CN105002906B CN201510454024.9A CN201510454024A CN105002906B CN 105002906 B CN105002906 B CN 105002906B CN 201510454024 A CN201510454024 A CN 201510454024A CN 105002906 B CN105002906 B CN 105002906B
Authority
CN
China
Prior art keywords
foundation
anchor cable
pile
stake
many
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510454024.9A
Other languages
Chinese (zh)
Other versions
CN105002906A (en
Inventor
王国富
路林海
曹殿彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201510454024.9A priority Critical patent/CN105002906B/en
Publication of CN105002906A publication Critical patent/CN105002906A/en
Application granted granted Critical
Publication of CN105002906B publication Critical patent/CN105002906B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The present invention relates to a kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof, composite pile structure includes anchor cable, the many foundation stake arranged centered by anchor cable and the binding hoop arranged around the stake of many foundation, casting concrete in binding hoop;Its construction method is first to arrange anchor cable, then arranges foundation pile around it.The invention have the advantages that the form of " many an of anchor ", eliminate the technological processes such as mud off, make construction period shorten;Can be as the primary structure member of agent structure, it is not necessary to reconstruct supporting member, and anchor pole quantity is few, cost-effective;This kind of composite pile can be prevented effectively from the problems such as collapse hole that in work progress, cast-in-situ bored pile occurs, undergauge, broken pile, interlayer, and pile quality is guaranteed.

