CN215367223U CN202120042578.9U CN202120042578U CN215367223U CN 215367223 U CN215367223 U CN 215367223U CN 202120042578 U CN202120042578 U CN 202120042578U CN 215367223 U CN215367223 U CN 215367223U
Authority
CN
China
Prior art keywords
pile
grouting
grouting pipe
area
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120042578.9U
Other languages
Chinese (zh)
Inventor
江泳
管玉国
葛雄宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Future Land Holdings Group Co ltd
Original Assignee
Future Land Holdings Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Future Land Holdings Group Co ltd filed Critical Future Land Holdings Group Co ltd
Priority to CN202120042578.9U priority Critical patent/CN215367223U/en
Application granted granted Critical
Publication of CN215367223U publication Critical patent/CN215367223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a pile head structure for grouting after rock-socketed piles, which comprises a pile hole, wherein a pile body is arranged in the pile hole, a super-grouting area is arranged below the pile top of the pile body, a hollow pile processing area is arranged between the pile top of the pile body and the ground, the pile body comprises a plurality of pile longitudinal ribs which are annularly arranged, spiral stirrups are arranged on the plurality of pile longitudinal ribs in the super-grouting area, a left grouting pipe and a right grouting pipe are arranged on the spiral stirrups, a plurality of additional fixed stirrups are arranged on the plurality of pile longitudinal ribs at intervals above and below the hollow pile processing area, the left grouting pipe and the right grouting pipe are connected with the plurality of additional fixed stirrups, first concrete is poured in the super-grouting area, and second concrete is poured in the hollow pile processing area. The utility model relates to a pile head structure for grouting after rock-socketed piles, which can solve the problems of high grouting construction difficulty, low construction efficiency and poor construction effect after rock-socketed piles in a karst area.

Description

Pile head structure for post-grouting of rock-socketed pile
Technical Field
The utility model relates to a pile head structure for grouting after rock-socketed pile, belonging to the technical field of building structures.
Background
The rotary digging pile is a pile type constructed by a rotary digging drilling machine and is called a rotary digging drilling bored concrete pile. The rotary drilling rig pore-forming method comprises the steps of firstly, carrying out rotary crushing on rock soil through a barrel type drill bit with a valve at the bottom, directly loading the rock soil into a drilling bucket, then, lifting the drilling bucket out of a hole by a drilling rig lifting device and a telescopic drill rod, and circularly and repeatedly taking and unloading the soil until the drilling reaches the designed depth. The rotary digging cast-in-place pile is mostly adopted in the construction of the pile foundation in the karst area, and the bearing capacity of the pile foundation can be improved through the pile bottom post-grouting process if necessary, so that the economic benefit is greatly improved.
The traditional post-grouting process is to simply keep a grouting pipe at the pile top, perform post-grouting to a grouting node, not effectively protect the grouting pipe, and not make requirements on an empty pile area from the designed pile top to the ground of a construction site. If according to traditional post grouting construction technology, often because cross operation, it is big to lead to the construction degree of difficulty of karst area pile foundation post grouting, and the efficiency of construction is low, and the construction effect is poor: because the slip casting tube head is blocked and cannot be found, the slip casting tube head is mechanically rolled to cause that clear water splitting cannot be timely completed or clear water splitting cannot be completed, so that the slip casting effect is poor, and even slip casting cannot be completed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem of providing a pile head structure for grouting after rock-socketed piles in the prior art, which can solve the problems of high grouting construction difficulty, low construction efficiency and poor construction effect after rock-socketed piles in a karst area.
The technical scheme adopted by the utility model for solving the problems is as follows: the utility model provides a slip casting pile head structure behind socketed pile, it includes the stake hole, be provided with the pile body in the stake hole, be the super region of irritating below the pile top of pile body, be empty stake treatment area between the pile top of pile body and the ground, the pile body includes steel reinforcement cage, steel reinforcement cage indulges the muscle including a plurality of stakes that are the annular and arrange, and a plurality of stakes are indulged and are provided with the spiral stirrup on the muscle in the super region of irritating, two slip casting pipes about being provided with on the spiral stirrup, the stake is indulged muscle and slip casting pipe upper end and is all passed empty stake treatment area and extend ground, and a plurality of stakes are indulged the muscle and are provided with a plurality of additional fixed stirrups about empty stake treatment area at the interval, and control two slip casting pipes and be connected with a plurality of additional fixed stirrups, the super region of irritating has pour first concrete, empty stake treatment area has pour the second concrete, the slip casting pipe upper end is provided with the stopcock.
Optionally, the part of the grouting pipe exposed out of the ground is painted with warning paint or wound with a reflective tape.
Optionally, the grouting pipe is exposed to the ground by m or more.
Optionally, the second concrete is low-grade concrete.
Compared with the prior art, the utility model has the advantages that:
1. the pile body grouting pipe of the utility model extends 300mm out of the ground, so that the grouting pipe can be conveniently and rapidly found in the later period, and the clear water thunderbolt can be completed in a specified time, thereby avoiding the condition of excavating the grouting pipe to the soil layer and conveniently verifying whether the grouting pipe is reserved;
2. the pile body pile longitudinal bar extends to the ground and serves as a fixing support for attaching the fixing hoop and serves as a fixing support for the grouting pipe together, so that the stability of the grouting pipe is improved;
3. according to the utility model, the empty pile processing area adopts low-grade concrete pouring to protect grouting after clean water splitting, and a grouting pipe is prevented from being mechanically rolled and deformed and blocked due to the wrapping protection of the low-grade concrete when machinery such as cross construction vehicles and the like in a field runs; the empty pile treatment area is free from collapse and burying a grouting pipe due to the filling of low-grade concrete;
4. the pipe plug aims to avoid the blockage of a grouting pipe, the finished pipe plug for blocking the head of the grouting pipe is low in price and critical in action, and when clean water splitting and post grouting are not carried out, sundries such as concrete slurry and the like can be prevented from entering the pipe to be deeply blocked in a whole process, so that the pipe is ensured not to be blocked, and the influence on the construction quality is huge;
5. the reflective belt aims to avoid the irreversible damage to the grouting pipe caused by the rolling of a worker operating a vehicle and mechanical equipment due to the fact that the worker and the like do not find the grouting pipe in time during construction; the reflective tape has bright color, can emit light at night, can play a good role in prompting construction in the day and at night, and can be additionally provided with warning words to play a better role in prompting due to the flat surface; the reflective tape has low price, is convenient to replace when being stained and can play a role in prompting in the whole process;
6. the bright color finish paint plays a role in strengthening prompt, and can still play a certain role in warning when the reflective tape is stained and cannot be replaced in time.
Drawings
Fig. 1 is a schematic diagram of a structure of a pile head for grouting after a rock-socketed pile according to the utility model.
Fig. 2 is a schematic cross-sectional view of an empty pile area of a post-socketed pile grouting pile head structure according to the utility model.
Wherein:
pile hole 1
Pile body 2
Reinforcement cage 21
Pile longitudinal bar 211
Spiral stirrup 212
Super irrigation zone 3
Empty pile treatment area 4
Grouting pipe 5
Additional fixing stirrup 6
First concrete 7
Second concrete 8
Pipe plug 9
Warning paint 10
A reflective tape 11.
Detailed Description
The utility model is described in further detail below with reference to the accompanying examples.
As shown in fig. 1 and 2, the pile head structure for grouting after rock-socketed pile according to the present invention includes a pile hole 1, a pile body 2 is disposed in the pile hole 1, a super-grouting region 3 is disposed below a pile top of the pile body 2, a hollow pile processing region 4 is disposed between the pile top of the pile body 2 and the ground, the pile body 2 includes a reinforcement cage 21, the reinforcement cage 21 includes a plurality of pile longitudinal ribs 211 annularly disposed, a plurality of spiral stirrups 212 are disposed on the plurality of pile longitudinal ribs 211 in the super-grouting region 3, a left grouting pipe 5 and a right grouting pipe 5 are disposed on the spiral stirrups 212, upper ends of the pile longitudinal ribs 211 and the grouting pipes 5 both pass through the hollow pile processing region 4 and extend out of the ground, a plurality of additional fixed stirrups 6 are disposed on the hollow pile processing region 4 at intervals, the left grouting pipe 5 and the right grouting pipe 5 are connected with the additional fixed stirrups 6, a first concrete 7 is poured in the super-grouting region 3, a second concrete 8 is poured in the empty pile processing area 4, and a pipe plug 9 is arranged at the upper end of the grouting pipe 5;
the part of the grouting pipe 5 exposed out of the ground is coated with warning paint 10 or wound with a reflective tape 11;
the grouting pipe 5 is exposed out of the ground by more than 300 mm;
the second concrete 8 is low-grade concrete.
A construction process for a rock-socketed post-grouting pile head structure comprises the following steps:
step one, finishing the processing of a reinforcement cage and a grouting pipe according to requirements, and plugging the end of the grouting pipe by a pipe plug;
step two, pouring concrete after hoisting the reinforcement cage, judging by an empty pile processing area according to a construction period, and selecting to pour the empty pile processing area to the ground once or pour the empty pile area to the ground twice;
thirdly, painting warning paint or winding a reflective tape on the part of the grouting pipe exposed out of the ground;
step four, when the time of the thunderbolt is reached, opening a pipe plug for water splitting, and plugging back the pipe plug after the water splitting technology;
in the cross construction process, the reflecting belt is changed in time by paying attention to the condition that the reflecting belt is stained;
step five, after the specified grouting time node is reached, opening a pipe plug to perform final grouting work;
and step six, after the grouting work is finished, the pipe plug, the reflective belt and the grouting pipe extending out of the ground can be timely disassembled according to actual requirements.
In addition, the present invention also includes other embodiments, and any technical solutions formed by equivalent transformation or equivalent replacement should fall within the protection scope of the claims of the present invention.

Claims (4)

1. The utility model provides a slip casting pile head structure behind embedded rock pile which characterized in that: the pile comprises a pile hole (1), a pile body (2) is arranged in the pile hole (1), a super-grouting area (3) is arranged below the pile top of the pile body (2), an empty pile processing area (4) is arranged between the pile top of the pile body (2) and the ground, the pile body (2) comprises a reinforcement cage (21), the reinforcement cage (21) comprises a plurality of pile longitudinal ribs (211) which are annularly arranged, spiral stirrups (212) are arranged on the plurality of pile longitudinal ribs (211) in the super-grouting area (3), a left grouting pipe and a right grouting pipe (5) are arranged on the spiral stirrups (212), the upper ends of the pile longitudinal ribs (211) and the grouting pipes (5) penetrate through the empty pile processing area (4) and extend out of the ground, a plurality of additional fixed stirrups (6) are arranged on the empty pile processing area (4) at intervals, and the left grouting pipe (5) and the right grouting pipe (5) are connected with the additional fixed stirrups (6), first concrete (7) is poured in the super-irrigation area (3), second concrete (8) is poured in the empty pile processing area (4), and a pipe plug (9) is arranged at the upper end of the grouting pipe (5).
2. The socketed pile post-grouting pile head structure according to claim 1, characterized in that: the part of the grouting pipe (5) exposed out of the ground is coated with warning paint (10) or wound with a reflective tape (11).
3. The socketed pile post-grouting pile head structure according to claim 1, characterized in that: the grouting pipe (5) is exposed out of the ground by more than 300 mm.
4. The socketed pile post-grouting pile head structure according to claim 1, characterized in that: the second concrete (8) adopts low-grade concrete.
CN202120042578.9U 2021-01-08 2021-01-08 Pile head structure for post-grouting of rock-socketed pile Active CN215367223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120042578.9U CN215367223U (en) 2021-01-08 2021-01-08 Pile head structure for post-grouting of rock-socketed pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120042578.9U CN215367223U (en) 2021-01-08 2021-01-08 Pile head structure for post-grouting of rock-socketed pile

Publications (1)

Publication Number Publication Date
CN215367223U true CN215367223U (en) 2021-12-31

Family

ID=79620672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120042578.9U Active CN215367223U (en) 2021-01-08 2021-01-08 Pile head structure for post-grouting of rock-socketed pile

Country Status (1)

Country Link
CN (1) CN215367223U (en)

Similar Documents

Publication Publication Date Title
CN102031784B (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106120839B (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN108589707A (en) A kind of full-sleeve long screw auger and churning driven combined type construction
CN210713897U (en) Pile foundation hole opening protection device
CN113174961B (en) Foundation pit slope supporting method
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN112982431A (en) Construction method of foundation pit supporting structure
CN114215042A (en) Miniature steel pipe pile for reinforcing foundation and construction method thereof
CN106948347B (en) Pile pulling method and pile pulling system
CN110777775A (en) Foundation pit structure and construction method thereof
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN215367223U (en) Pile head structure for post-grouting of rock-socketed pile
CN107237342A (en) New low pile cap foundation structure and its construction method
CN110924401A (en) Construction foundation pit supporting mode for combined arching and bearing of mixing piles and cast-in-place piles
CN112779908A (en) Rock-socketed pile post-grouting pile head structure and construction process thereof
CN107059872B (en) Inclined cable pile pulling method and inclined cable pile pulling system
CN110258600A (en) A kind of vertical cofferdam construction engineering method suitable for deep water waters
CN206928296U (en) Pile pulling system
CN201598650U (en) Device for reinforcing loose rubble underpinning in ancient building
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method
JP4074198B2 (en) How to remove existing piles
CN108086322B (en) Mud skin removing device and method for improving bearing capacity of cast-in-place pile by using same
CN207109839U (en) New low pile cap foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant