公开的任一特征,除非特别叙述,均可被其他等效或具有类似目的的替代特征加以替换。即,除非特别叙述,每个特征只是一系列等效或类似特征中的一个例子而已。
如图所示,一种多功能整体吊装架,包括主桁架1和次桁架2,主桁架1采用四根长为31.6m和四根长为29.5m的20#工字钢,其横向间距为71+78+71cm,主桁架1采用斜拉杆6对角焊接成稳定的三角形结构,斜拉杆6为10#工字钢,主桁架1的上架和下架通过竖拉杆5进行固定;次桁架2为10#工字钢,长度为31.6m,位于主桁架1的两侧,与主桁架1的间距为190cm,次桁架2通过横向10#工字钢焊接固定在主桁架1上;在主桁架1的上架上固定设置若干根上横梁8,在主桁架1的下架上固定设置若干根下横梁9,上横梁8和下横梁9的两端通过斜杆4固定连接;在下横梁9、主桁架1的下架和次桁架2上设置有192个吊环3,起吊钢丝绳7采用两种长度(分别用于底、腹板筋和顶板筋吊装),每根起吊钢丝绳7上设置有吊钩10,吊钩10为双钩;还可在吊装架的顶面和侧面加一层铁皮。
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。

Claims (8)

1.一种多功能整体吊装架,包括主桁架,所述主桁架的上架和下架通过竖拉杆进行固定,在主桁架的上架上固定设置若干根上横梁,在主桁架的下架上固定设置若干根下横梁,其特征在于:主桁架的上架的长度比下架的长度短;上横梁的长度比下横梁的长度短,上横梁和下横梁的两端通过斜杆固定连接;在主桁架的下架两侧固定设置有次桁架。
2.根据权利要求1所述的多功能整体吊装架,其特征在于:所述主桁架的上架和下架均采用二根或二根以上的20#工字钢。
3.根据权利要求1所述的多功能整体吊装架,其特征在于:所述主桁架采用斜拉杆对角焊接成三角形结构。
4.根据权利要求3所述的多功能整体吊装架,其特征在于:所述斜拉杆为10#工字钢。
5.根据权利要求1所述的多功能整体吊装架,其特征在于:所述次桁架采用两根10#工字钢,长度与主桁架下架的长度相等。
6.根据权利要求1所述的多功能整体吊装架,其特征在于:在所述下横梁、主桁架的下架和次桁架上设置有若干个吊环,在吊环上设置起吊钢丝绳,起吊钢丝绳上设置有吊钩。
7.根据权利要求6所述的多功能整体吊装架,其特征在于:所述吊钩为双钩。
8.根据权利要求1至7中任一项权利要求所述的多功能整体吊装架,其特征在于:在多功能整体吊装架的顶面和侧面覆盖有一层铁皮。
CN2009203121290U 2009-10-09 2009-10-09 多功能整体吊装架 Expired - Lifetime CN201512345U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203121290U CN201512345U (zh) 2009-10-09 2009-10-09 多功能整体吊装架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203121290U CN201512345U (zh) 2009-10-09 2009-10-09 多功能整体吊装架

Publications (1)

Publication Number Publication Date
CN201512345U true CN201512345U (zh) 2010-06-23

Family

ID=42483751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203121290U Expired - Lifetime CN201512345U (zh) 2009-10-09 2009-10-09 多功能整体吊装架

Country Status (1)

Country Link
CN (1) CN201512345U (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102992175A (zh) * 2012-12-14 2013-03-27 广东三和管桩有限公司 一种管桩钢笼吊装设备
CN106904526A (zh) * 2017-05-04 2017-06-30 中国矿业大学 一种起吊跨距可调的通用平衡梁吊具及其使用方法
CN107089586A (zh) * 2017-05-03 2017-08-25 中建科技有限公司深圳分公司 可升降调节的吊具以及具有该吊具的塔吊工装
CN108557627A (zh) * 2018-05-25 2018-09-21 浙江交工集团股份有限公司 提梁站内预制构件吊装的一体式吊具
CN108657931A (zh) * 2018-05-18 2018-10-16 中船黄埔文冲船舶有限公司 一种吊运总段的工装
CN108946435A (zh) * 2018-10-12 2018-12-07 中铁六局集团广州工程有限公司 一种吊梁结构
CN109110629A (zh) * 2018-10-12 2019-01-01 中铁六局集团广州工程有限公司 一种钢筋笼吊装装置
CN109775551A (zh) * 2019-03-21 2019-05-21 广东省水利水电第三工程局有限公司 一种用于贝雷桥整体运输的吊装系统及其施工方法
CN110217684A (zh) * 2019-05-16 2019-09-10 中交一公局厦门工程有限公司 一种箱梁底腹板钢筋吊装工具
CN113896084A (zh) * 2021-08-26 2022-01-07 舟山长宏国际船舶修造有限公司 一种单吊机吊装超长风叶吊架

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102992175A (zh) * 2012-12-14 2013-03-27 广东三和管桩有限公司 一种管桩钢笼吊装设备
CN107089586A (zh) * 2017-05-03 2017-08-25 中建科技有限公司深圳分公司 可升降调节的吊具以及具有该吊具的塔吊工装
CN107089586B (zh) * 2017-05-03 2018-09-07 中建科技有限公司深圳分公司 可升降调节的吊具以及具有该吊具的塔吊工装
CN106904526A (zh) * 2017-05-04 2017-06-30 中国矿业大学 一种起吊跨距可调的通用平衡梁吊具及其使用方法
CN108657931B (zh) * 2018-05-18 2020-04-14 中船黄埔文冲船舶有限公司 一种吊运总段的工装
CN108657931A (zh) * 2018-05-18 2018-10-16 中船黄埔文冲船舶有限公司 一种吊运总段的工装
CN108557627A (zh) * 2018-05-25 2018-09-21 浙江交工集团股份有限公司 提梁站内预制构件吊装的一体式吊具
CN108946435A (zh) * 2018-10-12 2018-12-07 中铁六局集团广州工程有限公司 一种吊梁结构
CN109110629A (zh) * 2018-10-12 2019-01-01 中铁六局集团广州工程有限公司 一种钢筋笼吊装装置
CN109110629B (zh) * 2018-10-12 2023-11-14 中铁六局集团有限公司 一种钢筋笼吊装装置
CN109775551A (zh) * 2019-03-21 2019-05-21 广东省水利水电第三工程局有限公司 一种用于贝雷桥整体运输的吊装系统及其施工方法
CN109775551B (zh) * 2019-03-21 2024-03-08 广东省水利水电第三工程局有限公司 一种用于贝雷桥整体运输的吊装系统及其施工方法
CN110217684A (zh) * 2019-05-16 2019-09-10 中交一公局厦门工程有限公司 一种箱梁底腹板钢筋吊装工具
CN113896084A (zh) * 2021-08-26 2022-01-07 舟山长宏国际船舶修造有限公司 一种单吊机吊装超长风叶吊架

Similar Documents

Publication Publication Date Title
CN201512345U (zh) 多功能整体吊装架
CN101886468B (zh) 高位连体结构悬挂式模板支撑施工方法
CN101613990B (zh) 铁路钢桁梁t型加劲肋正交异性板桥面的施工方法
CN202936736U (zh) 一种斜拉桥组合梁施工桥面吊机
CN202706503U (zh) 用于主体建筑施工的电动升降卸料平台
CN101220580A (zh) 钢桁梁纵向多点连续拖拉施工方法
CN102168405B (zh) 矮塔斜拉桥钢混混合y形塔施工工法
CN205012666U (zh) 一种高空钢结构连廊整体提升支座结构
CN106087745B (zh) 一种多片式组合梁桥上下部整体式结构施工方法
CN106758872A (zh) 波形钢腹板scc工法随车回旋吊移动挂篮及利用其施工的方法
CN109881587B (zh) 一种大风环境下主塔上横梁支架整体安装方法
CN205604080U (zh) 建筑施工平台
CN110700119A (zh) 一种组装式贝雷梁挂篮上走行系统及其设计工法
CN203461693U (zh) 贝雷桁架组合门式起重机超高钢支腿
CN202164030U (zh) 整体式箱梁吊架
CN203307719U (zh) 大悬臂钢腹板脊骨箱梁节段
CN108004932A (zh) 利用梁下运梁方式施工钢混组合梁的方法
CN201722621U (zh) 一种预制箱梁的整体吊装架
CN104179123A (zh) 一种两孔连做节段拼装造桥机
CN208668245U (zh) 一种用于斜拉桥的钢-uhpc组合梁构造
CN205242238U (zh) 一种应用于自锚式悬索桥的主梁结构
CN110373990A (zh) 双层结合钢桁梁整孔制造及架设施工方法
CN110172915A (zh) 一种高塔曲线型横梁钢筋施工方法
CN201943006U (zh) 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架
CN203187288U (zh) 一种箱梁吊架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160104

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU CORPORATION CHING ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190218

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU CORPORATION CHING ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20100623

CX01 Expiry of patent term