CN110130358A - A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure - Google Patents
A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure Download PDFInfo
- Publication number
- CN110130358A CN110130358A CN201910340844.3A CN201910340844A CN110130358A CN 110130358 A CN110130358 A CN 110130358A CN 201910340844 A CN201910340844 A CN 201910340844A CN 110130358 A CN110130358 A CN 110130358A
- Authority
- CN
- China
- Prior art keywords
- taper pile
- support
- pile
- foundation pit
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
Abstract
The invention discloses the taper pile support structures and construction method of a kind of pattern foundation pit supporting structure.The taper pile support structure is the skewed horizontal load structure being set on the inside of foundation pit, it is made of upper support cant beam and lower support taper pile;Blade is disposed on bearing taper pile;Taper pile support setting has one or more layers in vertical building enclosure;The inclination angle that upper layer is supportted with lower layer taper pile can be identical or different;Support cant beam is assembled by standard component, and energy utilization and recycle, top is connected with crown beam or waist rail, and bottom is connect with bearing taper pile;Bearing taper pile and support cant beam may remain on same axis or on not same axis;Bearing taper pile is inserted in the reinforcing body of major diameter and is located at foundation pit bottom surface or less.The internal support of foundation pit structure being assembled in this way has the social value of green, environmental protection and energy-saving and emission-reduction, while can reduce cost and shorten the construction period, and has great economic value.
Description
Technical field
The present invention relates to technical field of civil engineering, a kind of specifically inner supporting structure of pattern foundation pit supporting structure.
Background technique
The inner support of pattern foundation pit supporting structure mainly has horizontally-supported, oblique throwing to support two seed types, and common backing material is mixed for reinforcing bar
Solidifying soil and fashioned iron.Set at present is horizontally-supported, covers the excavation face of foundation pit, subsequent digging muck haulage and underground structure is caused to be applied
Work is inconvenient, increases the problems such as duration and cost.When foundation pit plane is larger, horizontally-supported cost is quite high, long construction period.
Then there is steel construction and tiltedly throw support structure, preferably solve the horizontally-supported existing above problem, but tiltedly throw support structure to be
It is supported on the bottom plate of underground structure, it is necessary to first stay native slope to excavate the bottom plate formation supporting-point for tiltedly throwing support bearing position, this
It needs to be arranged post-cast strip to underground structure bottom plate and generates waterproof problem.Key is that native region is stayed to be located at the lower section for tiltedly throwing support, at this
Digging muck haulage in a region will be very difficult, and increased duration and cost hinder the application of such kind of support construction.
Existing inner support technology there are aiming at the problem that, domestic pharmaceutical industry proposes some solutions, such as: patent application
Number it is 201711143352.2, proposes " a kind of combined type fashioned iron, slip casting steel pipe bearing diagonal foundation pit enclosure structure ";Patent application
Number be 201820137088.5, propose " a kind of steel pipe-shaped steel combination formula diagonal brace foundation pit supporting construction ";Number of patent application is
201810596971.5 proposing " a kind of foundation pit diagonal brace pile construction method and its auxiliary tool ";Number of patent application is
201310529197.3, it proposes " a kind of big foundation pit diagonal brace structure ", these patent applications are proposed using in the diagonal
Supporter is inserted into bottom of foundation ditch stratum, forms supporting-point, is formed and is infused in the slip casting from inside to outside of fashioned iron bearing diagonal by Grouting Pipe
Slurry generates the methods of supporting force to replace existing oblique throwing support to be supported on floor structure, to solve foundation pit support and the earthwork
The difference of the difficulty of construction, these patents is only that material specification used in bearing diagonal, combination and type of attachment not
Together, but through analysis there are the following problems:
1) reinforcing of the diagonal brace bearing soil body is realized by grouting method, the diffusion of slurries not can control, along diagonal brace direction
The consolidation effect of the periphery soil body is difficult to ensure, in soft soil foundation, the supporting force of needs can not be provided;
2) diagonal brace, taper pile or plumb pile and the contact area of foundation pit lower part weak soil are limited, and horizontal bearing capacity is low, and weak soil provides
Frictional resistance be unable to satisfy diagonal brace bearing requirement;
3) when needing biggish support force, diagonal brace increases horizontal supporting component, the length of diagonal brace by increasing inclination angle
It certainly will will lengthen, there is no column rest, stability will be unable to guarantee, the axial force of the supports provided will be greatly decreased;
4) when the length of diagonal brace is longer, biggish deformation will be generated by not applying prestressed supporting beam initial deformation,
Cause the larger displacement of foundation pit;
5) support force is improved by the length of the insertion hole following soil layer in bottom, not accounting for friction section is to have critical length
, it is more than critical length, support force can not improve.
Existing technology and patent, if improving supporting force by widened diagonal brace cross dimensions or lengthening insertion depth
Words, will lead to diagonal brace insertion constructional difficulties, and cost is excessively high.It can be said that these methods do not take the increase bottom of foundation ditch soil body to mention
The supporting force measure for supplying diagonal brace is difficult to the Deformation control requirement for meeting diagonal brace to pattern foundation pit supporting structure.
Therefore, engineering circles need to find effective diagonal brace bearing method, can overcome defect existing for current diagonal brace technology,
Cost can be reduced again, accelerates speed of application, protects the environment on foundation pit periphery, realize civilized construction.
Summary of the invention
Technical problem to be solved by the present invention lies in overcome irrationality, the construction matter of existing inclined support structure and stress
The deficiencies of amount is difficult to ensure and detects, deformation control of foundation pit effect is poor provides a kind of a kind of taper pile support of novel pattern foundation pit supporting structure
Structure and construction method, main innovation point are to manufacture the supporting mass of a major diameter by jet mixing method;Pass through increase
Blade improves frictional resistance;Supporting force is improved by reversed diagonal brace and controls the displacement of diagonal brace;By being arranged horizontally at hole bottom
Beam and reinforcement cushion constrain the horizontal displacement of diagonal brace.
In order to achieve the above objectives, this patent the technical solution adopted is that:
The taper pile support structure is the skewed horizontal load structure being set on the inside of foundation pit, it is by upper support cant beam and lower part
Support taper pile composition;The different level setting that taper pile supports vertically building enclosure is one or more layers;Upper layer and lower layer's taper pile
It the inclination angle of support can be identical or different;The material of taper pile support is fashioned iron or concrete prefabricated element;Fashioned iron is mainly steel pipe or H
Fashioned iron;It supports cant beam and supports taper pile and instead may be the same or different with the material specification of taper pile.
Blade can be arranged on the bearing taper pile, can not also arrange blade;Blade arrangement on bearing taper pile exists
In the outside of bearing taper pile, blade is divided into spiral or two kinds of side wing type for the bottom for supporting taper pile or step-by-step arrangement.Support taper pile
It may remain on same axis with support cant beam or not on coaxial line;Bearing taper pile is inserted in the reinforcing body of major diameter;Add
Solid is rotating spraying mixture pile or concrete-pile;Bearing taper pile is located at excavation of foundation pit face or less.
The top of the support cant beam is connect with crown beam or waist rail, and bottom is connect with bearing taper pile;
The horizontal ground beam is arranged in bottom of foundation ditch stratum, is cast-in-place concrete structure, is provided with steel mesh, and
It links together with bearing taper pile;Horizontal ground beam is precast reinforced concrete structure, is embedded with assembling connecting piece, the horizontal ground beam
It links together with bearing taper pile.
The reinforcement cushion setting links together in bearing taper pile position;When there is horizontal ground beam, reinforcement cushion
Entirety is formed with him.
The middle and lower part position of support cant beam is arranged in the reversed taper pile, with support cant beam oblique.The lower part of reversed taper pile
It is inserted into the following soil body in foundation pit bottom, reversed taper pile can be plugged into jet mixing pile body, supports to taper pile and provides supporting force.
The top setting that bearing taper pile is arranged in the reversed taper pile forms the bearing of a triangle with bearing taper pile
Structure supports to taper pile and provides supporting force.
Hydraulic jack of the top of support cant beam in axial direction, the device, which is arranged in, in the prestressing force loading device applies
The prestressing force added is maintained on support cant beam by protecting power key, to control the deformation of foundation pit.
A kind of construction method of the taper pile support structure of the pattern foundation pit supporting structure, comprising the following steps:
The first step, the axis supportted with slant rig along taper pile is to foundation pit inner hole, from the bottom position of bearing taper pile, under
Upward rotary jetting stirring grouting forms the rotating spraying mixture pile of major diameter;It, can guncreting in this position when hole bottom stratum is excessively soft
Form concrete-pile;
Further, it is located at crown beam taper pile support construction below, it can be before vertical building enclosure not be constructed, outside foundation pit
Side is constructed by method identical with the first step, but need to be supportted taper pile and be sent on the inside of the vertical fender post of foundation pit in the method for pile follower.
Taper pile support is acted on by vibration or rotation forces along the central axes direction of pilot hole, is inserted into major diameter by second step
Pile body (rotating spraying mixture pile or cast-with-pressure concrete pile) in;The taper pile support of insertion is segmented spreading at the scene;
Further, the construction of reversed taper pile is constructed on the inside of foundation pit, the construction method phase with the first step and second step
Together.
Third step pours into concrete crown beam after the top of taper pile support and prefabricated crown beam steel link together;
4th step, the reinforcing body and crown beam concrete of maintenance bearing taper pile up to after intensity can excavation pit, taper pile support part
The installation method of the earth excavation and horizontal ground beam and reversed diagonal brace of position is as follows:
It is weak when supporting stratum locating for taper pile, and when supporting force deficiency, answer first piecemeal to excavate support cant beam and support oblique
The stake intersection soil body retains the soil body on foundation pit enclosure stake periphery, and slope is excavated to bottom of foundation ditch, the axis direction supportted along taper pile,
The space of a horizontal ground beam of installation is excavated, timely construction ground beam simultaneously links together with taper pile support, improves by horizontal ground beam
The supporting force of taper pile support;
Reinforcement cushion is poured on horizontal ground beam periphery, and connects into entirety with horizontal ground beam.
The stratum weakness locating for the bearing taper pile cannot provide enough supporting forces, and when slope excavates more difficult, can prop up
The reversed taper pile of one with support cant beam axis oblique is arranged in the middle and lower part position for supportting cant beam, and the lower part of reversed taper pile is inserted into foundation pit
In bottom soil body;Support cant beam is fixed together in point of intersection using connector with reversed taper pile, and it is larger to support offer to taper pile
Supporting force.
When horizontal ground beam, reinforcement cushion maintenance reach some strength after, can excavation pit fender post periphery the soil body.
The utility model has the advantages that the present invention has by setting helical blade, horizontal ground beam and reversed taper pile and prestressing force loading device
The bearing capacity for improving to effect taper pile support, controls the deformation of foundation pit.Site operation strong operability, supporting beam and branch of the present invention
Assembling degree height, the operating efficiency for holding stake are high, can guarantee the globality and construction quality of structure, reduce project cost, work
Journey implementation result is good.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and specific embodiments.
Fig. 1 is a kind of taper pile support structure schematic diagram of pattern foundation pit supporting structure of the invention.
Fig. 2 is the helical blade of the invention distribution schematic diagram on bearing taper pile.
Fig. 3 is horizontal ground beam and bearing taper pile connection schematic diagram of the invention.
Fig. 4 is reinforcement cushion of the invention and horizontal ground beam and bearing taper pile connection schematic diagram.
Fig. 5 is the combining structure schematic diagram of the invention that reversed taper pile is arranged on support cant beam.
Fig. 6 is the combining structure schematic diagram of the invention that reversed taper pile is arranged at the top of bearing taper pile.
Fig. 7 is the prestressing force loading device being arranged in taper pile support of the invention.
Fig. 8 is the support form that two layers of taper pile of setting supports in deep basal pit of the invention.
In figure: the support of 1-taper pile, 11-support cant beams, 12-bearing taper piles, 13-reinforcing pile bodies, 14-assembled connectors,
15-stiffeners, 16-blades, 2-horizontal ground beams, 21-reinforcement cushions, 3-reversed taper piles, 4-loading devices, 41-is hydraulic
Jack, 42-backing plates, 43-Bao Lijian, 5-vertically go along with sb. to guard him piling wall, 6-crown beams, 61-waist rails.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below
Conjunction is specifically illustrating, and the present invention is further explained.
A kind of taper pile of pattern foundation pit supporting structure supports 1 structure mainly by support cant beam 11, assembled connector 14 and stiffener 15, branch
It holds taper pile 12 and major diameter is reinforced pile body 13 and formed, as shown in Figure 1.The steady of support cant beam 11 is improved by setting stiffener 15
It is qualitative, installation of realizing quickly and guarantee the quality using assembled connector 14;Major diameter reinforcing pile body 13 is arranged to provide to bearing taper pile 12
Higher bearing capacity, to solve the 1 hypodynamic problem of support of taper pile support.
Example one: setting blade improves bearing capacity to bearing taper pile
The blade 16 being set on bearing taper pile 12 is typically distributed across the bottom of bearing taper pile 12 or is located at bearing taper pile
12 top and bottom, as shown in Fig. 2, shape has spiral and side wing type;By the effect of blade 16, bearing taper pile is increased
Active force between 12 and reinforcing pile body 13, to improve the bearing capacity of bearing taper pile 12.
Example two: horizontal ground beam is set, reaction of bearing is provided
It is weak when supporting stratum locating for taper pile 12, and when supporting force deficiency, answer first piecemeal to excavate support cant beam 11 and prop up
12 intersection's soil body of taper pile is held, the soil body on 5 periphery of foundation pit enclosure stake is retained, slope is excavated to bottom of foundation ditch, along the axis of taper pile support 1
The space of the horizontal ground beam 2 of an installation is excavated in line direction, and horizontal ground beam 2 divides to coagulate for precast reinforced concrete beam and cast-in-place steel reinforced concrete
Tu Liang, horizontal ground beam 2 link together with bearing taper pile 12, and the supporting force of bearing taper pile 12 is improved by horizontal ground beam 2, is such as schemed
Shown in 3.
Example three: setting reinforcement cushion and horizontal ground beam provide reaction of bearing
In order to provide bigger bearing reaction to bearing taper pile 12, the reinforcement of larger area is poured on horizontal 2 periphery of ground beam
Bed course 21, and connect with horizontal ground beam 2 it is integral, as shown in Figure 4.
Example four: reversed taper pile is set, reaction of bearing is provided
The stratum weakness locating for the bearing taper pile 12 cannot provide enough supporting forces, and when slope excavates more difficult, can be
Support the middle and lower part position of cant beam 11 that the reversed taper pile 3 of one with support 11 axis oblique of cant beam are set, the lower part of reversed taper pile 3 is inserted
Enter into the pile body 13 by pre-reinforcement;Support cant beam 11 is fixed together in point of intersection using connector with reversed taper pile 3, can be given
Taper pile support 1 provides biggish supporting force, as shown in Figure 5 and Figure 6.
Example four: setting prestressing apparatus controls foundation pit deformation
End and crown beam 6 when supporting cant beam 1 longer and requiring very high to the Deformation control of foundation pit, in support cant beam 1
Junction increases a loading device 4, which is made of guarantor's power key 43 and hydraulic jack 41 and backing plate 42, such as Fig. 7 institute
Show.
Example five: the foundation pit supporting construction that two layers of taper pile of setting supports
When excavation of foundation pit is deeper, two layers of taper pile need to be set and supportted to carry out supporting, i.e., be distributed along 5 vertical direction of fender post
At two layers;Upper layer and the inclination angle of lower layer support cant beam 11 may be the same or different;The length of upper and lower layer bearing taper pile 12
Degree is different, as shown in Figure 8.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent defines.
Claims (9)
1. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure, characterized in that taper pile support structure is set on the inside of foundation pit
Skewed horizontal load structure, it is made of upper support cant beam and lower support taper pile;Blade is disposed on bearing taper pile;Taper pile support
It is arranged in outside the different level of vertical building enclosure, is arranged one or more layers;Upper layer and the inclination angle of lower layer's taper pile support can
With identical or different;Support cant beam is assembled by standard component, and energy utilization and recycle, top is connected with crown beam or waist rail, bottom
It is connect with bearing taper pile;Bearing taper pile and support cant beam may remain on same axis;It supports taper pile and support cant beam can also
To be not kept on same axis;Bearing taper pile is inserted in the reinforcing body of major diameter;Reinforcing body is rotating spraying mixture pile or coagulation
Native stake;Bearing taper pile is located at excavation of foundation pit face or less.
2. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that bearing taper pile
On blade arrangement in the bottom of bearing taper pile or step-by-step arrangement in the outside of bearing taper pile, blade is divided into spiral or side wing type
Two kinds.
3. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that oblique in support
The intersection of beam and bearing taper pile, is provided with horizontal ground beam in bottom of foundation ditch stratum;Horizontal ground beam is cast-in-situ steel reinforced concrete
Structure, and link together with bearing taper pile;Horizontal ground beam is precast reinforced concrete structure, is embedded with assembling connecting piece, should
Horizontal ground beam links together with bearing taper pile.
4. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that oblique in bearing
Reinforcement cushion is arranged in stake position, and links together;When there is horizontal ground beam, reinforcement cushion forms entirety with him.
5. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that oblique in support
The middle and lower part position setting of beam and the reversed taper pile of support cant beam oblique, the lower part of reversed taper pile is inserted into the following soil body in foundation pit bottom
In, reversed taper pile can be plugged into jet mixing pile body, supports to taper pile and provides supporting force.
6. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that oblique in bearing
The reversed taper pile of one with bearing taper pile oblique is arranged in the top of stake, and the supporting structure of a triangle is formed with bearing taper pile,
It is supportted to taper pile and supporting force is provided.
7. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that taper pile support
Material is fashioned iron or concrete prefabricated element;Fashioned iron is mainly steel pipe or H profile steel;Support cant beam and bearing taper pile and reversed taper pile
Material specification may be the same or different.
8. the taper pile support structure and construction method of a kind of pattern foundation pit supporting structure according to claim 1, characterized in that oblique in support
The axially disposed prestressing force loading device in the top of beam, the prestressing force that the hydraulic jack in the device applies is by protecting power
Key is maintained on support cant beam, to control the deformation of foundation pit.
9. a kind of construction method of the taper pile support structure of pattern foundation pit supporting structure according to claim 1, characterized in that including following
Step:
The first step, the axis supportted with slant rig along taper pile is to foundation pit inner hole, from the bottom position of bearing taper pile, from bottom to top
Rotary jetting stirring grouting forms the rotating spraying mixture pile of major diameter;When hole bottom stratum is excessively soft, guncreting is needed to be formed in this position
Concrete-pile;
Further, it is located at crown beam taper pile support construction below, can be pressed before vertical building enclosure is not constructed from foundation pit outside
Method construction identical with the first step, but taper pile need to be supportted and be sent on the inside of the vertical fender post of foundation pit in the method for pile follower.
Taper pile support is acted on by vibration or rotation forces along the central axes direction of pilot hole, is inserted into the stake of major diameter by second step
In body (rotating spraying mixture pile or cast-with-pressure concrete pile);The taper pile support of insertion is segmented spreading at the scene;
Further, the construction of reversed taper pile is constructed on the inside of foundation pit, identical as the construction method of the first step and second step.
Third step is poured into concrete crown beam after connecting at the top that taper pile supports with crown beam steel reinforcement cage;
4th step, the reinforcing body and crown beam concrete of maintenance bearing taper pile up to after intensity can excavation pit, taper pile support part position
The installation method of earth excavation and horizontal ground beam and reversed diagonal brace is as follows:
It is weak when supporting stratum locating for taper pile, and when supporting force deficiency, it answers first piecemeal to excavate support cant beam and support taper pile and hands over
The soil body at remittance retains the soil body on foundation pit enclosure stake periphery, and slope is excavated to bottom of foundation ditch, along the axis direction of taper pile support, excavates
The space of one horizontal ground beam of installation, timely construction ground beam simultaneously link together with taper pile support, pass through horizontal ground beam and improve taper pile
The supporting force of support;
Reinforcement cushion is poured on horizontal ground beam periphery, and connects into entirety with horizontal ground beam.
The stratum weakness locating for the bearing taper pile cannot provide enough supporting forces, and when slope excavates more difficult, can be oblique in support
The reversed taper pile of one with support cant beam axis oblique is arranged in the middle and lower part position of beam, and the lower part of reversed taper pile is inserted into bottom of foundation ditch
In the soil body;Support cant beam is fixed together in point of intersection using connector with reversed taper pile, can be supportted to taper pile and be provided biggish branch
Load.
When horizontal ground beam, reinforcement cushion maintenance reach some strength after, can excavation pit fender post periphery the soil body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910340844.3A CN110130358A (en) | 2019-04-25 | 2019-04-25 | A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910340844.3A CN110130358A (en) | 2019-04-25 | 2019-04-25 | A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110130358A true CN110130358A (en) | 2019-08-16 |
Family
ID=67571013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910340844.3A Withdrawn CN110130358A (en) | 2019-04-25 | 2019-04-25 | A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110130358A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227384A (en) * | 2020-10-29 | 2021-01-15 | 北京中岩大地科技股份有限公司 | Construction method of resistance-increasing large-deformation enclosure structure |
CN113089683A (en) * | 2021-03-24 | 2021-07-09 | 浙江省建筑设计研究院 | Inclined pile supporting structure and construction method |
CN114197485A (en) * | 2021-12-23 | 2022-03-18 | 上海勇创环境岩土工程有限公司 | Construction process of inclined support pile for soft soil base enclosure |
CN114908762A (en) * | 2022-03-18 | 2022-08-16 | 东通岩土科技股份有限公司 | Foundation pit inclined pile supporting structure capable of pre-stressing |
CN115094907A (en) * | 2022-07-13 | 2022-09-23 | 上海勘察设计研究院(集团)有限公司 | Layered sectional type upright self-stabilizing enclosure structure and construction method |
CN115387346A (en) * | 2022-09-21 | 2022-11-25 | 安徽省城建基础工程有限公司 | Method for taking soil from below earthwork of foundation pit inner wall diagonal brace |
-
2019
- 2019-04-25 CN CN201910340844.3A patent/CN110130358A/en not_active Withdrawn
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227384A (en) * | 2020-10-29 | 2021-01-15 | 北京中岩大地科技股份有限公司 | Construction method of resistance-increasing large-deformation enclosure structure |
CN112227384B (en) * | 2020-10-29 | 2022-06-21 | 北京中岩大地科技股份有限公司 | Construction method of resistance-increasing large-deformation enclosure structure |
CN113089683A (en) * | 2021-03-24 | 2021-07-09 | 浙江省建筑设计研究院 | Inclined pile supporting structure and construction method |
CN114197485A (en) * | 2021-12-23 | 2022-03-18 | 上海勇创环境岩土工程有限公司 | Construction process of inclined support pile for soft soil base enclosure |
CN114908762A (en) * | 2022-03-18 | 2022-08-16 | 东通岩土科技股份有限公司 | Foundation pit inclined pile supporting structure capable of pre-stressing |
CN115094907A (en) * | 2022-07-13 | 2022-09-23 | 上海勘察设计研究院(集团)有限公司 | Layered sectional type upright self-stabilizing enclosure structure and construction method |
CN115387346A (en) * | 2022-09-21 | 2022-11-25 | 安徽省城建基础工程有限公司 | Method for taking soil from below earthwork of foundation pit inner wall diagonal brace |
CN115387346B (en) * | 2022-09-21 | 2023-06-09 | 安徽省城建基础工程有限公司 | Soil sampling method for earthwork under inclined strut on inner wall of foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110130358A (en) | A kind of the taper pile support structure and construction method of pattern foundation pit supporting structure | |
CN101775807B (en) | Structure for supporting deep foundation pit of soft soil foundation | |
CN111636417A (en) | Grouting type steel pipe pile and construction method thereof | |
CN111810185B (en) | Tunnel bottom pre-reinforcement construction method | |
CN210106749U (en) | Counter-force structure of soft soil foundation super large section push pipe jacking operation | |
CN108035360A (en) | A kind of method for pattern foundation pit supporting structure | |
CN108005086B (en) | A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure | |
CN113863706B (en) | Construction method and application device of existing building low-clearance lower rotary-jet static pressure composite pile | |
CN109440781A (en) | Active inclination foundation pit supporting method with double rows of piles | |
CN201232189Y (en) | Composite soil nail wall supporting construction for adding piers | |
CN110863496B (en) | Method for replacing, supporting, excavating and constructing arch center foundation by concrete supporting in stone-filled island building area | |
CN113653064A (en) | Front-support rear-pull type foundation pit enclosure system and construction method thereof | |
CN112942377A (en) | Novel support shear-resistant structure and construction method thereof | |
CN219386338U (en) | A work pit envelope for push pipe operation | |
CN218175854U (en) | M-shaped wall foundation pit supporting structure using transverse single-width underground continuous wall as counterfort | |
CN218373894U (en) | Prestressed inclined throwing support | |
CN219240605U (en) | Steel-concrete combined tower crane foundation | |
CN109440778A (en) | Active inclined in two-way method for supporting and protecting row pile pit | |
CN109440779A (en) | Active X-shaped foundation pit supporting method with double rows of piles | |
CN113585336B (en) | Quick construction method of sinking type concrete mixing station in soft foundation environment | |
CN216428286U (en) | Drilling filler mud jacking miniature pile and soil nail composite supporting structure | |
CN215441921U (en) | Novel support shear structure | |
CN209066470U (en) | A kind of steel tube-concrete series connection stake combination multi-column pier foundation | |
CN212427117U (en) | Foundation ditch stagnant water supporting construction | |
CN115198787B (en) | Steel tube column type tower crane foundation and construction method thereof, and cover-excavation reverse construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190816 |