CN208517947U - Steel pipe column can be recycled in combined type - Google Patents
Steel pipe column can be recycled in combined type Download PDFInfo
- Publication number
- CN208517947U CN208517947U CN201820993855.2U CN201820993855U CN208517947U CN 208517947 U CN208517947 U CN 208517947U CN 201820993855 U CN201820993855 U CN 201820993855U CN 208517947 U CN208517947 U CN 208517947U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- recycled
- clip
- pipe column
- combined type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of combined types, and steel pipe column can be recycled, including the lower section steel pipe being permanently inserted in fender post and floor structure, the middle part steel pipe connecting with the lower section steel pipe and the upper segment steel pipe connecting with the middle part steel pipe;Pass through steel pipe column flanged joint between the upper segment steel pipe and the middle part steel pipe and the middle part steel pipe and the lower section steel pipe, steel pipe column flange top is provided with clip, the top of the clip is provided with supporting plate, it is provided with the linking beam to support foundation pit horizontally-supported on the supporting plate, is provided with gusset on the outside of the clip;The top of the upper segment steel pipe and concrete linking beam pass through flanged joint.Steel pipe column can be recycled in the combined type of the utility model using the above structure, convenient for on-site hoisting, combination connection and dismantles, has bad luck and stores, while convenient for being recycled, having saved construction cost, having reduced construction risk.
Description
Technical field
The utility model relates to Construction Techniques for Deep Foundation Pit fields, and steel pipe column can be recycled more particularly, to a kind of combined type.
Background technique
Subway station (deep basal pit) is usually using lattice column or steel pipe column as the biggish monolithic construction of lateral length
Vertical Auxiliary support, it is larger in foundation pit span, when lattice column stiffness (bearing capacity) is not able to satisfy design requirement, use larger diameter
Steel pipe column substitutes lattice column, construction speed is influenced using site welding, while length is excessive is not easy to lift, using over-the-counter entirety
Welded bands carry out transport difficult etc..
Integrated steel tube column production, transport difficult and at high cost are removed difficult and are unfavorable for reusing, be also unfavorable for applying
The reduction of work cost.Metro station excavation excavates in (half lid is dug) construction, and steel pipe column is located at foundation pit longitudinal axis position, to foundation pit
Lateral bracing members play additional vertical supporting role, and steel pipe column (lattice column) includes being applied in combination into petrosa point with reinforcing bar, are embedded to
Bottom plate is equipped with blind hereinafter, at plate upper surface to be permanently embedded to earth formation part below bottom plate at upper base surface
Flange is equipped with waterproof construction between this section of steel pipe (bottom plate), and the connecting hole of blind flange is interior wire hole, and blind flange is most lower with steel pipe column
The flange of section is connected with.Downwards by ground, the height of N1 section meets the design height of the M1 layers of minimum absolute altitude of bracing members, with N1
Section connection is N2 section, is N3 section ... with N2 section connection, is M2 layers of bracing members at N2 section, is M3 layers of bracing members at N3 section
... it is height adjustable structure that N1, which saves (first segment) steel pipe top, and N1 section top flange connect with connection beam flange in the bottom, contacts
Beam is removed after foundation pit structure is all constructed, and lattice column can be saved by N1 before top board construction and be removed section by section.
For these reasons, it is necessary for designing a kind of combined type and steel pipe column can be recycled.
Utility model content
The purpose of the utility model is to provide a kind of combined type can be recycled steel pipe column, convenient for on-site hoisting, combination connection with
It dismantles, have bad luck and stores, while convenient for being recycled, having saved construction cost, having reduced construction risk.
To achieve the above object, the utility model provides a kind of recyclable steel pipe column of combined type, including is permanently inserted and encloses
Lower section steel pipe in fender pile and floor structure, the middle part steel pipe being connect with the lower section steel pipe and with the middle part steel
The upper segment steel pipe of pipe connection;
Between the upper segment steel pipe and the middle part steel pipe and the middle part steel pipe and the lower section steel pipe
By steel pipe column flanged joint, steel pipe column flange top is provided with clip, and the top of the clip is provided with supporting plate, described
It is provided with the linking beam to support foundation pit horizontally-supported on supporting plate, is provided with gusset on the outside of the clip;
The top of the upper segment steel pipe and concrete linking beam pass through flanged joint.
Preferably, the end face of the gusset and the steel pipe column flange contact, and the welding position of the gusset is staggered institute
The connection bolt on steel pipe column flange is stated, the clip is half Snap ring structure, and connects by clamp bolt.
Preferably, the linking beam on the supporting plate is I-shaped structure.
Preferably, the gusset is set as ladder structure of right angle, and is symmetricly set on the two sides of the clip, the clip
Internal diameter it is identical as the outer diameter of the upper segment steel pipe, the middle part steel pipe and the lower section steel pipe.
Preferably, the lower section steel pipe and the fender post and floor structure pass through flanged joint.
Preferably, the clip, the gusset and the supporting plate are to be welded to connect.
Therefore, steel pipe column can be recycled in the combined type of the utility model using the above structure, convenient for on-site hoisting, combination connection
With dismantle, have bad luck and store, while convenient for be recycled, saved construction cost, reduced construction risk.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that steel pipe column embodiment can be recycled in a kind of combined type of the utility model;
Fig. 2 is the clamping hoop type bracket structure schematic diagram that steel pipe column embodiment can be recycled in a kind of combined type of the utility model.
Specific embodiment
Embodiment
Fig. 1 is the structural schematic diagram that steel pipe column embodiment can be recycled in a kind of combined type of the utility model, and Fig. 2 is that this is practical new
The clamping hoop type bracket structure schematic diagram of steel pipe column embodiment can be recycled in a kind of combined type of type.As shown, the utility model provides
Steel pipe column can be recycled in a kind of combined type, including the lower section steel pipe 2 being permanently inserted in fender post and floor structure 1 and lower part
The middle part steel pipe 3 of the connection of Duan Gangguan 2 and the upper segment steel pipe 4 being connect with middle part steel pipe 3;Upper segment steel pipe 4 and middle part
It is connected by steel pipe column flange 5 between steel pipe 3 and middle part steel pipe 3 and lower section steel pipe 2, the setting of 5 top of steel pipe column flange
There is clip 6, the top of clip 6 is provided with supporting plate 7, and the linking beam 8 to support foundation pit horizontally-supported is provided on supporting plate 7, blocks
The outside of hoop 6 is provided with gusset 9;The top of upper segment steel pipe 4 is connect with concrete linking beam 10 by flange 11, gusset 9
End face is contacted with steel pipe column flange 5, and the welding position of gusset 9 is staggered the connection bolt on steel pipe column flange 5, and clip 6 is half
Snap ring structure, and connected by clamp bolt 12, the utility model is convenient for on-site hoisting, combination connection and dismantles, has bad luck and deposits
It puts, while convenient for being recycled, having saved construction cost, having reduced construction risk.
Linking beam 8 on supporting plate 7 is I-shaped structure.
Gusset 9 is set as ladder structure of right angle, and is symmetricly set on the two sides of clip 6, the internal diameter and upper segment steel of clip 6
Pipe 4, middle part steel pipe 3 are identical with the outer diameter of lower section steel pipe 2.
Lower section steel pipe 2 is connect with fender post and floor structure 1 by flange 13.
Clip 6, gusset 9 and supporting plate 7 are to be welded to connect.
The method for supporting deep foundation pit of steel pipe column can be recycled in a kind of combined type, comprising the following steps:
A, upper segment steel pipe, middle part steel pipe and lower section steel pipe are made according to design drawing, by design cross-brace
Design spacing determines the length of every section steel pipe, according to upper segment steel pipe, middle part steel pipe and lower section steel pipe enter rock length and
Its design drawing makes the lower section steel-tube construction in fender post and bottom plate, then determines production clip according to the joint number of steel pipe
And the quantity of gusset, top linking beam anchor bar is made according to design requirement;
B, according to the drilling of design stake position, using drill hole of drilling machine to required hole depth, steel reinforcement cage and lower part are hung after qualification of verifying
In Duan Gangguan, middle part steel pipe and upper segment steel pipe to stake holes, then carry out stake top absolute altitude repetition measurement, according to design cubic amount of concrete,
By requirement concrete perfusion of confiding a technological secret;
C, the flange on upper segment steel pipe top Yu linking beam anchor bar is excavated to according to construction technical requirement, by technology
It is required that construction top concrete linking beam.
D, each node construction is completed according to working procedure, is excavated at first of linking beam, clamping hoop type bracket structure is installed,
Clamping hoop type bracket structure is made of clip, supporting plate and gusset, places the linking beam of I-shaped structure, is continued to excavate, successively be installed
Second, third road clamping hoop type bracket structure and linking beam;
E, excavation of foundation pit is completed, after main structure construction, and by construction technical requirement, layering is removed and linked from bottom to top
Beam and clip, first linking beam remove after can merogenesis remove upper segment steel pipe, middle part steel pipe and lower section steel pipe, transition and deposit
It puts, in case being used in turn.
Therefore, steel pipe column can be recycled in the combined type of the utility model using the above structure, convenient for on-site hoisting, combination connection
With dismantle, have bad luck and store, while convenient for be recycled, saved construction cost, reduced construction risk.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model rather than limit it
System, although the utility model has been described in detail with reference to the preferred embodiment, those skilled in the art should manage
Solution: it still can be with the technical solution of the present invention is modified or equivalently replaced, and these are modified or equally replace
Changing also cannot make modified technical solution be detached from the spirit and scope of the technical scheme of the present invention.
Claims (6)
1. steel pipe column can be recycled in a kind of combined type, it is characterised in that:
Including the lower section steel pipe being permanently inserted in fender post and floor structure, the middle part steel being connect with the lower section steel pipe
Pipe and the upper segment steel pipe being connect with the middle part steel pipe;
Pass through between the upper segment steel pipe and the middle part steel pipe and the middle part steel pipe and the lower section steel pipe
Steel pipe column flanged joint, steel pipe column flange top are provided with clip, and the top of the clip is provided with supporting plate, the supporting plate
On be provided with linking beam to support foundation pit horizontally-supported, be provided with gusset on the outside of the clip;
The top of the upper segment steel pipe and concrete linking beam pass through flanged joint.
2. steel pipe column can be recycled in combined type according to claim 1, it is characterised in that: the end face of the gusset and the steel
Tubing string flange contact, and the welding position of the gusset is staggered the connection bolt on the steel pipe column flange, the clip is half
Snap ring structure, and connected by clamp bolt.
3. steel pipe column can be recycled in combined type according to claim 2, it is characterised in that: the linking beam on the supporting plate
For I-shaped structure.
4. steel pipe column can be recycled in combined type according to claim 3, it is characterised in that: the gusset is set as right-angled trapezium
Structure, and the two sides of the clip are symmetricly set on, the internal diameter of the clip and the upper segment steel pipe, the middle part steel pipe
It is identical with the outer diameter of the lower section steel pipe.
5. steel pipe column can be recycled in combined type according to claim 4, it is characterised in that: the lower section steel pipe is enclosed with described
Fender pile and floor structure pass through flanged joint.
6. steel pipe column can be recycled in combined type according to claim 5, it is characterised in that: the clip, the gusset and institute
Stating supporting plate is to be welded to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820993855.2U CN208517947U (en) | 2018-06-26 | 2018-06-26 | Steel pipe column can be recycled in combined type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820993855.2U CN208517947U (en) | 2018-06-26 | 2018-06-26 | Steel pipe column can be recycled in combined type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208517947U true CN208517947U (en) | 2019-02-19 |
Family
ID=65337609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820993855.2U Expired - Fee Related CN208517947U (en) | 2018-06-26 | 2018-06-26 | Steel pipe column can be recycled in combined type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208517947U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560566A (en) * | 2018-06-26 | 2018-09-21 | 姚晓宁 | The recyclable steel pipe column of combined type and its method for supporting deep foundation pit |
-
2018
- 2018-06-26 CN CN201820993855.2U patent/CN208517947U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560566A (en) * | 2018-06-26 | 2018-09-21 | 姚晓宁 | The recyclable steel pipe column of combined type and its method for supporting deep foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110439571B (en) | Transverse channel construction method for leading flat pilot tunnel to main tunnel and transverse channel | |
CN102720140B (en) | Large-span prestress concrete continuous beam deepwater pier construction process | |
CN103469817B (en) | Existing subway station main structure broadening construction method | |
CN110847177A (en) | Fixed verticality adjusting and upward floating preventing device and method with steel pipe supporting column serving as structural column | |
CN104131565B (en) | A kind of against making the construction method that the earthwork is just made to excavate | |
CN105350527A (en) | Prestressed pipe pile construction method based on building information modeling (BIM) and prestressed pipe pile | |
CN103195076A (en) | Method for constructing silt deep foundation pit tower crane foundation | |
CN111622268B (en) | Protection construction method based on large rigid box culvert penetrating under power pipe gallery | |
CN104264683B (en) | Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition | |
CN103174132A (en) | Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel | |
CN103174131A (en) | Underground engineering guiding-cavity-excavating small-diameter pile construction complete equipment system | |
CN208517947U (en) | Steel pipe column can be recycled in combined type | |
CN108560566A (en) | The recyclable steel pipe column of combined type and its method for supporting deep foundation pit | |
CN109235507B (en) | Stratum reinforcing system and method for reinforcing existing tunnel | |
JP5189946B2 (en) | Pile hole drilling method | |
JP6428014B2 (en) | Construction method of back strut | |
CN207828995U (en) | Open caisson construction structure | |
CN115614045A (en) | Large underground structure constructed by underground excavation in saturated soft soil and construction method thereof | |
RU2502873C1 (en) | Shaft lining, complex for its erection and method of its erection | |
CN212656218U (en) | Heavy pile machine load underpinning structure | |
CN105002906B (en) | A kind of cluster anchor cable composite pile structure as agent structure column and construction method thereof | |
CN110552702B (en) | Underground excavation construction method for assembled corrugated steel plate underground comprehensive pipe gallery | |
CN210370668U (en) | Earth surface reinforcing structure for extending tunnel below existing highway | |
CN111911169A (en) | Construction method and structure of shallow buried tunnel under existing railway line | |
CN205296177U (en) | Dado bearing structure suitable for hole friction pile stake hole is dug in manual work |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190219 Termination date: 20210626 |