Description

A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof
Technical field
The invention belongs to construction engineering technical field, be specifically related to a kind of cluster anchor cable composite pile as agent structure column and tie Structure and construction method thereof.
Background technology
Along with the development of economic society, people constantly promote for the concern saved land.Root according to the statistics made by the departments concerned, in recent years Whole nation vehicle guaranteeding organic quantity improves constantly, and wherein private car recoverable amount increases the fastest, motor vehicles to park contradiction the fiercest. Especially for old town and the multi-storey building district that do not has garage, owing to the reason such as history, overall planning causes " car multidigit is few " Phenomenon.For solving this contradiction, related researcher propose a kind of in former address the scheme of newly-built underground garage, in order to reduce construction On surrounding and the impact of resident living, using shallow mining method, its key technology is pressing pile construction scheme.In view of environment, The impact of the factors such as place, the construction technology feature of anchor cable (bar) static pressed pile meets related request.
Traditional anchor cable (bar) static pressed pile is a kind of to be applied to strengthening of foundation, drag the technology changed and rectify a deviation, and construction technology typically flows Journey: 1, on the basis of reserved or dig out stake holes 2, rearmounted anchor pole or reserved anchor pole 3, install reaction frame prepare piling 4, pile extension, Piling, Stake head handling.There is following point in the method: 1: anchor pole quantity is many, and cost is high, 2, underground soil property situation more complicated, When prospecting is not clear or meets boulder, often result in piling difficulty, 3, when construct in resident compact district, occupy place relatively greatly, to resident just Often life has considerable influence, and 4, the problems such as collapse hole, undergauge, broken pile easily occurs in work progress, pile quality is poor, and 5, hold Loading capability is low.
Summary of the invention
The purpose of the present invention is contemplated to solve the problems referred to above, it is provided that a kind of prefabricated segment type stake is as the binding of agent structure column Formula anchor cable composite pile structure and construction method thereof.
To achieve these goals, the present invention adopts the following technical scheme that
A kind of cluster anchor cable composite pile structure as agent structure column, including anchor cable, centered by anchor cable arrange many Foundation pile and the binding hoop arranged around the stake of many foundation, casting concrete in binding hoop, it is achieved that the structure that an anchor is many, whole Structure can be not required to reconstruct supporting member as the primary structure member of agent structure, saved cost.
Further, the stake of many foundation is arranged at four angles of a rectangle, totally four foundation stake, and described anchor cable is arranged on this square The center of shape, described binding hoop is arranged on outside this rectangle, the setting of four foundation stakes, facilitates the later stage and carries out in cornerwise mode Piling.
Further, binding hoop includes many vertical muscle and stirrup, and stirrup, round the stake of many foundation, is set to square, many vertical muscle It is vertically arranged on the limit of stirrup institute squarely, the setting of vertical muscle and stirrup defines binding hoop, by binding hoop to many foundation Stake carries out one and fixes.
Further, pile crown is set in the bottom of each described foundation pile, conveniently carries out piling.
Further, foundation pile is segment type precast square pile.
Further, the termination often saving square pile is cased with steel bushing, is fixed by steel hoop between saving and saving.
The construction method of a kind of cluster anchor cable composite pile structure as agent structure column, comprises the following steps:
1) position that foundation pile is to be set is chosen;
2) on the ground, machine drilling is used to get out the anchor cable hole for arranging anchor cable;
3) in step 2) in be vertically arranged anchor cable in the boring that gets out, the bottom anchor of anchor cable is in the ground of bottom;
4) centered by the position of anchor cable, in the four foundation stakes that are arranged around of anchor cable, four foundation stakes are vertically arranged in a rectangle At four angles;
5) carry out piling, pile extension, extract pile follower bar, remove jack and holder device;
6) the subsurface excavation method excavation underground space, surflaes between cleaning stake week and stake;
7) stirrup and vertical muscle are set outside multiple foundation piles, form binding stake;
8) in step 7) in formed binding stake in casting concrete, formed composite pile structure.
Step 4) in centered by anchor cable, limit a rectangular area, be vertically arranged stake position with four angles of rectangular area and draw hole, Draw hole according to stake position and foundation pile is set.
Step 5) in specifically comprise the following steps that
5-1) in described step 4) in the top of four foundation stakes that arranges put steel bushing respectively, steel bushing welds with steel hoop;
5-2) in step 5-1) in the four foundation stakes that arrange the foundation pile top on a diagonal one jack is respectively set, The top of jack arranges reaction frame, and anchor cable passes reaction frame;
5-3) in step 5-2) at least two hoist cables arranged vertically above of reaction frame of arranging;
5-4) distance step 5-2) in the upper horizontal of reaction frame that arranges one support is set, support is arranged by four root posts On the ground, four root posts are arranged at four angles of another rectangle;
5-5) utilize step 4 described in reaction frame and jack pair) in foundation pile on one diagonal of rectangle carry out piling to specifying Position, is provided counter-force by anchor cable;
5-6) by support lift reaction frame;
5-7) utilize step 4 described in another group reaction frame and jack pair) in foundation pile on another diagonal of rectangle carry out piling To the position specified;
5-8) by support lift 5-7) in another group reaction frame and jack;
5-9) draw in each stake position and continue at hole to arrange a joint foundation pile, be cased with steel bushing, and and steel hoop at the top of this joint foundation pile Welding;
5-10) repeat step 5-5) to step 5-9), until it reaches the position of requirement.
Step 6) in concrete setting steps as follows:
6-1) from described step 5) scope that the stake top that formed down sets, the outer surface along the stake of many foundation is vertically arranged many Vertical muscle;
6-2) in step 6-1) set up vertical muscle after, be horizontally disposed with the many stirrups that the stake of many foundation is included in center.
The operation principle of the present invention is: after selected good installation site, first arranging anchor cable, the lower anchor of anchor cable, in ground, encloses The stake of many foundation is set around anchor cable, anchor cable provides counter-force that a clump of piles around is pressed onto the position specified, this construction method, shorten Engineering time, reduce the impact of Construction on Environment, draw hole by stake position and ensure that piling puts in place, there is simple to operate, construction effect Rate is high, save material, the advantage of high financial profit.
Compared with prior art, the invention have the advantages that
1. saving fund: the form of " many an of anchor ", eliminates the technological processes such as mud off, makes construction period shorten;Permissible Primary structure member as agent structure, it is not necessary to reconstruct supporting member, and anchor pole quantity is few, cost-effective.
2. pile quality is good: this kind of composite pile can be prevented effectively from the collapse hole of cast-in-situ bored pile appearance in work progress, undergauge, break The problems such as stake, interlayer, pile quality is guaranteed.
3. bearing capacity is big: forming an independent vertical member after being bundled by a clump of piles, bearing capacity is greatly improved.
4. environmental friendliness: avoid the slurry coat method pollution to surrounding, it is to avoid the big machinery construction shadow to resident living Ring.
Accompanying drawing explanation
Fig. 1 is the construction process figure of composite pile of the present invention;
Fig. 2 is the site plan of a clump of piles 1,2,3,4 of the present invention;
Fig. 3 (a)-Fig. 3 (g) is the composite pile construction way figure of the present invention;
Wherein: Fig. 3 (a) is the generalized section after anchor cable drilling machine has been holed;
Fig. 3 (b) is the generalized section of anchorage cable anchoring position perfusion grouting material;
Fig. 3 (c) draws the generalized section in hole for being provided with 4 stake positions;
Fig. 3 (d) carries out the generalized section of piling along a pair linea angulata to foundation pile;
Fig. 3 (e) carries out the generalized section of piling along another diagonal to foundation pile;
The generalized section of Fig. 3 (f) binding stake steel bar arrangement;
Generalized section after Fig. 3 (g) binding stake casting concrete;
Section A-A figure in Fig. 3 (d) during the precast concrete square pile that Fig. 4 provides for the embodiment of the present invention;
Section B-B figure in Fig. 3 (f) during the precast concrete square pile that Fig. 5 provides for the embodiment of the present invention;
C-C sectional view in Fig. 3 (g) during the precast concrete square pile that Fig. 6 provides for the embodiment of the present invention;
Partial enlarged drawing in Fig. 3 (d) during the precast concrete square pile that Fig. 7 provides for the embodiment of the present invention;
Reaction frame plane graph in Fig. 7 during the precast concrete square pile that Fig. 8 provides for the embodiment of the present invention;
The top view of support during the precast concrete square pile that Fig. 9 provides for the embodiment of the present invention;
The structure chart of fixation clamp during the precast concrete square pile that Figure 10 provides for the embodiment of the present invention;
In figure, 1 is No. 1 foundation pile;2 is No. 2 foundation piles;3 is No. 3 foundation piles;4 is No. 4 foundation piles;5 is anchor cable hole;6 anchor cables; 7 is injecting paste material;8 draw hole for stake position;9 is jack;10 reaction frames;11 is support;12 is binding stake;13 indulge muscle; 14 concrete;16 is hoist cable;15 is stirrup;17 is buckle;18 is steel hoop;19 is girder steel;20 columns;21 is solid Clamp;22 is high-strength bolt;23 ground.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Embodiment 1
As in figure 2 it is shown, a kind of cluster anchor cable composite pile structure as agent structure column, including anchor cable 6, with anchor cable 6 Centered by arrange the stake of many foundation and around the stake of many foundation arrange binding hoop, binding hoop in casting concrete 14.
Specifically, the stake of many foundation is arranged at four angles of a rectangle, totally four foundation stake, 1, No. 2 bases of respectively No. 1 foundation pile Stake 2,3, No. 4 foundation piles 4 of No. three foundation piles, anchor cable 6 is arranged on the center of this rectangle, and binding hoop is arranged on outside this rectangle, The top center of four foundation stakes is horizontally disposed with girder steel 19;Or the stake of many foundation is arranged in the circle with anchor cable 6 as the center of circle, between foundation pile Every the distance set.
Binding hoop includes many vertical muscle 13 and stirrup 15, and stirrup 15, round the stake of many foundation, is set to square, many vertical muscle 13 It is vertically arranged on the limit of 15 squarelys of stirrup, the setting of vertical muscle 13 and stirrup 15 defines binding hoop.
Arranging pile crown in the bottom of each foundation pile, pile crown is cone, it is simple to foundation pile is deep into underground.
Foundation pile is segment type precast square pile, and the termination often saving square pile is cased with steel bushing, is fixed by steel hoop, steel between saving and saving Sleeve and steel hoop 18 are by being welded to connect.
Fig. 1 is the structure flow chart of composite pile in the present invention, a kind of cluster anchor cable composite pile structure as agent structure column Construction method, comprise the following steps:
1) position that foundation pile is to be set is chosen;
2) on the ground, machine drilling is used to get out the anchor cable hole 5 for arranging anchor cable 6, such as Fig. 3 (a);
3) in step 2) in be vertically arranged anchor cable 6 in the boring that gets out, the bottom anchor of anchor cable 6 in the ground of bottom, anchor Injecting paste material 7 is filled, such as Fig. 3 (b) in rope anchoring section;
4) centered by the position of anchor cable 6, in the four foundation stakes that are arranged around of anchor cable 6, four foundation stakes are vertically arranged in a square At four angles of shape, as shown in Fig. 3 (d) and Fig. 4;
5) carry out piling, pile extension, extract pile follower bar, remove jack 9 and support 11 device;
6) the subsurface excavation method excavation underground space, surflaes between cleaning stake week and stake are used;
7) stirrup 15 and vertical muscle 13 are set outside multiple foundation piles, form binding stake 12;
8) in step 7) in casting concrete 14 in the binding stake that formed, block anchor cable 6, form composite pile structure.
Step 4) in centered by anchor cable 6, limit a rectangular area, be vertically arranged stake position with four angles of rectangular area and draw Hole 8, draws hole 8 according to stake position and arranges foundation pile, such as Fig. 3 (c).
Step 5) in specifically comprise the following steps that
5-1) in described step 4) in the top of four foundation stakes that arranges put steel bushing respectively, at upper horizontal, steel hoop is set 18, steel bushing welds with steel hoop 18;
5-2) in step 5-1) in the four foundation stakes that arrange in an object line A foundation pile top of (Fig. 2) respectively arrange one thousand Jin top 9, arranges reaction frame 10 on the top of jack 9, and anchor cable passes reaction frame 10, is provided above preventing at reaction frame 10 The buckle 17 of anchor cable 6 sliding, buckle 17 is through on anchor cable 6, such as Fig. 3 (d);
5-3) in step 5-2) at least two hoist cables 16 arranged vertically above of reaction frame 10 of arranging, hoist cable 16 one end is even Being connected on support 11, the other end is arranged on reaction frame 10, is used for promoting reaction frame 10, such as Fig. 3 (e);
5-4) distance step 5-2) in the upper horizontal of reaction frame 10 that arranges a support 11 is set, support 11 is by four Column 20 is arranged on ground 23, and four root posts are arranged at four angles of another rectangle;Support 11 is a support means, Reaction frame 10 is promoted by hoist cable 16;
5-5) utilize reaction frame 10 and jack 9 to described step 4) on one diagonal of rectangle A to foundation pile press Stake, to the position specified, is provided counter-force by anchor cable 6;
5-6) promote reaction frame 10 and jack 9 by support 11;
5-7) utilize rectangle another diagonal B to reaction frame 10 and jack 9 to described step 4) in B on (Fig. 2) Foundation pile carries out piling;Wherein A, the B two piling on direction is separate;B to piling time, anchor cable 6 by A to anchor Tool fastening;B postpones to specific bit to piling, and anchor cable 6 is fastened to anchorage by B, unclamps A to anchorage, promotes A to reaction frame 10 and jack 9, carry out pile extension at A to continuing to arrange a joint foundation pile, be cased with steel bushing at the top of this joint foundation pile, and with Steel hoop welds, and falls jack 9;
5-8) A postpones to specific bit to piling, is fastened to anchorage by A by anchor cable, unclamps B to anchorage, promotes B to reaction frame 10 and jack 9;Carry out pile extension at B to continuing to arrange a joint foundation pile, be cased with steel bushing at the top of this joint foundation pile, and with Steel hoop 18 welds;B is to starting piling.
5-9) repeat step 5-7) to step 5-8), A, B two is to alternately promoting piling, until foundation pile is delivered to refer to by pile follower bar Location is put, and wherein steel bushing is not placed on the top of final section foundation pile.
Step 7) in concrete setting steps as follows:
7-1) from described step 5), 6) scope that the stake top that formed down sets, the outer surface along the stake of many foundation vertically sets Put many vertical muscle;
7-2) in step 7-1) set up vertical muscle 13 after, be horizontally disposed with the many stirrups 15 that the stake of many foundation is included in center, By vertical muscle 13 and the outside being arranged on four foundation stakes of stirrup 15, total defines a binding stake 12.
Additionally, as seen from Figure 8, when reaction frame 10 is set, it is provided above a center for passing through anchor cable at reaction frame 10 The fixed plate of 6, fixed plate is fixed on reaction frame 10 by bolt and nut or other clamp devices, perpendicular below reaction frame 10 Directly arranging a fixing device, this fixing device includes the fixation clamp 21 that two parts are symmetrical, and the center vertical of fixation clamp 21 is arranged For placing the space of anchor cable 6, being installed with bolt hole in the horizontal direction, two fixation clamps 21 are when clamping anchor cable 6, by height Strength bolt 22, nut fasten, and are the structure chart of a fixation clamp as shown in Figure 10.
Embodiment 2
A kind of cluster anchor cable composite pile structure as agent structure column, including anchor cable 6, setting centered by anchor cable 6 The stake of many foundation and the binding hoop arranged around the stake of many foundation, casting concrete 14 in binding hoop.
Specifically, the stake of many foundation is arranged at four angles of a rectangle, totally four foundation stake, 1, No. 2 bases of respectively No. 1 foundation pile Stake 2,3, No. 4 foundation piles 4 of No. three foundation piles, anchor cable 6 is arranged on the center of this rectangle, and described binding hoop is arranged on outside this rectangle, Top center in four foundation stakes is horizontally disposed with girder steel 19;Or the stake of many foundation is arranged in the circle with anchor cable 6 as the center of circle, foundation pile The distance that interval sets.
Binding hoop includes many vertical muscle 13 and stirrup 15, and stirrup 15, round the stake of many foundation, is provided in round, many vertical muscle 13 It is vertically arranged on the conglobate limit of stirrup 15 institute, the setting of vertical muscle 13 and stirrup 15 defines binding hoop.
Pile crown is set in the bottom of each foundation pile, it is simple to foundation pile is deep into underground.
Foundation pile is segment type pre-rounding stake, is connected by steel hoop 18 is fixing between circle pile section and joint.
There is steel bushing the termination often saving square pile, and steel bushing and steel hoop 18 are by being welded to connect.
Its concrete construction method is identical with embodiment 1.
The above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, Under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should be regarded as this Bright protection domain.

Claims (9)

1. the cluster anchor cable composite pile structure as agent structure column, it is characterised in that include anchor cable, the many foundation stake arranged centered by anchor cable and the binding hoop arranged around the stake of many foundation, casting concrete in binding hoop.
2. cluster anchor cable composite pile structure as claimed in claim 1, it is characterized in that, described many foundation stake is arranged at four angles of a rectangle, totally four foundation stake, described anchor cable is arranged on the center of this rectangle, described binding hoop is arranged on outside this rectangle, and the top center in four foundation stakes is horizontally disposed with girder steel.
3. cluster anchor cable composite pile structure as claimed in claim 1, it is characterised in that described binding hoop includes many vertical muscle and stirrup, and stirrup, round the stake of many foundation, is set to square, and many vertical muscle are vertically arranged on the limit of stirrup institute squarely.
4. cluster anchor cable composite pile structure as claimed in claim 1, it is characterised in that pile crown is set in the bottom of each described foundation pile.
5. cluster anchor cable composite pile structure as claimed in claim 1, it is characterised in that described foundation pile is segment type precast square pile.
6. cluster anchor cable composite pile structure as claimed in claim 5, it is characterised in that the termination often saving described square pile is cased with steel bushing, is fixed by steel hoop between saving and saving.
7. the construction method as the cluster anchor cable composite pile structure of agent structure column, it is characterised in that comprise the following steps:
1) position that foundation pile is to be set is chosen;
2) on the ground, machine drilling is used to get out the anchor cable hole for arranging anchor cable;
3) in step 2) in be vertically arranged anchor cable in the boring that gets out, the bottom anchor of anchor cable is in the ground of bottom;
4) centered by the position of anchor cable, in the four foundation stakes that are arranged around of anchor cable, four foundation stakes are arranged at four angles of a rectangle;
5) carry out piling, pile extension, extract pile follower bar, remove jack and holder device;
6) the subsurface excavation method excavation underground space, surflaes between cleaning stake week and stake;
7) stirrup and vertical muscle are set outside multiple foundation piles, form binding stake;
8) casting concrete in the binding stake formed in step 7), forms composite pile structure;
Specifically comprising the following steps that of described step 5)
5-1) steel bushing is overlapped on the top of the four foundation stakes arranged in described step 4) respectively, arranges steel hoop at steel bushing upper horizontal, and steel bushing welds with steel hoop;
5-2) in step 5-1) in the four foundation stakes that arrange the foundation pile top in an object line one jack is respectively set, on the top of jack, reaction frame is set, anchor cable passes reaction frame;
5-3) in step 5-2) at least two hoist cables arranged vertically above of reaction frame of arranging;
5-4) distance step 5-2) in the upper horizontal of reaction frame that arranges one support is set, support is arranged on the ground by four root posts, and four root posts are arranged at four angles of another rectangle;
Foundation pile 5-5) utilized in step 4) described in reaction frame and jack pair on one diagonal of rectangle carries out piling to the position specified, anchor cable provide counter-force;
5-6) by support lift reaction frame;
Foundation pile 5-7) utilized in step 4) described in another group reaction frame and jack pair on another diagonal of rectangle carries out piling to the position specified;
5-8) by support lift 5-7) in another group reaction frame and jack;
5-9) draw in each stake position and continue at hole to arrange a joint foundation pile, be cased with steel bushing at the top of this joint foundation pile, and weld with steel hoop;
5-10) repeat step 5-5) to step 5-9), until it reaches the position of requirement.
8. construction method as claimed in claim 7, it is characterised in that in described step 4) centered by anchor cable, limit a rectangular area, be vertically arranged stake position with four angles of rectangular area and draw hole, draw hole according to stake position and foundation pile is set.
9. construction method as claimed in claim 7, it is characterised in that the concrete setting steps of described step 6) is as follows:
6-1) the scope that the stake top formed from described step 5) down sets, the outer surface along the stake of many foundation is vertically arranged many vertical muscle;
6-2) in step 6-1) set up vertical muscle after, be horizontally disposed with the many stirrups that the stake of many foundation is included in center.
CN201510454024.9A 2015-07-28 2015-07-28 A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof Active CN105002906B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510454024.9A CN105002906B (en) 2015-07-28 2015-07-28 A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510454024.9A CN105002906B (en) 2015-07-28 2015-07-28 A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof

Publications (2)

Publication Number Publication Date
CN105002906A CN105002906A (en) 2015-10-28
CN105002906B true CN105002906B (en) 2016-08-24

Family

ID=54375750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510454024.9A Active CN105002906B (en) 2015-07-28 2015-07-28 A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof

Country Status (1)

Country Link
CN (1) CN105002906B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544579B (en) * 2015-12-04 2017-08-29 黄国庆 A kind of construction method of pile foundation
CN107059872B (en) * 2017-04-01 2022-06-07 南京瑞迪建设科技有限公司 Inclined cable pile pulling method and inclined cable pile pulling system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1313681C (en) * 2005-02-28 2007-05-02 王凯 Binding anti-slide pile structure and construction method
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN201857606U (en) * 2010-11-09 2011-06-08 上海强劲地基工程股份有限公司 Novel combined uplift pile
CN102691302B (en) * 2012-06-03 2014-12-17 蒋凤昌 Concrete structure for supporting deep foundation pit
JP2014088689A (en) * 2012-10-30 2014-05-15 Ssc Pile Association Loading test method and loading test device for composite reinforcement ground
CN103967004A (en) * 2014-04-13 2014-08-06 北京工业大学 Supporting and protecting composite anti-slide pile suitable for high-attitude and high-intensity regions
CN104790384A (en) * 2015-03-05 2015-07-22 浙江工业大学 Multivariable control type vibration isolation piles
CN204849759U (en) * 2015-07-28 2015-12-09 济南轨道交通集团有限公司 Cluster anchor rope composite pile structure as major structure stand

Also Published As

Publication number Publication date
CN105002906A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN106065577B (en) A kind of structure and method of new pile foundation underpinning
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN106400813A (en) Foundation pit support system and construction method thereof
KR101070426B1 (en) Improved Underpinning Method Using the micro pile
CN110130358A (en) A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN107476337A (en) The prefabricated side wall assembling and construction method in open cut subway assembled station
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN105926963A (en) Vertical supporting method of underground top-down storey addition of existing high-rise building
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN102605783A (en) Construction method for applying prestress to anchor jacked piles
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN105002906B (en) A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN209585054U (en) Be used for foundation ditch to speedily carry out rescue work emergent bracing fast
CN204849759U (en) Cluster anchor rope composite pile structure as major structure stand
CN104452775B (en) Pre-loaded support struts and construction method for foundation ditch
CN102926382A (en) Construction method of soil mixing wall (SMW) engineering method
CN105064355B (en) A kind of anchor cable composite pile structure and its construction method as agent structure column
CN111305182A (en) Soft foundation reinforcement construction method
CN108560566A (en) The recyclable steel pipe column of combined type and its method for supporting deep foundation pit
CN116856932A (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN208517947U (en) Steel pipe column can be recycled in combined type
CN109555129A (en) Rapid emergency diagonal bracing for foundation pit emergency and construction method
CN204780903U (en) Anchor rope composite pile structure as major structure stand

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant