CN207582472U - A kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile - Google Patents
A kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile Download PDFInfo
- Publication number
- CN207582472U CN207582472U CN201720280937.8U CN201720280937U CN207582472U CN 207582472 U CN207582472 U CN 207582472U CN 201720280937 U CN201720280937 U CN 201720280937U CN 207582472 U CN207582472 U CN 207582472U
- Authority
- CN
- China
- Prior art keywords
- campshed
- pile
- rotary churning
- double
- churning pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses the Retaining Structure with Double-row Piles that a kind of pile body is equipped with rotary churning pile, the rear campshed capping beam of campshed and the linking beam of the preceding campshed of connection and rear campshed after the preceding campshed capping beam of rear campshed, the preceding campshed of connection including preceding campshed, set on preceding campshed side, connection;Rotary churning pile is equipped between the preceding campshed and rear campshed, the steel strand wires for its positioning are equipped in the rotary churning pile.Advantage is:The overall stiffness of the Double-row-piles Structure is larger, internal force is smaller, Supporting Structure deformation is small, without the supporting members such as setting support anchor in follow-up Excavation Process, reduce support pile material utilization amount, greatly facilitate the construction of earth excavation and underground structure in hole, significantly improve construction efficiency, the duration has been saved, has reduced construction cost, applicable base pit engineering range is wider.
Description
Technical field
The invention belongs to the double-row piles that building foundation pit supporting mechanism technology field more particularly to a kind of pile body are equipped with rotary churning pile
Supporting construction.
Background technology
With the fast development of urban construction, deep-foundation pit engineering is more and more, and difficulty of construction is also increasing, all kinds of foundation pits
Support pattern emerges in large numbers therewith.Double-row Piles Support is one of important support form in current base pit engineering, and Double-row Piles Support passes through
Linking beam between front and rear campshed, stake top Guan Liang and front and rear campshed forms space portal-rigid frames, can be shown compared with cantilevered campshed
Writing increases the rigidity of supporting construction, efficiently controls the deformation of support system, and during follow-up excavation, without
Setting support anchor, greatly improves construction efficiency.
However conventional two-row pilework faces that pile body shifting is excessive and antidumping energy sometimes in Deep Excavation
The problem of power is weaker.To meet Deformation control requirement, the stake top linking beam of larger cross-section size is generally required.
Utility model content
Purpose of utility model:The utility model, which is to provide, a kind of can be effectively reduced front and rear campshed in Double-row Piles Support
Internal forces, improve Double-row Piles Support overall stiffness pile body be equipped with rotary churning pile Retaining Structure with Double-row Piles.
Technical solution:The pile body of the utility model be equipped with rotary churning pile Retaining Structure with Double-row Piles, including preceding campshed, be set on before
After the rear campshed of campshed side, the preceding campshed capping beam of the preceding campshed of connection, connection before the rear campshed capping beam of campshed and connection
The linking beam of campshed and rear campshed;Rotary churning pile is equipped between the preceding campshed and rear campshed, is equipped in the rotary churning pile as its positioning
Steel strand wires.
The utility model in traditional Double-row Piles Support before and after be additionally arranged rotary churning pile between campshed, can be well by waist
Beam, front and rear campshed and inter-pile soil body link together, and reduce the Internal forces of preceding campshed and rear campshed, significantly increase branch
The overall stiffness of shield provides larger drag, is conducive to the Deformation control of foundation pit, and reduce pile shaft material dosage, improves economical
Benefit;Secondly, using steel strand wires localization method, the method for improving jet grouting pile construction at pile body has saved the duration, has provided standard
True positioning method improves the construction precision of deep layer rotating spraying stake, when avoiding jet grouting pile construction due to direction determine it is unstable
The construction error brought and the intensity for influencing pile body around foundation pit, reduce the injury to front and rear pile body of row pile in traditional supporting.
Furtherly, the steel strand wires of the utility model are anchored by the anchor being set on rear campshed;The anchoring
Device includes anchor disk and anchor end plate.
It further says, the preceding campshed of the utility model is equipped with the waist rail for connecting the preceding campshed, parallel to set
The lower section of campshed capping beam before being placed in;One end of rotary churning pile is connect with waist rail, and the other end is connect with rear campshed;The slip casting of rotary churning pile
Material is cement mortar, and the ratio of mud is 0.4~0.45, and cement-sand ratio is 0.5~1.0.
Furtherly, preceding campshed is the deposited reinforced concrete pile of circular cross-section;Campshed is the reinforcing bar of circular cross-section afterwards
Cast-in-place concrete pile;The horizontal layout of preceding campshed and rear campshed is plum blossom array arrangement.
Advantageous effect:Compared with prior art, it is the advantages of the utility model:The overall stiffness of the Double-row-piles Structure compared with
Greatly, internal force is smaller, Supporting Structure deformation is small, without the supporting members such as setting support anchor in follow-up Excavation Process, reduces
Support pile material utilization amount greatly facilitates the construction of earth excavation and underground structure in hole, significantly improves construction efficiency,
The duration has been saved, has reduced construction cost, applicable base pit engineering range is wider.
Description of the drawings
Fig. 1 is the structure diagram for the Double-row-piles Structure that the utility model pile body is equipped with rotary churning pile;
Fig. 2 is the longitudinal cross-section schematic diagram for the Double-row-piles Structure that the utility model pile body is equipped with rotary churning pile;
Fig. 3 is the strand structure schematic diagram for the Double-row-piles Structure that the utility model pile body is equipped with rotary churning pile;
Fig. 4 is pulled to structure during horizontal position for the steel strand wires of Double-row-piles Structure of the utility model pile body equipped with rotary churning pile
Schematic diagram;
Fig. 5 is the structure diagram of the anchor for the Double-row-piles Structure that the utility model pile body is equipped with rotary churning pile.
Specific embodiment
The technical solution of the utility model is described further with reference to embodiment.
As shown in Figures 1 and 2, pile body of the present invention is equipped with the Retaining Structure with Double-row Piles of rotary churning pile, including preceding campshed 1, sets
The rear campshed capping beam 4 of campshed 2 after rear campshed 2 in preceding 1 side of campshed, the preceding campshed capping beam 3 of the preceding campshed 1 of connection, connection
And the linking beam 5 of the preceding campshed 1 of connection and rear campshed 2, wherein, preceding campshed 1 is the deposited reinforced concrete pile of circular cross-section, preceding
Campshed 1 is equipped with the waist rail 9 for connecting the preceding campshed 1, the lower section of campshed capping beam 3, rear campshed 2 before being arranged in parallel in
For the deposited reinforced concrete pile of circular cross-section, preceding campshed 1 uses plum blossom array arrangement with rear campshed 2;The preceding campshed 1 and after
Rotary churning pile 6 is equipped between campshed 2, one end of rotary churning pile 6 connect stress with waist rail 9, and the other end is connect with rear campshed 2, rotary churning pile 6
Injecting paste material is cement mortar, and the ratio of mud is 0.4~0.45, and cement-sand ratio is 0.5~1.0, using medium coarse sand mix.The rotary churning pile
The steel strand wires 7 for its positioning are additionally provided in 6, which is anchored by the anchor 8 being set on rear campshed 2, and anchor
Be fixedly mounted with put 8 include anchor disk 81 and anchor end plate 82, as shown in Figure 5.
The construction method of the double supporting construction of the utility model includes the following steps:
(1) according to the hydrogeologic condition of base pit engineering, cutting depth and Deformation control requirement etc., to pattern foundation pit supporting structure body
System is designed calculatings, selectes the stake diameter and arrangement of reinforcement of preceding campshed 1 and rear campshed 2 in support system, preceding campshed 1 and rear campshed 2 it
Between spacing, the sectional dimension of waist rail 9, the relevant parameter of preceding campshed capping beam 3, rear campshed capping beam 4 and linking beam 5 etc..
(2) live banding steel cage.According to design requirement, preceding 1 steel reinforcement cage of campshed, 2 steel reinforcement cage of rear campshed are bound respectively, it will
Steel reinforcement cage is lain against on ground, binds anchor 8 according to design requirement position on 2 steel reinforcement cages of rear campshed, while by steel
Twisted wire 7 is anchored in anchor 8, and 7 subsequent campshed 2 of steel strand wires is squeezed into the soil body together, and preceding campshed capping beam 3 should show before constructing will
3 bottom horizontal position of campshed capping beam, prevents from being influenced by preceding campshed capping beam 3 during drawing steel stranded wire 7 and can not apply before steel strand wires 7 are pulled to
Work, as shown in Figures 3 and 4.
(3) pore-forming.It should be by《Building foundation pit supporting technical regulation》4.4 regulation construction in JGJ120-2012.
Claims (5)
1. a kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile, it is characterised in that:The supporting construction include preceding campshed (1),
Before rear campshed (2), connection set on preceding campshed (1) side after the preceding campshed capping beam (3) of campshed (1), connection after campshed (2)
Campshed capping beam (4) and the preceding campshed (1) of connection and the linking beam (5) of rear campshed (2);The preceding campshed (1) and rear campshed (2)
Between be equipped with rotary churning pile (6), the steel strand wires (7) for its positioning are equipped in the rotary churning pile (6), after the steel strand wires (7) are by being set on
Anchor (8) on campshed (2) is anchored, which includes anchor disk (81) and anchor end plate (82), before described
Campshed (1) is equipped with the waist rail (9) for connecting preceding campshed (1), the lower section of campshed capping beam (3) before being arranged in parallel in, rotation
One end of spray stake (6) is connect with waist rail (9), and the other end is connect with rear campshed (2).
2. pile body according to claim 1 is equipped with the Retaining Structure with Double-row Piles of rotary churning pile, it is characterised in that:The rotary churning pile
(6) injecting paste material is cement mortar, and the ratio of mud is 0.4~0.45, and cement-sand ratio is 0.5~1.0.
3. pile body according to claim 1 is equipped with the Retaining Structure with Double-row Piles of rotary churning pile, it is characterised in that:The preceding campshed
(1) it is the deposited reinforced concrete pile of circular cross-section.
4. pile body according to claim 1 is equipped with the Retaining Structure with Double-row Piles of rotary churning pile, it is characterised in that:Campshed after described
(2) it is the deposited reinforced concrete pile of circular cross-section.
5. pile body according to claim 1 is equipped with the Retaining Structure with Double-row Piles of rotary churning pile, it is characterised in that:The preceding campshed
(1) it is plum blossom array arrangement with the horizontal layout of rear campshed (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720280937.8U CN207582472U (en) | 2017-03-22 | 2017-03-22 | A kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720280937.8U CN207582472U (en) | 2017-03-22 | 2017-03-22 | A kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207582472U true CN207582472U (en) | 2018-07-06 |
Family
ID=62718138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720280937.8U Expired - Fee Related CN207582472U (en) | 2017-03-22 | 2017-03-22 | A kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207582472U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914394A (en) * | 2019-03-30 | 2019-06-21 | 西安科技大学 | A kind of zigzag Row Piles Supporting Structure |
CN111021369A (en) * | 2019-12-31 | 2020-04-17 | 深圳宏业基岩土科技股份有限公司 | Chair type double-row pile anchor construction method |
-
2017
- 2017-03-22 CN CN201720280937.8U patent/CN207582472U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914394A (en) * | 2019-03-30 | 2019-06-21 | 西安科技大学 | A kind of zigzag Row Piles Supporting Structure |
CN111021369A (en) * | 2019-12-31 | 2020-04-17 | 深圳宏业基岩土科技股份有限公司 | Chair type double-row pile anchor construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104110039B (en) | There is pressure dispersing type and arrange the blower foundation of high-strength prestressed anchor pole (rope) | |
CN101812843B (en) | Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby | |
CN204023578U (en) | Retaining Structure with Double-row Piles | |
CN110130358A (en) | A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure | |
CN109930609A (en) | A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground | |
CN203222809U (en) | Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line | |
CN207582472U (en) | A kind of pile body is equipped with the Retaining Structure with Double-row Piles of rotary churning pile | |
CN104295112B (en) | A kind of reinforced concrete post connects steel core concrete column syndeton and construction method | |
CN110777802A (en) | Deep foundation pit high-low span supporting structure and construction method thereof | |
CN206233249U (en) | Complicated precipitous precipice depth side slope comprehensive support structure | |
CN202543945U (en) | Mixing pile structure | |
CN102926382B (en) | A kind of construction method of SMW engineering method | |
CN204174955U (en) | Reinforced concrete post connects steel core concrete column syndeton | |
CN202194127U (en) | Reducing high-pressure jet-grouting rigid pile | |
CN205276289U (en) | Prestressed concrete beam formula double row pile struts system | |
CN204849759U (en) | Cluster anchor rope composite pile structure as major structure stand | |
CN105064357B (en) | A kind of embedded anchor of prestress anchorage cable and anchoring process | |
CN105002906B (en) | A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof | |
CN204125965U (en) | There is the blower foundation that pressure dispersing type arranges high-strength prestressed anchor bar/anchor cable | |
CN203096746U (en) | Reinforced rib soil restraining composite supporting structure | |
CN107975034B (en) | The floating stake ground processing method of hollow preformed pile | |
CN207109839U (en) | New low pile cap foundation structure | |
CN202194144U (en) | Ground pit inclined tension pile | |
CN215367223U (en) | Pile head structure for post-grouting of rock-socketed pile | |
CN206186053U (en) | Arch prefabricated mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180706 Termination date: 20200322 |
|
CF01 | Termination of patent right due to non-payment of annual fee |